Loading...
HomeMy WebLinkAboutItem 06.d Date: July 5, 2016 Item No. APPROVAL OF A CONTRACT WITH SHARROW LIFTING PRODUCTS FOR BRIDGE CRANE AND HOIST INSPECTION AND MAINTENANCE SERVICES Proposed Action Staff recommends adoption of the following motion: Move to approve a contract with Sharrow Lifting Products for bridge crane and hoist inspection and maintenance services. Overview The Occupational Safety and Health Administration requires that cranes and hoists receive annual inspections to ensure their safe operation. These inspections evaluate each crane and hoist for deterioration, kinks or wear points in cables, excessive wear on brake systems and chain drives, loose bolts, deformed or cracked lifting hooks, and look at other components to determine if a safety hazard exists. The City has two bridge cranes, one cable hoist, and two chain hoists that are used for tasks such as lifting and positioning chlorine cylinders and pumps and motors at the Water Treatment Facility, lifting and moving heavy parts and equipment at the Central Maintenance Facility, lifting mechanical equipment at the Police Department, and lifting equipment for cell phone service providers at the Central Maintenance Facility water tower. Each of these cranes and hoists is inspected and serviced annually. The City solicited proposals from five contractors. Two responded, with Sharrow Lifting Products providing the lowest price for inspection and maintenance services at $1,740.00 for the two-year term of the contract. Staff recommends approval. Primary Issues to Consider • None Supporting Information • A copy of the proposal tabulation and contract are attached. Financial Impact: $1,740.00 Budgeted: Yes Source: Department Budgets Related Documents (CIP, ERP, etc.): Envision Lakeville Community Values: Good Value for Public Services Report Completed by: Neil Normandin, Public Works and Facilities Coordinator CONTRACT FOR SERVICES THIS AGREEMENT made this 5th day of July 2017, by and between the CITY OF LAKEVILLE, hereinafter referred to as the “City”, and SHARROW LIFTING PRODUCTS, hereinafter referred to as the “Contractor”. THE CITY AND THE CONTRACTOR, FOR THE CONSIDERATION HEREINAFTER STATED, AGREE AS FOLLOWS: 1. SCOPE OF SERVICES. The scope of services is detailed in the Contract Documents but generally consists of inspection and maintenance of the cranes and hoists in designated City facilities. The Contractor agrees to perform the services as detailed in the Contract Documents. 2. CONTRACT DOCUMENTS. The following documents shall be referred to as the "Contract Documents", all of which shall be taken together as a whole as the contract between the parties as if they were set verbatim and in full herein: A. This document entitled “Contract for Services”. B. HVAC Maintenance Specifications. C. Equipment Listing, Exhibit A. D. Contractor’s Proposal. If there is a conflict among the provisions of the Contract, the order in which they are listed above shall control in resolving any such conflicts with Contract Document "A" having the first priority and Contract Document "D" having the last priority. 3. OBLIGATIONS OF THE CONTRACTOR. The Contractor agrees that the work contemplated by the Contract shall be fully and satisfactorily completed in accordance with the terms of the Contract Documents. 4. PAYMENT. A. The City agrees to pay and the Contractor agrees to receive and accept payment in accordance with the prices quoted, which is inclusive of sales tax, as set forth in the completed Proposal Form. Payment to the Contractor shall be made based on work completed and submission and approval of an invoice. B. Payments to Subcontractor. Pursuant to Minn. Stat. § 471.25, Subd. 4a, the Contractor must pay any subcontractor within ten (10) days of the Contractor’s receipt of payment from the City for undisputed services provided by the subcontractor. The Contractor must pay interest of 1½ percent per month or any part of a month to the subcontractor on any undisputed amount not paid on time to the subcontractor. The minimum monthly interest penalty payment for an unpaid balance of $100.00 or more is $10.00. For an unpaid balance of less than $100.00, the Contractor shall pay the actual penalty due to the subcontractor. 5. INDEMNIFICATION. A. The Contractor shall indemnify, defend and hold harmless the City and its officials, agents, representatives, and employees from any loss, claim, liability and expense (including reasonable attorney’s fees and expenses of litigation) with respect to: (a) Worker’s Compensation benefits payable on account of injury or death to any Contractor employee or to any employee of Contractor’s subcontractors, where the injury or death arises out of or is in any way related to the work performed or to be performed under the Contract; (b) claims for personal injury, death, or property damage or loss asserted by a Contractor or subcontractor or any of their officers, agents, representatives, or employees where the injury, death, damage, or loss arises out of or is in any way related to the work performed or to be performed under the Contract; and (c) claims for personal injury, death, or property damage or loss as asserted by third-parties at the work site, where the claim is based in the whole or in any part on, or is in any way related to, any act or omission by Contractor, or Contractor’s subcontractors, agents, employees or delegates. B. Contractor shall agree that the indemnities stated above shall be construed and applied in favor of indemnification. To the extent permitted by law, the stated indemnities shall apply regardless of any strict liability or negligence attributable to the City and regardless of the extent to which the underlying harm is attributable to the negligence or otherwise wrongful act or omission (including breach of contract) of Contractor, its subcontractors, agents, employees or delegates. Contractor