LAKEVILLE POINTE FINAL PLAT
Proposed Action
Staff recommends adoption of the following motion: Move to approve a resolution approving the final
plat of Lakeville Pointe.
Overview
Ron Clark Construction representatives are requesting approval of the Lakeville Pointe final plat of one
lot and one outlot for the construction of a 49-unit apartment building with underground parking on a
3.26 acre lot located east of Kenwood Trail (CSAH 50) at Jurel Way. The subject property is zoned O-R,
Office/Residential Transition District. Multiple family dwellings are allowed by CUP in the O-R District.
The Lakeville Pointe preliminary plat and conditional use permit were approved by the City Council at
their June 20, 2016 meeting. At their September 19, 2016 meeting the City Council approved an
amendment to the Zoning Ordinance to allow multiple family uses to request deferred parking by
administrative permit. The developer may defer 21 of 123 required parking spaces, 62 of which will be
located in an underground parking garage. The final plat is consistent with the approved preliminary
plat.
Primary Issues to Consider
None
Supporting Information
• Final plat resolution
• Signed development contract, warranty deed, and easement agreement
• September 16, 2016 planning and engineering reports
• August 23, 2016 Dakota County Plat Commission letter
Financial Impact: $ Budgeted: Y☐ N☐ Source:
Related Documents: (CIP, ERP, etc.):
Envision Lakeville Community Values: A Home for All Ages and Stages of Life
Report Completed by: Daryl Morey, Planning Director
October 17, 2016
Zoning and Subdivision Ordinances
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. __________
RESOLUTION APPROVING THE FINAL PLAT OF
LAKEVILLE POINTE
WHEREAS, the owner of the plat described as Lakeville Pointe has requested
final plat approval; and
WHEREAS, the preliminary plat was reviewed by the Planning Commission and
the Parks, Recreation and Natural Resources Committee and approved by the City
Council; and
WHEREAS, the final plat is consistent with the preliminary plat approved by the
City Council on June 20, 2016; and
WHEREAS, the final plat is acceptable to the City.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The final plat of Lakeville Pointe is hereby approved subject to the
development contract and security requirements.
2. The Mayor and City Clerk are hereby directed to sign the final plat mylars and
the development contract.
3. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
ADOPTED by the Lakeville City Council this 17th day of October 2016.
CITY OF LAKEVILLE
BY: _____________________
Matt Little, Mayor
ATTEST:
________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _______ is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 17th day of October 2016 as shown by the
minutes of said meeting in my possession.
________________________
Charlene Friedges, City Clerk
(SEAL)
MEMORANDUM
TO: Daryl Morey
FROM: D. Daniel Licht, AICP
DATE: 16 September 2016
RE: Lakeville – Lakeville Pointe; Final Plat
TPC FILE: 135.01
BACKGROUND
Ron Clark Construction & Design has submitted plans for the final plat of Lakeville Pointe, which
consists of one, 3.1 acre lot to be developed with a three story multiple family building with 49
dwelling units. The subject site is located at the northeast quadrant of Kenwood Trail (CSAH 50)
and 185th Street (CSAH 60). Applications for preliminary plat and a conditional use permit for
multiple family dwellings within an O-R District and building height greater than 35 feet were
approved by the City Council on 20 June 2016. Section 10-2-3.C of the Subdivision Ordinance
makes application for final plat approval subject only to review and approval of the City Council.
Exhibits:
A. Site Location
B. Approved Preliminary Plat
C. Final Plat
D. Site Plan
ANALYSIS
Comprehensive Plan. The subject site is guided by the Comprehensive Plan for development as
Office/Residential Transition. This land use category anticipates development of neighborhood
oriented retail or service businesses, low intensity offices, or conditional allowance of medium
to high density residential uses. The proposed land use is consistent with the Comprehensive
Plan.
