HomeMy WebLinkAboutItem 02 Date: Item No.
SPIRIT OF BRANDTJEN FARM 18TH ADDITION FINAL PLAT
Proposed Action
Staff recommends adoption of the following motion: Move to approve: 1) a resolution approving the
Spirit of Brandtjen Farm 18th Addition final plat, 2) a resolution vacating public drainage and utility
easements, and 3) a resolution designating “No Parking” areas.
Overview
Tradition Development (a/k/a SBF Development Corp.) representatives are requesting approval of the
Spirit of Brandtjen Farm (SBF) 18th Addition final plat of 55 single family lots, 63 detached townhome
lots, five HOA common area lots, one HOA community clubhouse lot, and 13 outlots. This is the first
phase of the SBF 18th Addition preliminary plat of 190 single family lots and 63 detached townhome
lots approved by the City Council on May 15, 2017. SBF 18th Addition is located south of 160th Street
(CSAH 46) and east of Eagleview Drive. The layout of the final plat is consistent with the approved
preliminary plat.
In conjunction with the final plat, the developer is requesting the vacation of a public drainage and
utility easement located on one of the parent parcels, which will be replaced by a new drainage and
utility easement with the SBF 18th Addition final plat. A “No Parking” resolution is also required in
conjunction with the final plat consistent with the street designs approved with the SBF PUD. The
Planning Commission held a public hearing on the easement vacation request at their July 20, 2017
meeting and unanimously recommended approval. There was no public comment.
Primary Issue to Consider
• Who is responsible for installing and maintaining the greenway trail corridor landscaping within
Outlot D?
Supporting Information
• Staff response to Primary Issue to Consider
• Final plat, easement vacation, and “No Parking” resolutions
• Signed development contract, warranty deed, temporary turnaround easement agreements
• July 20, 2017 draft Planning Commission meeting minutes
• July 12, 2017 planning report and July 18, 2017 engineering report
Financial Impact: $ Budgeted: Y☐ N☐ Source:
Related Documents: (CIP, ERP, etc.):
Envision Lakeville Community Values: A Home for All Ages and Stages of Life
Report Completed by: Daryl Morey, Planning Director
July 24, 2017
Subdivision Ordinance, SBF PUD Booklet
Staff Response to Primary Issue to Consider
• Who is responsible for installing and maintaining the greenway trail corridor landscaping within
Outlot D?
The developer is proposing to install landscaping within Outlot D for the greenway trail corridor
that exceeds the standards included in the approved Dakota County North Creek Greenway Master
Plan. The developer has agreed to maintain the landscaping and planting beds in perpetuity. The
City will maintain the grass turf, after it has been established, in the area between the trail and the
landscape plantings. A landscape maintenance agreement is being drafted but has not yet been
finalized. The maintenance agreement will be forwarded to the City Council for consideration at a
future meeting after the details have been finalized.
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. __________
RESOLUTION APPROVING THE FINAL PLAT OF
SPIRIT OF BRANDTJEN FARM 18TH ADDITION
WHEREAS, the owner of the plat described as Spirit of Brandtjen Farm 18th
Addition has requested final plat approval; and
WHEREAS, the preliminary plat was reviewed by the Planning Commission and
the Parks, Recreation and Natural Resources Committee and approved by the City
Council; and
WHEREAS, the final plat is consistent with the approved preliminary plat; and
WHEREAS, the final plat is acceptable to the City.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The final plat of Spirit of Brandtjen Farm 18th Addition is hereby approved
subject to the development contract and planned unit development
agreement, the security requirements, and the terms and conditions of the
Spirit of Brandtjen Farm Master Planned Unit Development Stage Plan
Agreement dated October 17, 2005.
2. The Mayor and City Clerk are hereby directed to sign the final plat mylars and
the development contract.
3. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
ADOPTED by the Lakeville City Council this 24th day of July 2017.
CITY OF LAKEVILLE
BY: _______________________
Douglas P. Anderson, Mayor
ATTEST:
________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _______ is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 24th day of July 2017 as shown by the
minutes of said meeting in my possession.
________________________
Charlene Friedges, City Clerk
(SEAL)
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO._________
RESOLUTION VACATING PUBLIC DRAINAGE AND UTILITY EASEMENTS
WHEREAS, the City Council has conducted a public hearing, preceded by two (2)
weeks published notice, to consider the following described public drainage and utility
easement vacation, and
WHEREAS, the City Council has determined that it is in the public interest to approve
the public drainage and utility easement vacation.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The following public drainage and utility easements are hereby vacated:
A vacation of all the drainage and utility easements, as dedicated on the recorded plat of
SPIRIT OF BRANDTJEN FARM COMMERCIAL 2ND ADDITION, Dakota County, Minnesota,
which lie within Outlot G, said plat.
2. The City Clerk is directed to file a certified copy of this resolution with the Dakota
County Recorder.
ADOPTED by the Lakeville City Council this 24th day of July 2017
CITY OF LAKEVILLE
________________________
Douglas P. Anderson, Mayor
ATTEST:
________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _______ is a true and correct copy of the
resolution presented to and adopted by the City Council of the City of Lakeville at a duly
authorized meeting thereof held on the 24th day of July 2017, as shown by the minutes of said
meeting in my possession.
___________________________
Charlene Friedges, City Clerk
(SEAL)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO:
RESOLUTION DESIGNATING “NO PARKING” AREAS ON
162ND STREET, DUSKWOOD TRAIL, DUTCH BARN DRIVE, DURANGO TRAIL,
DUNFIELD DRIVE, AND DRYDEN ROAD
WHEREAS, the City Council for the City of Lakeville is authorized in accordance
with City Code to designate parking zones within the city, and
WHEREAS, the section of 162nd Street will be constructed to allow a single traffic
lane in each direction with no parking on both sides, and the sections of Duskwood
Trail, Dutch Barn Drive, Durango Trail, Dunfield Drive, and Dryden Road will be
constructed to allow a single traffic lane in each direction with parking on one side only,
all in Spirit of Brandtjen Farm 18th Addition, consistent with the approved street sections
in the Spirit of Brandtjen Farm planned unit development, and
WHEREAS, establishing “No Parking” areas on 162nd Street, Duskwood Trail,
Dutch Barn Drive, Durango Trail, Dunfield Drive, and Dryden Road will discourage
potential on-street parking, maintain sufficient access to the traffic lanes, provide
increased sight lines for drivers, and reduce the interaction between vehicles and
pedestrians.
NOW, THEREFORE, BE IT RESOLVED, that both sides of 162nd Street, the
west side of Duskwood Trail, the south side of Dutch Barn Drive, the southeast sides of
Durango Trail and Dunfield Drive, and the east side of Dryden Road shall be designated
“No Parking” anytime.
