Loading...
HomeMy WebLinkAboutBETHLEHEM BAPTISTCity of Lakeville Planning Department Memorandum To : Planning Commission From: Frank Dempsey, AICP, Associate Planner Date: July 27, 2017 Subject: Packet Material for the August 3, 2017 Planning Commission Meeting Agenda Item: Bethlehem Baptist Church: 1. The Preliminary and Final Plat of Bethlehem Baptist Church 2. A Conditional Use Permit to allow: a) a religious institution in the C-3, General Commercial District, b) building height greater than 35 feet, and c) an exception to the exterior building material requirements for an institutional use. Application Action Deadline: October 19, 2017 INTRODUCTION Applications for preliminary and final plat and conditional use permit have been submitted by representatives of Bethlehem Baptist Church for the development of a church (institutional use) in the C-3, General Commercial District with a building height greater than 35 feet. The subject property includes two separate parcels, one of which is a 15 foot wide strip of property along the south boundary presently owned by the City of Lakeville that the City has agreed to sell to the church as part of project. The larger of the two parcels is platted as an outlot from the single family residential neighborhood to the east known as St. Frances Woods. The subject property is located south of 205th Street, east of Kenrick Avenue and north of the Holiday Inn. The property totals 12.3 acres. The plans propose a 664 seat sanctuary church, administrative offices, nursery, classrooms and a gymnasium. The plans propose 300 possible future balcony seats for a total of 964 seats. Bethlehem Baptist Church currently has locations in Minneapolis, Burnsville, and Mounds View and currently holds Sunday services at Lakeville South High School. Church representatives 2 have been meeting with City staff since 2011 regarding possible locations and sketch layouts before they obtained the subject property that is now proposed for development of the church. The Bethlehem Baptist Church plans have been distributed to the Engineering Division, the Parks and Recreation Department and the Parks, Recreation and Natural Resources Committee. EXHIBITS A. Zoning and Location Map B. Aerial Photo C. Property Survey D. Preliminary Plat E. Final Plat F. Grading and Drainage Plan (2 Pages) G. Erosion and Sediment Control Plan H. Utility Plan I. Paving and Dimensions Plan J. Tree Preservation Plan (2 Pages) K. Site Plan L. Overall Floor Plan M. Lower and Upper Level Floor Plans (2 Pages) N. Building Elevation Plans and Material Sample Photo (4 Pages) O. Landscape Plan P. Lighting Plan PLANNING ANALYSIS PRELIMINARY AND FINAL PLAT Existing Conditions. The property is a 12.3 acre undeveloped site that is platted as Outlot F, St. Frances Woods 7th Addition. The property includes rolling topography, trees and a small wetland on the north side. A Centerpoint Energy high pressure gas main runs north and south through the east side of the property. The gas main is located within in a 100 foot wide private easement, of which 50 feet of the easement is located on the subject site. 3 Church representatives approached the City about purchasing a 15 foot wide strip of property that runs parallel to the church property. The City acquired the 9,003 square foot property in 1994 after it had gone tax forfeit so it could be used to convey storm water toward the Kenrick Avenue drainage ditch. It is uncertain how and when the property was subdivided from the parent parcel. The property presently conveys stormwater from the subject Outlot F, St. Frances Woods 7th Addition and from the Holiday Inn parking lot to the south. Adjacent Land Uses. North: Terra Products property and undeveloped commercial parcel (C-3 District) South: City owned 15 foot strip of property and Holiday Inn/Rudy’s Redeye Grill (C-3 District) East: City owned wetland and open space preservation outlot and single family homes and townhomes in the Enclave at St. Frances Woods (PUD District) West: Kenrick Avenue and commercial properties (C-3 District) The nearest single family homes to the east are more than 550 feet from the proposed church, 310 feet from the first phase parking lot and 72 feet from the second phase parking lot. Consistency with the Comprehensive Plan. The property is located in Planning District No. 6 of the 2030 Land Use Plan which guides the properties for commercial development. The church (assembly) use is consistent with other assembly (movie theater) uses allowed in commercial areas. Zoning. The subject properties are zoned C-3, General Commercial District which allows religious institution uses by conditional use permit. MUSA. The Bethlehem Baptist Church preliminary and final plat is located within the current Metropolitan Urban Service Area (MUSA). Premature Subdivision Criteria. A preliminary and final plat may be deemed premature if any of the criteria listed in Chapter 10-2-4-1 of the Subdivision Ordinance exist. Eligible criteria pertain to a lack of adequate: drainage, water, streets, sanitary sewer, and public service capacity (police and fire protection). The other pertinent criteria pertain to inconsistencies with the City Comprehensive Land Use and Capital Improvement Plans. Staff review of the Bethlehem Baptist Church preliminary and final plat against these criteria finds that it is not a premature subdivision. 4 Lots and Blocks. The minimum lot size for a property lot in the C-3 District is 20,000 square feet and the minimum lot width is 100 feet. The proposed preliminary and final plat exceeds the Zoning Ordinance requirements. Outlots. One outlot (Outlot A) is proposed on the north end of the property and will be deeded to the City for wetland preservation purposes. City Property Transfer. The 15 foot wide strip of property owned by the City along the south boundary of the preliminary plat was obtained by the City as a tax forfeit parcel for the purpose of conveying storm water drainage. Stormwater drainage now being conveyed through the City owned parcel will be conveyed through the church proposed storm drainage system. Bethlehem Baptist Church representatives have proposed to purchase the property to incorporate it into their plat. The City Council agreed to consider selling the property to the church subject to the church completing an appraisal of the property. The appraisal was completed in September 2016 and determined a value of $0.366 per square foot. The total cost of the parcel is $3,295.00. Setbacks. The Bethlehem Baptist Church preliminary and final plat and site plan meets the C-3 District setback requirements, as follows: Abutting a Public Street – 30 feet Side Yards – 10 feet Abutting a Residential Zoned Property – 30 feet Streets. The subject site abuts Kenrick Avenue to the west. Kenrick Avenue is classified as a minor arterial street adjacent to Interstate 35. No right-of-way dedication is required with this plat. The future street upgrade fee is required with the proposed final plat as noted in the Engineering Division report. Park and Open Space. No land dedication is identified in the Parks, Trails and Open Space Plan for this area and no park land dedication is proposed with the Bethlehem Baptist Church preliminary and final plat. The 11.89 net acre property will be subject to park dedication at a rate of $7,693 per acre for a total of $91,469.77 (2017 rate) at the time of final plat approval. The Parks, Recreation and Natural Resources Committee will review the Bethlehem Baptist Church Addition preliminary and final plat at their August 16, 2017 meeting. Their comments will be forwarded to the Planning Commission at the public hearing. 