HomeMy WebLinkAboutItem 06.h
Date: Item No.
LEE LAKE SUBDIVISION
FINAL PLAT AND EASEMENT VACATION
Proposed Action
Staff recommends adoption of the following motion: Move to approve: 1) a resolution approving the Lee
Lake Subdivision final plat, and 2) a resolution vacating a public drainage and utility easement and a
public drainage, utility and sloping easement.
Overview
Guardian Development of Wyoming, LLC representatives are requesting approval of the Lee Lake
Subdivision final plat of three lots and one outlot for the construction of a 120-unit apartment building, a
62,400 square foot enclosed self-storage facility, and a future multiple tenant commercial building on
property located east of Lee Lake, west of I-35 and south of 162nd Street (CSAH 46). The Lee Lake
Subdivision preliminary plat, PUD ordinance and CUP for a planned shoreland development were
approved by the City Council on May 15, 2017. In conjunction with the final plat, the City Council is
being asked to approve a resolution vacating an existing public drainage and utility easement and an
existing public drainage, utility and sloping easement located on the parent parcels. These easements will
be replaced by public drainage and utility easements as shown on the Lee Lake Subdivision final plat.
Primary Issues to Consider
• What documents other than the development contract are required with this final plat?
Supporting Information
• Staff response to primary issues to consider
• Final plat and easement vacation resolutions
• Signed development contract, warranty deed, encroachment agreement, and stormwater
management/best management practice facilities and easement agreement
• April 27, 2017 planning report (w/o exhibits, except Exhibits A, C and G)
• May 17, 2017 engineering report
Financial Impact: $ Budgeted: Y☐ N☐ Source:
Related Documents: (CIP, ERP, etc.):
Envision Lakeville Community Values: A Home for All Ages and Stages of Life
Report Completed by: Daryl Morey, Planning Director
July 17, 2017
Subdivision and Zoning Ordinances
Staff Response to Primary Issues to Consider
• What other documents other than the development contract are required with this final plat?
• Warranty Deed conveying Outlot A (Lee Lake, stormwater management basin) to the City.
• Encroachment agreement for the construction of a private retaining wall within a public drainage
and utility easement on Lot 2.
• Stormwater management/best management practice facilities easement agreement for maintenance
of the infiltration basin on Lot 2.
• Private cross access and maintenance agreement for the privately owned and maintained sanitary
sewer and watermain that will be installed across property lines in this plat.
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. __________
RESOLUTION APPROVING THE FINAL PLAT OF LEE LAKE SUBDIVISION
WHEREAS, the owner of the plat described as Lee Lake Subdivision has
requested final plat approval; and
WHEREAS, the preliminary plat was reviewed by the Planning Commission and
the Parks, Recreation and Natural Resources Committee and approved by the City
Council; and
WHEREAS, the final plat is consistent with the approved preliminary plat; and
WHEREAS, the final plat is acceptable to the City.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The final plat of Lee Lake Subdivision is hereby approved subject to the
development contract and security requirements.
2. The Mayor and City Clerk are hereby directed to sign the final plat mylars,
development contract, encroachment agreement, and stormwater
management/best management practice facilities and easement agreement.
3. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
ADOPTED by the Lakeville City Council this 17th day of July 2017.
CITY OF LAKEVILLE
BY: _______________________
Douglas P. Anderson, Mayor
ATTEST:
________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _______ is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 17th day of July 2017 as shown by the
minutes of said meeting in my possession.
________________________
Charlene Friedges, City Clerk
(SEAL)
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO._________
RESOLUTION VACATING A PUBLIC DRAINAGE AND UTILITY EASEMENT
AND A PUBLIC DRAINAGE, UTILITY AND SLOPING EASEMENT
WHEREAS, the City Council has conducted a public hearing, preceded by two (2)
weeks published notice, to consider vacating the following described public drainage and
utility easement and public drainage, utility and sloping easement, and
WHEREAS, the City Council has determined that it is in the public interest to approve
the vacation of the public drainage and utility easement and the public drainage, utility and
sloping easement.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The following public drainage and utility easement is hereby vacated:
(see attached Exhibit A)
The following public drainage, utility and sloping easement is hereby vacated:
(see attached Exhibit B)
2. The City Clerk is directed to file a certified copy of this resolution with the Dakota
County Recorder.
ADOPTED by the Lakeville City Council this 17th day of July 2017
CITY OF LAKEVILLE
________________________
Douglas P. Anderson, Mayor
ATTEST:
________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _______ is a true and correct copy of the
resolution presented to and adopted by the City Council of the City of Lakeville at a duly
authorized meeting thereof held on the 17th day of July 2017, as shown by the minutes of said
meeting in my possession.
___________________________
Charlene Friedges, City Clerk
(SEAL)
EXHIBIT A
(THE TRACT)
A permanent easement for utility and drainage purposes over, under and across all that part of
the SW ¼ of the NE ¼ of Section 1, Township 114, Range 21, Dakota County, Minnesota, lying
Westerly of the westerly right-of-way line of Interstate Highway No. 35 including West Frontage
Road, EXCEPT THEREFROM that part described as follows: Commencing at the southwest
corner of the NE ¼ of said Section 1; thence easterly on the south line of said NE ¼ a distance of
784.52 feet to the westerly right-of-way line of said Interstate Highway No. 35; thence northerly
on said right-of-way line a distance of 479.66 feet to the actual point of beginning; thence deflect
left 99 degrees 45 minutes 00 seconds on an assumed bearing of South 87 degrees 06 minutes 00
seconds west a distance of 75.82 feet; thence North 02 degrees 54 minutes 00 seconds West a
distance of 373.50 feet; thence North 87 degrees 06 minutes 00 seconds east a distance of 140.00
feet to the westerly right-of-way of said Interstate Highway No. 35; thence southerly on said
westerly right-of-way line a distance of 378.98 feet to the actual point of beginning. Except
parcel 1, Dakota County Right-Of-Way Map No. 147.
Which lies within the following permanent easement for utility and drainage purposes:
That part of the above-described tract of land which lies easterly of the following described line:
Commencing at the southwest corner of the NE ¼ of said Section 1; thence South 89 degrees 45
minutes 22 seconds East assumed bearing along the south line of said NE ¼ a distance of 753.01
feet to the point of beginning of said line to be hereinafter described; thence North 07 degrees 06
minutes 59 seconds East, 376.39 feet; thence North 16 degrees 21 minutes 46 seconds West,
99.85 feet, to the southwest corner of the first above described exception and said line there
terminating.
