Loading...
HomeMy WebLinkAboutItem 051 City of Lakeville Planning Department Memorandum To Planning Commission From: Frank Dempsey, AICP, Associate Planner Date: August 12, 2016 Subject: Packet Material for the August 18, 2016 Planning Commission Meeting Agenda Item: 1) Schneiderman’s Furniture Preliminary Plat 2) Conditional Use Permit to allow an exception to the commercial district exterior building materials requirements. Application Action Deadline: Preliminary Plat (October 28, 2016) INTRODUCTION Representatives of JAS Lakeville Properties, LLC and Schneiderman’s Furniture have submitted preliminary plat and conditional use permit plans for development of 4.8 acre Outlot B, Celebration Second Addition located south of Celebration Church and west of Kenyon Avenue. The proposal is to construct a 107,307 square foot, two story retail furniture store at this location. The plans have been forwarded to the Engineering Division, the Parks and Recreation Department and the Parks, Recreation and Natural Resources Committee. EXHIBITS A. Zoning Map B. Aerial Photo C. Applicant’s Building Design Narrative D. Preliminary Plat E. Existing Conditions Survey F. Site Plan G. Grading and Drainage Plan 2 H. Stormwater and Pollution Prevention Plan I. Utility Plan J. Tree Preservation Plan K. Landscape Plan L. Building Sight Section Plans (2 Pages) M. Upper and Lower Level Floor Plans (2 Pages) N. Building Elevations Plan O. Neighborhood Meeting Notes P. Resident email received following the neighborhood meeting Surrounding Land Uses and Zoning: North – Celebration Church (PUD District/Underlying C-3 District) South – Gander Mountain (C-3 District) East – Kenyon Avenue and Interstate 35 West – Jackson Heights Second Addition (RS-3 District) STAFF ANALYSIS I. PRELIMINARY PLAT. a. Existing Conditions. The subject property is platted as Outlot B, Celebration Second Addition and is presently owned by Celebration Church. Schneiderman’s Furniture proposes to purchase the property for the construction of their new furniture store. Celebration Church purchased the property as part of their 2001 building and parking lot expansion project with plans to possibly construct church associated buildings in the future. The property consists of moderately sloping terrain that rises approximately 21 feet from the lowest to highest point on the property from east to west between Kenyon Avenue and the west property line. The property also includes a stand of mature trees. b. Comprehensive Plan. The subject property is guided Commercial in the 2008 Comprehensive Land Use Plan and is located in Planning District No. 1, which incorporates the area of Interstate 35/County Road 50/Orchard Lake. The proposed commercial use of the property is consistent with the 2030 Land Use Plan and District 1 recommendations. c. Zoning. The property is zoned C-3, General Commercial District. The C-3 District allows retail, office, service and other commercial uses. The property has been zoned commercial since 1969. 3 d. Lots/Blocks. The Schneiderman’s Furniture preliminary plat consists of one lot on one block totaling 4.8 acres. e. Streets. The Schneiderman’s Furniture preliminary plat has frontage exclusively on Kenyon Avenue. Kenyon Avenue is designated as a major collector in the City’s Transportation Plan. Kenyon Avenue is a 44-foot wide road with a shared center left turn lane and eight foot wide sidewalk on the west side of the road. No additional right-of-way is required. f. Grading, Drainage, Erosion Control and Utilities. Grading, drainage, erosion control and utility plans have been submitted with the Schneiderman’s Furniture preliminary plat. A stormwater pond will be constructed on the south side of the property to serve the stormwater management needs from the development. The proposed new building will be able to utilize existing sanitary sewer and water utilities adjacent to the property. The existing City sanitary sewer and water utilities are adequate to accommodate the proposed commercial building. Grading, drainage, erosion control, and utility issues are addressed in the engineering review memo prepared by Matt Decur, Civil Engineer and Mac Cafferty, Environmental Resources Manager dated August 12, 2016. A copy of the engineering report is attached for your review. The Engineering Division recommends approval of the Schneiderman’s Furniture preliminary plat subject to the developer’s submittal of the following for City staff review for compliance with City standards as required by the subdivision ordinance: • Grading and construction plans for the deferred parking spaces. • Stormwater management plan. • Wetland determination and delineation, if applicable. • Tree preservation plan. • Stormwater Pollution Prevention Plan. g. Wetlands. A wetland determination or delineation, if applicable, has not been submitted for the subject property as required by the subdivision ordinance. h. Tree Preservation. A tree preservation plan showing all significant trees on the property has not been submitted. i. Park Dedication. Schneiderman’s Furniture will be subject to the commercial park dedication fee since the Park and Open Space Plan does not identify need for park purposes in the vicinity of this preliminary plat. The commercial rate for park dedication is $7,693 per acre which results in a total park dedication cash fee of $36,926.40 for the 4.8 acres. 