5 Trails and Sidewalks. There is no trail located on the east side of Kenrick Avenue. The Park and Open Space Plan identifies a future trail to be located on the east side of Kenrick Avenue when Kenrick Avenue is improved in the future. A cash escrow for the future trail construction cost is due with the final plat as noted in the Engineering Division report. Grading, Drainage and Utility Plans. The grading, drainage and utility plans were submitted to the Engineering Division for their review. The subject property has access to City sewer, water and storm water utilities. Overhead utility lines are located on the east side of Kenrick Avenue and are required to be buried as a conditional of approval of the preliminary and final plat. Please refer to the Engineering Division report for more detailed review comments. Tree Preservation. The tree preservation plan identifies 457 significant trees within the area of the preliminary and final plat. Forty-two (42) tree are proposed to be saved. The trees to be removed are primarily cottonwood, box elder, aspen. Wetlands. One wetland is located within the preliminary and final plat boundaries. The wetland has been delineated and incorporated into the preliminary and final plat plans. The 0.43 acre wetland and wetland buffer located in Outlot A vwill be deeded to the City. CONDITIONAL USE PERMIT Section 11-73-7.Q allows religious institutions in the C-3, General Commercial District subject to approval of a conditional use permit. Section 11-73-15.A also allows a building to exceed three stories or 35 feet in height subject to approval of a conditional use permit. Section 11-17-9.B requires exterior building materials on institutional buildings to provide a minimum of 65% Grade A materials and a maximum of 35% Grade B or Grade C material. Section 11-17-9.G allows exceptions to these provisions may be granted by conditional use permit subject to the following criteria: 1. The use is an essential service as defined by this title; or 2. The applicant shall have the burden of demonstrating that: a. The proposed building maintains the quality in design and materials intended by this title. The proposed primary exterior building material has been described to City staff as a thin brick finish veneer that is cast into the pre-cast concrete wall panels when the 6 concrete panel is poured to provide the appearance of a brick finish. The brick veneer will not be painted. A material sample will be available at the public hearing. The architect will be present to describe the proposed material. b. The proposed building design and materials are compatible and in harmony with other structures within the district. The proposed exterior building materials provide the look and durability desired for a religious institution use in the C-3 District and the appearance of proposed materials will be compatible with existing and future commercial land uses in the area. c. The justification for deviation from the requirements of this section shall not be based on economic considerations. The architect representing Bethlehem Baptist Church has presented the proposed precast concrete/brick inlay Grade B material as a superior quality material that will resemble a brick Grade A material wall for the church building. The architect has indicated that the proposed exterior wall material has been used in other institutional and commercial buildings in the Twin Cities metropolitan area including the University of Minnesota. The architect will be present at the Planning Commission meeting to describe this in more detail. Institutional Use in Commercial District. The proposed Bethlehem Baptist Church will be the owner and sole tenant use of the building. No other separate commercial use of the property is proposed, therefore, all traffic to, from and within the boundaries of the property will be associated with Bethlehem Baptist Church or other ancillary religious institution uses. Building and Cross Height and Criteria. The church building with the cross, is proposed to be greater than 35 feet in height, requiring a conditional use permit. The tallest part of the building will be 45 feet in height. The tallest point of the cross will be 52 feet in height. The proposed cross is not listed as an exemption to the building height regulations, therefore, a conditional use permit is required subject to certain criteria. Section 11-17-7 states that building heights in excess of the standards established within the individual zoning districts or this section may be allowed provided that: 1. The site is capable of accommodating the increased intensity of use. The proposed building and cross will not increase the intensity of the use of the property as a religious institution. 7 2. The increased intensity of use does not cause an increase in traffic volumes beyond the capacity of the surrounding streets. The building and cross will not increase the intensity of the use and will not cause an increase in traffic. 3. Public utilities and services are adequate. The building and cross will not impact utilize public utilities and services. 4. For each additional story over three stories or for each additional 10 feet above 35 feet, front and side yard setback requirements shall be increased by five feet. The building and cross will require a front yard setback of 40 feet and a side yard setback of 20 feet. The church building will be set back 316 feet in the front yard and 80 feet from the nearest side lot line. The rear yard setback will be 262 feet. 5. The increased height is not in conflict with airport zoning regulations as provided in chapter 36 of this title. The building and cross are in not in conflict with airport zoning regulations. 6. The performance standards and criteria of chapter 4 of this title are considered and satisfied (Conditional Use Permits). The performance standards and criteria for a conditional use permit are satisfactorily met. Findings of fact are attached. Future Expansion. The master site plan proposes a future building addition on the northeast corner of the first phase building for possible future administrative offices, according to the project architect. Parking. Parking for a church with a sanctuary with a seating capacity of less than 1,000 seats is one space for each three seats. The church is proposed to include sanctuary seating for 664 with future plans to add up to 300 additional seats for a total of 994 seats. The site plan proposes a phase one 303 space parking lot accessed from two driveways onto Kenrick Avenue. The master site plan proposes up to 516 parking spaces on site for the future total of 8 994 seats. The Zoning Ordinance would require a minimum of 331 seats at full seating capacity. Site circulation includes a drop-off/pick-up area at the front (west) side of the church building and parking on the east and west sides of the