EXHIBIT B
The part of the public drainage, utility and sloping easement recorded as Document No. 1107262
that lies within the following described parcels:
Parcel 1:
That part of the Southwest Quarter of the Northeast Quarter (SW ¼ of NE ¼) of Section One
(1), Township One Hundred Fourteen (114), Range Twenty One (21), Dakota County,
Minnesota, described as follows: Commencing at the Southwest corner of the Northeast Quarter
(NE ¼) of Said Section One (1); thence easterly along the south line of the said Northeast
Quarter (NE ¼), a distance of 784.52 feet, more or less, to the westerly right of way line of
Interstate Highway No. 35; thence northeasterly along said right of way line 479.66 feet to the
actual point of beginning, thence deflect left 99 degrees 45 minutes and on an assumed bearing
of South 87 degrees 06 minutes West a distance of 75.82 feet; thence bearing north 2 degrees 54
minutes West, a distance of 373.50 feet; thence bearing North 87 degrees 06 minutes East, a
distance of 140.00 feet to the westerly right of way line of said Interstate Highway No. 35; thence
bearing South 6 degrees 51 minutes West, along said right of way line 378.98 feet, more or less,
to the actual point of beginning.
Parcel 2:
All that part of the SW ¼ of the NE ¼ of Section 1, Township 114, Range 21, Dakota County,
Minnesota, lying westerly of the westerly right-of-way line of Interstate Highway No. 35
including West Frontage Road, EXCEPT THEREFROM that part described as follows:
Commencing at the southwest corner of the NE ¼ of said Section 1; thence easterly on the south
line of said NE ¼ a distance of 784.52 feet to the westerly right-of-way line of said Interstate
Highway No. 35; thence northerly on said right-of-way line a distance of 479.66 feet to the actual
point of beginning; thence deflect left 99 degrees 45 minutes 00 seconds on an assumed bearing
of South 87 degrees 06 minutes 00 seconds west a distance of 75.82 feet; thence North 02 degrees
54 minutes 00 seconds West a distance of 373.50 feet; thence North 87 degrees 06 minutes 00
seconds east a distance of 140.00 feet to the westerly right-of-way of said Interstate Highway No.
35; thence southerly on said westerly right-of-way line a distance of 378.98 feet to the actual
point of beginning. Except Parcel 1, Dakota County Right-of-Way Map No. 147.
MEMORANDUM
TO: Daryl Morey
FROM: D. Daniel Licht, AICP
DATE: 27 April 2017
RE: Lakeville – Lee Lake Subdivision; PUD Development Stage Plan
TPC FILE: 135.01
BACKGROUND
Guardian Development Company of Wyoming, LLC has submitted plans for a mixed use
development consisting of a 120-unit multiple family building, a 62,400 square foot enclosed
self-storage facility, and a 12,000 square foot multiple tenant retail building on 24.55 acres
located at the southwest quadrant of I-35 and CSAH 46. The subject site is adjacent to Kenyon
Avenue and abuts the east shoreline of Lee Lake. The development requires consideration of
an ordinance amending the existing Jackson Landscaping PUD, Planned Unit Development
District governing the property to allow for the proposed uses, a PUD Development Stage Plan,
conditional use permit for a planned shoreland development, preliminary plat, and final plat. A
public hearing to consider the applications has been noticed for the Planning Commission
meeting on 4 May 2017.
Exhibits:
A. Site location
B. Preliminary Plat
C. Final Plat
D. Existing Conditions
E. Removals Plan
F. Master Site Plan
G. Phase 1 Site Plan (2 pages)
H. Erosion Control Plan
I. Tree Preservation Plan
2
J. Grading Plan (3 pages)
K. Utility Plan
L. Storm Sewer Plan
M. Architectural Site Plan (2 pages)
N. Landscape Plan (3 pages)
O. Lighting Plan (3 pages)
P. Site Access and Signage Plan
Q. Multiple Family Building Floor Plans (4 pages)
R. Multiple Family Building Exterior Elevations and Perspective Views (8 pages)
S. Self-Storage Building Floor Plans (5 pages)
T. Self-Storage Building Exterior Elevations (3 pages)
U. Neighborhood Meeting Notes
ANALYSIS
Comprehensive Plan. The 2008 Comprehensive Plan guides the subject site for commercial
land uses. The retail use illustrated on the site plan is consistent with this land use designation.
Regarding the proposed multiple family use, the City Council, at a work session on 28 March
2016, requested that City staff provide preliminary information as to possible actions that could
be taken within the City’s land use controls to address increased demand for multiple family
development. This effort is being initiated in response to contacts made by several developers
interested in possible multiple family developments and in consideration of the Economic
Development Commission’s 2014-2016 Strategic Plan for Economic Development that
identified high density housing as a strategic priority. Direction was given by the City Council
that City staff will work with developers on consideration of multiple family uses within existing
commercial districts though establishment of a PUD District using the performance standards of
the RH-2 District as a basis. The Planning Commission discussed this issue at a work session on
21 July 2016 and supports the PUD District approach.
Self-storage facilities are generally considered to be a warehousing use allowed in areas guided
for industrial or office park, even though they are accessible to the general public for residential
storage and not directly business related. There have been increasing numbers of self-storage
facilities being constructed in commercial districts within the Twin Cities area. These facilities
can provide for a secondary use of a property that maximizes available lot area and provides
efficiency of development. The proposed self-storage facility shown on the site plan is an
example of such a development approach and is appropriate for the site.
Zoning. The subject site is zoned PUD, Planned Unit Development District and is also within
the Shoreland Overlay District of Lee Lake. Consideration of the retail commercial, multiple
family residential, and enclosed self-storage uses shown on the submitted plans requires
approval of an amendment to the existing Jackson Landscape PUD District and approval of a
PUD Development Stage Plan for the multiple family and self-storage uses. A PUD
Development Stage Plan will be required for the retail building in the future at the time of
3
development. The PUD District will also address the performance standards of the Shoreland
Overlay District as a planned shoreland development in accordance with the provisions of
Section 11-102-21 of the Zoning Ordinance.
Surrounding Land Uses. The subject site is surrounded by the following existing and planned
land uses shown in the table below. The proposed development will be compatible with
commercial uses within the I-35 Corridor and is separated from residential uses to the west by
Lee Lake and preservation of natural open spaces. The proposed development will actually
serve to buffer Lee Lake and residential uses to the west from I-35 traffic related impacts.
Direction Land Use Plan Zoning Map Existing Use
North Commercial C-3 District Senior housing
East -- -- I-35
South Commercial PUD District Celebration Church
West LD Residential RS-3 District Lee Lake
Single Family Homes
Setbacks. The table below illustrates setback requirements applicable to the proposed
development based on establishment of a PUD District and the requirements of the Shoreland
Overlay District as outlined in Section 11-102-13.D of the Zoning Ordinance. The setbacks of
the three principal buildings shown on the submitted plans comply with the Zoning Ordinance.
