HomeMy WebLinkAboutMULLER FAMILY THEATRECity of Lakeville
Planning Department
Memorandum
To: Planning Commission
From: Frank Dempsey, AICP, Associate Planner
Date: July 27, 2017
Subject: Packet Material for the August 3, 2017 Planning Commission Meeting
Agenda
Item: Muller Family Theatre Second Addition
1. Preliminary Plat
2. Final Plat
3. Site Plan Review
Application Action Deadline: October 7, 2017
BACKGROUND
Representatives of Muller Family Theatres Partnership have submitted applications for the
preliminary and final plat of two lots and site plan review for the development a proposed 10,745
square foot office building. The preliminary and final plat totals 11.88 acres. One lot will contain
the existing movie theater and one lot will be for future development of the office building. The
office building will be located in the northeast corner of the existing Emagine Lakeville movie
theater parking lot. The subject property is currently platted as Lot 1, Block 1, Muller Family
Theatre Addition and is zoned C-3, General Commercial District. The theater property was platted
and developed in 1997. The 1.75 acre commercial parcel in the southeast corner of the theater
property was administratively subdivided from the theater property in 2016 and remains
undeveloped. That parcel is shown as an exception to the preliminary plat. The subject property is
located south of 205th Street and west of Keokuk Avenue.
2
The Muller Family Theatre Second Addition preliminary and final plat plans have been submitted
to the Engineering Division, the Parks and Recreation Department and the Parks, Recreation and
Natural Resources Committee.
EXHIBITS
A. Location and Zoning Map
B. Aerial Photo
C. Preliminary Plat
D. Final Plat
E. Site Plan
F. Removals (Demolition) Plan
G. Parking and Easements Plan
H. Utility Plan
I. Grading Plan
Surrounding Land Uses and Zoning
North – 205th Street and undeveloped property (RM-1 District)
South – 207th Street and undeveloped property (C-3 District)
East – Keokuk Avenue and Walmart (C-3 District)
West – Morgan Square Townhomes (PUD District)
STAFF ANALYSIS
PRELIMINARY AND FINAL PLAT
Comprehensive Plan. The Muller Family Theatre Second Addition property is located in Planning
District No. 6 of the 2008 Comprehensive Plan which guides the property for commercial use. The
existing and proposed future commercial use is consistent with the commercial designation of the
Comprehensive Land Use Plan.
Zoning. The Muller Family Theatre Second Addition preliminary and final plat property is zoned
C-3, General Commercial District zoning which allows theaters, retail, offices, service businesses,
restaurants and the like.
3
Consistency with the Capital Improvement Plan (CIP). No public street construction or other
public funded infrastructure construction is proposed with the Muller Family Theatre Second
Addition preliminary and final plat. All City sanitary sewer, water and stormsewer improvements
required for the area of the Muller Family Theatre Second Addition were installed by the developer
with the Muller Family Theatre Addition development.
Lots/Blocks. The Muller Family Theatre Second Addition preliminary and final plat proposes
two lots on one block. The following C-3 District lot development requirements pertain to this
preliminary and final plat:
Lot Area: 20,000 square feet
Lot Width: 100 feet
Lot 1 Area (Theater): 10.13 acres
Lot 1 Width: 135.6 feet
Lot 2 Area: 1.75 acres
Lot 2 Width: 266 feet
Lots 1 and 2, Block 1, Muller Family Theatre Second Addition exceed the minimum lot
requirements in the C-3 District.
Outlots. No outlots are proposed with the Muller Family Theatre Second Addition preliminary
and final plat.
Streets. No new street construction is proposed with the Muller Family Theatre Second Addition
preliminary and final plat. The property is adjacent to 205th Street, 207th Street and Keokuk
Avenue. No additional road right-of-way is required with this preliminary and final plat. A new
driveway will be constructed onto Keokuk Avenue directly across from the south driveway of the
office building property across Keokuk Avenue to the east. The access at 205th Street will remain
and will be a shared access between the theater and the office building.