building. Future parking is possible northeast of the church as shown on the site plan. All drive aisles, parking spaces and driveways meet Zoning Ordinance design requirements. Landscaping and Screening. The landscape plan proposes the planting of 26 deciduous and coniferous trees as well as numerous shrubs throughout the site. A row of existing spruce mid-size spruce trees near the north property line must be removed as they are in the location of the proposed parking lot north of the church. The screening they provide will be replaced by a double row of arborvitae (cedar) trees to provide screening of the parking lot from the east. Future Accessory Storage Building. The site plan identifies a future 1,400 square foot detached accessory building to be located toward the rear of the property adjacent to the parking lot. Provided the accessory building exterior building materials match or are architecturally similar or aesthetically compatible with the church and the height is not greater than 15 feet, a building permit can be issued for this building when the church is ready to commence construction. Exterior Storage/Trash and Recycling Containers Enclosure. A trash and recyclable materials enclosure will be located near the north side of the gymnasium. The design of the structure must meet Zoning Ordinance requirements for building materials, total height, and gate construction. Lighting. The site lighting plan proposed 25, 20 foot tall freestanding light poles and fixtures throughout the parking lot and interior drives. The maximum allowable light intensity at the public right-of-way (Kenrick Avenue) is one foot-candle. The plan meets that requirement. The church has also agreed to install light shields on the light fixtures nearest the residential area to the east to minimize glare as shown on the lighting plan. Signs. A free-standing sign height up to 30 feet in height and 150 square feet in area is allowed in the C-3 District/Freeway Corridor District. A wall sign up to 440 square feet in area on the west elevation is also permitted. A sign permit is required prior to installation of any signage. 9 RECOMMENDATION The Bethlehem Baptist Church preliminary and final plat and conditional use permit meet the requirements of the Zoning and Subdivision Ordinances. City staff recommends approval subject to the following stipulations: 1. The recommendations listed in the Engineering Department memorandum dated July 26, 2017. 2. The building and site shall be developed consistent with the plans approved by the City Council. 3. The Grade A and Grade B exterior building materials shall not be painted. 4. The height of the cross shall not exceed 52 feet in height. 5. Outlot A shall be deeded to the City with the final plat. 6. A $15,000 landscape security shall be submitted with the final plat. 7. A sign permit application shall be submitted and approved by the City prior to the installation of any signage. 8. The future building addition requires approval of a conditional use permit amendment. cc: Jon Hendricks, Bethlehem Baptist Church Norman Schroeder P/OS P/OS P/OS C-3 RM-2 RM-2 RST-2PUD OP PUD RS-3 C-3 C-3 §¨¦35 KENSINGTONBLVDKENRICK AVE205TH ST W KAISERWAY20 3 R DS T W 205TH ST WKENRICK AVEKEARNEYPATHKENSINGTONWAYKENSFIELD TRLKENRIC K A V E 204TH ST W BETHLEHEM BAPTIST CHURCH Ü EXHIBIT A EXHIBIT B BEARINGS ARE BASED ON THE MOST NORHTERLY LINE OF OUTLOT F, ST. FRANCES WOODS 7TH ADDITION WHICH IS ^^hDdK,sZ/E'K&EϴϴΣϰϰΖϰϭΗt DENOTES FOUND 1/2 INCH IRON MONUMENT WITH CAP MARKED R.L.S. NO. 12294 DENOTES SET 1/2 INCH IRON MONUMENT WITH CAP MARKED R.L.S. NO. 47481 DENOTES CERTIFICATE OF TITLE NO. 60147 NOTE: NO MONUMENT SYMBOL SHOWN AT ANY STATUTE REQUIRED LOCATION INDICATES A PLAT MONUMENT THAT WILL BE SET WITHIN ONE YEAR FROM THE RECORDING DATE OF THIS PLAT. SAID MONUMENTS SHALL BE 1/2 INCH x 14 INCH IRON PIPES MARKED BY R.L.S. NO. 47481. Outlot F, ST. FRANCES WOODS 7TH ADDITION, according to the recorded plat thereof, Dakota County, Minnesota. And That part of the South half of the Southwest quarter of Section 25, Township 114 North, Range 21 West, Dakota County, Minnesota, described as follows: The northerly fifteen (15) feet of the parcel of land described as follows: Commencing at the Northeast corner of the South half of the Southwest ƋƵĂƌƚĞƌŽĨƐĂŝĚƐĞĐƚŝŽŶ͖ƚŚĞŶĐĞďĞĂƌŝŶŐ^ŽƵƚŚϴϵΣϱϲΖϮϵΗtĞƐƚ;ĂƐƐƵŵĞĚ bearing), along the North line of said South half of the Southwest quarter, 760.32 feet to the actual point of beginning of the tract to be described; ƚŚĞŶĐĞďĞĂƌŝŶŐ^ŽƵƚŚϬϭΣϭϬΖϱϴΗtĞƐƚ͕ϱϬϬ͘ϬϬĨĞĞƚ͖ƚŚĞŶĐĞďĞĂƌŝŶŐ^ŽƵƚŚϴϵΣ 56' 29" West, parallel with said North line, 671.20 feet, more or less, to the center line of old Minnesota Trunk Highway No. 65, as laid out and traveled; thence North along said center line, 500.00 feet, more or less, to the North ůŝŶĞŽĨƐĂŝĚ^ŽƵƚŚŚĂůĨŽĨƚŚĞ^ŽƵƚŚǁĞƐƚƋƵĂƌƚĞƌ͖ƚŚĞŶĐĞEŽƌƚŚϴϵΣϱϲΖϮϵΗ East, along said North line, 671.20 feet to the actual point of beginning. PROPERTY DESCRIPTION CITY REQUIREMENTS PER ZONING CODE 1. Field work was completed September 2012. 2. No specific title search for existence or non-existence of recorded or un-recorded easements has been conducted by the surveyor as a part of this survey. Only easements per the recorded plat are shown. 3. The gross area of the subject property is 12.342 Acres or 537,625 square feet. NOTES I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. That this survey does not purport to show all improvements, easements or encroachments, to the property except as shown thereon. Signed this 19th day of June, 2017 Marcus F. Hampton MN L.S. No. 47481 SURVEYOR'S CERTIFICATE The vertical datum is based on NAVD88 datum. Benchmark #1 Top nut hydrant southwest quadrant of Kearney Path and Kaiser Way. Elevation = 1030.71 BENCHMARK LEGEND SIGN POWER POLE OVERHEAD POWER UNDERGROUND ELECTRIC UNDERGROUND GAS UNDERGROUND SANITARY HYDRANT MANHOLE EXISTING FENCE FLARED END SECTION LIGHT POLE BITUMINOUS SURFACE UNDERGROUND WATER EXHIBIT C BEARINGS ARE BASED ON THE MOST NORHTERLY LINE OF OUTLOT F, ST. FRANCES WOODS 7TH ADDITION WHICH IS ^^hDdK,sZ/E'K&EϴϴΣϰϰΖϰϭΗt DENOTES FOUND 1/2 INCH IRON MONUMENT WITH CAP MARKED R.L.S. NO. 12294 DENOTES SET 1/2 INCH IRON MONUMENT WITH CAP MARKED R.L.S. NO. 47481 DENOTES CERTIFICATE OF TITLE NO. 60147 DRAINAGE AND UTILITY EASEMENTS BEING 5 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING LOT LINES, AND BEING 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING RIGHT OF WAY LINES, AS SHOWN ON THE PLAT. NOTE: NO MONUMENT SYMBOL SHOWN AT ANY STATUTE REQUIRED LOCATION INDICATES A PLAT MONUMENT THAT WILL BE SET WITHIN ONE YEAR FROM THE RECORDING DATE OF THIS PLAT. SAID MONUMENTS SHALL BE 1/2 INCH x 14 INCH IRON PIPES MARKED BY R.L.S. NO. 47481. Outlot F, ST. FRANCES WOODS 7TH ADDITION, according to the recorded plat thereof, Dakota County, Minnesota. And That part of the South half of the Southwest quarter of Section 25, Township 114 North, Range 21 West, Dakota County, Minnesota, described as follows: The northerly fifteen (15) feet of the parcel of land described as follows: Commencing at the Northeast corner of the South half of the Southwest ƋƵĂƌƚĞƌŽĨƐĂŝĚƐĞĐƚŝŽŶ͖ƚŚĞŶĐĞďĞĂƌŝŶŐ^ŽƵƚŚϴϵΣϱϲΖϮϵΗtĞƐƚ;ĂƐƐƵŵĞĚ bearing), along the North line of said South half of the Southwest quarter, 760.32 feet