ADOPTED by the Lakeville City Council this 24th day of July 2017.
CITY OF LAKEVILLE
By: ________________________
Douglas P. Anderson, Mayor
ATTEST:
__________________________________
Charlene Friedges, City Clerk
CITY OF LAKEVILLE
PLANNING COMMISSION MEETING MINUTES
July 20, 2017
Chair Swenson called the meeting to order at 6:00 p.m. in the Council Chambers at City
Hall. The pledge of allegiance to the flag was given.
Members Present: Chair Jason Swenson, Brooks Lillehei, Jason Kelvie, Karl Drotning,
ex-officio member Mike Lamm
Members Absent: Vice Chair Pat Kaluza, Scott Einck, Paul Reuvers
Others Present: Daryl Morey, Planning Director
3. Approval of the Meeting Minutes
The June 29, 2017 Planning Commission meeting minutes were approved as
presented.
4. Announcements
None
5. Spirit of Brandtjen Farm 18th Addition
Chair Swenson opened the public hearing to consider the application of SBF
Development Corp. for a vacation of public drainage and utility easements, located
south of 160th Street (CSAH 46) and east of Eagleview Drive.
Mr. Morey presented the planning report. He stated the easement vacation is in
conjunction with the Spirit of Brandtjen Farm 18th Addition final plat.
Chair Swenson opened the hearing to the public for comment.
There were no comments from the audience.
Motion was made by Lillehei seconded by Drotning to close the public hearing
at 6:02 p.m.
Voice vote was taken on the motion. Ayes – unanimous
Chair Swenson asked for comments from the Planning Commission. There were no
comments.
Planning Commission Meeting Minutes, July 20, 2017 Page 2
Motion was made by Lillehei seconded by Kelvie to recommend to City Council
approval of the public drainage and utility easement vacation subject to the recording
of the Spirit of Brandtjen Farm 18th Addition final plat.
Ayes: Kelvie, Lillehei, Swenson, Drotning
Nays: 0
There being no further business, the meeting was adjourned at 6:03 p.m. and the
Planning Commission immediately went into their work session.
Respectfully submitted,
Daryl Morey, Planning Director
MEMORANDUM
TO: Daryl Morey
FROM: D. Daniel Licht, AICP
DATE: 12 July 2017
RE: Lakeville – SBF; 18th Addition Final Plat
TPC FILE: 135.01
BACKGROUND
SBF Development Corporation has submitted final plat plans for Spirit of Brandtjen Farm 18th
Addition. The final plat consists of one club house lot, 63 detached townhouse lots, five
detached townhome base lots, 55 single family lots, 13 outlots, and public right-of-way located
south of 162nd Street and east of Eagleview Drive. The subject site is zoned PUD, Planned Unit
Development District as approved by the City Council on 20 June 2005. The PUD Development
Stage Plan and preliminary plat for SBF 18th Addition was approved by the City Council on 15
May 2017.
Exhibits:
A. Site Location Map
B. Title Sheet
C. Approved Preliminary Plat
D. Site Plan
E. Final Plat (6 pages)
ANALYSIS
SBF Land Use. The SBF Land Use Plan (Page 3.4 of the SBF PUD Booklet) illustrates
development of various forms of multiple family residential dwellings in the area of SBF 18th
2
Addition and guides the area for Low-Medium Density Residential (3-5du./ac.), Medium Density
Residential (6-8du./ac.), High Density Residential(12+du/ac.), Residential Village Center, public
park and trailway, and HOA park and trailway land uses. While lower in density than that
guided by the SBF Master Site Plan, the proposed land uses approved with the SBF 18th Addition
PUD Development Stage Plan and preliminary plat maintain the minimum of 3.0 dwelling units
per acre of density required by the Metropolitan Council for the City’s overall 2030 Land Use
Plan. Inclusion of the 63 detached townhomes is a positive addition of alternative single family
dwellings to the housing within SBF and the City’s overall housing stock.
Detached Townhomes. The final plat includes all of the 63 detached townhouse lots approved
with the SBF 18th Addition PUD Development Stage Plan and preliminary plat. The PUD
Development Stage Plan and preliminary plat provided each block of detached townhouses
more than 7,500 square feet of lot area per dwelling unit, which exceeds the requirements for
detached townhomes established for such uses in the RST-2 District. The proposed setbacks for
the detached townhomes are consistent with those established for townhouse uses within
areas designated for low to medium density land uses by the PUD Standards table on page 7.1
of the SBF PUD Booklet except that the PUD Standards specify a minimum 20 foot setback
between buildings. The PUD Development Stage Plan/preliminary plat was approved to allow a
minimum of 15 feet between buildings consistent with setbacks between detached townhouse
buildings required within the RST-2 District.
Single Family Lots. The 55 single family lots are proposed with a minimum 60 foot width
consistent with the minimum lot requirement for cottage lots as set forth in Section 7 of the
SBF PUD Booklet, shown in the table below:
Min.
Lot
Width
Setbacks
Front Side Rear
House Garage
Door Garage Interior
Corner
House Garage
Door Garage House Garage
60ft. 20ft. 25ft. 15ft. 7ft. 15ft 25ft 15ft 20ft. 10ft.
Clubhouse. Development of Lot 6, Block 1 will be subject to a separate application for a PUD
Development Stage Plan and subject to the performance standards outlined by 11-53-7.D of the
Zoning Ordinance for clubhouse facilities within residential areas.
Streets. The final plat includes right-of-way for 162nd Street as well as internal streets. The
right-of-way for 162nd Street is 80 feet consistent with the preliminary plat and requirements
for a minor collector roadway. Internal streets have 52 foot right-of-way consistent with the
preliminary plat and Street SC.3 in the SBF PUD Booklet. Street names shown on the final plat
comply with the Dakota County Grid System. Temporary cul-de-sacs must be provided at the
terminus of Duskwood Trail, Durango Trail, and Dunfield Drive. All street construction plans are
subject to review and approval of the City Engineer.
3
Pedestrian Access. Development of SBF 18th Addition includes the construction of public
sidewalks and both public and public accessible/privately maintained trails. There will be five
foot wide concrete sidewalks constructed along both sides of all streets. Privately owned and
publicly accessible trails will be constructed within Outlots B, C, and E and Lot 6, Block 1 (HOA
clubhouse).
