Loading...
HomeMy WebLinkAbout16268 Equestrian Tr SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. ENGINEERING REVIEWED Date:__________________11/08/2016 corlowsky EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. Planning DepartmentApprovedDate:__________________11/15/2016 dmorey