4 II. SITE PLAN Setbacks. Min. Required Setbacks Proposed Buildings Public Right of Way--------30 feet Public Right of Way----------------158 feet Side Yard --------------------10 feet Side Yards (north/south) –63 feet/166feet Rear Yard -------------------30 feet Rear Yard (west) ---------------------45 feet The proposed Schneiderman’s Furniture building meets the C-3 District setback requirements. Site Access. Access to the property will be from two driveways onto Kenyon Avenue near the north and souths sides of the property. Parking. The minimum required number of parking spaces is determined by calculating the total square footage of the building, minus a 10% floor area credit divided by the spaces-per-square- foot requirement for the proposed use. Furniture stores with a total floor area greater than 45,000 square feet are calculated differently than other retail uses. The proposed two level 112,000 square foot building will require a total of 182 parking spaces, calculated as follows: 112,000 square feet – 10% floor area credit = 100,800 square feet One parking space for each 400 square feet for the first 25,000 square feet = 56 spaces One parking space for each 600 square feet thereafter (75,800 square feet)/600 = 126 spaces Total Number of Spaces Required = 182 Total Spaces to be Constructed = 119 Total Spaces to be Deferred = 63 The Zoning Ordinance allows up to 50% of the parking spaces to be deferred provided the applicant can demonstrate that the number of proposed parking spaces can reasonably accommodate the anticipated parking demand. The site plan must be revised to provide the correct number of required parking spaces plus three additional deferred parking spaces prior to staff consideration of the parking deferment application. The grading plan needs to be modified to provide reasonable accommodation of the deferred parking spaces in the event that they need to be constructed. 5 Landscaping/Screening. Section 11-21-9.A.1 requires that commercial uses adjacent to residential zoned properties provide screening along the property line of a design that results in a continuous 20 foot wide, eight foot tall visual screen of evergreen and/or deciduous trees. Section 11-21-9.C.2.c requires that evergreen trees intended for screening be planted in a staggered row. The landscape plan proposes 36 spruce, pine and fir trees along the length of the building planted in a staggered row. The landscape plan proposes 18 additional deciduous trees and numerous shrubs throughout the property including those for parking lot screening and building foundation plantings. The proposed landscape materials meet the requirements of the Zoning Ordinance for size and species of plant materials as guided by the Corridor and Gateway Design Guidelines. The landscaped areas of the property will be irrigated as identified on the landscape plan and in compliance with Zoning Ordinance requirements. A financial security shall be submitted with City Council consideration of the final plat to guarantee installation of the landscaping. Cross Section Plan. Plan Sheets A1-1 and A1-2 provide a visual perspective between the west and east building elevations to the adjacent properties (west) and Kenyon Avenue (east). The grade elevations of the single family homes to the west sit at elevations between 1036 and 1020 feet (above sea level). The first floor elevation of the Schneiderman’s building will be 1032. The evergreen trees along the west property boundary will be planted at grade elevations between 1030 and 1036 feet along the entire west property boundary to provide visual screening of the building when the trees are a height of 18 feet or more as shown on Exhibit L. Trees planted between the west property line and the building will be a minimum of eight feet in height in compliance with Zoning Ordinance requirements. Business Hours. The applicant indicates that business hours are anticipated to be between 10am – 8pm Monday through Saturday and 11am – 6pm Sunday. Store pick-up hours are to be Tuesday-Saturday, 10am – 6pm. Loading/Unloading Dock. A loading/unloading dock will be located near the southwest corner of the building. A 35 foot long, 12 foot tall wood composite board wall is proposed to provide screening between the dock and the properties to the west. The landscape plan must be amended to increase landscape screening by including staggered row of evergreen trees for the property adjacent to the loading dock. Roof-Top Mechanical Equipment Screening. An 18 inch tall parapet wall is designed into the proposed commercial buildings which will provide screening for roof-top mechanical equipment. The parapet wall will be 31 inches below the top of the parapet wall. All roof-top mechanical units will be centered on the building’s roof. Including the elevation of the building from the street or adjacent buildings and the proposed building design will provide adequate screening. 6 Trash Storage. Schneiderman’s Furniture proposes to have all trash/recycling storage located inside the building. No outdoor trash enclosure is proposed. Signage. Signage is permitted in accordance with Zoning Ordinance requirements for a commercial use in the Freeway Corridor District. Section 11-23-19.E.1.a allows single occupancy buildings with a gross floor area of 45,000 square feet or greater to have one individual wall sign up to 440 square feet in area. A building of this size may also have a second wall sign not to exceed 200 square feet. Additional secondary wall signage is allowed on one façade either fronting a public street or the front building entrance, not exceeding a total of 144 square feet or 72 square feet per single sign. The Freeway Corridor District allows a single occupancy commercial building greater than 100,000 square feet to have a freestanding