Loading...
HomeMy WebLinkAboutSBFC 3rd ADDITION MEMORANDUM TO: Daryl Morey FROM: D. Daniel Licht, AICP DATE: 21 June 2017 RE: Lakeville – SBFC 3rd Addition TPC FILE: 135.01 BACKGROUND Thirty Eight Properties Lakeville, LLC has submitted plans for Spirit of Brandtjen Farm Commercial (SBFC) 3rd Addition to be platted from Outlot A, SBFC 1st Addition, located east of Pilot Knob Road and north of 162nd Street. The proposed preliminary and final plat consists of one lot proposed for development of a 9,360 square foot multiple tenant retail building and a 4,000 square foot medical office building. The proposed development requires applications for approval of a PUD Development Stage Plan, preliminary plat, final plat and vacation of existing drainage and utility easements. A public hearing to consider the applications has been noticed for the Planning Commission meeting on 29 June 2017. Exhibits: A. Site location map B. SBF Land Use Plan C. Preliminary Plat D. Final Plat E. Title Sheet F. ALTA Survey G. Grading & Drainage Plan H. Utility Plan I. Paving & Dimensional Plan J. Truck Turning Movements K. Landscape Plan L. Lighting Plan M. Building Floor Plans 2 N. Building Elevation Drawings O. Roof/Screening Plan ANALYSIS SBF Land Use Plan. The SBF Land Use Plan guides the subject site for mixed use development based on the uses allowed in the O-R District and C-3 District. An amendment to the SBF PUD was approved in 2010 to allow for development of a broader range of retail, office, and service uses within this area of SBF, which is consistent with the proposed uses. Uses. The submitted plans identify the proposed uses as a multiple tenant retail building and a single occupancy medical office building, which are permitted uses. The development plans include two principal buildings on one lot, which is allowed subject to the conditions established by Section 11-73-7.L of the Zoning Ordinance.  Building Design. The proposed buildings are designed with consistent architecture for both structures. The buildings are both one-story measuring 27.5 feet at their highest parapet, which is within the 35 foot height limit of the C-3 District applicable to this area of SBF. The architectural plans detail the location of roof equipment and demonstrate adequacy of the parapet to screen these mechanicals. Section 11-17-9.D.1 of the Zoning Ordinance requires the buildings to use a minimum of three Grade A materials listed in Section 11-17-9.B of the Zoning Ordinance for a minimum of 65 percent of the area of the building elevation. Grade B or C materials defined in Section 11-17-9.B of the Zoning Ordinance may be used for up to 35 percent of the area of the elevations, or 10 percent Grade D materials may be used. The design for the each of the proposed buildings exceed the minimum requirement for use of three Grade A materials.  Landscaping. A landscape plan has been submitted as required by Section 11-21-9.B and C of the Zoning Ordinance. The landscape plan provides a variety of tall growing deciduous and evergreen trees, shrubs and perennials. The yard adjacent to Pilot Knob Road is to be landscaped with plantings in a similar arrangement to the HyVee car wash and convenience store to the south for a complementary appearance. The types of plantings are appropriate and the proposed sizes of the plantings complies with Section 11-21-9.C.1 of the Zoning Ordinance.  Lot Requirements. The SBF PUD District does not establish minimum lot area or width requirements. A 30 foot setback for buildings and a 15 foot setback for parking from public rights-of-way is required at the perimeter of the PUD District. A 50 foot building setback and 25 foot reserve area is required from Pilot Knob Road to allow for a future interchange at 160th Street (CSAH 46) and Pilot Knob Road. Section 11-73-7.L.2 of the Zoning Ordinance requires a minimum of 20 feet between the two principal buildings. The proposed buildings comply with required setbacks and the parking and drive through lane is located outside the 25 foot reserve area. The proposed off-street parking area is setback less than 10 feet from the private driveway along the east lot 3 line. The setback distance is acceptable given the configuration of the Hy-Vee parking lot to the east, which will slow traffic on and accessing the private drive.  Access. The subject site is accessed via a shared private drive constructed along the west side of the Hy-Vee grocery store parking lot extending north from 162nd Street. A second access to the subject site is provided via a shared drive aisle with the HyVee car wash to the south. A five foot wide sidewalk is provided along the north line of the subject site from the building front out to the north-south private drive, where it will connect with existing/planned sidewalks for pedestrian access.  