to the actual point of beginning of the tract to be described; ƚŚĞŶĐĞďĞĂƌŝŶŐ^ŽƵƚŚϬϭΣϭϬΖϱϴΗtĞƐƚ͕ϱϬϬ͘ϬϬĨĞĞƚ͖ƚŚĞŶĐĞďĞĂƌŝŶŐ^ŽƵƚŚϴϵΣ 56' 29" West, parallel with said North line, 671.20 feet, more or less, to the center line of old Minnesota Trunk Highway No. 65, as laid out and traveled; thence North along said center line, 500.00 feet, more or less, to the North ůŝŶĞŽĨƐĂŝĚ^ŽƵƚŚŚĂůĨŽĨƚŚĞ^ŽƵƚŚǁĞƐƚƋƵĂƌƚĞƌ͖ƚŚĞŶĐĞEŽƌƚŚϴϵΣϱϲΖϮϵΗ East, along said North line, 671.20 feet to the actual point of beginning. PROPERTY DESCRIPTION CITY REQUIREMENTS PER ZONING CODE EXHIBIT D KNOW ALL PERSONS BY THESE PRESENTS: That Bethlehem Baptist Church of Minneapolis, Minnnesota, Inc., a Minnesota non-profit corporation , owner of the following described property: Outlot F, ST. FRANCES WOODS 7TH ADDITION, according to the recorded plat thereof, Dakota County, Minnesota. And That part of the South half of the Southwest quarter of Section 25, Township 114 North, Range 21 West, Dakota County, Minnesota, described as follows: The northerly fifteen (15) feet of the parcel of land described as follows: Commencing at the Northeast corner of the South half of the Southwest quarter of said section; thence bearing ^ŽƵƚŚϴϵΣϱϲΖϮϵΗtĞƐƚ;ĂƐƐƵŵĞĚďĞĂƌŝŶŐͿ͕ĂůŽŶŐƚŚĞEŽƌƚŚůŝŶĞŽĨƐĂŝĚ^ŽƵƚŚŚĂůĨŽĨƚŚĞ Southwest quarter, 760.32 feet to the actual point of beginning of the tract to be described; ƚŚĞŶĐĞďĞĂƌŝŶŐ^ŽƵƚŚϬϭΣϭϬΖϱϴΗtĞƐƚ͕ϱϬϬ͘ϬϬĨĞĞƚ͖ƚŚĞŶĐĞďĞĂƌŝŶŐ^ŽƵƚŚϴϵΣϱϲΖϮϵΗtĞƐƚ͕ parallel with said North line, 671.20 feet, more or less, to the center line of old Minnesota Trunk Highway No. 65, as laid out and traveled; thence North along said center line, 500.00 feet, more or less, to the North line of said South half of the Southwest quarter; thence North ϴϵΣϱϲΖϮϵΗĂƐƚ͕ĂůŽŶŐƐĂŝĚEŽƌƚŚůŝŶĞ͕ϲϳϭ͘ϮϬĨĞĞƚƚŽƚŚĞĂĐƚƵĂůƉŽŝŶƚŽĨďĞŐŝŶŶŝŶŐ͘ Has caused the same to be surveyed and platted as BETHLEHEM BAPTIST CHURCH and does hereby dedicate to the public for public use the public ways and the drainage and utility easements as created on this plat. In witness whereof said Bethlehem Baptist Church of Minneapolis, Minnnesota, Inc., a Minnesota non-profit corporation, has caused these presents to be signed by its proper officer this day of , 20 . Bethlehem Baptist Church of Minneapolis, Minnnesota, Inc. By: its Representative, Title STATE OF COUNTY OF This instrument was acknowledged before me on day of , 20 , by , the of Bethlehem Baptist Church of Minneapolis, Minnnesota, Inc., a Minnesota non-profit corporation , on behalf of the corporation. County, Printed Name My commission expires I Marcus F. Hampton do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of this certificate are shown and labeled on this plat; and all public ways are shown and labeled on this plat. Dated this day of , 20 ______________________________________________________________ Marcus F. Hampton, Licensed Land Surveyor, Minnesota License No. 47481 STATE OF MINNESOTA COUNTY OF This instrument was acknowledged before me on this day of , 20 , by Marcus F. Hampton. County, Printed Name My commission expires January 31, CITY COUNCIL, CITY OF LAKEVILLE, MINNESOTA This plat of BETHLEHEM BAPTIST CHURCH was approved and accepted by the City Council of the City of Lakeville, Minnesota at a regular meeting thereof held this day of , 20 , and said plat is in compliance with the provisions of Minnesota Statutes, Section 505.03, Subd. 2. By: Mayor Clerk BEARINGS ARE BASED ON THE MOST NORHTERLY LINE OF OUTLOT F, ST. FRANCES WOODS 7TH ADDITION WHICH IS ^^hDdK,sZ/E'K&EϴϴΣϰϰΖϰϭΗt DENOTES FOUND 1/2 INCH IRON MONUMENT WITH CAP MARKED R.L.S. NO. 12294 DENOTES SET 1/2 INCH IRON MONUMENT WITH CAP MARKED R.L.S. NO. 47481 DENOTES CERTIFICATE OF TITLE NO. 60147 DRAINAGE AND UTILITY EASEMENTS BEING 5 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING LOT LINES, AND BEING 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING RIGHT OF WAY LINES, AS SHOWN ON THE PLAT. DAKOTA COUNTY SURVEYOR I hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this day of , 20 . By: Dakota County Surveyor DAKOTA COUNTY DEPARTMENT OF PROPERTY TAXATION AND RECORDS Pursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable in the year 20 on the land hereinbefore described have been paid. Also pursuant to Minnesota Statutes, Section 272.12, there are no delinquent taxes and transfer entered this day of , 20 . By: Director Department Of Property Taxation and Records COUNTY RECORDER, COUNTY OF DAKOTA, STATE OF MINNESOTA I hereby certify that this plat of BETHLEHEM BAPTIST CHURCH was filed in the office of the County Recorder for public record on this day of , 20 , at o'clock . M. and was duly filed in Book of Plats, Page , as Document Number . County Recorder REGISTRAR OF TITLES, COUNTY OF DAKOTA, STATE OF MINNESOTA I hereby certify that this plat of BETHLEHEM BAPTIST CHURCH was filed in the office of the Registrar of Titles for public record on this day of , 20 , at o'clock . M. and was duly filed in Book of Plats, Page , as Document Number . Registrar of Titles NOTE: NO MONUMENT SYMBOL SHOWN AT ANY STATUTE REQUIRED LOCATION INDICATES A PLAT MONUMENT THAT WILL BE SET WITHIN ONE YEAR FROM THE RECORDING DATE OF THIS PLAT. SAID MONUMENTS SHALL BE 1/2 INCH x 14 INCH IRON PIPES MARKED BY R.L.S. NO. 47481.EXHIBIT E EXHIBIT F zzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzz z z z z z z z z z zzzz zzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzz z z z z z z z z z zzz zzzzzzzzzzzzzzzzzzzzzzzzzzEXHIBIT G EXHIBIT H EXHIBIT I 243 1049.04 COTTONWOOD 14,18 6501 1072.66 COTTONWOOD 18 X 6502 1070.02 COTTONWOOD 18 X 6503 1073.88 COTTONWOOD 10,18 X 6504 1071.30 COTTONWOOD 11 X 6505 1071.10 COTTONWOOD 15 X 6506 1069.80 COTTONWOOD 12 X 6507 1069.24 COTTONWOOD 9 X 6508 1072.89 COTTONWOOD 20 X 6509 1072.68 COTTONWOOD 8,10 X 6510 1072.30 COTTONWOOD 13 X 6511 1072.14 COTTONWOOD 10 X 6512 1071.31 COTTONWOOD 10 X 6513 - COTTONWOOD 8 X 6514 - COTTONWOOD 11 X 6515 1070.87 COTTONWOOD 19 X 6516 1071.72 COTTONWOOD 15 X 6517 1069.83 COTTONWOOD 12 X 6518 1070.14 COTTONWOOD 19 X 6519 1068.10 COTTONWOOD 13 X 6520 1069.29 COTTONWOOD 10 X 6521 1069.83 COTTONWOOD 10 X 6522 1069.43 COTTONWOOD 12 X 6523 1070.02 COTTONWOOD 10 X 6524 1069.18 COTTONWOOD 13 X 6525 1069.10 COTTONWOOD 8 X 6526 1070.19 BOXELDER 9 X 6527 1067.63 COTTONWOOD 11 X 6528 1066.73 COTTONWOOD 8 X 6529 - COTTONWOOD 8 X 6530 1067.91 COTTONWOOD 18 X 6531 1068.73 COTTONWOOD 18 X 6532 1069.34 COTTONWOOD 15 X 6533 1066.89 COTTONWOOD 9,14 X 6534 1066.14 COTTONWOOD 15 X 6535 1066.96 COTTONWOOD 16 X 6536 - COTTONWOOD 7 X 6537 1066.65 COTTONWOOD 10 X 6538 - COTTONWOOD 8 X 6539 1065.48 COTTONWOOD 12 X 6540 1066.01 COTTONWOOD 10 X 6541 -ASPEN 7 X 6542 1065.84 COTTONWOOD 11 X 6543 1066.13 COTTONWOOD 10 X 6544 -ASPEN 8 X 6545 -ASPEN 8 X 6546 -POPLAR 8 X 6547 1067.21 COTTONWOOD 11 X 6548 1067.06 COTTONWOOD 7,9 X 6549 1064.47 COTTONWOOD 12 X 6550 1066.22 COTTONWOOD 10 X 6551 1067.89 ASPEN 8 X 6552 1067.72 POPLAR 8 X 6553 1068.48 COTTONWOOD 9 X 6554 1069.43 COTTONWOOD 9 X 6555 1068.61 COTTONWOOD 11 X 6556 1068.38 POPLAR 9 X 6557 1067.94 POPLAR 9 X 6558 1070.67 COTTONWOOD 11 X 6559 1068.69 COTTONWOOD 14 X 6560 1068.46 COTTONWOOD 10 X 6561 1068.21 COTTONWOOD 13 X 6562 1067.91 COTTONWOOD 7,8 X 6563 1067.44 COTTONWOOD 8 X 6564 1065.82 COTTONWOOD 16 X 6565 1064.86 COTTONWOOD 12 X 6566 