HomeMy WebLinkAboutSurvey1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6.Grading plan date/revision date: 8/28/2015.7.Plan No. SBF15.08.03-BROADMOOR-B016'5Lot= 13,223 sq. ft.House/Garage= 3,193 sq. ft.Porch= 186 sq. ft.Driveway= 739 sq. ft.Total Impervious= 4,118 sq. ft. or 31.1 % of lot*#4&%18'4%#.%7.#6+105ProposedGarage Floor @ Front= 934.8Garage Top of Block= 935.5House Top of Block= 936.2Lowest Floor= 927.5Lot 8, Block 3, SPIRIT OF BRANDTJEN FARM 15TH ADDITION, Dakota County,Minnesota2412'46;&'5%4+26+1016576 Duluth Trail, Lakeville, Minnesota2412'46;#&&4'55I hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 28th day of February, 2017Marcus F. Hampton, MN L.S. No. 474815748';145%'46+(+%#6'(.114'.'8#6+105Top nut of hydrant located at Lots 10 and 11, Block 1 = 930.30$'0%*/#4-Denotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevation*DROP GARAGE TOP OF BLOCK 0.7'*The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________03/06/2017corlowskyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.Planning DepartmentApprovedDate:__________________03/07/2017dmorey