2
Zoning. The subject site is zoned O-R, Office/Residential Transition District. Multiple family
dwellings are allowed within the O-R District with approval of a CUP in accordance with Section
11-70-7.J of the Zoning Ordinance and subject to the performance standards of the RH-1
District. A conditional use permit allowing the proposed multiple family development was
approved by the City Council on 20 June 2016.
Surrounding Uses. The table below illustrates existing and planned land uses surrounding the
subject site. The proposed multiple family development will serve as a desirable land use
transition between CSAH 50 and the commercial properties to the north and the single family
dwellings to the east and south. The subject site is physically separated from the adjacent
single family neighborhood by a large Manage 2 wetland to the east of the subject site that will
be final platted in an outlot deeded to the City as part of the Raven Lake 3rd Addition final plat.
In addition, there will be no vehicle or pedestrian access between the subject site and the
adjacent single family neighborhood.
Direction Land Use Plan Zoning Map Existing Use
North Commercial PUD District Retail/Office/Convenience food
East LD Residential RS-2 District Raven Lake 3rd Add. (SF)
Single family
South LD Residential RS-2 District Single family
West HD Residential
Restricted
RH-1 District Southfork Village Apartments
CSAH 50, Wetland
Density. The 3.1 acre subject site is to be developed with 49 multiple family dwelling units.
The density of the proposed development is 15.8 dwelling units per net acre. This level of
density is consistent with the high density residential land use category defined by the
Comprehensive Plan. The proposed development will assist the City in maintaining an average
net density of 3.0 dwelling units per acre for residential land uses within the MUSA as required
by the Metropolitan Council.
Lot Area. Lots within the O-R District must be a minimum of 20,000 square feet. Additionally,
multiple family uses must provide 2,500 square feet of lot area per dwelling unit as required by
Section 11-61-13.B.2 of the Zoning Ordinance. With 49 multiple family dwelling units, the
minimum lot area required for the proposed development is 122,500 square feet or 2.81 acres.
The subject site is 135,236 square feet or 3.11 acres, which exceeds the minimum lot area
requirements of the Zoning Ordinance.
Lot Width. Lots within the O-R District must be a minimum width of 100 feet measured at the
front setback line. The subject site is 500 feet wide and complies with the requirements of the
Zoning Ordinance.
Setbacks. The table below outlines setback requirements of the RH-1 District applicable to the
subject site for development of a multiple family use:
3
Kenwood
Tr.
North East South Parking
ROW Side/Rear
Required 50ft. 30ft. 30ft. 30ft. 15ft. 5ft.
Proposed 60ft. 35ft. 35ft. 35ft. 15ft. 40ft.
Access. The subject site has one access to Kenwood Trail (CSAH 50), which is classified as an A-
Minor Expander (arterial) roadway by the 2008 Lakeville Comprehensive Plan. Section 11-19-
7.I.6 of the Zoning Ordinance does not allow direct access to minor arterial streets for multiple
family uses unless approved by the City Engineer. The access to Kenwood Trail (CSAH 50) is
appropriate (and necessary) as the subject site has no other alternative access available due to
existing adjacent development and physical constraints. The final plat and development plans
include dedication of additional right-of-way for Kenwood Trail (CSAH 50) and construction of a
dedicated right turn lane into the subject site. The design and location of the proposed access
to Kenwood Trail (CSAH 50) is subject to review and approval of the City Engineer and Dakota
County.
Off-Street Parking. Section 11-19-9 of the Zoning Ordinance requires multiple family uses to
provide 2.5 off-street parking stalls per dwelling unit. With 49 dwelling units, the subject site
must include 123 off-street parking stalls. The submitted building and site plans provide for 62
enclosed parking stalls under the principal building accessed from the south elevation. There
are also 40 surface parking stalls west of the principal building. The 102 off-street parking stalls
are less than 123 stalls required to be constructed. The site plan illustrates an additional 21
parking stalls as proof-of-parking stalls. Section 11-19-7.J of the Zoning Ordinance is proposed
to be amended to allow deferment of required parking for multiple family uses and the terms
of such deferment will be outlined in the development agreement.