sign with up to 400 square feet in area and 50 feet in height. A freestanding sign has not been designed and proposed but the building signage, while not yet dimensioned, is designed to be modest in size and design with a single sign fronting Kenyon Avenue. A sign permit must be issued by the Planning Department prior to the installation of any signage. Exterior Lighting. A site lighting and photometric plan has not been submitted. The plan must be submitted prior to issuance of a building permit. The Zoning Ordinance required down-cast lighting with light intensity not greater than one foot-candle at the property line. III. CONDITIONAL USE PERMIT Schneiderman’s Furniture proposes to construct a two level, 112,000 square foot, 35 foot tall building facing Kenyon Avenue. The building design includes an 80 foot by 60 foot wide architectural quadrilateral-shaped cupola located at the front of the building which will total 39 feet in height. The cupola is not occupied space and is used to provide natural light to the area of the building near the main entrance and is not subject to building height requirements. Exterior building materials are proposed to include limestone, glass, stucco and smooth and sandblasted finish architectural pre-cast concrete panels. The applicant is requesting approval of a conditional use permit to deviate from the minimum requirements for commercial exterior building materials for this project. Section 11-17- 9.D of the Zoning Ordinance requires minimum grades of exterior building materials be designed into all four sides of the building. Building materials are categorized by grades from brick and stone (Grade A) to integral colored concrete block (Grade D). A conditional use permit is required for the architectural exterior materials to deviate from the minimum requirements or to allow a variation in the required materials. The intent of the 7 conditional use permit option was to allow for architectural design flexibility while maintaining a high quality of both design and materials on all fours sides of the building. In the case of the proposed Schneiderman’s building, approximately 30% of the building exterior (west elevation) is not visible from the public street and the plan is to screen that entire elevation from view of the residential neighborhood with evergreen trees. The entire proposed west wall and portions of the north and south walls are proposed with maintenance free off-white integral colored panels. This material is considered to be a Grade D material. The applicant’s narrative (Exhibit C) reasons that the percentage of high quality exterior building materials concentrated on the building’s east face (front) can be reasonably balanced with less visually appealing materials, such as integral colored pre-cast concrete panels, on a portion of the sides and the entire rear (west) wall. The following breakdown of building materials on each building façades: East (front) Elevation: Natural Stone – 23% Glass – 54% Stucco – 20% Precast Concrete Panels – 3% South (side) Elevation: Natural Stone – 26% Glass – 13% Stucco – 5% Precast Concrete Panels – 56% North (side) Elevation: Glass – 1% Stucco – 2% Precast Concrete Panels – 97% West (rear) Elevation: Glass - >1% Stucco – 2% Precast Concrete Panels – 97% RECOMMENDATION 8 Planning Department staff recommends approval of the Schneiderman’s Furniture preliminary plat and conditional use permit subject to the following stipulations: 1. Compliance with the stipulations listed in the August 12, 2016 engineering report. 2. Implementation of the recommendations of the Parks, Recreation and Natural Resources Committee. 3. The site development and building exterior shall be developed in compliance with the plans approved by the City Council. 4. Landscaping shall be installed according to the landscape plan approved by the City Council. A financial security shall be submitted the final plat to guarantee installation of the landscaping. The landscape plan must be amended to increase landscape screening by including staggered row of evergreen trees for the property adjacent to the loading dock. 5. All signs shall comply with Zoning Ordinance requirement. A sign permit must be issued by the City prior to the installation of any signs. 6. The site plan must be revised to provide the correct number of required and proposed deferred parking spaces. A minimum of three additional deferred parking spaces must be shown on the site plan prior to staff consideration of the parking deferment application. A parking deferment application shall be submitted prior to issuance of a building permit. 7. Parking lot and building exterior lighting shall be down-cast cut-off type fixtures only. Tilt- up light fixtures or fixtures that glare onto adjacent properties are not permitted. A lighting and photometric plan shall be submitted with the building permit application. 8. All building materials shall be integral colored and shall not be painted. 