1064.25 COTTONWOOD 10 X 6567 1064.55 COTTONWOOD 13 X 6568 1065.69 COTTONWOOD 13 X 6569 1067.33 ASPEN 7 X 6570 -POPLAR 7 X 6571 1063.34 COTTONWOOD 11 X 6572 1062.59 COTTONWOOD 11 X 6573 1066.14 COTTONWOOD 13 X 6574 1065.69 COTTONWOOD 17 X 6575 1065.16 COTTONWOOD 9 X 6576 1065.27 COTTONWOOD 20 X 6577 1066.53 COTTONWOOD 20 X 6578 - COTTONWOOD 8 X 6579 1067.21 COTTONWOOD 13 X 6580 1066.73 COTTONWOOD 16 X 6581 -COTTONWOOD 13 X 6582 1068.30 COTTONWOOD 13 X 6583 -ELM 9 X 6584 1068.29 COTTONWOOD 13 X 6585 1067.46 ASPEN 8 X 6586 -ASPEN 7 X 6587 1065.28 COTTONWOOD 14,20 X 6588 1065.65 COTTONWOOD 18 X 6589 - COTTONWOOD 10 X 6590 1062.26 COTTONWOOD 11 X 6591 1062.42 COTTONWOOD 16 X 6592 1062.36 COTTONWOOD 12 X 6593 1063.18 ELM 12 X 6594 1061.11 COTTONWOOD 13 X 6595 1061.41 COTTONWOOD 8 X 6596 1060.90 COTTONWOOD 11 X 6597 - COTTONWOOD 8 X 6598 1060.26 COTTONWOOD 9 X 6599 1060.09 COTTONWOOD 10 X 6600 -COTTONWOOD 8 X 6601 -ELM 7 X 6602 - COTTONWOOD 8 X 6603 1059.20 COTTONWOOD 10,12 X 6604 1058.26 COTTONWOOD 10 X 6605 - COTTONWOOD 8 X 6606 1057.91 COTTONWOOD 10 6607 - COTTONWOOD 7 X 6608 - COTTONWOOD 7 X 6609 1060.31 COTTONWOOD 13 X 6610 1060.35 COTTONWOOD 9 6611 1058.80 ASPEN 11 X 6612 1059.95 ASPEN 8 X 6613 -ASPEN 7 X 6614 -ASPEN 7 6615 1060.59 COTTONWOOD 14 6617 1063.93 COTTONWOOD 10 6618 1063.38 COTTONWOOD 9 X 6619 1060.38 COTTONWOOD 8,9 6620 1064.75 COTTONWOOD 12 X 6621 1066.26 COTTONWOOD 8 X 6622 1063.11 COTTONWOOD 7 X 6623 1062.85 COTTONWOOD 12 X 6624 1061.74 COTTONWOOD 7,9 X 6625 1061.81 COTTONWOOD 14 X 6626 1061.75 COTTONWOOD 15 X 6627 1061.12 COTTONWOOD 9 X 6628 1061.18 COTTONWOOD 10 X 6629 1061.66 COTTONWOOD 7 X 6630 1061.35 COTTONWOOD 9,9 X 6631 -COTTONWOOD 7 X 6632 -ASPEN 8 X 6633 1062.20 COTTONWOOD 10 X 6634 1063.65 COTTONWOOD 10 X 6635 1062.07 COTTONWOOD 7 X 6636 1064.67 COTTONWOOD 14 X 6637 1066.03 COTTONWOOD 14 X 6638 -CEDAR 8 X 6639 -CEDAR 6 X 6640 1064.11 COTTONWOOD 16 X 6641 1063.50 ASPEN 9 X 6642 -ASPEN 7 X 6643 1062.96 ASPEN 8 X 6644 1062.65 COTTONWOOD 9 X 6645 1067.66 COTTONWOOD 14 X 6646 1066.89 COTTONWOOD 12 X 6647 -CEDAR 6 X 6648 1067.03 ASPEN 12 X 6649 1067.36 COTTONWOOD 7 X 6650 1067.53 ASPEN 8 X 6651 -ASPEN 8 X 6652 -ASPEN 7 X 6653 1065.90 COTTONWOOD 10,11 X 6654 1065.74 COTTONWOOD 10 X 6655 1064.42 COTTONWOOD 14 X 6656 1061.79 COTTONWOOD 20 X 6657 1062.81 COTTONWOOD 13 X 6658 1063.48 COTTONWOOD 10 X 6659 1063.59 ASPEN 8 X 6660 1063.72 ASPEN 8 X 6661 1063.75 ASPEN 9 X 6662 1064.20 ASPEN 9 X 6663 -ASPEN 8 X 6664 -ASPEN 8 X 6665 1063.97 ASPEN 8 X 6666 1064.11 ASPEN 8 X 6667 1064.58 ASPEN 8 X 6668 1064.19 ASPEN 8 X 6669 1062.96 ASPEN 8 X 6670 -ASPEN 8 X 6671 1061.48 COTTONWOOD 15 X 6672 1061.63 COTTONWOOD 11,11,11 X 6673 1061.35 COTTONWOOD 11 X 6674 1061.08 COTTONWOOD 10 X 6675 1061.20 COTTONWOOD 12 X 6676 1062.20 COTTONWOOD 14 X 6677 1061.36 ASPEN 11 X 6678 1061.57 COTTONWOOD 10 X 6680 -ASPEN 8 X 6681 1062.59 COTTONWOOD 8 X 6682 1062.67 COTTONWOOD 11 X 6683 1062.42 ASPEN 8 X 6684 1062.94 COTTONWOOD 10 X 6685 -ASPEN 8 X 6686 -ASPEN 8 X 6687 1064.44 COTTONWOOD 15 X 6688 1065.61 COTTONWOOD 12 X 6689 1065.30 COTTONWOOD 7 X 6690 1064.99 COTTONWOOD 8 X 6691 1063.84 COTTONWOOD 9 X 6692 1064.47 COTTONWOOD 12 X 6693 1063.53 COTTONWOOD 9 X 6694 1063.38 COTTONWOOD 11 X 6695 -COTTONWOOD 8 X 6696 1062.01 COTTONWOOD 9 X 6697 1062.51 COTTONWOOD 11 6698 1061.39 COTTONWOOD 10 X 6699 1063.97 COTTONWOOD 10 X 6700 1061.21 COTTONWOOD 9 X 6701 1061.75 COTTONWOOD 12 X 6702 1061.44 COTTONWOOD 10 X 6703 1061.30 ASPEN 8 X 6704 1058.03 COTTONWOOD 9 6705 1059.58 COTTONWOOD 9 6706 1058.01 ASPEN 9 6707 -ASPEN 8 X 6708 1061.31 ASPEN 9 X 6709 1060.96 ASPEN 12 X 6710 1061.45 ASPEN 8 X 6711 1061.27 ASPEN 10 X 6712 1058.22 COTTONWOOD 15,16 6713 1058.22 COTTONWOOD 14 6714 1056.77 COTTONWOOD 11 X 6715 1056.48 COTTONWOOD 19 X 6716 1056.58 ASPEN 7 X 6717 1056.17 ASPEN 8 X 6718 1055.61 ASPEN 8 X 6719 -ASPEN 8 X 6720 1056.76 ASPEN 7 X 6721 1056.04 ASPEN 8 X 6722 1053.57 COTTONWOOD 12 X 6723 -ASPEN 8 X 6724 1055.35 ASPEN 8 X 6725 1055.18 ASPEN 7 X 6726 1051.78 ASPEN 10 X 6727 1050.81 COTTONWOOD 10 X 6728 1050.78 COTTONWOOD 9 X 6729 1055.96 COTTONWOOD 9 X 6730 1056.28 ASPEN 8 X 6731 1055.99 ASPEN 10 X 6732 1055.21 COTTONWOOD 15 X 6733 1053.79 COTTONWOOD 16 X 6734 -ASPEN 8 X 6735 1055.17 ASPEN 7 X 6736 1055.16 ASPEN 7 X 6737 1055.19 ASPEN 11 X 6738 1055.06 ASPEN 9 X 6739 1050.76 ASPEN 7 X 6740 -ASPEN 8 X 6741 -ASPEN 9 X 6742 -ASPEN 9 X 6743 -ASPEN 8 X 6744 -ASPEN 10 X 6745 1053.20 ASPEN 7 X 6746 1053.30 ASPEN 8 X 6747 -ASPEN 9 X 6748 -ASPEN 10 X 6749 -ASPEN 9 X 6750 -ASPEN 7 X 6751 1047.49 COTTONWOOD 13 X 6752 1052.80 COTTONWOOD 11,12 X 6753 1053.51 COTTONWOOD 13 X 6754 1052.10 COTTONWOOD 13 X 6755 1048.88 COTTONWOOD 12,14 X 6756 -ASPEN 8 X 6757 -ASPEN 7 X 6758 -CHERRY 7,9 X 6759 1047.76 ELM 8 X 6760 1051.07 ASPEN 7 X 6761 1051.43 ASPEN 7 X 6762 1042.69 COTTONWOOD 18 X 6763 -ELM 9 X 6764 1041.38 COTTONWOOD 11 X 6765 1041.49 COTTONWOOD 14 X 6766 1041.84 COTTONWOOD 16 X 6767 1041.87 COTTONWOOD 12 X 6768 1041.30 COTTONWOOD 13 X 6769 1041.05 COTTONWOOD 9 X 6770 1040.98 COTTONWOOD 16 X 6771 1040.70 BOXELDER 9 X 6772 1040.61 COTTONWOOD 11 X 6773 1040.48 COTTONWOOD 8 X 6774 -ELM 7 X 6775 1040.43 COTTONWOOD 16 X 6776 1040.26 COTTONWOOD 8 X 6777 1040.63 COTTONWOOD 12 X 6778 1040.37 COTTONWOOD 20 X 6779 1040.68 ELM 12 X 6780 1042.22 COTTONWOOD 23 X 6781 1041.74 COTTONWOOD 21 X 6782 1041.39 BOXELDER 14 X 6783 1040.44 ELM 11 X 6784 1040.66 COTTONWOOD 17 X 6785 1040.50 COTTONWOOD 10 X 6786 1040.39 COTTONWOOD 8 X 6787 1040.64 COTTONWOOD 19 X 6788 1040.55 COTTONWOOD 12 X 6789 1040.59 COTTONWOOD 17 X 6790 1040.95 COTTONWOOD 20 X 6791 -COTTONWOOD 16 X 6792 1040.68 COTTONWOOD 13 X 6793 1040.85 COTTONWOOD 14 X 6794 1040.57 ELM 9 X 6795 1040.71 COTTONWOOD 11,11 X 6796 1040.82 COTTONWOOD 10 X 6797 1040.67 COTTONWOOD 7 X 6798 1041.10 COTTONWOOD 11 X 6799 1040.88 COTTONWOOD 11 X 6800 1041.39 COTTONWOOD 9 X 6801 1041.22 COTTONWOOD 19 X 6802 1040.93 COTTONWOOD 14 X 6803 1041.16 COTTONWOOD 11 X 6804 1041.05 COTTONWOOD 14 X 6805 1040.90 COTTONWOOD 15 X 6806 1041.26 BOXELDER 7,10,11,12,15 X 6807 1036.38 BOXELDER 19 X 6808 1043.40 COTTONWOOD 23 X 6809 1042.01 COTTONWOOD 14 X 6810 1042.39 COTTONWOOD 22 X 6811 1042.13 COTTONWOOD 13 X 6812 -ELM 8 X 6813 1042.39 COTTONWOOD 15 X 6814 -COTTONWOOD 13 X 6815 1042.32 COTTONWOOD 16 X 6816 1042.65 COTTONWOOD 15 X 6817 1042.16 BOXELDER 7 X 6818 -ELM 13 F 6819 1043.11 COTTONWOOD 23 X 6820 1043.57 COTTONWOOD 18 X 6821 1042.60 BOXELDER 11 X 6822 1043.18 BOXELDER 23 X 6823 -ELM 9 X 6824 1042.17 BOXELDER 10 X 6825 1041.96 BOXELDER 18 X 6826 1042.49 COTTONWOOD 20 X 6827 1042.45 COTTONWOOD 18 X 6828 1042.53 COTTONWOOD 20 X 6829 1042.28 COTTONWOOD 28 X 6830 1041.45 COTTONWOOD 36 X 6831 1036.59 BOXELDER 11 X 6832 1036.43 BOXELDER 10 X 6833 1036.19 BOXELDER 14 X 6834 -BOXELDER 12 X 6835 1028.31 BOXELDER 12,12,13 X 6836 1033.66 BOXELDER 12 X 6837 1037.39 BOXELDER 16 X 6838 1038.23 BOXELDER 16 X 6839 1038.76 BOXELDER 10,12 X 6840 1030.63 COTTONWOOD 22 X 6841 1034.07 COTTONWOOD 11 X 6842 1031.05 COTTONWOOD 17 X 6843 -BOXELDER 8 X 6844 -BOXELDER 9 X 6845 1032.55 COTTONWOOD 25 X 6846 -COTTONWOOD 14 6847 -BOXELDER 7 6848 1034.47 BOXELDER 11,12 X 6849 1032.78 BOXELDER 9 X 6850 -BOXELDER 8 X 6851 1033.78 BOXELDER 16 X 6852 1030.84 BOXELDER 24 X 6853 1029.62 BOXELDER 22 X 6854 1028.32 BOXELDER 13 X 6855 -BOXELDER 8 X 6856 -BOXELDER 10 X 6857 1028.57 BOXELDER 12 X 6858 -ELM 10 X 6859 -CHERRY 11 X 6860 -CHERRY 9 X 6861 1035.09 COTTONWOOD 29 X 6862 1031.81 BOXELDER 12,23 X 6863 1036.52 BOXELDER 31 X 6864 1040.29 BOXELDER 11 X 6865 1038.66 BOXELDER 9,12 X 6866 -BOXELDER 8 X 6867 1031.58 BOXELDER 20 X 6868 -BOXELDER 9 X 6869 1030.64 BOXELDER 11 X 6870 -BOXELDER 9 X 6871 -BOXELDER 10 X 6872 -BOXELDER 12 X 6873 -BOXELDER 13 X 6874 -ELM 17 X 6875 1028.13 BOXELDER 17 X 6876 -BOXELDER 8 X 6877 1039.72 BOXELDER 17,22 X 6878 1028.53 BOXELDER 7 X 6879 1026.97 BOXELDER 9 X 6880 -BOXELDER 10 X 6881 -BOXELDER 12 X 6882 -BOXELDER 9 X 6883 1028.78 COTTONWOOD 27 X 6884 1029.04 COTTONWOOD 16 X 6885 -BOXELDER 7 X 6886 1030.34 COTTONWOOD 17,21 X 6887 1028.12 WILLOW 8 X 6888 1027.74 COTTONWOOD 13,27 X 6889 1027.00 COTTONWOOD 21 X 6890 1027.07 COTTONWOOD 12,18 X 6891 1026.38 COTTONWOOD 16 X 6892 1027.84 COTTONWOOD 13 X 6893 1026.41 COTTONWOOD 15 6894 1025.95 COTTONWOOD 11 X 6895 1025.76 COTTONWOOD 9 X 6896 1025.22 COTTONWOOD 13 X 6897 -COTTONWOOD 7 X 6898 -COTTONWOOD 15 6899 1026.51 COTTONWOOD 13,14 6900 1026.97 COTTONWOOD 8,19,20 6901 1026.08 WILLOW 10,11 6902 1028.47 WILLOW 11 6903 -WILLOW 11 6904 1025.60 WILLOW 9 6905 -WILLOW 11 6906 1025.59 COTTONWOOD 16 6907 1025.76 COTTONWOOD 10 6908 1025.51 COTTONWOOD 11 6909 1025.63 WILLOW 10 6910 1025.58 WILLOW 9 6911 1024.79 WILLOW 10,11 6912 1024.52 WILLOW 12 6913 1024.27 WILLOW 10 6914 1023.94 WILLOW 11 6915 1024.37 WILLOW 10 6916 1024.06 WILLOW 13,14 6917 1024.30 WILLOW 9 6918 1024.11 WILLOW 10 6919 1024.31 WILLOW 7 6920 1024.05 WILLOW 11 6921 1024.32 WILLOW 10 6922 1024.48 WILLOW 9 6923 1024.34 WILLOW 12 6924 1024.26 WILLOW 8 6925 1024.15 WILLOW 7 6926 1023.86 COTTONWOOD 12 6927 1023.89 WILLOW 10 6928 1023.72 WILLOW 14 6929 1023.89 WILLOW 12 6930 1023.52 WILLOW 14,16 6931 1023.69 WILLOW 8 6932 1023.18 WILLOW 11 6933 1023.22 WILLOW 11 6934 1023.15 WILLOW 11 6935 1023.28 WILLOW 10 6936 1023.15 WILLOW 12 6937 1023.27 WILLOW 9 6938 1023.07 WILLOW 9 6939 1023.22 WILLOW 9 6940 1022.92 WILLOW 9 6941 1023.03 WILLOW 9 6942 1023.19 WILLOW 9 6943 1023.21 WILLOW 9 6944 1023.15 WILLOW 13 6945 1023.03 WILLOW 14,14,16,16,16 6946 1023.27 WILLOW 12 6947 1023.06 WILLOW 10 6948 1027.14 BOXELDER 20 6949 1023.46 COTTONWOOD 24 6950 1023.89 COTTONWOOD 21 6951 1023.82 COTTONWOOD 30 6952 1023.11 COTTONWOOD 16 6953 1022.92 WILLOW 31 6954 1023.00 WILLOW 13 6955 1022.80 WILLOW 10 6956 1023.03 WILLOW 18,18 6957 1022.89 WILLOW 10 6959 1047.99 COTTONWOOD 8,16 6960 1046.97 COTTONWOOD 10 6961 1070.04 PINE 6 X 6962 1068.51 PINE 6 X 6963 1068.94 PINE 7 X 6964 1064.55 SPRUCE 7 X 6965 1064.06 SPRUCE 7 X 6966 1060.61 SPRUCE 5,6 X 6967 1061.40 SPRUCE 4,6 X 6968 1061.03 PINE 8 X 6969 1060.96 PINE 8 X 6970 1059.66 PINE 5 X 6971 1057.73 PINE 8 X 6972 1056.62 PINE 7 X 6973 1055.18 SPRUCE 7 X 6974 1054.84 SPRUCE 7 X 6975 1053.88 SPRUCE 3,4 X 6976 1054.86 SPRUCE 4,5 X 6977 1054.34 SPRUCE 7 X 6978 1053.59 SPRUCE 7 X 6979 1053.56 PINE 7 X 6980 1051.69 PINE 7 X 6981 1052.47 PINE 8 X 6982 1052.18 PINE 7 X 6983 1048.34 SPRUCE 6 X 6984 1050.01 SPRUCE 6 X 6985 1048.15 SPRUCE 6 X 6986 1046.56 PINE 8 X 6987 1045.94 PINE 7 X 6988 1044.45 PINE 7 X 6989 1039.65 SPRUCE 6 6990 1040.01 SPRUCE 6 6991 1025.36 PINE 7 6992 -ASPEN 6 6993 -ASPEN 9 X EXHIBIT J EXHIBIT K EXHIBIT L EXHIBIT M EXHIBIT N EXHIBIT O EXHIBIT P 1 CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA CONDITIONAL USE PERMIT FINDINGS OF FACT AND RECOMMENDATION On August 3, 2017 the Lakeville Planning Commission met at it’s regularly scheduled meeting to consider the application of Bethlehem Baptist Church for a conditional use permit to allow: 1) a religious institution in the C-3, General Commercial District, 2) building height greater than 35 feet, and 3) an exception to the exterior building material requirements for an institutional use. The Planning Commission conducted a public hearing on the proposed conditional use permit preceded by published and mailed notice. The applicant was present and the Planning Commission heard testimony from all interested persons wishing to speak. FINDINGS OF FACT 1. The property is located in Comprehensive Planning District No. 6, Fairfield Business Campus/I-35/CR 70, which guides the property for commercial uses. 2. The property is zoned C-3, General Commercial District. 3. The legal description of the property is: Outlot F, St. Frances Woods 7th Addition; And That part of the South Half of the Southwest quarter of Section 25, Township 114 North, Range 21 West, Dakota County, Minnesota, described as follows: The northerly fifteen (15) feet of the parcel of land described as follows: Commencing at the Northeast corner of the South half of the Southwest quarter of said section; thence bearing South 89 degrees 56 minutes 29 seconds West (assumed bearing), along the North line of the said South half of the Southwest quarter, 760.32 feet to the actual point of beginning of the tract to be described; thence bearing South 01 degrees 10 minutes 58 seconds West, 2 500.00 feet; thence bearing South 89 degrees 56 minutes 29 seconds West, parallel with said North line, 671.20 feet, more or less, to the center line of old Minnesota Trunk Highway No. 65, as laid out and traveled; thence North along said center line, 500.00 feet, more or less, to the North line of said South half of the Southwest Quarter; thence bearing North 89 degrees 56 minutes 29 seconds East, along said North line, 671.20 feet to the actual point of beginning. 4. Section 11-4-3E of the City of Lakeville Zoning Ordinance provides that a conditional use permit may not be issued unless certain criteria are satisfied. The criteria and our findings regarding them are: a) The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. Finding: The proposed religious institution is consistent with uses allowed in commercial areas of the City. The building and cross height in excess of 35 feet and the exterior building materials exception for a church use is consistent with the policies and provisions of Planning District 6 of the Comprehensive Land Use Plan. b) The proposed use is or will be compatible with future land uses of the area. Finding: The proposed religious institution in the C-3 District will be compatible with existing and future land uses in the area. c) The proposed use conforms with all performance standards contained in the Zoning Ordinance and the City Code. Finding: The proposed religious institution use in the C-3 District will conform to the performance standards set forth in the Zoning Ordinance given approval of the conditional use permit for the building and height of the cross and exterior building materials. d) The proposed use can be accommodated with existing public services and will not overburden the City’s service capacity. 3 Finding: The proposed religious institution use will be served with existing public services and will not overburden the City’s service capacity. e) Traffic generation by the proposed use is within capabilities of streets serving the property. Finding: Traffic generation from the religious institution use can be accommodated by minor arterial Kenrick Avenue. 