Off-street parking areas are shown to be setback 15 feet from Kenyon Avenue right-of-way as
required by Section 11-19-11.C of the Zoning Ordinance. Off-street parking areas are also
subject to the structure setbacks outlined in Section 11-102-13.D of the Zoning Ordinance for
the Shoreland Overlay District. All of the off-street parking areas as shown on the submitted
plans comply with the minimum 113 foot setback requirement.
ROW Perimeter Between
Buildings
OWHL Parking
ROW Side/Rear
30ft. 30ft. 25ft. 113ft.1 15ft. 5ft.
1. Increased setback required per Section 11-102-21.D.2.b of the Zoning
Ordinance for allowed residential density increase.
Open Space. Section 11-102-21.C of the Zoning Ordinance establishes minimum open space
requirements for planned shoreland developments. The Zoning Ordinance requires 50 percent
of the total project area and 70 percent of the Shoreland Impact Zone to be preserved as open
space excluding building foundations, public rights-of-way, off-street parking areas, drive aisles,
storm water basins, and other developed areas. Information included with the submitted plans
indicates that 18.05 acres or 73.5 percent the subject site is preserved as open space. Section
11-102-19.C.3 of the Zoning Ordinance requires that commercial uses without water oriented
needs be located on parcels without water frontage. In order to comply with the intent of this
provision, the entire Shoreland Impact Zone for the subject site is to be platted as Outlot A and
deeded to the City to be preserved as open space. The area of preserved open space within
the subject site complies with the requirements of the Zoning Ordinance.
4
Impervious Surface. Section 11-102-13.F of the Zoning Ordinance establishes limits for
impervious surface for developments within the Shoreland Overlay District to 25 percent of the
lot area. The submitted plans identify impervious area of 3.02 acres of the 15.17 acre non-lake
area of the subject site as impervious surfaces, which is equal to 19.9 percent of non-lake area
of the subject site. The proposed impervious surface within the subject site complies with the
limits of the Zoning Ordinance.
Residential Density. Development of multiple family dwelling uses within a Shoreland Overlay
District as part of a planned shoreland development and PUD District is subject to the density
limits calculated in accordance with Section 11-102-21.D of the Zoning Ordinance. The allowed
density for the proposed residential use is calculated by dividing the net suitable area of each
tier by the single family residential lot size standard for the Shoreland Overlay District
applicable to Lee Lake of 15,000 square feet for a non-abutting lot.
The calculation of allowed residential density is shown below using the information regarding
the tier areas shown on the site plan. Section 11-102-21.D.2.b of the Zoning Ordinance allows
for an increase in residential development density if the minimum setback from the OHWL is
increased 50 percent (to 113 feet), which the proposed multiple family building complies with.
Tier Area* Min. Lot
Area/DU
Allowed
DU
Density
Increase
Max.
Density
1 574,586sf. 15,000sf. 38 50% 57
*Developer must verify net suitable area
Section 11-102-21.D.2.d of the Zoning Ordinance establishes a Residential Shoreland Density
Reserve of 209 dwelling units that the City may allocate at its discretion to developments within
the Shoreland Overlay District. The City has previously allocated 146 dwelling units from the
Residential Shoreland Density Reserve leaving 63 available. With 63 dwelling units available for
transfer from the Residential Shoreland Density Reserve, the proposed 120 unit multiple family
building complies with Shoreland Overlay District density limits.
Street. Kenyon Avenue is a rural section street abutting a portion of the subject site that will be
required to be upgraded to an urban section as part of the development. An eight foot wide
concrete sidewalk is provided on the west side of Kenyon Avenue south of CSAH 46 to the first
driveway to the Kent 46 development. The City will undertake a public improvement project to
reconstruct the rural section of Kenyon Avenue abutting the subject site and extend the
sidewalk. Right-of-way needs for Kenyon Avenue are subject to review and approval by the City
Engineer.
Access. The uses shown on the submitted plans are accessed via two shared driveways to
Kenyon Avenue. Kenyon Avenue is designated by the Transportation Plan as a major collector
roadway. Section 11-19-7.I.6 of the Zoning Ordinance requires driveway access from a site with
multiple commercial uses to a major collector street be spaced 125 feet from the nearest
5
intersection and 200 feet between driveways. The location of the two driveways to the subject
site are subject to review and approval of the City Engineer. Ingress/egress, shared parking,
and utility easements are required for all drive aisles, off-street parking areas, and private
utilities within Lots 1-3, Block 1.
Off-Street Parking. The table below summarizes off-street parking that will be required to be
provided for each of the uses. The off-street parking requirement for the multiple family use
would be applied through a PUD District based on development within 2,500 feet of a transit
facility and an average of 2.0 bedrooms or less per dwelling unit. The proposed multiple family
building has 1.38 bedrooms per dwelling unit. Depending on the occupancy of the multiple
tenant retail building (with a restaurant or without), the subject site either has sufficient
parking or a parking deficit of 6 stalls by Zoning Ordinance requirements. In that the parking
deficiency by Zoning Ordinance requirements is less than two percent of the required stalls, the
six stalls not provided are anticipated to be off-set by the peak demand of the three principal
uses and the parking provided on site is adequate.
Use Area Requirement Required
Stalls
Stalls
Provided
Multiple
Family
120 du.
2/du with one enclosed/du 120 surface
120 indoor
240 total
120 surface
124 indoor
244 total
Retail 12,000sf. No restaurant: 1/200nsf. 54 63
W/restaurant: 1/160nsf. 68
Self-Storage 62,400sf. ITE: 0.14 stalls/1,000gsf. 9 5
Total 303-317 311
The submitted plans illustrate the surface parking stalls to be nine feet by 20 feet and accessed
by 24 foot wide drive aisles as required by Section 11-19-7.I.1 of the Zoning Ordinance. Building
plans showing the proposed interior parking have been submitted and provide for stalls a
minimum of nine feet wide by 18 feet deep and accessed by 26 foot wide drive aisles. The off-
street parking stalls will be surfaced with asphalt and surrounded by perimeter concrete curb as
required by Section 11-19-7.I.12 and 15 of the Zoning Ordinance.
Building Materials. Building elevation plans have been submitted for the multiple family
building and self-storage building and both include a schedule of exterior materials.