Landscape Plan. The development includes a detailed landscape plan for the perimeter of the
building and front entry. The landscaping at the north, east and west sides of the building
includes significant numbers of evergreen trees to provide for year-round screening of the
principal building, with shade trees for additional coverage and variety. The landscape plan,
which was approved with the preliminary plat, specifies the sizes and quantities of all proposed
plantings, which comply with Section 11-21-9.C of the Zoning Ordinance. The development
agreement will include securities for the installation of the landscape plan.
Park Dedication. A trail adjacent to the subject site along Kenwood Trail (CSAH 50) has been
constructed as part of the recent Dakota County roadway improvement project. No land is to
be dedicated to the City for parks and trails purposes as part of the preliminary and final plat of
the subject site as no acquisitions are identified by the 2015 Parks, Trails and Open Space Plan.
Park dedication requirements will be satisfied as a cash fee in lieu of land based on the fee
schedule in effect at the time of final plat approval as outlined below:
49 dwelling units x $1,972/du = $96,628
4
Grading Plan. The submitted application includes grading, drainage and erosion control plans.
The developer has also submitted a survey of existing trees within the proposed construction
limits for the development. All grading, storm water management, and tree preservation issues
are subject to review and approval of the City Engineer.
Wetlands. Two small wetlands adjacent to Kenwood Trail are shown on the grading plan. Both
will be impacted by the proposed development. All wetlands and wetland impacts are subject
to review and approval of the City Engineer and Environmental Resources Manager.
Utility Plan. The subject site is within the MUSA and sanitary sewer and water utilities are
available to serve the property. The submitted development plans include a utility plan for
connection to sanitary sewer and water utilities. All utility issues are subject to review and
approval of the City Engineer.
Easements. Section 11-4-4.A of the Subdivision Ordinance requires establishment of 10 foot
wide drainage and utility easements at the perimeter of all proposed lots, which may overlay
side lot lines. Easements as required by the Subdivision Ordinance are shown on the final plat.
All drainage and utility easements are subject to review and approval of the City Engineer.
Outlots. The final plat includes no outlots.
Development Contract. The developer is required to enter into a development contract with
the City for the public and private improvements, payment of applicable fees and posting of
required securities. The development agreement will be drafted by the City Attorney and the
developer is required to execute the development agreement prior to City Council approval of
the final plat.
CONCLUSION
The proposed final plat for Lakeville Pointe is consistent with the Comprehensive Plan and the
approved preliminary plat and complies with the requirements of the Zoning Ordinance and
Subdivision Ordinance. Our office recommends approval of the final plat application subject to
the following conditions:
1. Access onto Kenwood Trail (CSAH 50) is subject to review and approval of the City
Engineer and Dakota County.
2. Landscaping shall be installed consistent with the approved plans and a security
provided for within the development agreement.
3. Park dedication requirements will be satisfied as a cash fee in lieu of land equal to
$96,628 to be paid upon execution of the development agreement.
5
4. All grading, storm water management, and tree preservation issues are subject to
review and approval of the City Engineer.
5. All wetland issues are subject to review and approval of the City Engineer and
Environmental Resources Manager.
6. All utility issues are subject to review and approval of the City Engineer.
7. All easements shall be subject to review and approval of the City Engineer.
8. The developer shall execute a development agreement prior to City Council
consideration of the final plat.
