HomeMy WebLinkAboutLA154398 revised planChange to 6'-0"Change to 10'-0"
(3)2x10 required to
carry flush beam point
load.
Ok to eliminate footing
with other changes
noted.
Concept Approval ONLY
Subject to Field Inspection
Inspector Date
2015
MN Bldg
Code
06/19/2017dmathews