HomeMy WebLinkAbout19520 Iteri Revised Survey07-07-2016
2017-01-06 ADDEND. 5
Addendum #5 - Relocated house, raised house and added retaining walls due to ground
water discovered at excavation. Soil boring done to confirm water level. Ok to proceed on
home per Matt Decur, with conditional site visit in spring to verify wetland location and
possible delineation or additional walls to limit extent of grading near wetland.