c. Justin Miller, City Administrator
Zachary Johnson, City Engineer
John Hennen, Parks and Recreation Director
Roger Knutson, City Attorney
±Lakeville Pointe
Final Plat
City of Lakeville
Aerial Map
LAKEVILLE
POINTE
BUILDING
SITE
K
E
N
W
O
O
D
T
R
A
I
L
(
C
S
A
H
5
0
)
J U R E L W A Y
JUREL CT
J A G U A R P A T H
EXHIBIT A
City of Lakeville
Public Works – Engineering Division
Memorandum
To: Daryl Morey, Planning Director
From: Matt Decur, Project Engineer
McKenzie L. Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
Date: September 16, 2016
Subject: Lakeville Pointe
• Final Plat Review
• Final Grading and Erosion Control Plan Review
• Final Utility Plan Review
• Final Tree Preservation Plan Review
BBAACCKKGGRROOUUNNDD
R.E.C., Inc./dba Ron Clark Construction has submitted a final plat named Lakeville Pointe. The
proposed development is located east of and adjacent to Kenwood Trail (CSAH 50) at the
intersection of Kenwood Trail and Jurel Way. The parent parcel consists of Outlot B, Raven
Lake Third Addition. The site is zoned O-R, Office/Residential Transition District.
The final plat consists of one (1) lot within one (1) block and one (1) outlot on 3.26 acres.
The outlot created with the final plat shall have the following use:
Outlot A: Wetland complex; to be deeded to the City (0.08 acres)
The proposed subdivision will be completed by:
Developer: R.E.C., Inc./dba Ron Clark Construction
Engineer: Sambatek
LLAAKKEEVVIILLLLEE PPOOIINNTTEE ––FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1166,, 22001166
PPAAGGEE 22 OOFF 88
SSIITTEE CCOONNDDIITTIIOONNSS
The Lakeville Pointe site consists of 3.26 acres of wooded, undeveloped land. The property
generally slopes west to east, draining to a wetland complex within Outlot A, Raven Lake
Third Addition. An overhead transmission line is located within a 75-foot easement and
crosses Kenwood Trail and through the northeast corner of the site.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
Kenwood Trail (CSAH 50)
Lakeville Pointe is east of and adjacent to Kenwood Trail, a minor arterial roadway as identified in
the City’s Comprehensive Transportation Plan. Dakota County controls the right-of-way
requirements and access locations along Kenwood Trail. Currently, Kenwood Trail is constructed
as a four-lane divided urban roadway with a dedicated left turn lane and right turn lane at the
intersection of Jurel Way. 10-foot wide trails are located along both sides of Kenwood Trail. The
current Dakota County Plat Needs Map dated April 16, 2013 identifies Kenwood Trail as a four-line
divided roadway with a 75-foot of half right-of-way requirement. The underlying plat of Raven
Lake Third Addition dedicated the necessary right-of-way; therefore, no additional right-of-way
dedication is required with the Lakeville Pointe plat. The Dakota County Plat Commission
reviewed the final plat at their August 22, 2016 meeting and recommended approval.
Kenwood Trail adjacent to the parent parcel was reconstructed in 2015 to a four lane divided
roadway with Dakota County Project Nos. 50-17 and 60-21 and City Project No. 09-07. The
cash fee for the future upgrade of Kenwood Trail has not been collected on the parent parcel.
The Developer shall provide a cash fee for the re-construction of Kenwood Trail. The cash fee
is based on the rate in effect at the time of final plat and is calculated as follows:
497.56 x $107 / ff = $53,238.92
Kenwood Trail front footage Residential Urban Section Future Upgrade Fee Total
The Developer will be required to comply with Dakota County permit requirements for access to
Kenwood Trail and work within County right of way. Dakota County is requiring installation of a
right turn lane on Kenwood Trail at the proposed access location. Design of the turn lane is
subject to review and approval by Dakota County.
SSIITTEE PPLLAANN
The proposed development consists of a 21,340 square foot, 49-unit apartment building and
parking lot.
Access to the site will be from a proposed driveway onto Kenwood Trail, directly across from
Jurel Way. The driveway and parking lot are adequately sized to allow truck circulation into
and out of the site. Underground parking is provided for 62 vehicles. The surface parking lot
will provide capacity for 61 vehicles, including two accessible stalls. Parking is being deferred
on 21 of the 61 stalls.
