Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Item 07.d
• • • • • • • • 2 • • • • • • Feasibilty Report Bid Results*Change 1,948.64$ 1,967.00$ 0.94% FF Rate Street Improvements (U. 206th St. - 210th St.)155.53 135.44 -12.92% FF Rate Sign Improvements (U. 206th St. - 210th St.)5.56 3.54 -36.33% SF Unit Rate (210th St. - 215th St.)1053.84 960.15 -8.89% FF Rate Street Improvements (210th St. - 215th St.)11.02 8.65 -21.51% 3 4