Off-Street Parking. The table below summarizes off-street parking requirements of Section 11-19-13 of the Zoning Ordinance for the proposed uses: Use Area Requirement Required Multi Retail w/ Restaurant 9,360sf. 1 stall/160sf. 53 Medical Office 4,000sf. 1 stall/200sf. 18 TOTAL 71 The site plan provides 74 parking stalls, or three stalls more than required by the Zoning Ordinance. The parking stalls are designed to be 9 feet wide by 20 feet deep accessed by 24 foot wide drive aisles for two-way traffic and the parking area is surfaced with asphalt and surrounded by concrete curb and gutter, which complies with the requirements of Section 11-19-7.I of the Zoning Ordinance.  Drive Through. The site plan for the north building incudes a drive through with a service window on the south elevation of the structure and bank teller window on the north elevation. The drive through is 20 feet wide to allow for a stacking lane and bypass lane with counter clockwise circulation. There is a median at the north side of the building to allow for a bank drive through window and bypass lane. The menu board for the south tenant space is located approximately 60 feet behind that service window and total stacking space is approximately 280 feet, which exceeds the requirements of Section 11-73-7.G.7 of the Zoning Ordinance. Specifications on the area of the menu board sign cannot exceed 50 square feet or 8 feet in height.  Loading. The submitted plans include a truck turning exhibit showing access and circulation of the subject site by a semi-tractor/trailer with 40 foot wheel base, as well as a single unit, dual axle 40 foot wheelbase fire truck. The turning exhibit indicates that a modification of the curb island northeast of the south building is necessary to allow for turning out of the drive through lanes. All other circulation within the site is adequate.  Signs. The submitted plans illustrate one freestanding sign at the southwest corner of the subject site. The proposed freestanding sign is a monument structure measuring 28 feet in height that includes integral space for up to 100 square feet of tenant 4 identification information. The proposed freestanding sign is consistent with the allowances for uses within the C-3 District established by Section 11-23-19.E.1.a of the Zoning Ordinance and is located outside the 25 foot reserve area for Pilot Knob Road. Because the site is eight feet below the elevation at the centerline of the roadway, the height of the sign may be increased by up to 10 feet to be not more than 20 feet above the elevation at the centerline of Pilot Knob Road in accordance with Section 11-23- 15.M.1.b of the Zoning Ordinance. The height of the proposed freestanding sign complies with this provision of the Zoning Ordinance. The proposed building elevations illustrate wall signs on the east and west elevations of the two buildings, which is allowed as the buildings have frontage to Pilot Knob Road and the internal private drive. Each tenant with an individual exterior entrance is allowed a 100 square foot wall sign affixed to the building at the location of their suite on the east and west elevations. The south building is a single occupancy building allowed one wall sign not larger than 100 square feet on each of the east and west elevations. The signs shown on the proposed building elevation plans comply with the requirements of the Zoning Ordinance.  Lighting Plan. The developer has submitted an exterior lighting plan indicating the location and illumination pattern of proposed exterior lighting. The intensity of the proposed lighting is less than one foot candle at the property line abutting Pilot Knob Road and interior property lines as allowed by Section 11-16-17.A.1 of the Zoning Ordinance. The proposed fixtures include a 90-degree horizontal cut-off and are not mounted higher than 35 feet as required by Section 11-16-17.B.1 and C.1 of the Zoning Ordinance, respectively.  Trash Enclosure. The proposed exterior elevation plans include details for a trash enclosure, which is shown on the site plan on the north side of the property. The proposed structure is constructed with brick veneer consistent with the materials used on the principal buildings. The proposed trash enclosure complies with the requirements of Section 11-18-11.B of the Zoning Ordinance. Utility Plan. The applicant has submitted plans for extension of public utilities to serve the proposed SBFC 3rd Addition. For multiple principal buildings on one lot, each building is required to have separate utility connections. The utility plans are to be subject to review and approval by the City Engineer. Grading Plan. The applicant has submitted grading plans for the proposed SBFC 3rd Addition. All grading, drainage, and erosion control issues are subject to review and approval by the City Engineer. Easements. Section 10-4-4 of the Subdivision Ordinance requires a 10 foot wide drainage and utility easement at the perimeter of all lots. The final