HomeMy WebLinkAboutItem 06.kDate: November 21, 2016 Item No. CHANGE ORDER #1 WITH KEVIN CASEY, LLC FOR THE CONSTRUCTION OF RITTER FARM DOG PARK Proposed Action Staff recommends adoption of the following motion: Move to approve Change Order #1 with Kevin Casey, LLC for the construction of Ritter Farm Dog Park. Overview On May 16, 2016 the Mayor and City Council approved an agreement with Kevin Casey, LLC for the construction of the Ritter Farm Dog Park at a cost of $78,420.00. As a result of unforeseen site conditions regarding a high water table and drainage issues on site, the parking lot had to be elevated which included the installation of a culvert under the entrance drive along with the construction of a rain garden and drain tile to prevent standing water from occurring on the site. The additional cost for this work along with the quantity adjustments to base bid items, which includes deducts, totals a net change order of $24,489.00. The approved 2016 Ritter Farm Dog Park budget financed from the Park Dedication Fund is $145,000. An additional $10,607 was fundraised through Lakeville Liquors and Chuck and Don's Pet Supply Company which equates to a total budget of $155,607. The estimated final cost for the dog park construction is $156,654 which is a difference of $1,047 as noted below which can be funded through the Park Dedication Fund. BUDGET EXPENSE DIFFERENCE $155,607 $156,654 ($1,047) Primary Issues to Consider • Was the additional work to construct a rain garden, elevate the parking lot and complete site work modifications needed to improve drainage and grading issues on site? Yes. Supporting Information • Change Order #1 with Kevin Casey, LLC Financial Impact: $24,489.00 Budgeted: Y® N❑ Source: Park Dedication Fund Related Documents: (CIP, ERP, etc.): Envision Lakeville Community Values: Good Value for Public Services Report Completed by: John Hennen, Parks & Recreation Director Contract Summary Sheet Contract Change Order #1 for: Ritter Dog Park City of Lakeville, MN 20195 Holyoke Avenue Lakeville, MN 55044 To (Contractor): Kevin Casey LLC 7491 Casey Pkwy Prior Lake, MN 55372 Distribution To: O Owner O Field O Consultant O Other O Contractor Date: 14 -Nov -16 Consultants Project: 2686-020 CHANGES TO THE CONTRACT (The contractor shall make the following changes to the contract) . DESCRIPTION DIEDU C01.1 Additional costs for Rain Garden Work 15,529.00 C01.2 Additional costs for Parking Lot ! Site Work 10,760.00 EFantily Adjustments to Base Bid Items (refer to Itemized list) e50.0o 2,450.00 TOTAL CHANGE ORDER ADDS AND DEDUCTS: 26,939.00 2,450.00 NET CHANGE 01iDEEt TOTAL: $24,4"09.00 Contract Summary to Date Original Base Bid Contract Sum: 78,420.00 Previously Authorized Chane Orders: Net Change of this Chane Order: 1 24,489.00 Total Contract Sum(Including all Change Orders to Date):1 $102,909.00 Consultant: WSB & Associates, Inc. 701 Xenia Ave. South - Suite 300 Minneapolis, MN 55416 Contractor: Kevin Casey LLC 7491 Casey Pkwy Prior Lake, MN 55372 Owner: City of Lakeville, MN 20195 Holyoke Avenue Lakeville, MN 55044 s4rature Signafwe Page i of 1 t -�4'10 Date li -14-n' Date Dale