LLAAKKEEVVIILLLLEE PPOOIINNTTEE ––FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1166,, 22001166
PPAAGGEE 33 OOFF 88
There is a tot lot, patio, and reinforced grass courtyard on the north side of the parking lot.
The reinforced grass courtyard will serve as a fire lane to access the north end of the
apartment building.
The landscaping plan provides for several types of trees and shrubs in landscaped areas
around the building and parking lot. Landscaping areas around the main building will be
sodded and irrigated.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility and site construction shall be from
Kenwood Trail at the location of the proposed driveway.
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS
The Parks, Trails and Open Space Plan identifies a 10-foot wide trail on the east side of
Kenwood Trail. A 10-foot wide concrete sidewalk was constructed adjacent to Lakeville Pointe
in 2015 with City Project No. 09-07. The Developer shall provide a cash fee for its 5/8ths share
of the construction costs (excluding grading and restoration) of the concrete sidewalk, based
on the contractor’s bid prices for the project, at the time Lakeville Pointe is final platted. The
cash fee is calculated as follows:
$13,179.54 x 5/8 = $8,237.21
Trail Construction Cost (excluding grading
and restoration)
Developer’s Cost Share Total
The Park Dedication Fee has not been collected on the parent parcel and shall be paid at the
time of final plat approval. The Park Dedication Fee is based on the rate in effect at the time of
final plat approval and is calculated as follows:
49 units x $1,972.00/dwelling unit = $96,628.00
Dwelling Units High Density Residential Park Dedication Fee Rate Total
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR
Lakeville Pointe is located within subdistrict OL-56110 and OL-56120 of the Orchard Lake
sanitary sewer district as identified in the City’s Comprehensive Sanitary Sewer Plan.
Wastewater will be conveyed via existing trunk sanitary sewer to the MCES Farmington
Interceptor and continue to the Empire Wastewater Treatment Facility. The downstream
facilities have sufficient capacity to serve the proposed development.
Private sanitary sewer will be extended from an existing stub within Kenwood Trail. An inside
drop manhole will be constructed at the existing stub and 6” private sanitary sewer will be
extended into the site to provide service to the development.
LLAAKKEEVVIILLLLEE PPOOIINNTTEE ––FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1166,, 22001166
PPAAGGEE 44 OOFF 88
The Lateral Sanitary Sewer Access charge is required for the sanitary sewer within Kenwood
Trail. The fee will be required at the time Lakeville Pointe is final platted and will be based on
the rate in effect at the time of final plat approval. The cash fee is calculated as follows:
497.56 x $41.50 = $20,648.74
Kenwood Trail Front Footage Lateral Sanitary Sewer Access Charge per Front Foot Total
The Sanitary Sewer Availability Charge has been collected on the parent parcel.
WWAATTEERRMMAAIINN
Development of Lakeville Pointe includes connection to an existing 16” service stub within
Kenwood Trail. Private watermain will be extended within the development to provide water
service to the development.
The Lateral Watermain Access Charge for watermain in Kenwood Trail has not been collected
on the parent parcel. The Lateral Watermain Access Charge shall be collected at the time of
final plat approval, based on the current rate in effect at the time of final plat. The cash fee is
calculated as follows:
497.56 x $41.00 = $20,399.96
Kenwood Trail Front Footage Lateral Watermain Access Charge per Front Foot Total
1 x $408.00 = $408.00
Watermain Service Connections Lateral Watermain Access Charge per service Total
Final sewer and water service connection locations and sizes will be reviewed by City staff
with the final construction plans.
OOVVEERRHHEEAADD LLIINNEESS
The private existing overhead transmission lines, located at the northwest corner of Lot 1,
Block 1 are not required by City Code to be buried and shall remain with the Lakeville Pointe
improvements.
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
Lakeville Pointe is located within subdistricts OL-12A and OL-13 of the Orchard Lake drainage
district as identified in the City’s Water Resources Management Plan. The City’s plan does not
identify any storm sewer improvements within the proposed plat.