plat indicates a 10 foot drainage and utility easement abutting Pilot Knob Road and a 25 foot drainage easement to be dedicated 5 over the west half of the north-south private driveway. The applications include vacation of an existing drainage and utility easement along the east lot line as shown on the ALTA Survey. This easement will be superseded by drainage and utility easements dedicated with the SBFC 3rd Addition final plat. The need for five foot wide drainage and utility easements along the north and south lot lines, and all other easements are subject to review and approval of the City Engineer. Park Dedication. Lot 1, Block 1 as shown on the preliminary and final plat is subject to park dedication requirements at the time of final plat approval. The park dedication requirements will be met as a cash fee in lieu of land at $5,400 per acre for commercial uses in accordance with the SBF Master PUD Agreement. Lot 1, Block 1 is 1.86 acres in area for a park dedication fee of $10,044. Development Contract. The developer is required to enter into a development contract with the City for the public and private improvements, payment of applicable fees, and posting of required securities. The development agreement will be drafted by the City Attorney and the developer is required to execute the development agreement prior to City Council approval of the final plat. CONCLUSION The proposed PUD Development Stage Plan, preliminary plat, and final plat of Spirit of Brandtjen Farm Commercial 3rd Addition, together with vacation of existing drainage and utility easements, is consistent with the SBF Land Use Plan and the requirements of the SBF PUD District, Zoning Ordinance, and Subdivision Ordinance. City staff and our office recommend approval of the applications subject to the following conditions: 1. Menu boards for each drive through tenant lane shall comply with Section 11-73- 7.G.11.c of the Zoning Ordinance. All signs require approval of a sign permit prior to installation, subject to approval of the Zoning Administrator. 2. Revise the curb island at the northeast corner of Building 2 to allow turning movements for service trucks exiting the drive through aisle, subject to review and approval of City staff. 3. All exterior lighting fixtures shall have a 90 degree horizontal cutoff and shall be limited to a height of 35 feet or less in compliance with Section 11-16-17 of the Zoning Ordinance. 4. An ingress/egress easement shall be recorded over the private drives overlying the east lot line and abutting the south lot line. 5. All utility plans are subject to review and approval of the City Engineer. 6 6. All grading, drainage, and erosion control plans are subject to review and approval of the City Engineer. 7. All easements are subject to review and approval of the City Engineer. 8. The developer shall pay $10,044 as a cash fee in lieu of land for park dedication requirements in accordance with the SBF Master PUD Agreement. 9. The developer shall execute a development agreement drafted by the City Attorney prior to City Council approval of the final plat. c. Justin Miller, City Administrator Alex Jordan, Senior Project Engineer John Hennen, Parks and Recreation Director Andrea McDowell Poehler, City Attorney EXHIBIT A DRAINAGE AND UTILITY EASEMENTS BEING 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING RIGHT OF WAY LINES, AS SHOWN ON THE PLAT. BEARINGS ARE BASED ON THE SOUTH LINE OF OUTLOT A, SPIRIT OF BRANDTJEN FARM COMMERCIAL 1ST ADDITION WHICH IS ^^hDdK,sZ/E'K&^ϴϵΣϱϮΖϰϬΗ DENOTES 1/2 INCH IRON MONUMENT FOUND WITH CAP MARKED R.L.S. NO. 12294 DENOTES SET 1/2 INCH IRON MONUMENT WITH CAP MARKED R.L.S. NO. 47481 DENOTES RESTRICTED ACCESS TO DAKOTA COUNTY PER DOCUMENT NO. 3032559 That part of Outlot A, SPIRIT OF BRANDTJEN FARM COMMERCIAL 1ST ADDITION, Dakota County, Minnesota, described as follows: Beginning at the southwest corner of said Outlot A; thence on an assumed bearing of South 89 degrees 52 minutes 40 seconds East, along the south line of said Outlot A, a distance of 275.03 feet to the east line of said Outlot A; thence North 00 degrees 07 minutes 20 seconds East, along said east line and its northerly extension, a distance of 293.11 feet; thence North 89 degrees 52 minutes 40 seconds West a distance of 276.58 feet to the west line of said Outlot A; thence South 00 degrees 13 minutes 24 seconds East, along said west line, a distance of 246.27 feet; thence southerly 46.85 feet, along said west line, being a tangential curve, concave to the west, having a central angle of 00 degrees 31 minutes 35 seconds and a radius of 5100.00 feet to the point of beginning. PROPERTY DESCRIPTION EXHIBIT C DRAINAGE AND UTILITY EASEMENTS BEING 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING RIGHT OF WAY LINES, AS SHOWN ON THE PLAT. KNOW ALL PERSONS BY THESE PRESENTS: That Thirty Eight Properties Lakeville, LLC, a Minnesota