also agrees that if applicable law limits or precludes any aspect of the stated indemnities, then the indemnities will be considered limited only to the extent necessary to comply with that applicable law. The stated indemnities continue until all applicable statutes of limitations have run. C. If a claim arises within the scope of the stated indemnity, the City may require Contractor to furnish a written acceptance of tender of defense and indemnity from Contractor’s insurance company. Contractor will take the action required by City within fifteen (15) days of receiving notice from City. 6. RIGHTS AND REMEDIES. A. The duties and obligations imposed by the Contract Documents and the rights and remedies available thereunder shall be in addition to and not a limitation of any duties, obligations, rights and remedies otherwise imposed or available by law. B. No action or failure to act by the City or the Contractor shall constitute a waiver of any right or duty afforded by any of them under the Contract, nor shall any such action or failure to act constitute an approval of or acquiescence in any breach thereunder, except as may be specifically agreed in writing. 7. GOVERNING LAW. The Contract shall be governed by the laws of the State of Minnesota. 8. INSURANCE. Prior to commencing work on the Contract, the Contractor shall furnish the City a certificate of insurance. The Contractor shall furnish and maintain during the project such public liability and property damage insurance as shall protect Contractor and any subcontractors performing work covered by the Contract from claims for property damages or personal injury which may arise from operations under this Contract, whether such operations are by Contractor or by any subcontractor or anyone directly or indirectly employed by either of them and the amounts of insurance shall be as follows: Worker’s Compensation Employer’s Liability Bodily Injury by Disease per employee - $500,000 Bodily Injury by Disease aggregate - $500,000 Bodily Injury by Accident - $500,000 Commercial General Liability – $2,000,000 annual aggregate. Business Automobile Liability - $2,000,000 per occurrence combined single limit. Excess/Umbrella Liability - $2,000,000 each occurrence/aggregate All insurance policies (or riders) required by this Agreement shall be (i) Taken out by the Contractor and maintained with responsible insurance companies organized under the laws of one of the states of the United States and qualified to do business in the State of Minnesota, (ii) Shall contain a provision that the insurer shall not cancel or revise coverage thereunder without giving written notice to Contractor as an insured party and to City as an additional insured at least thirty (30) days before cancellation or revision becomes effective, (iii) Shall name Contractor as an insured party and City as an additional insured with respect to General Liability, Auto Liability, and umbrella policies on a primary and non-contributory basis, (iv) Shall be in accordance with specifications approved by the insurance advisory for City, and (v) Shall be evidenced by a Certificate of Insurance listing City as an additional insured which shall be filed with the City. Certificates of Insurance that do not meet these requirements will not be accepted. Certificates of Insurance shall include the policy endorsements showing the City named as additional insured on a primary and non-contributory basis. 9. TERM. The term of this Contract shall begin on or about June 5, 2017 –and end on May 31, 2019, both dates inclusive, unless sooner terminated as hereinafter provided. 10. SUPPLIES, EQUIPMENT, AND INCIDENTALS. The City and Contractor agree that the Contractor shall furnish any and all supplies, equipment, and incidentals necessary for Contractor’s performance of this Contract. 11. SUPERVISION OF CONTRACTOR. The City’s designated supervisor will be the Facilities Maintenance Supervisor. The Facilities Maintenance Supervisor, acting on the City’s behalf, shall be responsible for providing communication and direction as to the provision of services by the Contractor under this Contract. The Contractor will contact the City of Lakeville by e-mail as to the dates and times they will perform work at each facility. The Facilities Maintenance Supervisor’s mailing address is: 20195 Holyoke Avenue, Lakeville, MN 55044; telephone numbers are: (W) 952-985-2630; (C) 952-292- 3374; email address is tredepenning@lakevillemn.gov. 12. TERMINATION WITHOUT CAUSE BY CITY. The City reserves the right to terminate Contractor at will immediately without cause at any time within the term of this Contract. In the event of such termination, the City shall provide Contractor written notice of termination and upon receipt of same, Contractor shall immediately cease and desist Contractor’s provision of services under this Contract and City shall have no further obligation under this Contract to pay any further compensation to Contractor except for compensation due and owing for services prior to Contractor’s receipts of the written notice of termination. 13. INDEPENDENT CONTRACTOR. City and Contractor agree that Contractor, while engaged in carrying out and complying with the terms and conditions of this Contract and the provision of services thereunder, shall be considered at all times an independent contractor and not an officer, employee, or agent of the City. City and Contractor further agree that Contractor shall not at any time or in any manner represent that Contractor or any of the Contractor’s agents or employees are in any manner agents or employees of the City. City and Contractor further agree that Contractor shall be exclusively responsible under this Contract for Contractor’s own FICA payment, workers compensation payments, unemployment compensation payments, withholding amounts, and/or self-employment taxes or other taxes if any such payments, amounts, or taxes are required to be paid by law or regulations. 