HomeMy WebLinkAboutItem 8City of Lakeville P °°si i;i ed t ri e July 20, 2016 Ms. Holly Anderson Dakota County Transportation Department 14955 Galaxie Avenue, 3" Floor Apple Valley, MN 55124 SUBJECT: Dakota County 2017-2021 Transportation Capital Improvement Program Request Dear Holly, Thank you for the opportunity to participate in Dakota County's 2017-2021 Transportation Capital Improvement Program process. Staff will review the City's draft 2017-2021 Transportation Capital Improvement Plan (CIP) with the City Council at the July 25, 2016 work session. Projects programmed in the City's approved 2016-2020 CIP, as well as projects under consideration, are listed below: PROTECTS PROGRAMMED IN CITY'S APPROVED 20I6-2020 TRANSPORTATION CIP 1. Kenwood Trail Reconstruction (CSAH 50): Dodd Boulevard (CSAH 9) to 185th Street (CSAH 60) The project is programmed in the City's and County's approved 2016-2020 CIP for construction starting in 2017. The project reconstructs CSAH 50 to a 4 -lane divided highway from CSAH 9 to CSAH 60. The project includes an access road connecting CSAH 50 and Icenic Trail, and potentially a temporary secondary access to the Jaguar Path neighborhood. The County will advance fund $3 million of the City's share of the project costs, with equal $1 million payments made in 2018-2020. 2. Pilot Knob Road (CSAH 31) and 160th Street (CSAH 46): Fiber Interconnect and Signal Revisions The project is programmed in the City's and County's approved 2016-2020 CIP for construction in 2018. The project installs advanced traffic management systems along CSAH 31 and CSAH 46. The project includes fiber interconnectivity, traffic signal modifications (flashing yellow arrows) and traffic monitoring cameras. Federal funding provides 80% of the project costs. NON -PROGRAMMED PROTECTS The following projects are not programmed in the City's approved 2016-2020 CIP. Due to other financing priorities, funding for these projects has not yet been identified and the City may not be able to provide the financing for these projects in the foreseeable future. City staff will continue to discuss financing options with the City Council. 20195 Holyoke Avenue, Lakeville, MN 55044 952-985-4400.952-985-4499 fax www.lakevillemn.gov City of Lakeville Positioned to Thrive 1. 162"d Street (CSAH 46) and Buck Hill Road/Kenyon Avenue Intersection Improvement This project includes intersection improvements (traffic signal) at CSAH 46 and Buck Hill Road/Kenyon Avenue. The County would be the project lead. Estimated City cost is $200,000. Construction is anticipated in 2018. 2. 202"d Street (CSAH 50) Reconstruction: Holyoke Avenue to Cedar Avenue (CSAH 23) Intersection improvements at CSAR 50 and Hamburg Avenue are programmed in the City's and County's approved 2016-2020 CIP for construction in 2018. This project reconstructs CSAH 50 to a 2 -lane divided highway with dedicated left and right turn lanes from Holyoke Avenue to CSAH 23. The project includes a traffic signal at CSAH 23 and CSAH 50, a pedestrian underpass and trails along both sides. The County would be the project lead. The County applied for Federal FAST Act funding for 80% of the construction costs (FY 2019). Estimated City cost is $1,850,000 (assumes Federal Funding). Construction is anticipated in 2019. 3. Dodd Boulevard (CSAH 9) Intersection Improvements at 202"d Street (CSAH 50) and Heritage Drive/Icenic Trail This project includes the construction of a multi -lane roundabout at CSAH 9 and CSAH 50, and the conversion of the CSAH 9 and Heritage Drive/Icenic Trail intersection to M. The County applied for Federal FAST Act funding for 80% of the construction costs (FY 2020). Estimated City cost is $625,000 (assumes Federal Funding). Construction is anticipated in 2020. 4. Dodd Boulevard (CSAH 9) and Flagstaff Avenue Intersection Improvement This project includes the construction of a single -lane roundabout at CSAH 9 and Flagstaff Avenue. The City would be the project lead. Estimated County cost is $850,000. Construction is anticipated in 2020. 5. CR 70 (210th/215th Street) Reconstruction: Kenrick Ave. (CSAH 5) to Dodd Boulevard (CSAH 9) A Principal Arterial System Planning Study (Study), including the CSAH 70 corridor through the City of Lakeville, is programmed in the City's and County's approved 2016-2020 CIP for 2016. This project reconstructs CSAH 70 to a 4 -lane divided highway from CSAH 5 to CSAH 9. The County would be the project lead. After adoption of the recommendations of the Study, the City and County will consider applying for federal funding as part of the 2018 Regional Solicitation. Estimated City cost is $5,925,000 (assumes no Federal Funding or functional classification change). Construction is anticipated in 2021. If the Study recommendation is to classify CSAH 70 as a Principal Arterial, the City's share of the project costs will be reduced to a maximum of 25% (per County policy included in the County's Transportation Plan). 