• The exterior of the multiple family building utilizes a combination of brick, stone, cedar
siding and fiber cement siding with articulation of the building elements and changes in
color/texture to provide a varied and attractive appearance for the building that
minimizes mass. The multiple family building is required to comply with the minimum
exterior finish requirements for uses within the RH-1 District as established by Section
11-61-19.B of the Zoning Ordinance. Brick or stone exterior finish materials must be
used for at least 50 percent of the combined area of elevations of the proposed
building. The schedule of exterior materials includes the percentage of each material
6
used on each elevation and the overall exterior of the multiple family building. The
overall use of stone, brick and brick cast concrete exterior materials is 53 percent of the
overall building exceeding the requirements of the Zoning Ordinance.
• The exterior finish for the self-storage building is required to comply with the minimum
exterior finish requirements for uses within the C-3 District. Section 11-17-9.D.1 of the
Zoning Ordinance requires the building to use a minimum of three Grade A materials
listed in Section 11-17-9.B of the Zoning Ordinance for a minimum of 65 percent of the
area of the building elevations. Grade B or C materials defined in Section 11-17-9.B of
the Zoning Ordinance may be used for up to 35 percent of the area of the elevations, or
10 percent Grade D materials may also be used. The exterior finish consists of brick,
two forms of stucco, metal panel, and a glass storefront. Brick, stone and glass are Class
A materials and are 68 percent of the exterior finish. The exterior finish of the
proposed self-storage building complies with the requirements of the Zoning Ordinance
for uses in the C-3 District.
• No plans have been provided for the future retail building. Development of the future
retail building will be subject to the exterior finish requirements for principal buildings
within the C-3 District established by Section 11-17-9.D.1 of the Zoning Ordinance
Building Height. There is no maximum height limit established for a PUD District. The
maximum building height allowed in the underlying C-3 District is three stories or 35 feet,
although buildings up to 6 stories or 65 feet (whichever is less) are allowed as a conditional use
by Section 11-73-7.P of the Zoning Ordinance.
• The multiple family building is to be three stories in height with a flat roof except for a
center architectural design element. The height of the proposed building as defined by
Section 11-17-7.A of the Zoning Ordinance from mean ground level to the mid-point of
the pitched roof portion of the building is 46 feet.
• The self-storage building is proposed to be four stories. The height of the self-storage
building is 44 feet to a flat roof, with a two-foot high parapet, which would screen
rooftop mechanical equipment.
The proposed building heights are consistent with the allowances for structures within the C-3
District and appropriate for the subject site abutting the I-35 corridor.
Residential Floor Area. The proposed multiple family building includes the following dwelling
units shown in the table below. The floor area of the individual units complies with the
requirements of Section 11-17-13.B of the Zoning Ordinance:
7
Unit Number
Of Units
% of
Total
Min. Area Min. Area
Required
Studio 26 22% 573sf. 500sf.
1 Bedroom 54 45% 703sf. 700sf.
2 Bedroom 34 28% 975sf. 800sf.
3 Bedroom 6 5% 1,218sf. 880sf.
Section 11-17-15 of the Zoning Ordinance limits the number of studio apartments to 10 percent
of the total number of dwelling units. The proposed number of studio apartments within the
proposed building is 22 percent of the total. However, given the location of the proposed
multiple family use within a mixed use development adjacent to the I-35 transit corridor, the
proposed number of studio apartments is appropriate for the development and may be allowed
as part of the PUD Development Stage Plan.
Landscaping. The subject site is mostly devoid of tree cover outside of the shoreline area. The
submitted plans include a landscape plan for the overall site and phase 1 (not including Lot 1) as
required by Section 11-21-9 of the Zoning Ordinance. The landscape plan provides general site
and foundation plantings, screening of off-street parking areas from view of the public right-of-
way and the building from view of residential properties to the west. Landscaping was added
to the site plan adjacent to the drive aisle to/from the underground garage for the multiple
family building to ensure headlight glare is not cast towards Lee Lake. Quantities of the
landscaping are generous and plant sizes comply with Section 11-21-9.C.1 of the Zoning
Ordinance.
Signs. The submitted plans identify the following signs:
• There is monument sign identifying the multiple family building shown to the west of
the north site access to Kenyon Avenue. The proposed sign is setback 15 feet from the
public right-of-way as required by Section 11-23-21 of the Zoning Ordinance. The sign
plan indicates that the area will be 100 square feet or less and comply with Section 11-
23-19.B.1.a(2) regulating signs for multiple family uses within the RH-1 District.
• The self-storage facility has two signs on the east elevation facing I-35, one that is 57
square feet and a second that is 81 square feet. There is also a 36 square foot sign
identifying the use on the north façade along with three directional signs, two that are
seven square feet and one that is 4.5 square feet. There is no freestanding sign shown
for the self-storage facility. Given that the east and north elevations of the self-storage
facility face a public street and shared private drive, installation of signs on both
elevations is consistent with Section 11-23-19.E.1.b(1) of the Zoning Ordinance. The
number and area of the proposed wall signs is also consistent with Section 11-23-
19.E.1.b(3) of the Zoning Ordinance for single occupancy commercial buildings larger
than 45,000 square feet.
8
• No signs are identified for the proposed future retail building on Lot 1, Block 1. Signs for
this use will be subject to the provisions of Section 11-23-15.R and Section 11-23-19.E of
the Zoning Ordinance.
Exterior Lighting. A photometric lighting plan indicating the type, location, height, and
illumination pattern of all proposed exterior lighting has been submitted, which is subject to
compliance with Section 11-16-17 of the Zoning Ordinance. All exterior lighting is to be
shielded as required by Section 11-16-17.B.1 of the Zoning Ordinance and intensity is limited as
outlined by Section 11-16-17.A of the Zoning Ordinance. Pole mounted fixtures are limited to
35 feet and building mounted fixtures cannot exceed the height of the building in accordance
with Section 11-16-17.C of the Zoning Ordinance. The majority of the exterior lighting for the
surface parking areas will be screened from view of Lee Lake by the multiple family building, as
well as existing and proposed landscaping. The photometric lighting plan indicates that no light
is cast onto Outlot A or onto public rights-of-way. The proposed lighting plan complies with
the requirements of the Zoning Ordinance.
Grading. A grading, drainage, and erosion control plan has been submitted for the subject site.
A tree preservation plan identifying existing significant trees and those to be removed has also
been submitted for evaluation in conjunction with the proposed grading plan. Existing trees
within the Shoreland Impact Zone must be preserved to the extent possible in compliance with
Section 11-102-19.A of the Zoning Ordinance. A storm water basin will be constructed within
Outlot A, which will be deeded to the City as required by Section 10-4-4.D of the Subdivision
Ordinance. A privately-owned and maintained storm water basin will be located within Lot 2,
Block 1. All grading, drainage, erosion control, and storm water management issues are subject
to review and approval of the City Engineer.
