Loading...
HomeMy WebLinkAbout4746 165th St Survey1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6.Grading plan date/revision date: 6/13/16.7.Plan No. SBF17.04.02 - BALEY - ELEVATION B016'5Lot= 10,502 sq. ft.House/Garage= 2,483 sq. ft.Porch= 92 sq. ft.Driveway= 809 sq. ft.Total Impervious= 3,384 sq. ft. or 32.2 % of lot*#4&%18'4%#.%7.#6+105ProposedGarage Floor @ Front= 938.0Garage Top of Block= 938.7House Top of Block= 938.7Lowest Floor= 930.7Lot 4, Block 2, SPIRIT OF BRANDTJEN FARM 17TH ADDITION, Dakota County,Minnesota2412'46;&'5%4+26+104746 165th Street West, Lakeville, Minnesota2412'46;#&&4'55I hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 10th day of May, 2017Marcus F. Hampton, MN L.S. No. 474815748';14ž5%'46+(+%#6'(.114'.'8#6+105Top nut of hydrant located at Lots 2 and 3, Block 2 = 938.60$'0%*/#4-Denotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationMaintain min 2% gradefor proper surfacedrainageMaintain min 2% gradefor proper surfacedrainageThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________05/18/2017ibradshawEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.Planning DepartmentApprovedDate:__________________05/19/2017dmorey