Development of Lakeville Pointe includes construction of a private stormwater management
basin to collect and treat runoff generated from the site. The basin will be located in the
southeast corner of the site, adjacent to the wetland in Outlot A, Raven Lake Third Addition.
The final grading plan must indicate any proposed borrow areas in which the building
footings will be placed on fill material. The grading specifications must indicate that all
LLAAKKEEVVIILLLLEE PPOOIINNTTEE ––FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1166,, 22001166
PPAAGGEE 55 OOFF 88
embankments meet FHA/HUD 79G specifications. A final certificate of occupancy shall not be
issued until an as-built certified grading plan has been submitted and approved by the City
Engineer.
Lakeville Pointe contains more than one acre of site disturbance. A National Pollution
Discharge Elimination System General Stormwater Permit for construction activity is required
from the Minnesota Pollution Control Agency for areas exceeding one acre being disturbed
by grading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the
City.
RREETTAAIINNIINNGG WWAALLLLSS
Any retaining wall necessary for the building construction shall be privately owned and
maintained and located outside of the public drainage and utility easements. Any retaining
wall that is greater than 4-feet in combined height shall be designed by a registered
geotechnical or structural engineer, consistent with MnDOT requirements. The Building
Official must approve the retaining wall design and plans.
SSTTOORRMM SSEEWWEERR
The development of Lakeville Pointe includes the construction of a private storm sewer
system. The privately-owned and maintained storm sewer will collect and convey stormwater
runoff generated from within the development. Stormwater will be conveyed to a private
filtration basin and eventually to the wetland located in Outlot A, Raven Lake Third Addition.
Development of Lakeville Pointe also includes relocation of a public catch basin and public
storm sewer within Kenwood Trail. A permit from Dakota County is required for work within
the Kenwood Trail right of way.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcel and shall be
paid at the time of final plat approval. The Trunk Storm Sewer Area Charge is calculated as
follows:
Gross Area of Raven Lake Third Addition 141,828.00 s.f.
Less Area of Outlot A (Wetland) (-) 3,564.00 s.f.
Total = 138,264.00 s.f.
138,264.00 s.f. x $0.198/s.f. = $27,376.27
Net Area of Raven
Lake
Third Addition
Multi Family Residential
Area Charge
Total
The Developer will receive a credit to the Trunk Storm Sewer Area Charge for deeding Outlot
A to the City, consistent with City policy. The credit is based on the area of the outlot and is
calculated at the rate of $5,500.00 per acre, and will be applied to the Lakeville Pointe final
plat cash fees. The credit is calculated as follows:
0.08 acres x $5,500/acre = $440.00
LLAAKKEEVVIILLLLEE PPOOIINNTTEE ––FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1166,, 22001166
PPAAGGEE 66 OOFF 88
Total Area of Outlot A Per Acre Credit Total
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
FEMA FLOODPLAIN ANALYSIS
Lakeville Pointe is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the Federal
Emergency Management Agency (FEMA). Based on this designation, there are no areas in the
plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA.
WWEETTLLAANNDDSS
The wetland delineation for the site identifies two small wetlands adjacent to Kenwood Trail.
Wetland 2 will be deeded to the City within Outlot A, Lakeville Pointe. Wetland 3 will be
impacted with the development. A de minims exemption for wetland 3 was processed and
approved. It is the applicant’s responsibility to obtain proper wetland approvals from the U.S.
Army Corps of Engineers.
There are areas where the proposed grading extends into the minimum wetland buffer areas
within Outlot A, Raven Lake Third Addition. A maintenance agreement for grading within the
wetland buffer has been developed for the area. The agreement is included in the
Development Contract. A $20,000 security will be held until the maintenance is completed
per the maintenance agreement.
Natural Area signs will be installed along the property line adjacent to the wetlands (13
locations) for Lot 1, Block 1.