Utilities. Section 11-102-12.B of the Zoning Ordinance requires all uses within the proposed
development to be served by municipal sanitary sewer and water utilities. The subject site is
within the MUSA and utilities are available at the property for connection. A utility plan has
been submitted and all utility issues are subject to review and approval of the City Engineer.
Easements. All lots proposed as part of the preliminary plat and final plat must provide for 10
foot wide drainage and utility easements at their perimeter as required by Section 10-4-4 of the
Subdivision Ordinance. The final plat illustrates a 10 foot easement abutting the Kenyon
Avenue right-of-way but not along interior lot lines. All easements are subject to review and
approval of the City Engineer.
Park Dedication. The Parks, Trails, and Open Space Plan does not identify acquisition of land
for public park facilities within the area of the subject site. Park dedication requirements
established by Section 10-4-8 of the Subdivision Ordinance will be satisfied as a cash fee in lieu
of land at the time of final plat approval. The cash fee in lieu of land will be determined based
on the following fee schedule established for the respective land uses within the proposed
development:
9
Lot Use 2017 Fee
Schedule
Area or
DU
Cash Fee in
Lieu of Land
1 Retail $7,693/ac. 1.49ac. $11,462.57
2 Multiple Family $1,972/du. 120du. $236,640.00
3 Self-Storage $7,693/ac. 0.94ac $7,231.42
Total $255,333.99
Billboard. There is an existing billboard within the property. Section 11-23-15.W of the
Zoning Ordinance makes billboards a principal use of property, which are not allowed to be
located on a lot with another principal use. As such, the existing conditions and removal plan
sheets must identify the billboard and indicate its removal from the proposed PUD
Development Stage Plan.
Neighborhood Meeting. The developer hosted a neighborhood meeting for the proposed
development on 14 March 2017 at Bowlero near the subject site. City staff was present and
there were 30 residents in attendance. Comments received during the neighborhood meeting
were incorporated into the revised plans submitted with the development applications.
CONCLUSION
The proposed Lee Lake Subdivision promotes the goals of the 2008 Comprehensive Plan and
2014-2016 Strategic Plan for Economic Development and is consistent with the approach
discussed by the City Council and Planning Commission for allowing opportunity for multiple
family uses at appropriate locations along transportation corridors integrated with planned
commercial development. The PUD Development Stage Plan for the mixed use development is
further consistent with the intent of Zoning Ordinance performance standards for multiple
family, commercial, and shoreland development. Our office and City staff recommend
approval of the applications subject to the following conditions:
1. The submitted plans and applications shall be subject to review by the DNR.
2. The developer shall provide for ingress/egress and cross parking and utility easements
over drive-aisles, surface parking stalls and private utilities within Lots 1-3, Block 1.
3. Construction of the future retail building on Lot 1, Block 1 shall be subject to PUD
Development Stage Plan approval.
4. All grading, drainage, erosion control, and storm water management issues are subject
to review and approval of the City Engineer.
5. All utility issues are subject to review and approval of the City Engineer.
10
6. Park dedication requirements shall be satisfied as a cash fee in lieu of land in accordance
with Section 10-4-8 of the Subdivision Ordinance and the 2017 Fee Schedule.
7. The existing billboard within the subject site shall be removed from the subject site
consistent with Zoning Ordinance requirements prior to the issuance of any building
permits.
c. Justin Miller, City Administrator
David Olson, Community and Economic Development Director
Alex Jordan, Senior Project Engineer
John Hennen, Parks and Recreation Director
Andrea McDowell Poehler, City Attorney
±
162ND ST (CS AH 46)
City of LakevilleAerial MapLee Lake SubdivisionPreliminary & Final PlatConditional Use PermitEasement VacationPUD AmendmentEXHIBIT A
KENYON AVE
I-35KENORA WAY
KENT
T
R
L
166TH ST BU C K H I L L R D
Lee Lake
Subdivision
City of Lakeville
Public Works – Engineering Division
Memorandum
To: Daryl Morey, Planning Director
From: Alex Jordan, Senior Project Engineer
McKenzie L. Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
Dave Olson, Community and Economic Development Director
Date: May 17, 2017
Subject: Lee Lake Subdivision
• Final Plat Review
• Site Plan Review
• Final Grading and Erosion Control Plan Review
• Final Utility Plan Review
• Easement Vacation
BBAACCKKGGRROOUUNNDD
Guardian Development Company of Wyoming, LLC has submitted a final plat named Lee Lake
Subdivision and a site plan application to construct a three-story, 120 unit apartment
building, and a four-story conditioned storage building. This is the first and only phase of the
preliminary plat approved by the City Council on May 15, 2017. The proposed development is
located south and west of and adjacent to Kenyon Avenue, south of 160th Street (CSAH 46)
and west of Interstate 35. The parent parcels consist of two meets and bounds parcels zoned
PUD, Planned Unit Development (PID No. 220011008013) and C-3, General Commercial
District (PID No. 2200110080104).
The final plat consists of three lots within one block and one outlot on 24.56 acres.
The proposed development will be completed by:
Developer: Guardian Development Company of Wyoming, LLC
LLEEEE LLAAKKEE SSUUBBDDIIVVIISSIIOONN –– FFIINNAALL PPLLAATT
MMAAYY 1177,, 22001177
PPAAGGEE 22 OOFF 1111
Engineer/Surveyor: Wenk Associates
SSIITTEE CCOONNDDIITTIIOONNSS
The existing site consists of multiple previous uses. A portion of the site contains an existing
commercial rental business while the majority of the site was previously used as a commercial
landscape business and storage area. Existing buildings and site improvements are located on
the site and are planned for removal with the development improvements. The removals
shall include, but are not limited to; buildings, concrete, bituminous, and gravel parking
surfaces, fences, well and septic tanks, retaining walls, and fuel tanks. The Developer shall
post a $50,000 security with the final plat to ensure all removals are completed per all
applicable codes and regulations.
EEAASSEEMMEENNTT VVAACCAATTIIOONN
Several existing public and private easements exist on the parent parcels. The Developer shall
vacate the following public easements with the final plat:
• Drainage and Utility Easement per Document No. 3023214
• Public Drainage, Utility, and Sloping Easement per Document No. 1107262
The following private easements shall not be vacated and will remain on the parent parcels:
• Highway Drainage Easement per Document No. 343601
• Electric Utility Easement per Doc No. 730898
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
Kenyon Avenue
Lee Lake Subdivision is located south and west of Kenyon Avenue, a major collector roadway
as identified by the City’s Transportation Plan. Kenyon Avenue is currently constructed as a
two lane urban roadway adjacent to the north plat boundary and a two lane rural roadway
adjacent to the east plat boundary. An 8-foot wide sidewalk is located along the north side of
Kenyon Avenue.