limited liability company, owner of the following described property: That part of Outlot A, SPIRIT OF BRANDTJEN FARM COMMERCIAL 1ST ADDITION, Dakota County, Minnesota, described as follows: Beginning at the southwest corner of said Outlot A; thence on an assumed bearing of South 89 degrees 52 minutes 40 seconds East, along the south line of said Outlot A, a distance of 275.03 feet to the east line of said Outlot A; thence North 00 degrees 07 minutes 20 seconds East, along said east line and its northerly extension, a distance of 293.11 feet; thence North 89 degrees 52 minutes 40 seconds West a distance of 276.58 feet to the west line of said Outlot A; thence South 00 degrees 13 minutes 24 seconds East, along said west line, a distance of 246.27 feet; thence southerly 46.85 feet, along said west line, being a tangential curve, concave to the west, having a central angle of 00 degrees 31 minutes 35 seconds and a radius of 5100.00 feet to the point of beginning. Has caused the same to be surveyed and platted as SPIRIT OF BRANDTJEN FARM COMMERCIAL 3RD ADDITION and does hereby dedicate to the public for public use the the drainage and utility easements as created by this plat. In witness whereof said Thirty Eight Properties Lakeville, LLC, a Minnesota limited liability company, has caused these presents to be signed by its proper officer this day of , 20 . Thirty-Eight Lroperties,LLC By: the STATE OF COUNTY OF This instrument was acknowledged before me on , by the of Thirty Eight Properties Lakeville, LLC, a Minnesota limited liability company, on behalf of the company. Notary Public, My commission expires I, Marcus F. Hampton, do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of this certificate are shown and labeled on this plat; and all public ways are shown and labeled on this plat. Dated this day of , 20 ______________________________________________________________ Marcus F. Hampton, Licensed Land Surveyor, Minnesota License No. 47481 STATE OF MINNESOTA COUNTY OF This instrument was acknowledged before me on this , by Marcus F. Hampton. Notary Public, My commission expires CITY COUNCIL OF LAKEVILLE, MINNESOTA This plat was approved by the City Council of Lakeville, Minnesota, this day of , 20 , and hereby certifies compliance with all requirements as set forth in Minnesota Statutes, Section 505.03, Subd. 2. By: Mayor Clerk DAKOTA COUNTY SURVEYOR I hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this day of , 20 . By: Dakota County Surveyor DAKOTA COUNTY BOARD We do hereby certify that on the ________ day of __________________, 20___, the Board of Commissioners of Dakota County, Minnesota, approved this plat of SPIRIT OF BRANDTJEN FARM COMMERCIAL 3RD ADDITION and said plat is in compliance with the provisions of Minnesota Statutes, Section 505.03, Subd. 2, and pursuant to the Dakota County Contiguous Plat Ordinance. By: ___________________________________ Attest: ___________________________________ Chair, Dakota County Board Dakota County Treasurer - Auditor DAKOTA COUNTY DEPARTMENT OF PROPERTY TAXATION AND RECORDS Pursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable in the year 20 on the land hereinbefore described have been paid. Also, pursuant to Minnesota Statutes, Section 272.12, there are no delinquent taxes and transfer entered this day of ,20 . By: Director Department Of Property Taxation and Records COUNTY RECORDER, COUNTY OF DAKOTA, STATE OF MINNESOTA I hereby certify that this plat of SPIRIT OF BRANDTJEN FARM COMMERCIAL 3RD ADDITION was filed in the office of the County Recorder for public record on this day of , 20 , at o'clock . M. and was duly filed in Book of Plats, Page , as Document Number . County Recorder BEARINGS ARE BASED ON THE SOUTH LINE OF OUTLOT A, SPIRIT OF BRANDTJEN FARM COMMERCIAL 1ST ADDITION WHICH IS ^^hDdK,sZ/E'K&^ϴϵΣϱϮΖϰϬΗ DENOTES 1/2 INCH IRON MONUMENT FOUND WITH CAP MARKED R.L.S. NO. 12294 DENOTES SET 1/2 INCH IRON MONUMENT WITH CAP MARKED R.L.S. NO. 47481 DENOTES RESTRICTED ACCESS TO DAKOTA COUNTY PER DOCUMENT NO. 3032559 EXHIBIT D EXHIBIT E EXHIBIT F EXHIBIT G EXHIBIT H EXHIBIT I EXHIBT J EXHIBIT K PATIO 42 21 11 4 4 All Luminaires Are Flat Lens - Full Cutoff Type L ighting By: Charlie Leavitt, LC, MIES Lighting Fundamentals, LLC PO Box 50827 Mendota, MN 55150-0877 651-399-7768 MH: 12 WWWW MH: 12 WW MH: 12 WW MH: 12 WW MH: 12 W W M H: 12 WW MH: 12 WW MH: 12 WW MH: 12 WW MH: 12 W W M H: 12 MH: 12 WWWW MH: 12 M H: 12 W W DD MH: 13.5 MH: 13.5 DD A A M H: 25MH: 25 AA B B M H: 25 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.8 0.5 0.3 0.3 0.4 0.5 0.5 0.4 0.3 0.2 0.1 0.1 0.0 0.0 0.00.00.10.10.20.30.40.40.40.30.20.30.30.30.30.30.40.40.40.40.30.30.30.30.20.20.20.20.20.2 0.2 0.4 0.5 0.5 0.6 0.6 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.6 0.4 0.4 0.4 0.4 0.3 0.3 0.2 0.3 0.3 0.2 0.1 0.1 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.9 1.0 1.0 1.1 1.1 1.1 1.1 