The Parks, Trails, and Open Space Plan identifies a 10-foot wide bituminous trail along the south
side of 160th Street adjacent to the development. The Developer must grade the trail bench
from Pilot Knob Road to Diamond Path with the SBF 18th Addition preliminary plat
improvements. The trail will be constructed from Pilot Knob Road to Eagleview Drive at the
time Outlots K and L, SBFC 2nd Addition are final platted into lots and blocks, and from
Eagleview Drive to Diamond Path at the time Outlots L and M, SBF 18th Addition are final
platted into lots and blocks. Additionally, the Developer must explore the possibility of
providing a connection from the trail along 160th Street to the greenway corridor at the time
Outlots L and M, SBF 18th Addition are preliminary platted into lots and blocks with a PUD
Development Stage Plan.
Landscaping. A landscape plan was approved with the PUD Development Stage Plan and
preliminary plat. Plantings must be installed in the yards abutting Eagleview Drive, the
detached townhouse foundations and common open spaces, and interior street boulevards
consistent with the landscape plan approved with the preliminary plat and PUD Development
Stage Plan. The developer will be required to provide a security for installation of the
landscaping within the proposed final plat as part of the development agreement.
Park Dedication. The Parks, Trails and Open Space Plan and SBF Land Use Plan identify the area
of the parent parcels as a location for a future greenway corridor and trail system. The
greenway corridor will follow the alignment of the existing Metropolitan Council Sanitary Sewer
easement, extending from the at-grade street crossing at 162nd Street to the pedestrian
underpass at Eagleview Drive. The Developer proposes to construct the greenway corridor
improvements, which include, but are not limited to, the construction of a trail, lighting
(including electrical), and landscaping. The City will credit the Developer’s park dedication for
the cost of the greenway corridor improvements and land to be dedicated, consistent with the
SBF Master PUD Agreement. The credit is calculated as follows:
Gross area of SBF 18th Addition 122.86 acres
Less:
160th St. Right-of-way 0.003 acres
Outlot F 0.15 acres
Outlot G 6.68 acres
Outlot H 16.99 acres
Outlot I 20.95 acres
Outlot J 2.84 acres
Outlot K 9.61 acres
4
Outlot L 17.28 acres
Outlot M 3.75 acres
Net Area of SBF 18th Addition 44.61 acres
Detached Dwelling Units 118 units
Net Density 2.65 units/acre
Consistent with the SBF Land Use Plan, the land required to be dedicated for park dedication
for a density of 2.65 units/acre is 11%. Therefore, the land required to be dedicated with SBF
18th Addition is 4.91 acres. The Developer is proposing to dedicate Outlot D (greenway corridor)
to the City to satisfy a portion of the park dedication requirement. Outlot D is encumbered by
existing utility easements owned by the Metropolitan Council and City of Apple Valley which
shall be excluded from the land dedication calculation as the City is not able to use the
encumbered land to its maximum extent. The total land dedicated within Outlot D, excluding
the easements, is 2.34 acres. Consistent with the SBF Master PUD Agreement, the value of the
dedicated land and the cost of the park development incurred by the Developer shall be
determined and subtracted from the required cash contribution. The required cash
contribution with the final plat as outlined by the Engineering Division review.
The City has agreed to reimburse the Developer in the form of a credit with the final plat for the
land outside of the easements and the construction of the improvements within the greenway
corridor in Outlot D. The greenway corridor improvements shall include the construction of the
10-foot wide bituminous trail, trail lighting (including electrical), and landscaping. The City must
approve the improvement plans for Outlot D to ensure that the credit will be applied to the
improvements that the City is requiring to be installed within the corridor, consistent with the
approved Dakota County North Creek Greenway Master Plan. The Developer must coordinate
with the Metropolitan Council and City of Apple Valley for all improvements that are proposed
to be constructed within the existing easements on Outlot D. Prior to approval of construction
plans for the project, the Developer must submit in writing confirmation from the Metropolitan
Council and City of Apple Valley that they have approved the plans for the improvements within
the easements. The credit amount will be determined at the time the greenway corridor
improvement plan is approved, but is estimated in the Engineering Division memorandum as
$32,252.61.
The Developer (or HOA as assigned) will maintain the trees, landscaping, and turf surrounding
these improvements within Outlot D permanently. The Developer must enter into a
maintenance agreement for the landscaping improvements prior to recording the final plat. The
Developer will plant and maintain all landscaping and turf within Outlot D until it has been
completely established, as determined by the City’s Parks and Recreation Director. After the
turf has been established, the City will maintain the turf (with the exception of the areas
directly adjacent to the landscaping and trees) within Outlot D. The Developer must provide a
two year warranty for all landscaping and shall re-plant any dead or damaged landscaping
within the warranty period.
5
The Parks, Trails, and Open Space Plan also identifies a 10-foot wide bituminous trail along the
south side of 160th Street adjacent to the development. The Developer shall grade the trail
bench from Pilot Knob Road to Diamond Path with the SBF 18th Addition preliminary plat
improvements and construct the trail from Pilot Knob Road to Diamond Path as follows:
• Pilot Knob Road to Eagleview Drive with the development of Outlots L and K, SBF
Commercial 2nd Addition.
• Eagleview Drive to Diamond Path with the development of Outlots L and M, SBF 18th
Addition.
The remainder of the park dedication will be collected in the form of cash fees in lieu of land for
Outlots F, G, H, I, J, K, L, and M at the time they are final platted into lots and blocks, and will be
determined with each phase final plat, consistent with the SBF Master PUD Agreement.
Additionally, the Developer must explore the possibility of providing a connection from the trail
along 160th Street to the greenway corridor within the PUD Development Stage Plan and
preliminary plat for Outlots L and M.
Grading Plan. The developer has submitted grading, drainage and erosion control plans. All
grading plans are subject to review and approval by the City Engineer.
MUSA/Utilities. The subject site is located within the current MUSA and plans have been
submitted for extension of sanitary sewer and water utilities to serve the proposed SBF 18th
Addition. All utility plans are subject to review and approval of the City Engineer.
Outlots. The final plat includes the following outlots:
Outlots Purpose Ownership
A Stormwater basin Deed to City
B, C, E HOA maintained/
publicly accessible open space
HOA
D Public greenway trail corridor Deed to City
F, G, H, I, J,K, L, M Future development Developer
Easements. The final plat illustrates drainage and utility easements at the perimeter of all of
the lots as required by Section 10-4-4 of the Subdivision Ordinance. All drainage and utility
easements are subject to review and approval of the City Engineer.
Homeowners Association. Documents including SBF 18th Addition as part of the SBF Master
Homeowners Association and establishing separate homeowners association provisions for the
detached townhomes are required. All homeowners association documents are subject to
review and approval by the City Attorney.
6
Development Agreement. The Subdivision Ordinance requires the developer to provide
construction and warranty securities for the public improvements within the final plat that are
to be outlined within a development agreement. The development agreement will be drafted
by the City Attorney and is to be executed by the applicant prior to City Council consideration of
the final plat.