9. Retaining walls shall not be constructed in a drainage and utility easement. Findings of Fact for the conditional use permit are attached. Lee Lake RS-3 PUD C-3 C-3 P/OS P/OS P/ O S RS-3 K E N R I C K A V E 1 6 7 TH STW 166TH ST W K E N Y O N A V E K E N W O O D T R L J O N Q U IL AVE 164TH ST W 165TH ST W KLAMATHTRL 170TH ST W K E N O S H A A V E KE N M O R E D R 1 6 8 T H ST W UPPER 167TH ST W I- 3 5 I- 3 5 LOWER 167TH ST W 166TH ST W Ü SCHNEIDERMAN'S FURNITUREPRELIMINARY PLAT & CONDITIONAL USE PERMIT EXHIBIT A LOUCKS W: \ 2 0 1 6 \ 1 6 0 0 3 \ C A D D D A T A \ C I V I L \ _ d w g S h e e t F i l e s \ C 1 - 1 E x i s t i n g C o n d i t i o n s Pl o t t e d : 0 8 / 0 5 / 2 0 1 6 1 1 : 2 1 A M 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION SCHNEIDERMANS FURNITURE LAKEVILLE, MN SCHNEIDERMANS C1-1 EXISTING CONDITIONS PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 STORM WATER POLLUTION PREVENTION PLAN C3-3 SWPPP DETAILS & NOTES C4-1 UTILITY PLAN C8-1 DETAIL SHEET 06-21-16 PRELIMINARY CITY SUBMITTAL 07-06-16 RESPONSE TO CITY COMMENTS 07-13-16 PRELIMINARY PLAT RESUBMITTAL 08/05/16 PRELIMINARY PLAT RESUBMITTAL Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Jeffrey A. Shopek - PE 19624 Project Lead Drawn By Checked By Loucks Project No.16003 JAS TRG JDK 06-21-16 06-21-16 EXISTING CONDITIONS PLAN C1-1 DESCRIPTION OF PROPERTY SURVEYED OUTLOT B, CELEBRATION 2ND ADDITION, DAKOTA COUNTY, MINNESOTA. ABSTRACT PROPERTY WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. N EXISTING CONDITIONS GENERAL NOTES 1. THE INFORMATION SHOWN ON THIS EXISTING CONDITIONS PLAN WAS PREPARED FROM A BOUNDARY AND TOPOGRAPHIC SURVEY PREPARED BY LOUCKS ASSOCIATES. UTILITY INFORMATION SHOWN ON THIS PLAN, SUCH AS SANITARY SEWER, WATERMAIN, STORM SEWER, FORCEMAIN, ETC. WAS PROVIDED BY THE CITY OF SHAKOPEE RECORD PLANS. 2. THE BEARINGS FOR THIS SURVEY ARE BASED ON THE PLAT CELEBRATION 2ND ADDITION. 3. BENCHMARK: TOP NUT HYDRANT AT SOUTHEAST CORNER OF PROPERTY AS SHOWN HEREON. ELEVATION = 1025.68 (NAVD 88) 4. THE GROSS LAND AREA IS 212,541 +/- SQUARE FEET OR 4.88 +/- ACRES. 5. WE HAVE SHOWN BURIED STRUCTURES AND UTILITIES ON AND/OR SERVING THE SITE TO THE BEST OF OUR ABILITY, SUBJECT TO THE FOLLOWING RESTRICTIONS: A. UTILITY OPERATORS DO NOT CONSISTENTLY RESPOND TO LOCATE REQUESTS THROUGH THE GOPHER STATE ONE CALL SERVICE FOR BOUNDARY AND LOCATION PURPOSES SUCH AS THIS. B. THOSE UTILITY OPERATORS THAT DO RESPOND, OFTEN WILL NOT LOCATE SERVICES FROM THE MAIN LINE TO THE CUSTOMER'S STRUCTURE OR FACILITY - THEY CONSIDER THOSE SEGMENTS PRIVATE INSTALLATIONS THAT ARE OUTSIDE OF THEIR JURISDICTION. IF A PRIVATE SERVICE TO AN ADJOINER'S SITE CROSSES THIS SITE OR A SERVICE TO THIS SITE CROSSES AN ADJOINER, IT MAY NOT BE LOCATED SINCE MOST OPERATORS WILL NOT MARK SUCH "PRIVATE" SERVICES. C. SNOW AND ICE CONDITIONS DURING WINTER MONTHS MAY OBSCURE OTHERWISE VISIBLE EVIDENCE OF A BURIED STRUCTURE OR UTILITY. D. MAPS PROVIDED BY UTILITY OPERATORS, EITHER ALONG WITH A FIELD LOCATION OR IN LIEU OF SUCH A LOCATION, ARE VERY OFTEN INACCURATE OR INCONCLUSIVE. MAPS PROVIDED BY UTILITY OPERATORS ARE VERY OFTEN AT A VERY SMALL SCALE, OR NO SCALE. E. EXTREME CAUTION MUST BE EXERCISED BEFORE AN EXCAVATION TAKES PLACE ON OR NEAR THE SITE. BEFORE DIGGING, YOU ARE REQUIRED BY LAW TO NOTIFY GOPHER STATE ONE CALL AT LEAST 48 HOURS IN ADVANCE AT 651-454-0002. F. UTILITY INFORMATION SHOWN ON THIS PLAN, SUCH AS NATURAL GAS, ELECTRIC LINES, TELEPHONE LINES, FIBEROPTIC LINES, CABLE TELEVISION LINES, UNDERGROUND PIPELINES, ETC. WAS SUPPLIED OR LOCATED BY GOPHER STATE ONE CALL, TICKET NUMBERS 161264910 & 161270014. 6. THIS PROPERTY IS CONTAINED IN ZONE X (AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN) PER FLOOD INSURANCE RATE MAP, COMMUNITY PANEL NO. 2701070183E, EFFECTIVE DATE OF DECEMBER 2, 2011. EXHIBIT E LOUCKS W: \ 2 0 1 6 \ 1 6 0 0 3 \ C A D D D A T A \ C I V I L \ _ d w g S h e e t F i l e s \ C 2 - 1 S i t e P l a n Pl o t t e d : 0 8 / 0 9 / 2 0 1 6 3 : 4 5 P M 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION SCHNEIDERMANS FURNITURE LAKEVILLE, MN SCHNEIDERMANS C1-1 EXISTING CONDITIONS PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 STORM WATER POLLUTION PREVENTION PLAN C3-3 SWPPP DETAILS & NOTES C4-1 UTILITY PLAN C8-1 DETAIL SHEET L1-1 LANDSCAPE PLAN L1-2 LANDSCAPE DETAILS 06-21-16 PRELIMINARY CITY SUBMITTAL 07-06-16 RESPONSE TO CITY COMMENTS 07-13-16 PRELIMINARY PLAT RESUBMITTAL 08/05/16 PRELIMINARY PLAT RESUBMITTAL Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Jeffrey A. Shopek - PE 19624 Project Lead Drawn By Checked By Loucks Project No.16003 JAS TRG JDK 06-21-16 06-21-16 SITE PLAN C2-1 1.ALL PAVING, CONCRETE CURB, GUTTER AND SIDEWALK SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH THE DETAILS SHOWN PER THE DETAIL SHEET(S) AND STATE/LOCAL JURISDICTION REQUIREMENTS. 2. ACCESSIBLE PARKING AND ACCESSIBLE ROUTES SHALL BE PROVIDED PER CURRENT ADA STANDARDS AND LOCAL/STATE REQUIREMENTS. 3. ALL CURB DIMENSIONS SHOWN ARE TO THE FACE OF CURB UNLESS OTHERWISE NOTED. 4. ALL BUILDING DIMENSIONS ARE TO THE OUTSIDE FACE OF WALL UNLESS OTHERWISE NOTED. 5. TYPICAL FULL SIZED PARKING STALL IS 9' X 18' UNLESS OTHERWISE NOTED. 6. ALL CURB RADII SHALL BE 5.0' UNLESS OTHERWISE NOTED. 7. BITUMINOUS IMPREGNATED FIBER BOARD TO BE PLACED AT FULL DEPTH OF CONCRETE ADJACENT TO EXISTING STRUCTURES AND BEHIND CURB ADJACENT TO DRIVEWAYS AND SIDEWALKS. 