1.0 0.9 0.8 0.9 0.9 1.0 1.0 1.7 2.6 2.7 2.4 2.8 3.2 2.9 3.0 2.8 2.0 1.8 2.3 2.7 2.5 2.5 2.6 1.8 1.6 4.0 7.5 6.4 5.0 6.7 8.3 6.5 7.5 7.3 4.0 3.3 5.3 7.8 5.9 6.1 7.5 4.5 2.0 1.1 3.8 3.0 3.5 1.3 1.5 4.9 4.2 2.0 1.2 1.9 6.7 6.6 5.2 2.3 2.0 7.2 8.6 8.3 3.0 1.5 4.4 5.3 4.7 2.2 1.0 2.2 1.9 2.0 1.3 1.1 2.5 1.0 3.5 1.6 2.0 4.4 8.3 7.0 7.6 9.1 5.7 3.1 1.6 2.6 3.9 4.0 4.8 5.3 5.0 5.2 5.0 4.1 4.0 4.5 4.9 4.4 4.5 4.5 3.4 2.6 4.1 4.5 4.0 3.9 1.3 1.8 2.3 2.7 3.0 3.2 3.5 3.5 3.5 3.3 3.2 3.2 3.3 3.4 3.4 3.3 3.0 2.6 2.3 2.2 2.4 2.7 2.9 2.8 2.7 2.2 1.3 1.3 1.6 2.0 2.4 2.8 3.1 3.3 3.3 3.3 3.2 3.1 3.2 3.2 3.2 3.3 3.2 3.0 2.7 2.3 2.3 2.3 2.5 2.6 2.7 2.8 2.2 1.1 1.7 2.1 2.6 3.1 3.3 3.5 3.5 3.5 3.4 3.3 3.3 3.5 3.5 3.5 3.5 3.2 3.0 2.6 2.4 2.4 2.5 2.7 3.1 3.4 2.8 1.3 2.3 2.8 3.3 3.7 3.9 3.8 3.8 3.7 3.5 3.5 3.7 3.8 3.8 3.9 3.6 3.2 2.8 2.5 2.5 2.7 3.0 3.6 4.3 3.6 2.7 2.7 3.3 4.4 4.8 3.9 3.4 3.2 3.0 3.0 3.2 3.5 4.1 4.8 4.0 3.1 2.6 2.2 2.3 2.5 2.9 3.8 4.8 4.2 2.1 2.8 3.4 4.3 4.6 4.0 3.8 3.7 3.6 3.6 3.7 3.8 4.2 4.6 4.0 3.3 2.8 2.5 2.6 2.8 3.1 3.8 4.7 4.0 3.9 1.7 2.2 2.7 3.1 3.4 3.6 3.6 3.6 3.5 3.3 3.4 3.5 3.6 3.6 3.6 3.4 3.1 2.7 2.4 2.4 2.5 2.8 3.3 3.9 3.3 2.1 1.5 1.9 2.3 2.7 3.0 3.1 3.1 3.1 3.0 2.9 3.0 3.1 3.2 3.1 3.1 2.9 2.6 2.3 2.1 2.2 2.3 2.4 2.8 3.0 2.4 1.0 1.3 1.5 1.9 2.2 2.5 2.6 2.7 2.6 2.5 2.5 2.5 2.5 2.6 2.7 2.6 2.4 2.2 1.9 1.9 2.0 2.0 2.1 2.2 2.2 1.7 0.7 1.5 1.7 2.0 2.1 2.2 2.1 2.1 2.1 2.1 2.1 2.2 2.1 2.1 1.9 1.7 1.6 1.5 1.6 1.7 1.8 1.7 1.6 1.2 0.5 1.2 1.3 1.6 1.6 1.6 1.7 1.7 1.7 1.7 1.7 1.7 1.6 1.5 1.3 1.2 1.3 1.3 1.4 1.4 1.3 1.1 Luminaire Schedule Symbol Qty Label A rrangement T otal Lamp Lumens L LF D escription A rr. Watts B UG Rating 2 AA B ACK-BACK N .A.0 .850 P hilips Gardco #PFAS-92L-700-NW-G1-5W-BZ Back to Back at 25ft Mounting Height on NAFCO Rd. St. Steel Pole 4 60 B 5-U0-G3 1 BB S INGLE N .A.0 .850 P hilips Gardco #PFAS-92L-700-NW-G1-3-BZ Single at 25ft Mounting Height on NAFCO Rd. St, Steel Pole 2 30 B 3-U0-G3 2 DD S INGLE N .A.1 .000 H alo #PR815D010 - PR8M12WDMW - 4000K 1 5 B 1-U0-G0 14 WW S INGLE N .A.0 .850 L eotek #ES1-24H-MV-NW-W-XX-700 Wall Mounted at 14ft 5 8.6 B 2-U0-G1 C alculation Summary L abel C alcType U nits A vg M ax Min Avg/Min M ax/Min L ot Surface I lluminance F c 3 .00 9 .1 0.5 6.00 1 8.20 P roperty Line I lluminance F c 0 .24 0 .8 0.0 N.A.N .A.PROPOSED BUILDING FOR:SBFC 3RD ADDITION - SPIRIT POINTELAKEVILLE, MNISSUE/REVISIONS PROJECT # 16286.0106-14-2017 CITY COMMENTS SL1 SITE LIGHTING EXHIBIT L PROPOSED BUILDING FOR:SBFC 3RD ADDITION - SPIRIT POINTELAKEVILLE, MNISSUE/REVISIONS PROJECT # 16286.0106-14-2017 CITY COMMENTS A1 FLOOR PLANS140'-0" 38'-8"24'-0"44'-8"32'-8"67'-4"66'-0"26'-0"11'-4"28'-8"70'-8"72'-0"56'-0" 16'-8"39'-4" SUITE 140 2,600 SF SUITE 130 1,600 SF SUITE 120 2,600 SF SUITE 110 2,200 SF SUITE 100 4,000 SF UTILITY ROOM 360 SF 3'-4" BUILDING ONE BUILDING TWO FLOOR PLANS SCALE: 1/8" = 1'-0" 1 A1 NORTHEXHIBIT M PROPOSED BUILDING FOR:SBFC 3RD ADDITION - SPIRIT POINTELAKEVILLE, MNISSUE/REVISIONS PROJECT # 16286.0106-14-2017 CITY COMMENTS A2.1 BUILDING ELEVATIONS SUITE 100 SUITE 110 SUITE 120 SUITE 130 SUITE 140 BUILDING TWO BUILDING ONE SUITE 100SUITE 140 SUITE 130 SUITE 120 SUITE 110 BUILDING ONE BUILDING TWO EXTERIOR ELEVATION - EAST SCALE: 1/8" = 1'-0" 1 A2.1 EXTERIOR ELEVATION - SOUTH (BUILDING ONE) SCALE: 1/8" = 1'-0" 3 A2.1 EXTERIOR ELEVATION - WEST SCALE: 1/8" = 1'-0" 4 A2.1 EXTERIOR ELEVATION - NORTH (BUILDING ONE) SCALE: 1/8" = 1'-0" 2 A2.1 EXTERIOR ELEVATION - SOUTH (BUILDING TWO) SCALE: 1/8" = 1'-0" 6 A2.1 EXTERIOR ELEVATION - NORTH (BUILDING TWO) SCALE: 1/8" = 1'-0" 5 A2.1 EXTERIOR BUILDING FINISHES EIFS BRICK VENEER-2 BRICK VENEER-1 BRICK VENEER-3 STONE VENEER FIBER CEMENT PANELS-1 FIBER CEMENT PANELS-2 A2 A1 A3 A4 C3 C4 C2 GRADE A: GRADE C: INSULATED GLASSA5 PREFINISHED METALM1 MISCELLANEOUS: TENANT SIGNAGE - 100 S.F. / SIGNM2 AREA (SF)PERCENTAGE 997.34 5.70% 4,665.31 26.64% 1,567.55 8.95% 1,329.47 7.59% 3,086.37 17.63% 704.00 4.02% 2,662.71 15.21% 1,344.25 7.68% 5,863.63 33.49% 11,646.04 66.51% 17,509.67 100% THIN BRICKC1 1,152.67 6.58% WALL MOUNTED LIGHT FIXTUREM3 NOTES COMPLIMENTARY BRICK ACCENT BRICK TO MATCH HY-VEE COMPLIMENTARY BRICK ACCENT COMPLIMENTARY STONE ACCENT ALUMINUM AND GLASS TO MATCH HY-VEE EIFS TO MATCH HY-VEE BRICK TO MATCH HY-VEE M1 C3 C4 C2 A2 A1 A3A4 A5 EXTERIOR ELEVATION - TRASH ENCLOSURE SCALE: 1/8" = 1'-0" 7 A2.1 WEST (EAST AND NORTH SIMILAR) SOUTH OPEN SUITE 140 SUITE 130 SUITE 120 SUITE 110 SUITE 100 T.O. SIGN EL. = 128' GRADE EL. = 100' (947.0')13'-4" PILOT KNOB RD EL. = 108' (955.0') CL EXTERIOR ELEVATION - MONUMENT SIGN SCALE: 1/8" = 1'-0" 8 A2.1 SOUTH (NORTH MIRROR) EAST (WEST MIRROR) M2 C1 A1 C1 C1 A1 A1 A2 A1 A1 T.O. WALL EL. = 110' GRADE EL. = 100' B.O. CANOPY EL. = 113' T.O. PARAPET EL. = 123' T.O. PARAPET CAP EL. = 127'-6" 13'-6" CLEAR M3 T.O. CANOPY EL. = 117' A2 M1 A2 (5) SIGN PANELS 10' x 2' = 100 S.F. EXHIBIT N T.O. PARAPET EL. = 123'-0" FINISHED FLOOR