20195 Holyoke Avenue, Lakeville, MN 55044 952-985-4400.952-985-4499 fax www.lakevillemn.gov 6. Dodd Blvd. (CSAH 9) Reconstruction: Cedar Ave. (CSAH 23) to Pilot Knob Road (CSAH 31) This project constructs CSAH 9 to a 2 -lane divided highway with dedicated left and right turn lanes from CSAH 23 to CSAH 31. Dodd Boulevard is a future jurisdictional transfer from the County to City and must be improved to current County standards prior to any turn back; the City and County will coordinate planning efforts in the future. The County would be the project lead. Estimated City cost is $6,100,000. 7. 179''' Street (Future CSAH 9) and Flagstaff Avenue Intersection Improvement This project includes the construction of a roundabout at 179' Street and Flagstaff Avenue. The project coincides with subdivision of the property and the Developer -installed construction of 179" Street as a 2 -lane divided highway from its current terminus east of Flagstaff Avenue to Pilot Knob Road (CSAH 31). The City would be the project lead. Estimated County cost is $850,000. The Dakota County 2030 Transportation Plan includes a policy in which the County will participate in engineering and construction costs for constructing County transportation facilities to County standards; the 179th Street extension/expansion is programmed in the County's approved 2016-2020 CIP. Thank you for your consideration of the City's requests. Please call me at 952-985-4501 if you have any questions. Respectfully, Zach Johnson, P.E. City Engineer C: Justin Miller, City Administrator Chris Petree, Public Works Director Jerilyn Erickson, Finance Director 20195 Holyoke Avenue, Lakeville, MN 55044 952-985-4400.952-985-4499 fax www.lakevillemn.gov CITY OF LAKEVILLE RESOLUTION NO. 16-143 RESOLUTION OF SUPPORT DAKOTA COUNTY 2017-2021 TRANSPORTATION CAPITAL IMPROVEMENT PROGRAM WHEREAS, Dakota County ("County") asked cities and townships to request projects for inclusion in the County's 2017-2021 Transportation Capital Improvement Program ("CIP"); and WHEREAS, in the last five years the City of Lakeville ("City") has financed its share of costs for County roadway and State highway interchange projects with property taxes and other revenue sources; and WHEREAS, the City supported the County's Federal FAST Act funding applications for the 202nd St. (CSAH 50) Reconstruction and Dodd Blvd. (CSAH 9) Intersection Improvement projects; and WHEREAS, the County's 2030 Transportation Plan identifies Dodd Blvd. (CSAH 9), from Highview Ave. to Pilot Knob Rd. (CSAH 9), as a potential jurisdictional transfer, and the City agrees to coordinate efforts with the County to evaluate the timing and highway improvements and/or financial payment necessary for a jurisdictional turnback. NOW, THEREFORE, BE IT RESOLVED, the City supports the following transportation projects in the County's 2017-2021 CIP: Year Project Name/Location Project Description 2017 162nd St. (CSAH 46) Traffic Signal Construction • 162nd St. (CSAH 46)/Kenyon Ave. Intersection 2017 Kenwood Tr. (CSAH 50) Reconstruction Construction • Dodd Blvd. (CSAH 9) to 185th St. (CSAH 60) 2017 162nd/160th St. (CSAH 46)/Pilot Knob Rd. (CSAH 31) ATMS Design 2018 • Kenrick Ave. to Pilot Knob Rd. (CSAH 31) Construction 2017 Dodd Blvd. (CSAH 9)/Flagstaff Ave. Roundabout Design 2018 • Dodd Blvd. (CSAH 9)/Flagstaff Ave. Intersection R/W Acquisition 2019 Construction 2017 202nd St. (CSAH 50) Reconstruction Design 2018 • Holyoke Ave. to Cedar Ave. (CSAH 23) R/W Acquisition 2019 Construction Year Project Name/Location Project Description 2018 Dodd Blvd. (CSAH 9) intersection Improvements Design 2019 • Dodd Blvd. (CSAH 9) /202" St. (CSAH 50) Roundabout R/W Acquisition 202() • Dodd Blvd. (CSAH 9)/Heritage Dr. 3/4. Intersection Construction 2019 Dodd Blvd. (CSAH 9) Reconstruction Design 2020 • Gerdine Path to Dodd Lane R/W Acquisition 2021 Construction BE IT FURTHER RESOLVED, the City requests that these projects be included in the County's 2017-2021 CIP for construction in the year indicated and financed with County, State or Federal funding sources as follows: • The City will request that the County advance fund the City's share of the project costs for the 162' St. (CSAH 46) Traffic Signal project, with payment made in 2018. • The City will request that the County advance fund the City's share of the project costs for the Dodd Blvd. (CSAH 9)/Flagstaff Ave. Roundabout, with payments made in 2018, 2019 and 2020. BE IT FURTHER RESOLVED, the City requests that the County conduct a County- wide principal arterial system planning study in 2016/2017 to evaluate the potential for the 215th/210' Street (CSAH 70) corridor to be classified as a principal arterial and consider programming recommended improvements in future County CIPs. ADOPTED by the Lakeville City Council this 17th day of Octoher, 2016 Charlene Fried.ges, City Douglas . Anderson, Acting Mayor