CONCLUSION
The SBF 18th Addition final plat is consistent with the requirements of the SBF PUD District,
Zoning Ordinance, Subdivision Ordinance, and PUD Development Stage Plan and preliminary
plat. Our office and City staff recommends approval of the proposed development subject to
the conditions outlined below:
1. SBF 18th Addition shall be developed consistent with the approved SBF Master Plan, the
PUD booklet dated 20 June 2005 and the PUD Development Stage Plan/Preliminary Plat.
2. The single family lots within the SBF 18th Addition final plat are subject to the
requirements established for cottage lots and traditional lots as shown on the Lot
Designation Plan approved with the PUD Development Stage Plan.
3. The detached townhouse units within the SBF 18th Addition final plat are subject to the
following setback requirements:
Min.
Lot
Width
Setbacks
Front Side Rear
House Garage
Door Garage Btwn.
Bldgs.
Corner
House Garage
Door Garage House
NA 15ft. 25ft. 15ft. 15ft. 20ft 25ft 15ft 15ft.
4. Development of Lot 6, Block 1 will be subject to a separate application for a PUD
Development Stage Plan and subject to the performance standards outlined by 11-53-
7.D of the Zoning Ordinance for clubhouse facilities within residential areas.
5. All street construction plans, including provision of temporary cul-de-sacs, shall be
subject to review and approval of the City Engineer.
6. Outlot A shall be deeded to the City for storm water management purposes.
7. All grading, drainage and erosion control plans shall be subject to review and approval
of the City Engineer.
8. All utility plans shall be subject to review and approval of the City Engineer.
7
9. Park dedication requirements shall be satisfied at the time of final plat approval as:
a. Dedication of Outlot D to the City.
b. Payment of a cash fee in lieu of land of $267,750.00 based on the formula
established by the SBF Master PUD Development Agreement, and:
(1) The City shall credit the developer for the construction of improvements
within Outlot D, estimated to be $306,002.62.
(2) The improvements within Outlot D shall include the construction of the
10-foot wide bituminous trail, trail lighting, benches, and landscaping as
approved by the City.
(3) The Developer shall submit in writing confirmation from the
Metropolitan Council and City of Apple Valley approval of the plans for
the improvements within easements within Outlot D prior to City
approval of construction plans.
(4) The Developer (or HOA as assigned) shall maintain the trees, landscaping,
and turf surrounding these improvements within Outlot D permanently
and shall enter into a maintenance agreement for the landscaping
improvements prior to recording the final plat.
(5) The Developer shall plant and maintain all landscaping and turf within
Outlot D until it has been completely established, as determined by the
City’s Parks and Recreation Director; after the turf has been established,
the City shall maintain the turf (with the exception of the areas directly
adjacent to the landscaping and trees) within Outlot D.
(6) The Developer shall provide a two year warranty for all landscaping and
shall re-plant any dead or damaged landscaping within the warranty
period.
c. The remainder of the park dedication will be collected in the form of cash fees in
lieu of land for Outlots F, G, H, I, J, K, L, and M at the time they are final platted
into lots and blocks as determined with each phase final plat, consistent with the
SBF Master PUD Agreement.
d. The PUD Development Stage Plan and preliminary plat for Outlots L and M shall
provide for a trail connection from the trail along 160th Street to the greenway
corridor.
8
10. The Developer shall grade the trail bench from Pilot Knob Road to Diamond Path with
the SBF 18th Addition preliminary plat improvements and construct the trail from Pilot
Knob Road to Diamond Path as follows:
a. Pilot Knob Road to Eagleview Drive with the development of Outlots L and K, SBF
Commercial 2nd Addition.
b. Eagleview Drive to Diamond Path with the development of Outlots L and M, SBF
18th Addition
11. Homeowners Association documents for SBF 18th Addition are subject to review and
approval by the City Attorney.
12. The applicant shall execute a development agreement with the City as drafted by City
Attorney and subject to approval of the City Council.
c. Justin Miller, City Administrator
Alex Jordon, Senior Project Engineer
John Hennen, Parks and Recreation Director
Andrea McDowell Poehler, City Attorney
City of Lakeville
Public Works– Engineering Division
Memorandum
To: Daryl Morey, Planning Director
From: Alex Jordan, Senior Project Engineer
McKenzie Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
Date: July 18, 2017
Subject: Spirit of Brandtjen 18th Addition
• Final Plat Review
• Final Grading Plan Review
• Utility Plan Review
• Erosion Control Plan Review
BBAACCKKGGRROOUUNNDD
SBF Development Corporation has submitted a final plat named Spirit of Brandtjen Farm (SBF)
18th Addition. This is the first phase of the SBF 18th Addition Preliminary Plat approved by the
City Council on May 15, 2017. The proposed development is located south of and adjacent to
160th Street (CSAH 46), west of and adjacent to Diamond Path (future CSAH 33), east of and
adjacent to Eagleview Drive, and north of 165th Street. The parent parcels consist of Outlots B
and C, Spirit of Brandtjen Farm Elementary Addition, Outlot G, Spirit of Brandtjen Farm
Commercial 2nd Addition, and Outlots C, D and E, Spirit of Brandtjen Farm 17th Addition. The
development is zoned PUD, Planned Unit Development. The Developer is dedicating 0.003
acres as County right-of-way (CSAH 46).
The preliminary plat consists of 55 single family lots, 63 detached townhome lots, five (5)
common open space lots, one clubhouse lot within 10 blocks and thirteen (13) outlots. The
outlots created with the final plat will have the following uses:
Outlot A: Stormwater management basin; to be deeded to the City (3.26 acres)
Outlot B: Common open space and private trail; to be retained by the Developer (0.60
acres)
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1188TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 1188,, 22001177
PPAAGGEE 22
Outlot C: Common open space and private trail; to be retained by the Developer (0.17
acres)
Outlot D: Greenway corridor and existing Metropolitan Council and Apple Valley
easements; to be deeded to the City (4.69 acres)
Outlot E: Common open space and private trail; to be retained by the Developer (1.87
acres)
Outlot F: Future development; to be retained by the Developer (0.15 acres)
Outlot G: Future development; to be retained by the Developer (6.68 acres)
Outlot H: Future development and stormwater management basin; to be retained by the
Developer (16.99 acres)
Outlot I: Future development and stormwater management basin; to be retained by the
Developer (20.95 acres)
Outlot J: Future development; to be retained by the Developer (2.84 acres)
Outlot K: Future development; to be retained by the Developer (9.61 acres)
Outlot L: Future development; to be retained by the Developer (17.28 acres)
Outlot M: Future development; to be retained by the Developer (3.75 acres)
The proposed development will be completed by:
Developer: SBF Development Corporation
Engineer/Surveyor: James R. Hill, Inc.