TTRREEEE PPRREESSEERRVVAATTIIOONN
A tree preservation plan has been submitted. The plan shows a total of 788 significant trees
within the site. The plan proposes to save 544 (69%) trees.
The tree preservation plan satisfies City requirements. All “save” trees that are damaged or
removed will require replacement at a ratio of 2:1 as per the Lakeville Subdivision Ordinance.
EERROOSSIIOONN CCOONNTTRROOLL
The Developer is responsible for obtaining a MPCA Construction Permit for the site as well as
developing a SWPPP for the site prior to construction. The permit requires that all erosion and
sediment BMPs be clearly outlined in a SWPPP. Changes made throughout construction must
be documented in the SWPPP. All basin slopes and slopes adjacent to wetlands must have
erosion control blanket.
Additional erosion control measures may be required during construction as deemed
necessary by City staff or the Dakota County Soil and Water District. Any additional measures
required shall be installed and maintained by the Developer.
LLAAKKEEVVIILLLLEE PPOOIINNTTEE ––FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1166,, 22001166
PPAAGGEE 77 OOFF 88
SSEECCUURRIITTIIEESS
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to Lakeville Pointe.
CONSTRUCTION COSTS
Connect to Existing Sanitary Sewer and Construct Manhole $13,100.00
Connect to Existing Watermain 1,900.00
Erosion Control, Grading, and Restoration 79,000.00
SUBTOTAL - CONSTRUCTION COSTS $ 94,000.00
OTHER COSTS
Developer’s Design (3.0%) $ 2,820.00
Developer’s Construction Survey (2.5%) 2,350.00
City’s Legal Expense (0.5%) 470.00
City Construction Observation (5.0%) 4,700.00
Developer’s Record Drawing (0.5%) 470.00
Maintenance Agreement – Grading in Wetland Buffer 20,000.00
Natural Area Signs 1300.00
Lot Corners 200.00
SUBTOTAL - OTHER COSTS $32,310.00
TOTAL PROJECT SECURITIES $ 126,310.00
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
$200.00. The City shall hold this security until the Developer’s land surveyor certifies that all
irons have been placed following site grading.
CCAASSHH FFEEEESS
A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat
approval and is calculated as follows:
49 units x $8.42/unit/qtr. x 4 qtrs. = $1,650.32
Dwelling Units Streetlight Operating Fee Total
A cash fee for one-year of environmental resources expenses shall be paid at the time of final
plat approval and is calculated as follows:
49 units x 0.25 x $7.75/unit/qtr. x 4 qtrs. = $379.75
Dwelling Units Utility Factor Environmental Resources Fee Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
LLAAKKEEVVIILLLLEE PPOOIINNTTEE ––FFIINNAALL PPLLAATT
SSEEPPTTEEMMBBEERR 1166,, 22001166
PPAAGGEE 88 OOFF 88
2 units
x $75.00/unit
= $150.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be either a .dwg file (AutoCAD) or a .dxf format.
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction costs, or $2,820.00.
CASH REQUIREMENTS
Future Upgrade Fee – Kenwood Trail $ 53,238.92
Cash Fee – Trail Construction Costs 8,237.21
Park Dedication Fee 96,628.00
Lateral Sanitary Sewer Access Charge 20,648.74
Lateral Watermain Access Charge 20,807.96
Trunk Storm Sewer Area Charge 27,376.27
Streetlight Operating Fee 1,650.32
Environmental Resources Expenses 379.75
City Base Map Updating Fee 150.00
City Engineering Administration (3.00%) 2,820.00
SUBTOTAL - CASH REQUIREMENTS $231,937.17
CREDITS TO THE CASH REQUIREMENTS
Outlot A (Trunk Storm Sewer Fund) $440.00
SUBTOTAL - CREDITS TO THE CASH REQUIREMENTS = $440.00
TOTAL CASH REQUIREMENTS $231,497.17
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the final plat, grading and erosion control plan, utility
plan and tree preservation plan for Lakeville Pointe, subject to the requirements within this
report.