The Developer shall construct an eastbound right turn lane along Kenyon Avenue at the
location of the north driveway entrance with the development improvements. The final
design of the turn lane improvements will be reviewed with the final construction plans.
The Developer shall post an escrow for the future upgrade of Kenyon Avenue with the final
plat, calculated as a length of the plat boundary adjacent to the rural section of Kenyon
Avenue:
1046.82 l.f. x $160/f.f. = $167,491.20
Front Footage adjacent to
Rural Kenyon Avenue
Commercial Future Street
Upgrade Fee
Total Required with
the final plat
LLEEEE LLAAKKEE SSUUBBDDIIVVIISSIIOONN –– FFIINNAALL PPLLAATT
MMAAYY 1177,, 22001177
PPAAGGEE 33 OOFF 1111
The upgrade of the rural section of Kenyon Avenue adjacent to the plat is not included in the
City’s current Capital Improvement Plan (CIP). The City is anticipating including
improvements to Kenyon Avenue in 2018 in the draft 2018-2022 CIP.
The parent parcels were previously assessed for the street and utility improvements to
Kenyon Avenue (assessment Nos. 0938 and 0945 for City Project 91-3). The remaining balance
of $7,163.84 shall be paid with the final plat.
The Developer shall provide a security for one year of real estate taxes with the final plat. The
security is estimated as $59,780.46 (PID 220011008013 = $49,611.92; PID 220011008014 =
$10,168.54).
SSIITTEE PPLLAANN
Lee Lake Subdivision includes the construction of a 120-dwelling unit, 3-story apartment
building (Lot 2), 4-story conditioned storage building (Lot 3), and plans for the future
construction of a retail building (Lot 1). Access to the site will be from two driveway entrances
along Kenyon Avenue, on the north and east plat boundaries. The driveway design includes
commercial concrete driveway aprons, stop signs, stop bars, cross walk striping and
pedestrian curb ramps. The Developer shall provide a $1,500 escrow for the future
construction of the commercial driveway entrance for the south driveway, which will be
constructed with the future improvements to Kenyon Avenue.
An underground parking garage for the apartment building and a shared at-grade parking lot
will be constructed to provide resident, customer, employee and guest parking. Access to the
underground parking garage will be from the south side of the apartment building.
A portion of the shared at grade parking lot on Lot 1, Block 1 will not be constructed with the
first phase final plat improvements. The additional parking area will be constructed at the
time a site plan application is submitted to the City for building improvements on Lot 1. The
required parking spaces and design will be reviewed by staff at the time a use is defined for
Lot 1, Block 1.
The Developer will construct a series of privately owned and maintained trails accessing the
public sidewalk to be constructed along Kenyon Avenue. The private trail improvements must
be constructed on the privately-owned lots and not encroach onto Outlot A.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility, building and street construction
shall be from a single rock construction entrance on Kenyon Avenue on the east plat
boundary in the location of the proposed driveway access.
LLEEEE LLAAKKEE SSUUBBDDIIVVIISSIIOONN –– FFIINNAALL PPLLAATT
MMAAYY 1177,, 22001177
PPAAGGEE 44 OOFF 1111
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS
The Park Dedication requirement for the parent parcels has not been paid and will be satisfied
through a cash contribution with the final plat, calculated as follows:
2.43 acres x $7,693.00 = $18,729.35
Acres of Lots 1 and 3, Block 1 Commercial Park
Dedication Rate
Commercial Park
Dedication
120 dwelling units x $1,972.00 = $236,640.00
Units on Lot 2, Block 1 High Density Park
Dedication Rate
High Density Park
Dedication
$18,729.35 + $236,640.00 = $255,333.99
Commercial Park Dedication High Density Park
Dedication
Total Required with
the final plat
Kenyon Avenue is a major collector roadway and consistent with the City’s Transportation
Plan, the Developer shall install an 8-foot wide sidewalk along the south and west side of
Kenyon Avenue adjacent to the plat. The Developer shall construct the sidewalk from the
existing driveway at Kent 46 to the proposed north driveway entrance with the final plat
improvements. The Developer will receive a $7,045.07 credit for the cost of the sidewalk
construction west of the plat to make a connection to the driveway at Kent 46. The credit was
based on an estimate provided by the Developer’s engineer.
The remainder of the sidewalk from the north driveway entrance to the south plat boundary
will be constructed with the future Kenyon Avenue roadway improvements. The Developer
shall grade the trail bench between the proposed driveway entrances with the final plat
improvements. The Developer shall post a $103,020.67 escrow for the future sidewalk
construction, based on an estimate provided by the Developer’s Engineer.
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR
Lee Lake Subdivision is located within subdistrict CL-41200 of the Crystal Lake sanitary sewer
district as identified in the City’s Comprehensive Sanitary Sewer Plan. Wastewater will be
conveyed via existing trunk sanitary sewer to the MCES Burnsville Southwest Interceptor and
continue to the Seneca Wastewater Treatment Facility. The downstream facilities have
sufficient capacity to serve the proposed commercial development.
Development of Lee Lake Subdivision includes the extension of two private sanitary sewer
services that were installed with the Interstate-35/CSAH 46 Interchange Project (City Project
91-3). The sanitary sewer improvements were assessed to the parent parcels and therefore
the lateral sanitary sewer access charge will not be collected with the final plat.
LLEEEE LLAAKKEE SSUUBBDDIIVVIISSIIOONN –– FFIINNAALL PPLLAATT
MMAAYY 1177,, 22001177
PPAAGGEE 55 OOFF 1111
The Trunk Sanitary Sewer Area Charge was previously assessed to the parent parcels. The
assessments have been paid and therefore the Sanitary Sewer Availability Charge will be not
required with the final plat.
WWAATTEERRMMAAIINN
The watermain within Kenyon Avenue to serve the proposed development was constructed
with the Interstate-35/CSAH 46 Interchange Project (City Project 91-3) and previously
assessed to the parent parcels; therefore, the lateral watermain access charge will not be
collected with the final plat.
Development of Lee Lake Subdivision includes the extension of the two existing private
watermain stubs located on the parent parcels. Privately owned and maintained 8”
watermain will be extended throughout Lots 1, 2, and 3 to provide water service to the
proposed building improvements.
A cross access easement is required for the privately owned and maintained sanitary sewer
and watermain that will be installed across multiple property lines to serve the subdivision.