SSIITTEE CCOONNDDIITTIIOONNSS
The site was previously a gravel processing operation. The gravel processing on the parent
parcels has been completed and the site encroachments have been removed.
The site is sloped to a series of existing wash basins located on the eastern portion of the parent
parcels. These wash basins were constructed for sand processing of the gravel operations. The
largest basin is proposed to remain with the development improvements and to be utilized for
stormwater treatment and volume reduction of the stormwater generated within the watershed.
Existing trunk public and private utilities are located throughout the site.
EEAASSEEMMEENNTTSS
The parent parcels contain existing public and private easements. The following easements
will remain with the development and will not be impacted:
• 20-foot wide public right-of-way, drainage, and utility easement per Doc. No. 1656358.
• 35-foot wide Metropolitan Council Sanitary Sewer Easement per Doc. No. 1292581.
• Williams Brothers pipeline easement per book 80 of miscellaneous records, Page 186
and amended per Document No. 545492, over E ½ of the NE ¼ of Sec. 1.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1188TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 1188,, 22001177
PPAAGGEE 33
The following public easement shall be vacated with the final plat:
• 10-foot wide public right-of-way, drainage, and utility easement on Outlot G, SBF
Commercial 2nd Addition along Eagleview Drive, per the SBFC 2nd Addition final plat.
The following easements will expire (and be re-dedicated as necessary) upon final platting of
the underlying outlots into lots and blocks:
• Temporary drainage and utility easement per Doc. No. 3139215 on all of Outlot C,
Spirit of Brandtjen Farm Elementary Addition.
• Temporary easement per Doc. No. 3139216 on Outlot B, Spirit of Brandtjen Farm
Elementary Addition.
• Temporary easement per Doc. No. 3139217 on Outlot G, Spirit of Brandtjen Farm
Commercial 2nd Addition.
• Temporary roadway easement per Doc. No. 3139213 on Outlot C, Spirit of Brandtjen
Farm Elementary Addition.
• Temporary roadway easement per Doc. No. 3139214 on Outlot C, Spirit of Brandtjen
Farm Elementary Addition.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
160th Street (CSAH 46)
SBF 18th Addition is located south of and adjacent to 160th Street, a minor arterial County roadway
as identified in the City’s Transportation Plan. 160th Street adjacent to the site is a four-lane
divided urban roadway, with a continuous concrete center median island. Dakota County
controls the right-of-way requirements and access locations along 160th Street. The current
Dakota County Plat Review Needs Map indicates a half right-of-way requirement of 100-feet and
designates this roadway as a future six-lane divided urban roadway over its entire length adjacent
to the plat. The widening of 160th Street is not identified in the City’s or County’s current Capital
Improvement Plans. Additional right-of-way for 160th Street shall be dedicated with the final plat
to satisfy the County’s right-of-way requirement. The final plat was reviewed and recommended
for approval by the Dakota County Plat Commission at their July 10, 2017 meeting.
Diamond Path (Future CSAH 33)
SBF 18th Addition is located west of and adjacent to Diamond Path, a future major collector
roadway as identified in the City’s Transportation Plan. The current Dakota County Road Plat
Review Needs Map identifies Diamond Path as a future three-lane undivided urban roadway
with center turn lanes or a two-lane divided urban County State Aid Highway with a ½ right of
way requirement of 60 feet. The Developer dedicated the necessary right-of-way with
previous phases of Spirit of Brandtjen Farm. Diamond Path adjacent to the plat will not be
constructed with the plat improvements and is not identified to be constructed in the current
City or County Capital Improvement Plan (CIP).
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1188TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 1188,, 22001177
PPAAGGEE 44
162nd Street
Development of SBF 18th Addition includes the construction of 162nd Street, a minor collector
roadway as identified in the City’s Transportation Plan. 162nd Street is designed as a 36-foot
wide two-lane urban roadway, within 80-feet of right-of-way. A concrete median will be
constructed east of Eagleview Drive as the approach to the existing roundabout. 5-foot wide
concrete sidewalks will be installed along the north and south sides of the street. 162nd
Street will be constructed with the final plat improvements to a point 400 feet east of
Eagleview Drive to provide access to the HOA clubhouse lot. 162nd Street will be extended
with future phases of the SBF 18th Addition preliminary plat to provide a connection to the
existing 162nd Street west of Diamond Path. The Developer shall install a future street
extension sign, dedicate a temporary roadway easement over the temporary cul-de-sac and
provide a $2,000 security with the final plat for the future removal and restoration of the cul-
de-sac.
Dutch Barn Drive and Durango Trail
Development of Spirit of Brandtjen Farm 18th Addition includes the construction of Dutch
Barn Drive and Durango Trail, both local roadways. The local roadways are designed as 28-
foot wide urban roadways with a 5-foot wide concrete sidewalk along both sides of the
streets. The Developer is dedicating 52-feet of right-of-way. Dutch Barn Drive and Durango
Trail will provide access to Eagleview Drive. The street and landscaped boulevard design is
consistent with the Spirit of Brandtjen Farm Planned Unit Development Plan. Dutch Barn
Drive and Durango Trail will terminate in a temporary cul-de-sac until the streets are
extended when the adjacent outlots are final platted into lots and blocks. The Developer shall
install future street extension signs, dedicate a temporary roadway easement over the
temporary cul-de-sacs and provide a $4,000 security with the final plat for the future removal
and restoration of the cul-de-sacs.
Dunfield Drive
Development of Spirit of Brandtjen Farm 18th Addition includes the construction of Dunfield
Drive, a local roadway. Dunfield Drive is designed as a 28-foot wide urban roadway with a 5-
foot wide concrete sidewalk along both sides of the street. The Developer is dedicating 52-
feet of right-of-way. Dunfield Drive will provide an access to Eagleview Drive. The street and
landscaped boulevard design is consistent with the Spirit of Brandtjen Farm Planned Unit
Development Plan.
Dryden Road
Development of Spirit of Brandtjen Farm 18th Addition includes the construction of Dryden
Road, a local roadway. Dryden Road is designed as a 28-foot wide urban roadway with a 5-
foot wide concrete sidewalk along both sides of the street. Dryden Road will provide an
access to 162nd Street which will align with the driveway entrance to the elementary school
on Lot 1, Block 1, SBF Elementary Addition. The Developer is dedicating 52-feet of right-of-
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1188TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 1188,, 22001177
PPAAGGEE 55
way. The street and landscaped boulevard design is consistent with the Spirit of Brandtjen
Farm Planned Unit Development Plan.