5. The planning report dated July 27, 2017 prepared by Associate Planner Frank Dempsey is incorporated herein. RECOMMENDATION Dated: August 3, 2017 The Planning Commission recommends that the City Council approve the conditional use permit in the form attached thereto. LAKEVILLE PLANNING COMMISSION _______________________ Jason Swenson, Chair City of Lakeville Public Works – Engineering Division Memorandum To: Frank Dempsey, Associate Planner From: Matt Decur, Senior Project Engineer McKenzie L. Cafferty, Environmental Resources Manager John Hennen, Parks and Recreation Director Copy: Zach Johnson, City Engineer Daryl Morey, Planning Director Jerilyn Erickson, Finance Director Gene Abbott, Building Official Date: July 26, 2017 Subject: Bethlehem Baptist Church • Preliminary Plat Review • Final Plat Review • Grading and Erosion Control Plan Review • Utility Plan Review • Tree Preservation Plan Review • Conditional Use Permit • Site Plan Review BBAACCKKGGRROOUUNNDD Bethlehem Baptist Church has submitted a preliminary and final plat named Bethlehem Baptist Church. The proposed subdivision is located east of and adjacent to Kenrick Avenue and north of CSAH 70 (210th Street). The parent parcels are Outlot F, St Frances Woods 7th Addition, and a metes and bounds parcel. The metes and bounds parcel is a 15-foot wide strip of land owned by the City of Lakeville. The City has agreed to sell the parcel to the Developer. Both parent parcels are zoned C-3, General Commercial District. The final plat consists of 1 lot, within 1 block, and 1 outlot on 12.34 acres. BBEETTHHLLEEHHEEMM BBAAPPTTIISSTT CCHHUURRCCHH JJUULLYY 2266,, 22001177 PPAAGGEE 22 OOFF 88 The outlot created with the final plat shall have the following use: Outlot A: Wetland and Wetland Buffer, to be deeded to the City (0.43 acres) The proposed development will be completed by: Developer: Bethlehem Baptist Church Engineer/Surveyor: James R. Hill, Inc. SSIITTEE CCOONNDDIITTIIOONNSS The Bethlehem Baptist Church site is partially wooded, undeveloped land. The site generally drains from east to west. A portion of the site drains north to an existing wetland. Existing overhead power lines are located along the east side of Kenrick Avenue. EEAASSEEMMEENNTTSS The parent parcel contains an existing private easement that will remain with the proposed development. • Minnegasco easement per document No. 1332047. SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT Kenrick Avenue Bethlehem Baptist Church is located east of and adjacent to Kenrick Avenue, a minor arterial roadway as identified in the City’s Transportation Plan. The existing right-of-way for Kenrick Avenue is 225 feet wide. Kenrick Avenue adjacent to the site is a two-lane undivided rural roadway built in the easterly half of the existing right-of-way. No additional right-of-way is required with this plat. Improvements to Kenrick Avenue are not identified in the City’s Capital Improvement Plan. A cash escrow for future upgrade of Kenrick Avenue is required with this development. The Cash Escrow for Future Upgrade of Kenrick Avenue will be collected with the final plat and is calculated as follows: 427.24 f.f. x $160.00/unit = $68,358.40 Front Footage on Kenrick Avenue Future Upgrade Fee for Commercial Rural Section Total New access driveways onto Kenrick Avenue shall have stop signs and stop bars. A security will be collected to ensure proper construction of driveways and restoration of Kenrick Avenue. CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS Construction traffic access and egress for grading, utility and site construction shall be from a single rock construction entrance off of Kenrick Avenue. BBEETTHHLLEEHHEEMM BBAAPPTTIISSTT CCHHUURRCCHH JJUULLYY 2266,, 22001177 PPAAGGEE 33 OOFF 88 PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS Park Dedication has not been collected on the parent parcel and will be satisfied through a cash contribution that shall be paid with the final plat. The Park Dedication Fee will be based on the rate in effect at the time of final plat approval, calculated as follows: 11.89 acres x $7,693/acre = $91,469.77 Lot 1, Block 1 Bethlehem Baptist Church Park Dedication Fee Park Dedication Requirement The City’s current Parks, Trails, and Open Space Plan identifies a trail along the east side of Kenrick Avenue adjacent to the plat. The Developer shall pay a cash fee for its 5/8th portion of the future trail construction costs adjacent to the plat along the east side of Kenrick Avenue. The cash fee, based on an estimate provided by the Developer’s engineer, shall be submitted with the final plat, calculated as follows: $5,660.93 x 5/8 = $3,538.08 Future Trail Construction Cost adjacent to Bethlehem Baptist Church (excluding grading and restoration) Developer’s Cost Share Total UUTTIILLIITTIIEESS SSAANNIITTAARRYY SSEEWWEERR Bethlehem Baptist Church is located within subdistrict SC-13200 of the South Creek sanitary sewer district as identified in the City’s Sewer Plan. Wastewater will be conveyed to the MCES Farmington Interceptor and continue to the Empire Wastewater Facility. Downstream facilities will be monitored for capacity constraints when residential properties develop west of Bethlehem Baptist Church. Facilities have sufficient capacity to serve the proposed development. Private sanitary sewer will be extended within the site from an existing sanitary sewer main within Kenrick Avenue. A manhole will be constructed in the existing 10-inch public sanitary sewer main and 8-inch private sanitary sewer service will be extended to the site. A $10,000 escrow will be collected to ensure proper construction of the sanitary sewer manhole. Lateral Sanitary Sewer and Watermain Charges for Outlot F, St. Frances Woods 7th Addition, were reassessed and deferred with the St. Frances Woods 7th Addition final plat. The $28,454.91 deferred balance will be collected with the Bethlehem Baptist Church final plat. The Sanitary Sewer Availability Charge is due for the parent parcels. The Sanitary Sewer Availability Charge shall be based on the SAC Unit determination and will be collected with the building permit. WWAATTEERRMMAAIINN Development of Bethlehem Baptist Church includes connection to an existing 20-inch watermain within Kenrick Avenue. Private watermain will be extended within the Bethlehem BBEETTHHLLEEHHEEMM BBAAPPTTIISSTT CCHHUURRCCHH JJUULLYY 2266,, 22001177 PPAAGGEE 44 OOFF 88 Baptist Church site to provide water service to the development. A $5,000.00 escrow will be collected to ensure proper connection to the public watermain. OOVVEERRHHEEAADD LLIINNEESS Consistent with the requirements of Chapter 7-6 of the City Code, the Developer shall remove and place underground the existing utility lines and poles adjacent to the Bethlehem Baptist Church plat along Kenrick Avenue. A $86,000 security will be collected to ensure the overhead lines are removed. DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG Bethlehem Baptist Church is located within subdistricts ML-5 and ML-6 of the Lake Marion stormwater district as identified in the City’s Water Resources Management Plan. Stormwater runoff generated from the Bethlehem Baptist Church site will be collected and treated by stormwater management basins constructed within the site. The basins will provide water quality treatment and rate control of the stormwater runoff generated from the Bethlehem Baptist Church