8. SEE SITE ELECTRICAL PLAN FOR SITE LIGHTING. CURRENT ZONING: C3-GENERAL COMMERCIAL DISTRICT PROPOSED ZONING: C3- GENERAL COMMERCIAL DISTRICT PROPERTY AREA:4.88 AC DISTURBED AREA:5.39 AC EXISTING IMPERVIOUS AREA: 0.0 AC (0%) PROPOSED IMPERVIOUS AREA: 2.66 AC (54%) PARKING REQUIREMENT: 105,000 SF X 0.9=94,500 TOTAL SF FLOOR AREA 25,000/400 + 69,500/600= 63 + 116= 179 REQUIRED STALLS TOTAL PARKING: 113 STALLS 85 STALLS-FUTURE PARKING EXHIBIT F LOUCKS W: \ 2 0 1 6 \ 1 6 0 0 3 \ C A D D D A T A \ C I V I L \ _ d w g S h e e t F i l e s \ C 3 - 1 G r a d i n g P l a n Pl o t t e d : 0 8 / 0 9 / 2 0 1 6 3 : 4 7 P M 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION SCHNEIDERMANS FURNITURE LAKEVILLE, MN SCHNEIDERMANS C1-1 EXISTING CONDITIONS PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 STORM WATER POLLUTION PREVENTION PLAN C3-3 SWPPP DETAILS & NOTES C4-1 UTILITY PLAN C8-1 DETAIL SHEET L1-1 LANDSCAPE PLAN L1-2 LANDSCAPE DETAILS 06-21-16 PRELIMINARY CITY SUBMITTAL 07-06-16 RESPONSE TO CITY COMMENTS 07-13-16 PRELIMINARY PLAT RESUBMITTAL 08/05/16 PRELIMINARY PLAT RESUBMITTAL Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Jeffrey A. Shopek - PE 19624 Project Lead Drawn By Checked By Loucks Project No.16003 JAS TRG JDK 06-21-16 06-21-16 GRADING & DRAINAGE PLAN C3-1 WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. GRADING, DRAINAGE & EROSION CONTROL NOTES 1. SPOT ELEVATIONS REPRESENT FINISHED SURFACE GRADES, GUTTER/FLOW LINE, FACE OF BUILDING, OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 2. CATCH BASINS AND MANHOLES IN PAVED AREAS SHALL BE SUMPED 0.04 FEET. ALL CATCH BASINS IN GUTTERS SHALL BE SUMPED 0.16 FEET. RIM ELEVATIONS SHOWN ON PLANS DO NOT REFLECT SUMPED ELEVATIONS. 3. GRADING OF THE INFILTRATION AREAS SHALL BE ACCOMPLISHED USING LOW-IMPACT EARTH-MOVING EQUIPMENT TO PREVENT COMPACTION OF THE UNDERLYING SOILS. SMALL TRACKED DOZERS AND BOBCATS WITH RUNNER TRACKS ARE RECOMMENDED. 4. ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE MINIMUM OF 4 INCHES OF TOP SOIL AND SEED/MULCH OR SOD. THESE AREAS SHALL BE WATERED/MAINTAINED BY THE CONTRACTOR UNTIL VEGETATION IS ESTABLISHED. 5. FOR SITE RETAINING WALLS "TW" EQUALS SURFACE GRADE AT TOP FACE OF WALL (NOT TOP OF WALL), "GW" EQUALS SURFACE GRADE AT WALL GRADE TRANSITION, AND "BW" EQUALS SURFACE GRADE AT BOTTOM FACE OF WALL (NOT BOTTOM OF BURIED WALL COURSES). 6. REFER TO THE REPORT OF GEOTECHNICAL EXPLORATION AND REVIEW (REPORT NO.01-06859), DATED JULY 11, 2016 AS PREPARED BY AMERICAN ENGINEERING TESTING, INC. FOR AN EXISTING SUBSURFACE SITE CONDITION ANALYSIS AND CONSTRUCTION RECOMMENDATIONS. 7. STREETS MUST BE CLEANED AND SWEPT WHENEVER TRACKING OF SEDIMENTS OCCURS AND BEFORE SITES ARE LEFT IDLE FOR WEEKENDS AND HOLIDAYS. A REGULAR SWEEPING SCHEDULE MUST BE ESTABLISHED. 8. DUST MUST BE ADEQUATELY CONTROLLED. 9. SEE SWPPP FOR ADDITIONAL EROSION CONTROL NOTES AND REQUIREMENTS. 10. SEE UTILITY PLAN FOR WATER, STORM AND SANITARY SEWER INFORMATION. 11. SEE SITE PLAN FOR CURB AND BITUMINOUS TAPER LOCATIONS.  23EXHIBIT G LOUCKS W: \ 2 0 1 6 \ 1 6 0 0 3 \ C A D D D A T A \ C I V I L \ _ d w g S h e e t F i l e s \ C 3 - 2 S W P P P P L A N Pl o t t e d : 0 8 / 0 9 / 2 0 1 6 3 : 5 0 P M 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION SCHNEIDERMANS FURNITURE LAKEVILLE, MN SCHNEIDERMANS C1-1 EXISTING CONDITIONS PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 STORM WATER POLLUTION PREVENTION PLAN C3-3 SWPPP DETAILS & NOTES C4-1 UTILITY PLAN C8-1 DETAIL SHEET L1-1 LANDSCAPE PLAN L1-2 LANDSCAPE DETAILS 06-21-16 PRELIMINARY CITY SUBMITTAL 07-06-16 RESPONSE TO CITY COMMENTS 07-13-16 PRELIMINARY PLAT RESUBMITTAL 08/05/16 PRELIMINARY PLAT RESUBMITTAL Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Jeffrey A. Shopek - PE 19624 Project Lead Drawn By Checked By Loucks Project No.16003 JAS TRG JDK 06-21-16 06-21-16 STORM WATER POLLUTION PREVENTION PLAN C3-2 WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER.  23 NOTE SEE SHEET C3-3 FOR SWPPP NOTES AND DETAILS. EXHIBIT H LOUCKS W: \ 2 0 1 6 \ 1 6 0 0 3 \ C A D D D A T A \ C I V I L \ _ d w g S h e e t F i l e s \ C 4 - 1 U t i l i t y P l a n Pl o t t e d : 0 8 / 0 9 / 2 0 1 6 3 : 5 6 P M 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION SCHNEIDERMANS FURNITURE LAKEVILLE, MN SCHNEIDERMANS C1-1 EXISTING CONDITIONS PLAN C2-1 SITE PLAN C3-1 GRADING & DRAINAGE PLAN C3-2 STORM WATER POLLUTION PREVENTION PLAN C3-3 SWPPP DETAILS & NOTES C4-1 UTILITY PLAN C8-1 DETAIL SHEET L1-1 LANDSCAPE PLAN L1-2 LANDSCAPE DETAILS 06-21-16 PRELIMINARY CITY SUBMITTAL 07-06-16 RESPONSE TO CITY COMMENTS 07-13-16 PRELIMINARY PLAT RESUBMITTAL 08/05/16 PRELIMINARY PLAT RESUBMITTAL Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Jeffrey A. Shopek - PE 19624 Project Lead Drawn By Checked By Loucks Project No.16003 JAS TRG JDK 06-21-16 06-21-16 UTILITY PLAN C4-1 WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER.  23 UTILITY PLAN GENERAL NOTES 1. ALL SANITARY SEWER, STORM SEWER AND WATERMAIN UTILITIES SHALL BE FURNISHED AND INSTALLED PER THE REQUIREMENTS OF THE SPECIFICATIONS, THE CITY AND THE STANDARD UTILITIES SPECIFICATION OF THE CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM), 1999 EDITION. ALL HDPE CONNECTIONS TO CONCRETE MANHOLES SHALL BE CONNECTED WITH AN INTERNAL RUBBER GASKET OR BY USING ADS WATERSTOP GASKET. ALL SANITARY SEWER MAIN LINE SHALL BE SDR 35. ALL SANITARY SEWER SERVICES SHALL BE SDR 26. 2. SEE SHEET C8-1 AND THE CONTRACT SPECIFICATIONS FOR SPECIFIC UTILITY DETAILS AND UTILITY SERVICE DETAILS. 3. ALL UTILITY PIPE BEDDING SHALL BE COMPACTED SAND OR FINE GRANULAR MATERIAL PER THE REQUIREMENTS OF THE CITY. ALL COMPACTION SHALL BE PERFORMED PER THE REQUIREMENTS OF THE CEAM SPECIFICATION. 4. ALL CONNECTIONS TO EXISTING UTILITIES SHALL BE PERFORMED PER THE REQUIREMENTS OF THE CITY. THE CITY DEPARTMENT OF ENGINEERING AND BUILDING INSPECTIONS DEPARTMENT AND THE CONSTRUCTION ENGINEER MUST BE NOTIFIED AT LEAST 48 HOURS PRIOR TO ANY WORK WITHIN THE PUBLIC RIGHT OF WAY, OR WORK IMPACTING PUBLIC UTILITIES. 5. ALL SANITARY SEWER AND WATER SERVICES SHALL TERMINATE AT THE PROPERTY LINE UNLESS OTHERWISE NOTED. 6. THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS PRIOR TO PERFORMING ANY EXCAVATION OR UNDERGROUND WORK. 7. THE CONTRACTOR SHALL FIELD ADJUST WATERMAIN TO AVOID CONFLICTS WITH SANITARY SEWER, STORM SEWER, AND SERVICES AS REQUIRED. INSULATION OF WATER AND SANITARY SEWER LINES SHALL BE PROVIDED WHERE 7.5 FEET MINIMUM DEPTH CAN NOT BE ATTAINED. 