Loading...
HomeMy WebLinkAboutLA154398 revised planChange to 6'-0"Change to 10'-0" (3)2x10 required to carry flush beam point load. Ok to eliminate footing with other changes noted. Concept Approval ONLY Subject to Field Inspection Inspector Date 2015 MN Bldg Code 06/19/2017dmathews