EL. = 100'-0" (947'-0") T.O. PARAPET EL. = 127'-6" T.O. STEEL EL. = 118'-3" PILOT KNOB RD EL. = 108'-0" (955'-0") FINISHED FLOOR EL. = 100'-0" (947'-0") T.O. STEEL EL. = 118'-3" T.O. STEEL EL. = 119'-7" T.O. STEEL EL. = 119'-7"PROPERY LINET.O. PARAPET EL. = 123'-0" T.O. PARAPET EL. = 127'-6"15'-0" SCALE: 1/16" = 1'-0" 2 A3.1 SITE LINES AT LOW PARAPET - BUILDING ONE SCALE: 1/16" = 1'-0" 3 A3.1 SITE LINES AT HIGH PARAPET - BUILDING ONE AREA OF POTENTIAL RTU PLACEMENT SHOWN HATCHED PILOT KNOB RD EL. = 108'-0" (955'-0") RTU RTUPROPERY LINECLEARFINISHED FLOOR EL. = 100'-0" (947'-0") T.O. PARAPET EL. = 127'-6" T.O. STEEL EL. = 118'-11"15'-0" SCALE: 1/16" = 1'-0" 4 A3.1 SITE LINES AT BUILDING TWO PILOT KNOB RD EL. = 108'-0" (955'-0")CLEART.O. STEEL EL. = 117'-11" T.O. PARAPET EL. = 123'-0"RTU PROPOSED BUILDING FOR:SBFC 3RD ADDITION - SPIRIT POINTELAKEVILLE, MNISSUE/REVISIONS PROJECT # 16286.0106-14-2017 CITY COMMENTS A3.1 ROOF PLAN / SCREENING EXHIBIT SCALE: 1/16" = 1'-0" 1 A3.1 ROOF PLAN NORTH STRUCTURE SLOPES RTU RTU RTU RTU RTU RTU RTU ROOF HATCH DRIVE-THRU CANOPY BELOW DRIVE-THRU CANOPY BELOW ROOF HATCH RTU RTU RTUSTRUCTURE SLOPESWALKWAY WALKWAY 2 A3.1 10'-0"10'-0"10'-0"10'-0"10'-0"10'-0" HATCHED AREA REPRESENTS AREA OF POTENTIAL RTU PLACEMENT 3 A3.1 4 A3.1PILOT KNOB RD.PAVED TRAILBUILDING ONE BUILDING TWO EXHIBIT O City of Lakeville Public Works – Engineering Division Memorandum To: Daryl Morey, Planning Director From: Alex Jordan, Senior Project Engineer McKenzie L. Cafferty, Environmental Resources Manager John Hennen, Parks and Recreation Director Copy: Zach Johnson, City Engineer Jerilyn Erickson, Finance Director Gene Abbott, Building Official Dave Olson, Community and Economic Development Director Date: June 22, 2017 Subject: Spirit of Brandtjen Farm Commercial 3rd Addition • Preliminary and Final Plat Review • Grading and Erosion Control Plan Review • Utility Plan Review • Site Plan Review • Easement Vacation BBAACCKKGGRROOUUNNDD Thirty Eight Properties Lakeville, LLC has submitted a preliminary and final plat named Spirit of Brandtjen Farm Commercial 3rd Addition and site plans to construct a multiple tenant retail building and a medical office building on Lot 1, Block 1. The proposed development is located south of 160th Street (CSAH 46), north of 162nd Street, east of and adjacent to Pilot Knob Road (CSAH 31), and west of Elmhurst Lane. The parent parcel consists of a portion of Outlot A, Spirit of Brandtjen Farm Commercial 1st Addition. The development is zoned PUD, Planned Unit Development. The preliminary and final plats consist of one lot within one block on 1.86 acres. The proposed development and site plan will be completed by: SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM CCOOMMMMEERRCCIIAALL 33RRDD AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT JJUUNNEE 2222,, 22001177 PPAAGGEE 22 OOFF 77 Developer: Thirty Eight Properties Lakeville, LLC Engineer/Surveyor: James R. Hill, Inc. SSIITTEE CCOONNDDIITTIIOONNSS The Spirit of Brandtjen Farm Commercial 3rd Addition site consists of 1.86 acres of undeveloped land. The property generally slopes west to east. Private drives border the east and south plat boundaries, providing access to the adjacent existing Hy-Vee grocery store and car wash. There are no wetlands or trees on the property. EEAASSEEMMEENNTTSS The parent parcel contains existing public Drainage and Utility Easements dedicated with the Spirit of Brandtjen Farm Commercial 1st Addition plat, which will be vacated with the final plat. The Drainage and Utility Easement will be re-dedicated with the final plat over the area containing existing public utilities located on the parent parcel. SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT Pilot Knob Road Spirit of Brandtjen Farm Commercial 3rd Addition is located east of and adjacent to Pilot Knob Road, a minor arterial County roadway. Pilot Knob Road is constructed as a four-lane divided roadway with ten-foot bituminous trails along both sides of the roadway adjacent to the site. The current Dakota County Plat Review Needs Map dated April 16, 2013 designates Pilot Knob Road as a future six-lane divided roadway with a half right-of-way requirement of 100-feet adjacent to the plat. The Dakota County Plat Commission reviewed the plat at its June 12, 2017 meeting and recommended the development for approval. SSIITTEE PPLLAANN RREEVVIIEEWW Spirit of Brandtjen Farm Commercial 3rd Addition includes the construction of an approximately 9,360-square foot multiple tenant retail building and a 4,000-square foot medical office building on Lot 1, Block 1. A shared parking lot is proposed to be constructed, with access provided to the adjacent private drives to the east and south. The multiple tenant building includes a drive-thru aisle providing access for two users with adequate stacking to maintain proper site circulation. A private cross access easement