development. The stormwater management designs are consistent with City requirements. A Stormwater Maintenance Agreement is required with the final plat. The final grading plan shall identify all fill lots in which the building footings will be placed on fill material. The grading specifications shall also indicate that all embankments meet FHA/HUD 79G specifications. The Developer shall certify to the City that all lots with footings placed on fill material are appropriately constructed. Building permits will not be issued until a soils report and an as-built certified grading plan have been submitted and approved by City staff. Bethlehem Baptist Church contains more than one acre of site disturbance. A National Pollution Discharge Elimination System General Stormwater Permit for construction activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the City upon receipt from the MPCA. SSTTOORRMM SSEEWWEERR Development of Bethlehem Baptist Church includes the construction of private storm sewer. Storm sewer will be installed within Lot 1, Block 1 to collect and convey stormwater runoff to the private stormwater management basins located on the site. Culverts will be installed in each driveway access to convey Kenrick Avenue drainage The Trunk Storm Sewer Area Charge is due for the parent parcel, and shall be paid with the Bethlehem Baptist Church final plat. The Trunk Storm Sewer Area Charge is calculated as follows: BBEETTHHLLEEHHEEMM BBAAPPTTIISSTT CCHHUURRCCHH JJUULLYY 2266,, 22001177 PPAAGGEE 55 OOFF 88 517,928 s.f. x $0.250/s.f. = $129,482.00 The Developer will receive a credit to the Trunk Storm Sewer Area Charge for deeding Outlot A to the City, consistent with City policy. The credit is based on the area of the Outlot and is calculated at the rate of $5,500.00 per acre. The Trunk Storm Sewer Area Charge will be applied to the Bethlehem Baptist Church final plat cash fees. The credit is calculated as follows: 0.43 acres x $5,500/acre = $2,365.00 Total Area of Outlot A Per Acre Credit Total Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final construction plans. FEMA FLOODPLAIN ANALYSIS Bethlehem Baptist Church is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the Federal Emergency Management Agency (FEMA). Based on this designation, there are no areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA. WWEETTLLAANNDDSS The wetland delineation for the site was completed. No impacts are proposed to the wetland. The wetland and wetland buffers will be deeded to the City in Outlot A. TTRREEEE PPRREESSEERRVVAATTIIOONN A tree preservation plan was submitted. 457 trees were identified on the site. The developer plans to save 42 trees, mostly in the wetland area. Any save trees that are removed will require a 2:1 replacement. EERROOSSIIOONN CCOONNTTRROOLL The developer is responsible for obtaining a MPCA Construction Permit for the site prior to construction. The permit requires that all erosion and sediment BMPS be clearly outlined in a site’s SWPPP. Changes made throughout construction must be documented in the SWPPP. Additional erosion control measures may be required during construction as deemed necessary by City staff. Any additional measures required shall be installed and maintained by the Developer. The Developer is responsible for the first 2 years of vegetation maintenance in the basin areas. This will include mowing 2 to 3 times, 30 days apart during the first year with the mower deck set about 6-8 inches off the ground. The second year, the basin areas must be mowed once before weeds set their seeds. This will reduce weed establishment, and help stimulate the desirable vegetation. BBEETTHHLLEEHHEEMM BBAAPPTTIISSTT CCHHUURRCCHH JJUULLYY 2266,, 22001177 PPAAGGEE 66 OOFF 88 SECURITIES The Developer shall provide a Letter of Credit as security for the Developer-installed improvements relating to Bethlehem Baptist Church. Construction costs are based upon estimates submitted by the Developer’s engineer. CONSTRUCTION COSTS Connect to Sanitary Sewer and Construct Manhole $ 10,000.00 Connect to Watermain 5,000.00 Street/Driveway Construction 10,000.00 Erosion Control, Grading and Grading Certification 25,000.00 SUBTOTAL - CONSTRUCTION COSTS $50,000.00 OTHER COSTS Developer’s Design (3.0%) $1,500.00 Developer’s Construction Survey (2.5%) 1,250.00 City’s Legal Expense (0.5%) 250.00 City Construction Observation (5.0%) 2,500.00 Developer’s Record Drawing (0.5%) 250.00 Removing Overhead Utility Poles and Lines 86,000.00 Landscaping 15,000.00 Street Lights 2,800.00 Lot Corners/Iron Monuments 200.00 SUBTOTAL - OTHER COSTS $109,175.00 TOTAL PROJECT SECURITY $154,175.00 The street light security totals $2,800 which consists of two (2) mast arm street lights at $1,400 each. The Developer shall post a security to ensure the final placement of iron monuments at property corners with the final plat. The security is $100.00 per lot and outlot for a total of $200.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all irons have been placed following site grading, street and utility construction. BBEETTHHLLEEHHEEMM BBAAPPTTIISSTT CCHHUURRCCHH JJUULLYY 2266,, 22001177 PPAAGGEE 77 OOFF 88 CCAASSHH FFEEEESS A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat approval and is calculated as follows: 427.24 feet x $0.2451/front foot/quarter x 4 quarters = $418.87 Front Footage, Lot 1 Block 1 Streetlight Operating Fee Total A cash fee for one-year of environmental resources expenses shall be paid at the time of final plat approval and is calculated as follows: 11.89 Acres x 4.2 x $37.20/unit = $1,857.69 Lot 1 Block 1 Utility Factor Environmental Resources Fee Total A cash fee for the preparation of record construction drawings and for upgrading the City base map shall be paid at the time of final plat approval and is calculated as follows: 2 units x $90.00/unit = $180.00 Lots/Outlots City Base Map Updating Fee Total The Developer shall submit the final plat and construction drawings in an electronic format. The electronic format shall be in either .dwg (AutoCAD) or .dxf format. The Developer shall also pay a cash fee for City Engineering Administration. The fee for City Engineering Administration will be based on three percent (3.00%) of the estimated construction cost, or $1,500.00. CASH REQUIREMENTS Park Dedication Fee $ 91,469.77 Future Upgrade of Kenrick Avenue 68,358.40 Future Trail Along Kenrick Avenue 3,538.08 Deferred Assessment 229 – Lateral Sanitary Sewer and Watermain 28,454.91 Trunk Storm Sewer Area Charge 129,482.00 Streetlight Operating Fee 418.87 Environmental Resources Fee 1,857.69 City Base Map Updating Fee 180.00 City Engineering Administration (3.00%) 1,500.00 SUBTOTAL - CASH REQUIREMENTS $325,259.72 CREDITS TO THE CASH REQUIREMENTS Outlot A (Trunk Storm Sewer Fund) $2,365.00 SUBTOTAL - CREDITS TO THE CASH REQUIREMENTS = $2,365.00 TOTAL CASH REQUIREMENTS $322,894.72 BBEETTHHLLEEHHEEMM BBAAPPTTIISSTT CCHHUURRCCHH JJUULLYY 2266,, 22001177 PPAAGGEE 88 OOFF 88 RREECCOOMMMMEENNDDAATTIIOONN Engineering recommends approval of the preliminary and final plat, grading and erosion control plan, utility plan, tree preservation plan, conditional use permit, and site plan for Bethlehem Baptist Church, subject to the requirements and stipulations within this report.