HomeMy WebLinkAbout4661 165th St Survey1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6.Grading plan date/revision date: 6/13/16.7.Plan No. SBF17.11.01 - ST. CROIX - ELEVATION D016'5Lot= 8,941 sq. ft.House/Garage= 2,150 sq. ft.Porch= 306 sq. ft.Driveway= 798 sq. ft.Total Impervious= 3,254 sq. ft. or 36.4 % of lot*#4&%18'4%#.%7.#6+105ProposedGarage Floor @ Front= 934.8Garage Top of Block= 935.5House Top of Block= 935.5Lowest Floor= 927.5Top of Block at Lookout Window= 930.7Lot 11, Block 1, SPIRIT OF BRANDTJEN FARM 17TH ADDITION, Dakota County,Minnesota2412'46;&'5%4+26+104661 165th Street W., Lakeville, Minnesota2412'46;#&&4'55I hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 24th day of May, 2017Marcus F. Hampton, MN L.S. No. 474815748';145%'46+(+%#6'(.114'.'8#6+105Top nut of hydrant located at Lots 10 and 11, Block 2 = 935.31$'0%*/#4-Denotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationENGINEERING REVIEWEDDate:__________________06/01/2017amakiEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.Planning DepartmentApprovedDate:__________________06/07/2017dmorey