and maintenance agreement is memorialized on the parent parcel for the shared driveway and utilities over the private driveway along the east side of the parcel. The parking lot is adequately sized to allow truck circulation into and out of the site, and will provide capacity to meet the requirements of the City’s Zoning Ordinance. SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM CCOOMMMMEERRCCIIAALL 33RRDD AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT JJUUNNEE 2222,, 22001177 PPAAGGEE 33 OOFF 77 The landscaping plan provides for several types of trees and shrubs in landscaped areas around the building and parking lot. Landscaping areas around the building will be sodded. CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS Construction traffic access and egress for grading, utility and site construction shall be from the private access drive in the location of the northerly driveway entrance. PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS Development of Spirit of Brandtjen Farm Commercial 3rd Addition includes the construction of private sidewalks. Private sidewalks will be installed along the north side of the proposed building providing a connection to the existing private sidewalk network. The Park Dedication fee has not been collected on the parent parcel and will be satisfied through a cash contribution with the final plat. The Park Dedication fee for commercial areas in Spirit of Brandtjen Farm is $5,400.00 per acre, consistent with the Spirit of Brandtjen Farm Master PUD Agreement. 1.86 acres x $5,400/acre = $10,044.00 Gross Area of Final Plat Park Dedication Charge Required Park Dedication UUTTIILLIITTIIEESS SSAANNIITTAARRYY SSEEWWEERR Spirit of Brandtjen Farm Commercial 3rd Addition is located within subdistrict NC-20060 of the North Creek sanitary sewer district, as identified in the City’s Comprehensive Sewer Plan. Wastewater will be conveyed to the MCES Farmington Interceptor and continue to the Empire Wastewater Treatment Facility. The downstream facilities have sufficient capacity to serve the proposed commercial development. A private sanitary sewer service will be extended from the existing service stub located on the parent parcel to provide sanitary sewer service to the development. The Sanitary Sewer Availability Charge has not been collected on the parent parcel and shall be collected with the Building Permit Application. The Sanitary Sewer Availability Charge will be calculated at the rate in effect at the time of approval of the Building Permit Application, as determined by the City’s Building Official. WWAATTEERRMMAAIINN Development of Spirit of Brandtjen Farm Commercial 3rd Addition includes the extension of an existing private watermain service to provide water service to the development. SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM CCOOMMMMEERRCCIIAALL 33RRDD AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT JJUUNNEE 2222,, 22001177 PPAAGGEE 44 OOFF 77 Final locations and sizes of all sanitary sewer and watermain facilities will be reviewed by City staff with the final construction plans submitted with the building permit application. A cross access easement and maintenance agreement is memorialized on the parent parcel for the private utilities extending across multiple properties. OOVVEERRHHEEAADD LLIINNEESS There are no overhead utilities located adjacent to or within the parent parcel. DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG Spirit of Brandtjen Farm Commercial 3rd Addition is located within subdistrict NC-9C and of the North Creek Stormwater District as identified in the City’s Water Resources Management Plan. Stormwater runoff generated from the Spirit of Brandtjen Farm Commercial 3rd Addition development will be conveyed via a proposed private storm sewer system within the private access street along the east side of the property. The stormwater management requirements for the parent parcel were satisfied through stormwater management basins constructed with Spirit of Brandtjen Farm Commercial 2nd Addition. The final grading plan must indicate any proposed borrow areas in which the building footings will be placed on fill material. The grading specifications must indicate that all embankments meet FHA/HUD 79G specifications. A final certificate of occupancy shall not be issued until an as-built certified grading plan has been submitted and approved by the City Engineer. Spirit of Brandtjen Farm Commercial 3rd Addition does not contain more than one acre of site disturbance, however because the project is part of a common development a National Pollution Discharge Elimination System General Stormwater Permit for construction activity is required from the Minnesota Pollution Control Agency. SSTTOORRMM SSEEWWEERR The development of Spirit of Brandtjen Farm Commercial 3rd Addition includes the construction of a private storm sewer system. The