Loading...
HomeMy WebLinkAboutItem 8City of Lakeville Public Works Memorandum To: Mayor and City Council Justin Miller, City Administrator From: Chris Petree, Public Works Director Copy: Jerilyn Erickson, Finance Director Date: June 26, 2017 Subject: Review the Central Maintenance Facility Space Needs Study PURPOSE Familiarize City Council with the results of the Central Maintenance Facility (CMF) space needs study completed in 2016 and proposed expansion to meet both existing and future needs. BACKGROUND • In 2016, the City hired Oertel Architects to perform a space needs study at the CMF as a planning and budgeting tool for any future expansion of the facility. Oertel’s team looked at all aspects of the facility to include administrative and office space, workshops and interior storage, fleet size and storage needs, staffing, and exterior storage of Streets and Parks Maintenance materials. • There are several areas that meet existing and future needs including, salt storage, lunchroom, fueling site, locker rooms, and restrooms. Similarly, there are several areas that should be expanded or reconfigured to better meet the needs of the City. Contributing to the need for expansion is the significant growth in infrastructure and the attendant increases in maintenance requirements, equipment needs, and staffing. • Outcomes from the space needs study demonstrate the impacts that growth within the City have had on the facility. This, coupled with changes in maintenance operations and decisions that eliminated potential workspace in satellite facilities, point to a need to plan to expand the CMF. • The expansion has been separated into two phases. The first oriented to meet existing and near-term needs for vehicle storage and maintenance and additional workspace. Estimated cost is $7,720,000.00. The second is oriented to future office expansion for the potential consolidation of services as the City reaches its full size. Estimated cost is $1,170,000.00. Staff has reviewed the study and associated documents and recommends a timeline for the expansion be established. RECOMMENDATION Establish a timeline for expansion of the Central Maintenance Facility. Positioned to Thrive Central Maintenance Facility Space Needs Study Building for today and tomorrow Positioned to Thrive Community Values and Strategic Priorities •Good value for public services •Safety throughout the community •Provide services that add value Positioned to Thrive Goal and Objective •Evaluate the CMF based on long term goals of the Public Works and Parks and Recreation Departments. •Look at: •Population growth •Staff/Fleet/Facility growth •Lane mile growth •Develop planning options and estimates of project cost. Positioned to Thrive Today’s Situation •Last study for the current facility completed in 2002 •Population Growth –from 43,192 to 60,965 (using 2016 population data) •Staff Growth •Streets Division: from 16 to 21 staff •Parks Maintenance: from 10 to 13 staff •Construction Services: new division adding 5 staff •Forester: new division adding 1 staff •Fleet Growth –from 149 to 243 vehicle and other equipment •Infrastructure Growth –from 210 to 330 centerline miles Positioned to Thrive Meeting Needs and Goals Long Term •Salt storage •Fueling system and fueling island •Total site area •Lunch/Break room •Restrooms, locker rooms, and portions of office area Positioned to Thrive Key Areas for Expansion •Truck parking •Welding bay/metal fabrication area •Wash bay •Shops and storage •Offices and administrative areas •Multipurpose meeting areas •Exterior materials storage •Building security Positioned to Thrive Expansion Plans •Expansion of vehicle storage to include additional storage and workshops •Add a new wash bay •Expand the fleet service area and improve the welding and metal fabrication areas •Reconfigure existing administrative and office areas •Cover and improve exterior materials storage •Improve building flow and security Positioned to Thrive 0 0 0 0 0 0 0 r , L _J 0 0 r , L _J I IIILJ(13) LARGE VEHICLE PARKING ,;,,-<,---7 ,-- 1 ISAITATION I I ,---7 -,,---_J I III t AREA BREAKDOWN: VEHICLE STORAGE:26,300 S.F. VEHICLE MAINTENANCE: 5,300 S.F. OFFICE (NEW): 3,500 S.F. OFFICE (RENOVATION): 6,500 S.F. MULTI-PURPOSE: 3,300 S.F. WASH BAY: 5,950 S.F. @ CD EXPANSION OPTION North , t RELOCATE OR SUPPLEMENT HAZARDOUS STORAGE BASEDONCODE INVESTIGATION CHEMICAL STORAGE OFF.OFF.OFF.OFF..-.--.--.--.--,OFF. I I OPBNOFFICE I I OFF. OFF. OFFICE REVIEW/RELOCATE KITCHENETTE LOCATION MULTI-PURPOSE OPERABLE CONSOLIDATE --f 7SIHb--l fN TOOLS/PARTS STORAGE CONSOLIDATE -t -=ltOFFICE/LIBRARYAREA 1 H»-''l----,1 1, --_,,_.,_ II 11 II (2)LARGE MAINTENANCE 11 II BAYS 11 -----_JI 1 L -----h-@- H»-''1----7 I , I _,,_.,_ 11 11 II DEDICATED WELDING IIIBAYII EXTEND O.H.BRIDGE-1 ------f --lr-°1 ------J1 CRANEAT MAINTENANCE ADDITION 100'-0' OERTELARCHITECTS 1795 Saint Clair AvenueST. Paul, Minnesota 55105 (651) 6%-5186 Tel STORAGEMEZZ.www.oertelarchitects.com ABOVENEW SHOP AREA WO D PROJECT NAME: CITY OF LAKEVILLE CMF SPACE NEEDS STUDY 7570 179TH ST W., LAKEVILLE, MN 55044 SH P STORAGE r7WQl,J<ROOM • TRUCK SMALLWASH\VEHICLE BAY WASH ••t rL _Jtt PROJECT NUMBER:16-12 DATE OF ISSUE: JUNE 29,2016 DRAWN BY; TRS CHECKED BY; JLO REVISIONS: 1'=20'-Q" I HEREBY CERTIFY THAT THISDOCUMENTWASPREPAREDBYMEORUNDERMYDIRECTSUPERVISIONANDTHATIAMADULYREGISTEREDARCHITECTINTHESTATEOFMINNESOTA SIGNATURE DATE REGISTRATION SHEIT NAME: FLOOR PLAN PLOTTED:6-<!-2016 FILE NAME: 1611 FllllrP\an.dtiJ SHEIT NO:OPT.F ProposedPlan Phase 1 Workshops and storage Additional vehicle storage Admin area reconfigure Multipurpose room Maintenance and welding bay Exterior materials storage Phase 2 Additional Offices Positioned to Thrive Cost Projections •Phase 1 –vehicle storage, fleet maintenance, wash bay, office/admin area reconfigure, multipurpose room, security upgrades •$7,720,000.00 •Phase 2 –Office addition (future) •$1,170,000.00 Positioned to Thrive Recommendation •Plan for and fund the expansion of the Central Maintenance Facility