Until 162nd Street is extended from Eagleview Drive to connect to Diamond Path, Dryden
Road, via Dunfield Drive will provide a secondary access to the elementary school on Lot 1,
Block 1, SBF Elementary Addition. Due to this, the City is concerned that cut through traffic
along the local roadways may create public safety issues. Additionally, the increased traffic
along the local roadway may be viewed negatively by the future residents of the lots along
these roadways. Until 162nd Street is extended from Eagleview Drive to connect to Diamond
Path, the Developer shall notify all homebuyers prior to closing on lots with frontage on
Dunfield Drive and Dryden Road about the temporary increase in traffic to and from the
elementary school. Additionally, the Developer shall restrict on street parking along these
streets, including construction vehicles, to one side of the street at all times. Signage shall be
posted by the Developer at their expense.
Duskwood Trail
Development of Spirit of Brandtjen Farm 18th Addition includes the construction of
Duskwood Trail, a local roadway. Duskwood Trail is designed as a 28-foot wide urban roadway
with a 5-foot wide concrete sidewalk along both sides of the street. The Developer is
dedicating 52-feet of right-of-way. The street and landscaped boulevard design is consistent
with the Spirit of Brandtjen Farm Planned Unit Development Plan. Duskwood Trail will
terminate in a temporary cul-de-sac until it is extended at the time adjacent outlots are final
platted into lots and blocks. The Developer shall install a future street extension sign, dedicate
a temporary roadway easement over the temporary cul-de-sac and provide a $2,000 security
with the final plat for the future removal and restoration of the cul-de-sac.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility and street construction for SBF 18th
Addition shall be restricted to a single entrance at 162nd Street, via Eagleview Drive.
PARKS, TRAILS AND SIDEWALKS
Development of SBF 18th Addition includes the construction of public sidewalks and trails. 5-
foot wide concrete sidewalks will be constructed along both sides of all streets. Privately
owned and publicly accessible trails will be constructed within Outlots B, C, and E and Lot 6,
Block 1.
The Parks, Trails and Open Space Plan and SBF Land Use Plan identify the area of the parent
parcels as a location for a future greenway corridor and trail system. The greenway corridor
will follow the alignment of the existing Metropolitan Council Sanitary Sewer easement,
extending from the at-grade street crossing at 162nd Street to the pedestrian underpass at
Eagleview Drive. The Developer proposes to construct the greenway corridor improvements,
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1188TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 1188,, 22001177
PPAAGGEE 66
which include, but are not limited to, the construction of a trail, lighting (including electrical),
and landscaping. The City will credit the Developer’s park dedication for the cost of the
greenway corridor improvements and land to be dedicated, consistent with the SBF Master
PUD Agreement. The credit is calculated as follows:
Gross area of SBF 18th Addition 122.86 acres
Less:
160th St. Right-of-way 0.003 acres
Outlot F 0.15 acres
Outlot G 6.68 acres
Outlot H 16.99 acres
Outlot I 20.95 acres
Outlot J 2.84 acres
Outlot K 9.61 acres
Outlot L 17.28 acres
Outlot M 3.75 acres
Net Area of SBF 18th Addition 44.61 acres
Detached Dwelling Units 118 units
Net Density 2.65 units/acre
Consistent with the SBF Land Use Plan, the land required to be dedicated for park dedication
for a density of 2.65 units/acre is 11%. Therefore, the land required to be dedicated with SBF
18th Addition is 4.91 acres. The Developer is proposing to dedicate Outlot D (greenway
corridor) to the City to satisfy a portion of the park dedication requirement. Outlot D is
encumbered by existing utility easements owned by the Metropolitan Council and City of
Apple Valley which shall be excluded from the land dedication calculation as the City is not
able to use the encumbered land to its maximum extent. The total land dedicated within
Outlot D, excluding the easements, is 2.34 acres. Consistent with the SBF Master PUD
Agreement, the value of the dedicated land and the cost of the park development incurred by
the Developer shall be determined and subtracted from the required cash contribution. The
required cash contribution with the final plat is calculated as follows:
119 units x $2,250 = $267,750.00
Lots in SBF 18th Addition Detached Unit Park
Dedication Rate
Total Required with
the final plat
The City has agreed to reimburse the Developer in the form of a credit with the final plat for
the land outside of the easements and the construction of the improvements within the
greenway corridor in Outlot D. The greenway corridor improvements shall include the
construction of the 10-foot wide bituminous trail, trail lighting (including electrical), and
landscaping. The City shall approve the improvement plans for Outlot D to ensure that the
credit will be applied to the improvements that the City is requiring to be installed within the
corridor, consistent with the approved Dakota County North Creek Greenway Master Plan.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1188TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 1188,, 22001177
PPAAGGEE 77
The credit amount will be determined at the time the greenway corridor improvement plan is
approved, and is estimated as follows:
Outlot D (excluding easements): 2.34 acres x $45,343/acre = $106,102.62
Landscaping + $90,000.00
Bituminous Trail Construction + $39,900.00
Trail Lighting + $32,843.00
Total Credit $268,845.62
Less Park Dedication Required with Final Plat - ($267,750.00)
Remaining Credit for Future Phases $1,095.62
The remaining credit will be applied to the Developer’s cash fees with future phases of the
SBF Development, consistent with the SBF Master PUD Agreement. The remainder of the park
dedication will be collected in the form of cash fees in lieu of land for Outlots F, G, H, I, J, K, L,
and M at the time they are final platted into lots and blocks, and will be determined with each
phase final plat, consistent with the SBF Master PUD Agreement.
The Developer (or HOA as assigned) shall maintain the trees, landscaping, and turf
surrounding these improvements within Outlot D permanently. The Developer shall enter
into a maintenance agreement for the landscaping improvements prior to recording the final
plat. The Developer shall plant and maintain all landscaping and turf within Outlot D until it
has been completely established, as determined by the City’s Parks and Recreation Director.
After the turf has been established, the City will maintain the turf (with the exception of the
areas directly adjacent to the landscaping and trees) within Outlot D. The Developer shall
provide a two year warranty for all landscaping and shall re-plant any dead or damaged
landscaping within the warranty period.
The Developer shall coordinate with the Metropolitan Council and City of Apple Valley for all
improvements that are proposed to be constructed within the existing easements on Outlot
D. Prior to approval of construction plans for the project, the Developer shall submit in writing
confirmation from the Metropolitan Council and City of Apple Valley that they have approved
the plans for the improvements within the easements.