Final locations and sizes of all sanitary sewer and watermain facilities will be reviewed by City
staff with the building permit application and final construction plans.
One of the parent parcels (PID No. 2200110080104) was connected to City utilities and paid
the sanitary sewer and watermain unit fees. The Developer is eligible to receive one City Sac
Unit and Watermain Unit credit for the property that was connected to City utilities.
OOVVEERRHHEEAADD LLIINNEESS
Overhead utility lines and poles are located on the southeast corner of the plat within Outlot
A. Consistent with the City’s Public Ways and Property Ordinance, the Developer shall remove
and place underground the existing overhead lines and poles with the final plat
improvements. The Developer shall submit a $25,000 security with the final plat to ensure
that the overhead lines and poles are removed.
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
Lee Lake Subdivision is located within subdistrict CL-12 of the Crystal Lake stormwater district
as identified in the City’s Water Resources Management Plan.
Development of Lee Lake Subdivision includes the construction of one publicly owned and
maintained stormwater basin and one privately owned and maintained infiltration basin. The
private infiltration basin will be located on Lot 2, Block 1 and will treat runoff generated from
the roof-tops and green space on the private lot. The Developer shall sign a private
maintenance agreement for the infiltration basin and dedicate a maintenance easement over
the basin area prior to City Council consideration of the final plat. The public stormwater
management basin will be located within Outlot A and will treat runoff generated for Lots 1,
2, and 3, Block 1 and Kenyon Avenue. The stormwater management design is consistent with
City requirements.
LLEEEE LLAAKKEE SSUUBBDDIIVVIISSIIOONN –– FFIINNAALL PPLLAATT
MMAAYY 1177,, 22001177
PPAAGGEE 66 OOFF 1111
Following completion of the site improvements and restoration, the Developer shall conduct
two double ring infiltrometer tests in the location of the infiltration basins to demonstrate
that the design infiltration rates have been achieved. The Developer shall provide a $2,000
security to ensure that this testing is completed.
The final grading plan shall identify all fill lots in which the building footings will be placed on
fill material. The grading specifications shall also indicate that all embankments meet
FHA/HUD 79G specifications. The Developer shall certify to the City that all lots with footings
placed on fill material are appropriately constructed. Building Certificate of Occupancies will
not be issued until a soils report and an as-built certified grading plan have been submitted
and approved by City staff.
Lee Lake Subdivision contains more than one acre of site disturbance. A National Pollution
Discharge Elimination System General Stormwater Permit for construction activity is required
from the Minnesota Pollution Control Agency for areas exceeding one acre being disturbed
by grading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the
City upon receipt from the MPCA.
SSTTOORRMM SSEEWWEERR
Development of Lee Lake Subdivision includes the construction of a private and public storm
sewer system. All of the storm sewer within Lots 1, 2, and 3 shall be privately owned and
maintained. The storm sewer within the Kenyon Avenue right-of-way and outlet control
structure for the stormwater management basin within Outlot A will be publically owned and
maintained.
The Developer will re-route the existing storm sewer within Kenyon Avenue through the site
to the public stormwater management basin in Outlot A to provide water quality and rate
control of the stormwater runoff generated within the public right-of-way. The existing storm
sewer currently discharges directly to Lee Lake without treatment and the storm sewer re-
route will provide a water quality improvement to the City’s water resources. The City will
credit the Developer $121,095.16 for the cost of the storm sewer re-route and the oversizing
of the storm sewers and stormwater basins within the site necessary to convey the additional
runoff.
The storm sewer re-route will require excavation within Kenyon Avenue. The Developer shall
maintain traffic at all times during the storm sewer construction.
The Trunk Storm Sewer Area Charge has not been collected and shall be paid with paid with
the final plat. The Trunk Storm Sewer Area Charge is calculated as follows:
106,051.00 sf x $0.250 = $26,512.75
Area of Lots 1 and 3, Block 1 Commercial Area
Charge
Commercial Area
Charge
182,001.00 sf x $0.198 = $36,036.20
LLEEEE LLAAKKEE SSUUBBDDIIVVIISSIIOONN –– FFIINNAALL PPLLAATT
MMAAYY 1177,, 22001177
PPAAGGEE 77 OOFF 1111
Area of Lot 2, Block 1 Multi-Family
Residential Charge
Multi-Family Residential
Charge
$26,512.75 + $36,036.20 = $62,548.95
Commercial Trunk
Storm Sewer
Multi-Family Residential
Trunk Storm Sewer
Total Required with
the final plat
The Developer will receive a credit to the Trunk Storm Sewer Area Charge for deeding Outlot
A to the City, consistent with City policy. The credit is based on the area of Outlot A at the rate
of $5,500 per acre. The credit will be applied to the final plat cash fees, calculated as follows:
(17.945 acres) x $5,500/acre = $98,670.00
Total Area of Outlot A Per Acre Credit Total
The Crystal Lake Surcharge has not been collected on the parent parcels and must be paid
with the final plat, calculated as follows:
106,051.00 sf x $0.0195 = $2,067.99
Area of Lots 1 and 3, Block 1 Commercial Area
Charge
Commercial Area
Charge
182,001.00 sf x $0.0153 = $2,784.62
Area of Lot 2, Block 1 Multi-Family
Residential Charge
Multi-Family Residential
Charge
$2,067.99 + $2,784.62 = $4,852.61
Commercial Charge Multi-Family Residential
Charge
Total Required with
the final plat
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the
building permit application and final construction plans.
RREETTAAIINNIINNGG WWAALLLLSS
Development of Lee Lake Subdivision includes the construction of a privately owned and
maintained big block segmental retaining wall. The proposed retaining wall will be located
within a drainage and utility easement on Lot 2 adjacent to Kenyon Avenue. The Developer
shall post a $30,000 security and enter into an encroachment agreement with the City prior to
City Council consideration of the final plat for the private improvements to be constructed
within the City’s easement. Retaining walls with a combined height greater than four feet
shall be designed by a registered geotechnical or structural engineer and constructed in
accordance with plans and specifications consistent with MnDOT requirements. A separate
building permit from the City’s Building Official is required prior to the construction of the
wall. The wall shall be inspected during construction and certified by the design engineer
following construction.