8. ALL STREET REPAIRS AND PATCHING SHALL BE PERFORMED PER THE REQUIREMENTS OF THE CITY. ALL TRAFFIC CONTROL SHALL BE PROVIDED BY THE CONTRACTOR AND SHALL BE ESTABLISHED PER THE REQUIREMENTS OF THE MINNESOTA MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND THE CITY. THIS SHALL INCLUDE ALL SIGNAGE, BARRICADES, FLASHERS AND FLAGGERS AS NEEDED. ALL PUBLIC STREETS SHALL BE OPEN TO TRAFFIC AT ALL TIMES. NO ROAD CLOSURES SHALL BE PERMITTED WITHOUT THE EXPRESSED AUTHORITY OF OF THE CITY. 9. ALL NEW WATERMAIN MUST HAVE A MINIMUM OF 7.5 FEET OF COVER. 10. ADJUST ALL EXISTING STRUCTURES, BOTH PUBLIC AND PRIVATE TO THE PROPOSED GRADES WHERE DISTURBED AND COMPLY WITH ALL REQUIREMENTS OF THE UTILITY OWNERS. STRUCTURES BEING RESET TO PAVED AREAS MUST MEET OWNERS REQUIREMENTS FOR TRAFFIC LOADING. 11. PROPOSED PIPE MATERIALS: WATERMAIN DIP CLASS 52 NO LESS THAN 7.5' DEEP. WATER SERVICE COPPER TYPE K,6" SERVICE TO PROPERTY LINE SANITARY SEWER PVC SDR26 20' - 25' DEEP. SANITARY SEWER PVC 8" SERVICE TO PROPERTY LINE. STORM SEWER HDPE 12" TO 24" DIAMETER. STORM SEWER RCP 18", CONNECTION TO EX. STUB DRAINTILE POLYETHYLENE BACK OF CURB, INFILTRATION BASIN. EXHIBIT I EXHIBIT M EXHIBIT N City of Lakeville Planning Department Memorandum TO: Planning Commission FROM: Frank Dempsey, AICP, Associate Planner DATE: July 29, 2016 SUBJECT: Schneiderman’s Furniture Neighborhood Meeting Notes On July 28, 2016, Schneiderman’s Furniture representatives hosted a neighborhood meeting for the proposed development of a 112,000 square foot, two story furniture retail store located between Gander Mountain and Celebration Church west of Kenyon Avenue. The open house meeting was held between 5:30 PM and 7:00 PM. The meeting was attended by the following individuals: • Jason Schneiderman and Mrs. Schneiderman • Jeremy Cunningham, OPUS • Ernesto Ruis-Garcia and Katie Hughes, Architects OPUS • Other representatives of OPUS and Loucks Associates • Six to eight neighborhood residents representing properties to the west • Associate Planner Frank Dempsey, Development Design Engineer Matt Decur The neighborhood meeting was an open house arrangement located on the proposed Schneiderman’s property. Property owners to the west that abut the Schneiderman’s property were in attendance. Property owners walked the site and near the west property line with the development representatives. Questions were raised about proposed screening and effectiveness of the proposed screening, building setbacks, building height, amount of excavation and proximity of grading to the property line. The meeting adjourned at 7:00 PM 1 CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA SCHNEIDERMAN’S CONDITIONAL USE PERMIT FINDINGS OF FACT AND RECOMMENDATION On August18, 2016 the Lakeville Planning Commission met at its regular meeting to consider the application of JAS Lakeville Properties, LLC and Schneiderman’s Furniture for a conditional use permit to allow an exception to the commercial district exterior building material provisions of the Zoning Ordinance. The Planning Commission conducted a public hearing on the proposed conditional use permit preceded by published and mailed notice. The applicant was present and the Planning Commission heard testimony from all interested persons wishing to speak. FINDINGS OF FACT 1. The property is zoned C-3, General Commercial District. 2. The property is located in Planning District No. 1 and is classified for commercial land use on the Comprehensive Land Use Plan. 3. The legal description of the property is: Outlot B, Celebration 2nd Addition 4. Section 11-4-3E of the City of Lakeville Zoning Ordinance provides that a conditional use permit may not be issued unless certain criteria are satisfied. The criteria and our findings regarding them are: a) The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the Official City Comprehensive Plan. The proposed commercial building is considered a permitted use within the C-3 District and is consistent with the goals and objectives noted in Planning District 1 of the Comprehensive Land Use Plan. The proposed exception to the commercial district exterior building material requirements are due to the scale and single street frontage of the building and compatibility with the existing large commercial buildings in the area, 2 which were constructed prior to the current exterior building materials requirements being enacted. 3 b) The proposed use is or will be compatible with future land uses of the area. The proposed commercial building’s exterior design will include architectural elements equal to or greater in quality compared to other large commercial buildings in the area. c) The proposed use conforms with all performance standards contained in the Zoning Ordinance and the City Code. The integral colored smooth and rough surface concrete wall panels (Grade D) proposed on the west, north and south sides of the building will be consistent with other large commercial buildings in the area. d) The proposed use can be accommodated with existing public services and will not overburden the City’s service capacity. The proposed building will be served with existing public services and will not overburden the City’s service capacity. e) Traffic generation by the proposed use is within capabilities of streets serving the property. Traffic generation by the proposed use can be accommodated on existing streets serving the property. 