The Parks, Trails, and Open Space Plan also identifies a 10-foot wide bituminous trail along the
south side of 160th Street adjacent to the development. The Developer shall grade the trail
bench from Pilot Knob Road to Diamond Path with the SBF 18th Addition preliminary plat
improvements and construct the trail from Pilot Knob Road to Diamond Path as follows:
• Pilot Knob Road to Eagleview Drive with the development of Outlots L and K, SBF
Commercial 2nd Addition
• Eagleview Drive to Diamond Path with the development of Outlots L and M, SBF 18th
Addition
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1188TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 1188,, 22001177
PPAAGGEE 88
Additionally, the Developer shall explore the possibility of providing a connection from the
trail along 160th Street to the greenway corridor at the time Outlots L and M are final platted
into lots and blocks.
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR::
SBF 18th Addition is located within sub-district NC-20060 of the North Creek sanitary sewer
district as identified in the City’s Comprehensive Sewer Plan. Wastewater will be conveyed via
existing trunk sanitary sewer to the MCES Farmington Interceptor and continue to the Empire
Wastewater Facility. The downstream facilities have sufficient capacity to serve the proposed
subdivision.
To provide sewer service to the subdivision, a connection is proposed to the existing
Metropolitan Council (METC) trunk sanitary sewer bisecting the parent parcels. A direct
connection permit will be required from the METC for the connection to the sanitary sewer.
The Sanitary Sewer Availability Charge has not been collected on the parent parcels and must
be paid with the final plat. The fee will be based on the rate in effect at the time of final plat
approval, calculated as follows:
119 units x $327.00/unit = $38,913.00
Detached units and
Clubhouse Lot
Sanitary Sewer
Availability Charge
Total Required with
the final plat
WWAATTEERRMMAAIINN::
The City’s Water Plan identifies 12-inch trunk watermain to be constructed along 162nd Street.
Temporary 12-inch watermain was installed along the 162nd Street corridor to provide service
to the elementary school within Lot 1, Block 1, SBF Elementary Addition. The Developer shall
remove the temporary watermain and install 12-inch permanent watermain along 162nd
Street, in accordance with the City’s Water Plan, extending from Eagleview Drive to the
existing permanent watermain with the SBF 18th Addition improvements.
A private water service was previously installed to Lot 19, Block 15 with the SBF Commercial
2nd Addition improvements to provide utility service to the future HOA clubhouse lot.
Final locations and sizes of all public sanitary sewer and watermain facilities will be reviewed
by City staff with the final construction plans.
OOVVEERRHHEEAADD LLIINNEESS
There are no existing overhead utility lines and/or poles within the parent parcels.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1188TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 1188,, 22001177
PPAAGGEE 99
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
BBAACCKKGGRROOUUNNDD
Spirit of Brandtjen Farm (SBF) is a planned unit development of which development began in
2005. The proposed development encompasses nearly all of the north half of Section 1,
Township 114 Range 20 and a substantial portion of the south half of said section. The initial
stormwater modeling and drainage plan for SBF, located on the south half of Section 1, was
prepared by Westwood Professional Services. The original design consisted of a main basin,
Spirit, surrounded by six National Urban Runoff Program (NURP) basins.
The Spirit basin design did not include a gravity outlet other than infiltration. A system of
pumps was incorporated into the design to serve three functions: 1) Irrigation supply, 2)
Recirculation for water features, and 3) Drawdown, if needed. During 2008, a decision was
made to not construct the recirculation features. As a result, the proposed pumping station
was not constructed, however, the pump station draw intake line was.
As development has continued, Spirit basin appears to have adequately infiltrated all runoff
from the development without the presence of the pumping system.
A gravel processing area has been in operation on the north half of Section 1 in excess of forty
years. As part of gravel operations years ago, a series of basins was constructed as wash basins
for sand processing. The operational need for these basins ended approximately in 2013 and
a reclamation plan was prepared for the gravel processing area. As part of the reclamation
plan, the largest basin was measured and quantified, and incorporated into the reclamation
plan with intended use as a stormwater management basin. The basin is referred to as
Nordeast Basin.
PPRROOPPOOSSEEDD SSTTOORRMMWWAATTEERR MMAANNAAGGEEMMEENNTT PPLLAANN
SBF 18th Addition is located within the North Creek drainage district as identified in the City’s
Water Resources Management Plan. The plat is located within sub-districts NC-9B, NC-11A,
NC-11B, NC-11C, NC-13, NC-14A, and NC 14-B. The North Creek Stormwater District
management plan identifies four stormwater basins in these drainage districts; NC-11-1, NC-
11-2, NC-11-3 and NC-13-1. Nordeast Basin and the proposed NURP basins are intended to
fulfill the requirements of these basins.
The proposed stormwater management plan is a regional plan that connects the 96 acres
within the Nordeast Basin drainage area. The proposed system utilizes the existing Nordeast
Basin for flood storage and infiltration, having peripheral National Urban Runoff Protection
(NURP) and stormwater collection systems. The pretreatment NURP basins are proposed to be
multi-celled. SBF 18th Addition includes the construction of two of the peripheral NURP basins.
An overflow pipe and overland route is proposed to be extended from the existing Spirit
Basin system to the Nordeast Basin with the SBF 18th improvements. The overflow pipe is
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1188TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 1188,, 22001177
PPAAGGEE 1100
designed as an emergency outlet, should the Nordeast Basin’s water elevation extend beyond
the peak design storm.
The proposed NURP basins and Nordeast basin will be located within Outlots H and I. The
proposed stormwater management design is consistent with City requirements.
An as-built certified grading plan will be required within 30-days of final stabilization of the
disturbed areas to verify that the basins were constructed in accordance with the final
grading plan.
A National Pollution Discharge Elimination System General Stormwater Permit for
construction activity is required by the Minnesota Pollution Control Agency for areas
exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit
Coverage must be submitted to the City upon receipt from the MPCA.
SSTTOORRMM SSEEWWEERR
Development of SBF 18th Addition includes the construction of a public and private storm
sewer system. Storm sewer will be installed to collect and convey stormwater runoff
generated from the streets and open space within the development. The storm sewer will
convey the runoff to the stormwater management basins within the development. The
constructed public storm sewer shall be located within public right-of-way and/or public
drainage and utility easements.
The privately owned and maintained storm sewer will be located within Outlots B and E and
Lot 6, Block 1 to collect the runoff generated from the HOA common lots.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcels and shall be
paid with the final plat, at the rate in effect at the time of final plat approval calculated as
follows:
Gross area of SBF 18th Addition 5,351,728.00 s.f
Less:
160th St Right-of-way 141.76 s.f.
Outlot A 141,887.00 s.f.
Outlot D 204,252.00 s.f.
Outlot F 6,469.00 s.f.
Outlot G 290,792.00 s.f.
Outlot H 740,160.00 s.f.