LLEEEE LLAAKKEE SSUUBBDDIIVVIISSIIOONN –– FFIINNAALL PPLLAATT
MMAAYY 1177,, 22001177
PPAAGGEE 88 OOFF 1111
SSHHOORREELLAANNDD OOVVEERRLLAAYY DDIISSTTRRIICCTT
Lee Lake Subdivision is located within the Shoreland Overlay District of Lee Lake and is
therefore subject to the Shoreland Overlay District requirements. The maximum impervious
surface coverage allowed within the Shoreland Overlay District is 25%. The impervious
surface coverage for Lee Lake Subdivision is calculated as follows:
131,511.20 s.f. / 660932.60s.f. = 19.90%
Impervious Surface of Lee
Lake Subdivision, excluding Lee Lake
Net Area of Lee Lake
Subdivision, excluding Lee
Lake
Total Percent
Impervious
FEMA FLOODPLAIN ANALYSIS
A portion of Lee Lake Subdivision (entirely contained within Outlot A) is located within areas
shown on the Flood Insurance Rate Map (FIRM) as Zone A, Flood Hazard Zone. Based on this
designation, a portion of the development is located within a Special Flood Hazard Area
(SFHA), as determined by FEMA. No improvements or grading is proposed within this area.
The remaining area of Lee Lake Subdivision is shown on the FIRM as Zone X, which is not
designated as a SFHA.
WWEETTLLAANNDDSS
A wetland delineation for the site was conducted by Wenk Associates. Three wetland areas
were identified within the project boundaries. In addition to the delineation a No-Loss was
approved for wetland 3.
TTRREEEE PPRREESSEERRVVAATTIIOONN
A tree preservation plan has been submitted. The plan shows a total of 215 significant trees
within the project area. The plan proposes to save 165 trees (77%).
The tree preservation plan satisfies City requirements. All “save” trees that are damaged or
removed will require replacement at a ratio of 2:1 as per the Lakeville Subdivision Ordinance.
EERROOSSIIOONN CCOONNTTRROOLL
The plans include a detailed erosion and sediment control plan. The Developer is responsible
for meeting all the requirements of the MPCA Construction Permit. Additional erosion control
measures may be required during construction as deemed necessary by City staff or the
Dakota County Soil and Water District. Any additional measures required shall be installed
and maintained by the Developer.
LLEEEE LLAAKKEE SSUUBBDDIIVVIISSIIOONN –– FFIINNAALL PPLLAATT
MMAAYY 1177,, 22001177
PPAAGGEE 99 OOFF 1111
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to Lee Lake Subdivision.
CONSTRUCTION COSTS
Public Street and Sidewalk Improvements $79,161.55
Kenyon Avenue Storm Sewer 46,335.16
Site Grading, Erosion Control, Restoration and Grading
Certification
Infiltration and Filtration Basin Restoration
78,987.75
25,000
SUBTOTAL - CONSTRUCTION COSTS $ 229,484.46
OTHER COSTS
Developer’s Design (3.0%) $ 6,884.53
Developer’s Construction Survey (2.5%) 5,737.11
City’s Legal Expense (0.5%) 1,147.42
City Construction Observation (5.0%) 11,474.22
Developer’s Record Drawing (0.5%) 1,147.42
Building and Site Removals
One Year Real Estate Taxes
Retaining Wall
Overhead Utility Removal
Infiltration Testing
Landscaping
50,000.00
59,780.46
30,000.00
25,000.00
2,000.00
65,000.00
Street Lights 2,800.00
Lot Corners/Iron Monuments 400.00
SUBTOTAL - OTHER COSTS $261,371.16
TOTAL PROJECT SECURITY $ 490,855.62
The street light security totals $2,800 which consists of two mast-arm street lights at $1,400
each.
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
$400.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all
irons have been placed following site grading, street and utility construction.
CCAASSHH FFEEEESS
A cash fee for traffic control signs is due with Lee Lake Subdivision. Street signing consists of a
right turn lane sign for $350.00, and a mobilization fee of $150.00 a total of $500.00. If the
street signs are installed during frost conditions, the developer shall pay an additional
$150.00 for each street sign location.
LLEEEE LLAAKKEE SSUUBBDDIIVVIISSIIOONN –– FFIINNAALL PPLLAATT
MMAAYY 1177,, 22001177
PPAAGGEE 1100 OOFF 1111
A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat
approval and is calculated as follows:
120 units x $35.03/unit. = $4,203.60
Dwelling Units Streetlight Operating Fee Total
(210 lf + 607.86) x $.2451/ff/qtr. x 4 qtrs. = $801.83
Lot 3, Block 1 Frontage Lot 1, Block 1 Frontage Streetlight Operating Fee Total
$4,203.60 + $801.83 = $5,005.43
Residential Commercial Total
A cash fee for one-year of environmental resources expenses shall be paid at the time of final
plat approval and is calculated as follows:
120 units x $9.30/unit/qtr. x 0.25 x 4 qtrs. = $1,116.00
Dwelling Units Environmental Resources Fee Utility Factor Total
(1.49 acres +0.94 acres) x $9.30/unit/qtr. x 4.2 x 4 qtrs. = $379.66
Lot 1, Block 1 Lot 3, Block 1 Environmental Resources Fee Utility Factor
$1,116.00 + $379.66 = $1,495.66
Residential Commercial Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
4 units x $90.00/unit = $360.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be in either .dwg (AutoCAD) or .dxf format.
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction cost, or $6,884.53.
CASH REQUIREMENTS
Kenyon Avenue Future Upgrade Fee
Park Dedication Fee
Future Sidewalk Construction – Kenyon Avenue
Future Driveway Entrance
Trunk Storm Sewer Area Charge
$
167,491.20
255,333.99
103,020.67
1,500.00
62,548.95
Crystal Lake Surcharge
Traffic Control Signs
4,852.61
500.00
LLEEEE LLAAKKEE SSUUBBDDIIVVIISSIIOONN –– FFIINNAALL PPLLAATT
MMAAYY 1177,, 22001177
PPAAGGEE 1111 OOFF 1111
Streetlight Operating Fee 5,005.43
Environmental Resources Fee 1,495.66
City Base Map Updating Fee 360.00
City Engineering Administration (3.00%) 6,884.53
TOTAL - CASH REQUIREMENTS $608,993.04
CREDITS TO THE CASH REQUIREMENTS WITH FINAL PLAT
Off-site Sidewalk Construction (Park Dedication)
Storm Sewer Re-route (Trunk Storm Sewer)
Outlot A (deeded to City) (Trunk Storm Sewer)
$ 7,045.07
121,095.16
98,670.00
SUBTOTAL- CREDITS TO CASH REQUIREMENT
TOTAL CASH REQUIREMENTS WITH FINAL PLAT
= $226,810.23
= 382,182.81
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the final plat, site plan, grading and erosion control
plan, utility plan, tree preservation plan and easement vacation for Lee Lake Subdivision,
subject to the requirements and stipulations within this report.