14. WRITTEN NOTICE OR OTHER CORRESPONDENCE. Any written notice or other correspondence to be provided by or between the City and the Contractor in accordance with this Contract shall be hand delivered or mailed by registered or certified mail to the following address: CITY: CONTRACTOR: 15. WAIVER OF DEFAULT. Any waiver by City of a default under the provisions of this Contract by Contractor shall not operate or be construed as a waiver of a subsequent default by the Contractor. No waiver shall be valid unless in writing and signed by the Mayor and the City Administrator on behalf of the City. 16. NO ASSIGNMENT OR SUBCONTRACTING. The City and Contractor agree that the services to be rendered by the Contractor under this Contract are unique and personal. Accordingly, the Contractor may not assign or subcontract out any of the Contractor’s rights or any of the Contractor’s duties or obligations under this Contract. 17. INVALIDITY OF PROVISIONS. If any term or provision of this Contract or any application hereof to any person or circumstances, shall to any extent be invalid or unenforceable, the remainder of this Contract or the application of such term or provision to persons or circumstances other than those as to which it is held invalid or unenforceable City of Lakeville 20195 Holyoke Avenue Lakeville, MN 55044 Sharrow Lifting Products 301 County Road E2 West New Brighton MN 55112 shall not be effected hereby and each term and provision of this Contract shall be valid and be enforced to the fullest extent permitted by law. 18. DATA PRACTICES/RECORDS. A. All data created, collected, received, maintained, or disseminated for any purpose in the course of this Contract is governed by the Minnesota Government Data Practices Act, Minn. Stat. Ch. 13, any other applicable state statute, or any state rules adopted to implement the act, as well as federal regulations on data privacy. B. All books, records, documents, and accounting procedures and practices of the Contractor and its subcontractors, if any, relative to this Contract are subject to examination by the City. 19. WARRANTY. The Contractor shall be held responsible for any and all defects in workmanship, materials, and equipment which may develop in any part of the contracted service, and upon proper notification by the City shall immediately replace, without cost to the City, any such faulty part or parts and damage done by reason of the same in accordance with the bid specifications. 20. ENTIRE AGREEMENT. This instrument herein contains the entire and only agreement between the parties and no oral statement or representation or prior written matter not contained in this instrument shall have any force and effect. This Contract shall not be modified in any way except by writing executed by both parties. 21. DISCRIMINATION. Contractor agrees to comply with Minnesota Statute 181.59 that states: Subsection A. That, in the hiring of common or skilled labor for the performance of any work under any contract, or any subcontract, no contractor, material supplier or Contractor, shall, by reason of race, creed, or color, discriminate against the person or persons who are citizens of the United States or resident aliens who are qualified and available to perform the work to which the employment relates; Subsection B. That no contractor, material supplier, or Contractor, shall, in any manner, discriminate against, or intimidate, or prevent the employment of any person or persons identified in clause (1) of this section, or on being hired, prevent, or conspire to prevent the person or persons from the performance of work under any contract on account of race, creed, or color; Subsection C. That a violation of this section is a misdemeanor; and Subsection D. That this contract may be canceled or terminated by the state, county, city, town, school board, or any other person authorized to grant the contracts for employment, and all money due, or to become due under the contract, may be forfeited for a second or any subsequent violation of the terms or conditions of this contract. 22. WORK HOURS. Inspections and maintenance services shall start at 8:00 a.m. and be completed before 3:30 p.m. 23. BACKGROUND CHECKS. The City must receive from the Contractor and each Contractor’s employee written authorization permitting the City of Lakeville Police Department to perform a criminal history background check and further authorize the Police Department to release the information obtained to the Lakeville City Council, City Administrator and other appropriate employees. The City reserves the right to deny access to City facilities to those Contractors or Contractor’s employees that it deems inappropriate. CITY OF LAKEVILLE BY: Douglas P. Anderson, Mayor AND Charlene Friedges, City Clerk CONTRACTOR: BY: Its EXHIBIT A FACILITY EQUIPMENT LISTING Central Maintenance Facility 7570 179th Street West, Lakeville MN 55044 Unit Manufacturer Capacity Model # Serial # Control Bridge Crane R&M Spacemaster 5 Ton SX40410050P35FCLOF HJW18977 R&M Racon Radio Central Maintenance Facility Water Tower Unit Manufacturer Capacity Model # Serial # Control Chain Hoist Budgit 1 Ton USA01 06FU043 Hand Chain Hoist uses Abell Howe 1-ton jib Water Treatment Facilty 18400 Ipava Avenue, Lakeville MN 55044 Unit Manufacturer Capacity Model # Serial # Control Cable Hoist R&M Spacemaster 2 Ton DB224 1789249701 Telemecanique 4-button pendant Bridge Crane R&M Spacemaster 7½ Ton D-37-530 178259701 Duct-o-wire 8-button pendant Police Station 9237 183rd Street West, Lakeville MN 55044 Unit Manufacturer Capacity Model # Serial # Control Cable Hoist Dayton 1 Ton 3YB83 JM4310RX Dayton 2-button pendant PROPOSAL TABULATION 2017 - 2018 Bridge Crane and Hoist Inspection June 7, 2017 Contractor Total Cost Sharrow Lifting Products 1,740.00 JB Controls Inc. 2,518.12