Outlot I 912,742.00 s.f.
Outlot J 123,579.00 s.f.
Outlot K 418,698.00 s.f.
Outlot L 752,844.00 s.f.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1188TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 1188,, 22001177
PPAAGGEE 1111
Outlot M 163,207.00 s.f.
Net Area of SBF 18th Addition 1,596,956.24 s.f.
1,596,956.24 s.f. x $0.178/s.f. = $284,258.21
Net Area of SBF 18th Trunk Storm Sewer
Area Charge
Total Required with
the final plat
The Developer will receive a credit to the Trunk Storm Sewer Area Charge for deeding Outlot
A to the City, consistent with City policy. The credit is based on the area of the outlots
calculated at the rate of $5,550.00 per acre, and will be applied to the SBF18th Addition final
plat cash fees. The credit is calculated as follows:
3.26 acres x $5,500/acre = $17,915.03
Total Area of Outlot A Per Acre Credit Total
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
FFEEMMAA FFLLOOOODDPPLLAAIINN AANNAALLYYSSIISS
A portion of SBF 18th Addition (southwest corner of Outlot E, SBF 17th Addition) is located
within areas shown on the Flood Insurance Rate Map (FIRM) as Zones AE and A, Floodway and
Flood Fringe respectively. Based on this designation, a portion of the development is located
within a Special Flood Hazard Area (SFHA), as determined by FEMA. The Developer is
proposing to construct roadway, trail, and utility improvements within the Floodway and
Floodplain Districts, both allowed per Zoning Ordinance Section 11-101-11. The Developer
shall be responsible for any requirements deemed necessary for construction of the streets
and utilities within the Floodway or Flood Fringe Districts, including but not limited to
obtaining a CLOM-R. The Developer shall provide a $50,000 security with the final plat for the
floodway and flood fringe mitigation requirements, to be calculated with the final plat.
The remaining area of SBF 18th Addition is shown on the Flood Insurance Rate Map (FIRM) as
Zone X by the Federal Emergency Management Agency (FEMA).
WWEETTLLAANNDDSS
There are no wetlands within the project area.
TTRREEEE PPRREESSEERRVVAATTIIOONN
There are no significant trees within the project area.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1188TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 1188,, 22001177
PPAAGGEE 1122
EERROOSSIIOONN CCOONNTTRROOLL
The Developer is responsible for obtaining a MPCA Construction Permit for the site as well as
developing and maintaining the SWPPP throughout construction phase. The permit requires
that all erosion and sediment BMPS be clearly outlined in a site’s SWPPP. Changes made
throughout construction should be documented in the SWPPP.
Additional erosion control measures may be required during construction as deemed
necessary by City staff or the Dakota County Soil and Water District. Any additional measures
required shall be installed and maintained by the developer.
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to Spirit of Brandtjen Farm 18th Addition. Construction costs are based
upon estimates submitted by the Developer’s engineer on June 12, 2017.
CONSTRUCTION COSTS
Sanitary Sewer $ 424,318.40
Watermain 513,335.00
Storm Sewer 790,075.00
Street Construction 846,313.75
Erosion Control, Grading Certification and Restoration 200,000.00
SUBTOTAL - CONSTRUCTION COSTS $ 2,774,042.15
OTHER COSTS
Developer’s Design (3.0%) $ 83,221.26
Developer’s Construction Survey (2.5%) 69,351.05
City’s Legal Expense (0.5%) 13,870.21
City Construction Observation (5.0%) 138,702.11
Developer’s Record Drawing (0.5%) 13,870.21
Temporary Cul-de-sac Removal and Restoration 8,000.00
Floodway Mitigation
Landscaping
50,000.00
25,000.00
Street Lights 27,600.00
Lot Corners/Iron Monuments 13,700.00
SUBTOTAL - OTHER COSTS $443,314.84
TOTAL PROJECT SECURITY $ 3,217,356.99
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1188TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 1188,, 22001177
PPAAGGEE 1133
The street light security totals $25,200 which consists of twenty-three (23) post-top street
lights at $1,200 each.
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
$13,700.00. The City shall hold this security until the Developer’s Land Surveyor certifies that
all irons have been placed following site grading, street and utility construction.
CASH FEES
A cash fee for traffic control signs is due with Spirit of Brandtjen Farm 18th Addition. Street
signing consists of nine stop signs with street blade combinations at $450.00 each, two
pedestrian crossing signs with down arrows at $475.00 each, fifteen nine-button delineators
at $175.00 each, five future street signs at $75.00 each, plus a mobilization fee of $150.00, for
a total of $8,150.00. If the street signs are installed during frost conditions, the developer shall
pay an additional $150.00 for each street sign location.
A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat
approval and is calculated as follows:
119 units x $8.42/unit/qtr. x 4 qtrs. = $4,007.92
Dwelling Units Streetlight Operating Fee Total
A cash fee for one-year of environmental resources expenses shall be paid at the time of final
plat approval and is calculated as follows:
119 units x $7.75/unit/qtr. x 4 qtrs. = $3,689.00
Dwelling Units Environmental Resources Fee Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
137 units x $90.00/unit = $12,330.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be in either .dwg (AutoCAD) or .dxf format.
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction cost, or $83,221.26.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1188TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
JJUULLYY 1188,, 22001177
PPAAGGEE 1144
CASH REQUIREMENTS
Park Dedication Fee $ 267,750.00
Sanitary Sewer Availability Charge 38,913.00
Trunk Storm Sewer Area Charge 284,258.21
Traffic Control Signs 8,150.00
Streetlight Operating Fee 4,007.92
Environmental Resources Fee 3,689.00
City Base Map Updating Fee 12,330.00
City Engineering Administration (3.00%) 83,221.26
SUBTOTAL - CASH REQUIREMENTS $702,319.40
CREDITS TO CASH REQUIREMENTS
Credit for Outlot D Land and Greenway Corridor Improvements
Deeding Outlot A to City (Trunk Storm Sewer)
$267,750.00
$ 17,915.03
SUBTOTAL – CREDITS TO CASH REQUIREMENTS
$ 285,665.03
TOTAL CASH REQUIREMENTS WITH THE FINAL PLAT $416,654.37
FUTURE PHASE CASH CREDITS
**Greenway Corridor Improvements $ 1,095.62
ESTIMATED FUTURE PHASE CREDITS = $ 1,095.62
**Based on an estimated provided by the Developer. The City will provide the credit for the
greenway corridor improvements with future phases of the development. The amount of the
credit will be determined when the improvement plan has been approved by City staff.
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the SBF 18th Addition final plat, grading plan, utility
plan, and erosion control plan subject to the requirements and stipulations of this report.