5. The planning report dated August 12, 2016 prepared by Associate Planner Frank Dempsey is incorporated herein. Dated: August 18, 2016 RECOMMENDATION The Planning Commission recommends that the City Council approve the conditional use permit in the form attached thereto. LAKEVILLE PLANNING COMMISSION 4 BY:_____________________________ Jason Swenson, Chair City of Lakeville Public Works – Engineering Division Memorandum To: Frank Dempsey, Associate Planner From: Matt Decur, Project Engineer McKenzie L. Cafferty, Environmental Resources Manager John Hennen, Parks and Recreation Director Copy: Zach Johnson, City Engineer Jerilyn Erickson, Finance Director Gene Abbott, Building Official Date: August 12, 2016 Subject: Schneidermans Furniture • Preliminary Plat Review • Preliminary Site Plan Review BBAACCKKGGRROOUUNNDD JAS Lakeville Properties LLC has submitted a preliminary plat named Schneidermans Furniture. The proposed development is located west of and adjacent to Kenyon Avenue. The parent parcel consists of Outlot B, Celebration 2nd Addition. The site is zoned C-3, General Commercial District. The preliminary plat consists of one lot within one block on 4.88 acres. The proposed development will be completed by: Developer: JAS Lakeville Properties LLC Engineer/Surveyor: Loucks SSIITTEE CCOONNDDIITTIIOONNSS The Schneidermans Furniture site consists of 4.88 acres of wooded, undeveloped land. The property generally slopes east and west from a ridge at the center of the property. SSCCHHNNEEIIDDEERRMMAANNSS FFUURRNNIITTUURREE –– PPRREELLIIMMIINNAARRYY PPLLAATT AAUUGGUUSSTT 1122,, 22001166 PPAAGGEE 22 OOFF 55 EEAASSEEMMEENNTTSS The parent parcel contains the following easements which will be vacated with the final plat: •• DDrraaiinnaaggee aanndd uuttiilliittyy eeaasseemmeennttss ppeerr tthhee ppllaatt ooff CCeelleebbrraattiioonn 22nndd AAddddiittiioonn •• RRooaaddwwaayy,, DDrraaiinnaaggee,, aanndd UUttiilliittyy EEaasseemmeenntt ppeerr DDoocc.. NNoo.. 1177008800660055 •• TTrraaiill EEaasseemmeenntt ppeerr DDoocc.. NNoo.. 1177008800660055 •• DDrraaiinnaaggee,, UUttiilliittyy,, && SSttrreeeett EExxppaannssiioonn EEaasseemmeenntt ppeerr DDoocc.. NNooss 116677446633 aanndd 11770088996677 SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT Kenyon Avenue Schneidermans Furniture is west of and adjacent to Kenyon Avenue, a major collector roadway as identified in the City’s Comprehensive Transportation Plan. Currently, Kenyon Avenue is constructed as a 44-foot wide three-lane urban roadway with a shared center left turn lane. An 8- foot wide sidewalk is located along the west side of Kenyon Avenue. Kenyon Avenue adjacent to the parent parcel was reconstructed in 2001 to a three lane roadway with City Project No. 00-21/Dakota County Project No. 05-35. Right of way was dedicated with the Celebration 2nd Addition plat over the roadway, drainage, and utility easement being vacated with Schneidermans Furniture. SSIITTEE PPLLAANN The proposed development consists of a 112,000 square foot commercial building and parking lot. Access to the site will be from proposed driveways onto Kenyon Avenue. The parking lot will provide capacity for 119 vehicles, including five accessible stalls. Parking is being deferred on 63 stalls. Grading and construction plans for the deferred parking were not provided, so constructability of the proposed deferred parking was not reviewed. The construction of deferred parking may require the construction of retaining walls and grading within the stormwater management basin. The landscaping plan provides for several types of trees and shrubs in landscaped areas around the building and parking lot. A landscaping buffer is being provided to the west of the building, adjacent to neighboring residential properties. Landscaping areas around the main building will be sodded and irrigated. CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS Construction traffic access and egress for grading, utility and site construction shall be from Kenyon Avenue at the location of the proposed south driveway. SSCCHHNNEEIIDDEERRMMAANNSS FFUURRNNIITTUURREE –– PPRREELLIIMMIINNAARRYY PPLLAATT AAUUGGUUSSTT 1122,, 22001166 PPAAGGEE 33 OOFF 55 PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS The Parks, Trails and Open Space Plan identifies a multi-purpose trail on the west side of Kenyon Avenue. An 8-foot wide concrete sidewalk was constructed adjacent to Schneidermans Furniture in 2000 with City Project No. 00-21. There are no other public sidewalks or trails proposed with the Schneidermans Furniture improvements. Pedestrian curb ramps will be added to the existing sidewalk along Kenyon Avenue at the location of new driveways. The Park Dedication requirement has not been collected on the parent parcel, and will be satisfied through a cash contribution that will be paid with the final plat based on the Park Dedication Fee in effect at the time of final plat. UUTTIILLIITTIIEESS SSAANNIITTAARRYY SSEEWWEERR Schneidermans Furniture is located within subdistrict OL-54000 of the Orchard Lake sanitary sewer district as identified in the City’s Comprehensive Sanitary Sewer Plan. Wastewater will be conveyed through subdistrict OL-51200 via existing trunk sanitary sewer to the MCES Farmington Interceptor and continue to the Empire Wastewater Treatment Facility. The downstream facilities have sufficient capacity to serve the proposed development. Wastewater from Schneidermans Furniture will be conveyed through lift station LS07, which is monitored for possible future capacity constraints. Lift Station LS07 is identified in the City’s Comprehensive Sanitary Sewer Plan Capital Improvement Plan for upgrade in 2025-2030. Public sanitary sewer will be