privately-owned and maintained storm sewer will be located within Lot 1, Block 1 and will collect and convey stormwater runoff generated from within the development to the private storm sewer system located within the private access street along the east side of the property. A private cross access and maintenance agreement is memorialized on the parent parcel for the private utilities extending across multiple properties. SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM CCOOMMMMEERRCCIIAALL 33RRDD AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT JJUUNNEE 2222,, 22001177 PPAAGGEE 55 OOFF 77 The Trunk Storm Sewer Area Charge has not been collected on the parent parcel and must be paid with the final plat. The Trunk Storm Sewer Area Charge for Lot 1, Block 1 is calculated as follows: 80,812.00s.f. x $0.250/s.f. = $20,203.00 Gross Area of Final Plat Commercial Area Charge Total Trunk Storm Sewer Area Charge Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final construction plans. FEMA FLOODPLAIN ANALYSIS Spirit of Brandtjen Farm Commercial 3rd Addition is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the Federal Emergency Management Agency (FEMA). Based on this designation, there are no areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA. WWEETTLLAANNDDSS There are no existing wetlands on the site. TTRREEEE PPRREESSEERRVVAATTIIOONN No significant trees are located on the property. EERROOSSIIOONN CCOONNTTRROOLL The Developer is responsible for obtaining a MPCA Construction Permit for the site as well as developing and maintaining the SWPPP throughout construction phase. The permit requires that all erosion and sediment BMPS must be clearly outlined in a site’s SWPPP. Changes made throughout construction should be documented in the SWPPP. Additional erosion control measures may be required during construction as deemed necessary by City staff or the Dakota County Soil and Water District. Any additional measures required shall be installed and maintained by the Developer. SECURITIES The Developer shall provide a Letter of Credit as security for the Developer-installed improvements relating to Spirit of Brandtjen Farm Commercial 3rd Addition. CONSTRUCTION COSTS Grading, Erosion Control, and Restoration $ 10,000.00 SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM CCOOMMMMEERRCCIIAALL 33RRDD AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT JJUUNNEE 2222,, 22001177 PPAAGGEE 66 OOFF 77 SUBTOTAL - CONSTRUCTION COSTS $ 10,000.00 OTHER COSTS Developer’s Design (3.0%) $ 300.00 Developer’s Construction Survey (2.5%) 250.00 City’s Legal Expense (0.5%) 50.00 City Construction Observation (5.0%) 500.00 Developer’s Record Drawing (0.5%) 50.00 Landscaping 87,000.00 Lot Corners/Iron Monuments 100.00 SUBTOTAL - OTHER COSTS $88,250.00 TOTAL PROJECT SECURITY $ 98,250.00 The Developer shall post a security to ensure the final placement of iron monuments at property corners with the final plat. The security is $100.00 per lot and outlot for a total of $100.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all irons have been placed following site grading, street and utility construction. CCAASSHH FFEEEESS A cash fee for one-year of the Environmental Resources Fee shall be paid at the time of final plat approval and is calculated as follows: 1.86 acres x 4.20 x $9.30/unit/qtr. x 4 qtrs. = $290.61 Lot 1, Block 1 Spirit of Brandtjen Farm Commercial 3rd Addition Commercial/Industrial Residential Equivalent Utility Factor Environmental Resources Fee Total A cash fee for the preparation of record construction drawings and for upgrading the City base map shall be paid at the time of final plat approval and is calculated as follows: 1 unit x $90.00/unit = $90.00 Lots/Outlots City Base Map Updating Fee Total The Developer shall submit the final plat and construction drawings in an electronic format. The electronic format shall be in either .dwg (AutoCAD) or .dxf format. The Developer shall also pay a cash fee for City Engineering Administration. The fee for City Engineering Administration will be based on three percent (3.00%) of the estimated construction cost, or $600.00. CASH REQUIREMENTS Sanitary Sewer Availability Charge to be paid with building permit Park Dedication Fee $ 10,044.00 SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM CCOOMMMMEERRCCIIAALL 33RRDD AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT JJUUNNEE 2222,, 22001177 PPAAGGEE 77 OOFF 77 Trunk Storm Sewer Area Charge 20,203.00 Environmental Resources Fee 290.61 City Base Map Updating Fee 90.00 City Engineering Administration (3.00%) 300.00 TOTAL - CASH REQUIREMENTS $ 30,927.61 RREECCOOMMMMEENNDDAATTIIOONN Engineering recommends approval of the Spirit of Brandtjen Farm Commercial 3rd Addition preliminary and final plat, grading and erosion control plan and utility plan subject to the requirements and stipulations within this report.