extended to the Schneidermans Furniture north property line from an existing stub located within an easement on the Celebration Church property. Private sanitary sewer will be extended from the new sanitary sewer main to provide service to the development. The Sanitary Sewer Availability Charge has not been collected on the parent parcel and will be collected at the time Schneidermans Furniture is final platted. WWAATTEERRMMAAIINN Development of Schneidermans Furniture includes connection to existing 8” service stubs within Kenyon Avenue. Private watermain will be extended within the development to provide water service to the development. The Lateral Watermain Access Charge for trunk watermain in Kenwood Trail has not been collected on the parent parcel. The Lateral Watermain Access Charge shall be collected at the time of final plat approval, based on the current rate in effect at the time of final plat. Final locations and sizes of all sanitary sewer and watermain facilities will be reviewed by City staff with the final construction plans submitted with the building permit application. SSCCHHNNEEIIDDEERRMMAANNSS FFUURRNNIITTUURREE –– PPRREELLIIMMIINNAARRYY PPLLAATT AAUUGGUUSSTT 1122,, 22001166 PPAAGGEE 44 OOFF 55 OOVVEERRHHEEAADD LLIINNEESS The existing private overhead service lines, located adjacent to the northwest corner of Lot 1, Block 1 are not required by City Code to be buried and shall remain with the Schneidermans Furniture development. All service lines installed for the Schneidermans Furniture development shall be buried. DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG Schneidermans Furniture is located within subdistricts CL-10 and CL-12 of the Crystal Lake drainage district as identified in the City’s Water Resources Management Plan. The City’s plan does not identify any trunk storm sewer improvements within the proposed plat. Development of Schneidermans Furniture includes construction of a private stormwater management basin to collect and treat runoff generated from the site. The basin will be located in the southeast corner of the site. The proposed stormwater management plan was reviewed by City staff and Barr Engineering on July 22 and August 9, 2016. A revised stormwater management plan that meets City requirements must be submitted. The final grading plan must indicate any proposed borrow areas in which the building footings will be placed on fill material. The grading specifications must indicate that all embankments meet FHA/HUD 79G specifications. A final certificate of occupancy shall not be issued until an as-built certified grading plan has been submitted and approved by the City Engineer. Schneidermans Furniture contains more than one acre of site disturbance. A National Pollution Discharge Elimination System (NPDES) General Stormwater Permit for construction activity is required from the Minnesota Pollution Control Agency (MPCA) for areas exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the City. SSTTOORRMM SSEEWWEERR The development of Schneidermans Furniture includes the construction of a private storm sewer system. Plans submitted August 10, 2016, indicate the privately-owned and maintained storm sewer will be located within Lot 1, Block 1, and will collect and convey stormwater runoff generated from within the development. Stormwater will be conveyed to proposed private stormwater basin and eventually to an existing public stormwater basin in Outlot A, Gander Mountain; and to an existing storm sewer stub within Kenyon Avenue. The Trunk Storm Sewer Area Charge has not been collected on the parent parcel and will be collected with the Schneidermans Furniture final plat. SSCCHHNNEEIIDDEERRMMAANNSS FFUURRNNIITTUURREE –– PPRREELLIIMMIINNAARRYY PPLLAATT AAUUGGUUSSTT 1122,, 22001166 PPAAGGEE 55 OOFF 55 Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final construction plans. FEMA FLOODPLAIN ANALYSIS Schneidermans Furniture is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the Federal Emergency Management Agency (FEMA). Based on this designation, there are no areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA. WWEETTLLAANNDDSS A wetland determination of the parent parcel must be submitted. TTRREEEE PPRREESSEERRVVAATTIIOONN A Tree Preservation Plan showing proposed grading, utilities and the location of all significant trees within the parent parcel must be submitted. EERROOSSIIOONN CCOONNTTRROOLL The Developer is responsible for obtaining a MPCA NPDES Construction Permit and developing a Storm Water Pollution Prevention Plan (SWPPP) for the site prior to any land disturbing activity. The permit requires all erosion and sediment Best Management Practices (BMPs) be clearly outlined in the SWPPP. Changes made throughout construction must be documented in the SWPPP. Slopes greater than 3:1 are not allowed. Erosion control blanket is required on all 3:1 slopes, pond slopes and swales. Additional erosion control measures may be required during construction as deemed necessary by City staff or the Dakota County Soil and Water District. Any additional measures required shall be installed and maintained by the Developer. RREECCOOMMMMEENNDDAATTIIOONN Engineering recommends approval of the preliminary plat and site plan for Schneidermans Furniture, subject to the requirements within this report. The following must be submitted by the Developer and approved by City staff: • A revised storm water management plan • A revised grading plan incorporating storm water management plan changes and deferred parking areas • A wetland determination • A tree preservation plan • A SWPPP