Trails and Sidewalks. There is no trail located on the south side of 205th Street. An eight foot wide
concrete sidewalk is located on the west side of Keokuk Avenue. The Muller Family Theatre plat
approved in 1997 was the first development of the Lakeville Commerce Center property abutting
205th Street at that time. The construction of the movie theater building and parking lot required
extensive work on 205th Street with the construction of turn lanes at the west driveway entrance and
at the 205th Street and Keokuk Avenue intersection. Trail construction was to occur at the time of
205th Street urbanization or when the trail was constructed with the development of the properties
4
to the west and on the east side of Keokuk Avenue. The trail is in place at those locations so the
trail must now be constructed in conjunction with the Muller Family Theatre Second Addition
plat.
Grading, Drainage, Erosion Control, and Utilities. No significant changes to the grading and
storm water facilities is proposed with this plat since the new lot will be replacing existing
bituminous surface parking lot. City sewer and water utilities are adjacent to the property and
are of adequate design to serve the new commercial lot. Grading, drainage and erosion control
and utility plans have been submitted with the preliminary and final plat and site plans and have
been reviewed by Matt Decur, Senior Project Engineer and Mac Cafferty, Environmental
Resources Manager. A copy of the engineering report dated July 26, 2017 is attached for your
review. The Engineering Division recommends approval of the preliminary and final plat and
site plan subject to the recommendations outlined in the report.
Tree Preservation. There are no significant trees located on the subject property.
Wetlands. There are no wetlands located on the subject property.
Park Dedication. Park dedication was paid with the Muller Family Theatre Addition final plat
in 1997. No additional park dedication is required with the final plat.
The Parks, Recreation and Natural Resources Committee will review the Muller Family Theatre
Second Addition preliminary and final plat plans at their August 2, 2017 meeting. Their
comments will be forwarded to the Planning Commission at the public hearing.
SITE PLAN
The proposed site plan shows a conceptual layout for a proposed office building parking lot.
Setbacks. Development of the Muller Family Theatre Second Addition site plan is subject to the
following minimum building setback (C-3, General Commercial District) requirements:
Abutting a Public Street: 30 feet
Interior Lot Lines: 10 feet
Parking: 15 feet (abutting street), 5 feet (interior lot lines)
The proposed office building and parking lot meet the C-3 District setback requirements.
5
Parking - Lot 2 (Office). The proposed 10,745 square foot building will require 48 parking spaces at a
ratio of one space required for each 200 square feet of floor area, minus a 10% floor area credit. Ninety
(90) parking spaces are proposed. Use of the office parking lot for theater patron parking may be
allowed, but is not required. A shared parking agreement should be in place between the two
properties if shared parking arrangements are proposed.
Parking - Lot 1 (Theater). The Zoning Ordinance requires a ratio of one parking space for each
3.4 seats in the theater. The total number of seats in the theater is 2009 which requires a total of
591 parking spaces. A total of 760 parking spaces are shown for Lot 1.
The proposed parking, spaces and drive aisle dimensions meet the requirements of the Zoning
Ordinance. Parking aisles will be 24 feet in width and parking stall dimensions will be 9 feet in
width and 18 feet in length with a two foot curb overhang.
Circulation. Access to the sites will continue to be from existing driveways on 205th Street and
Keokuk Avenue. A new driveway is proposed from Keokuk Avenue to serve the new office
building.
Landscaping. All existing landscaping on site will remain in place. A landscaping plan will be
required with the submittal of a building permit for the new office building.
Future Building, Lot 2. The future office building will be subject to the exterior building material
requirements for commercial uses outlined in the Zoning Ordinance. These requirements will be
reviewed upon submittal of building plans with the building permit application.
Trash Enclosure. If trash and recycle containers are to be stored outdoors, an enclosure will be
required of a design in compliance with Zoning Ordinance requirements. This will be addressed
upon plan submittal with the building permit application.
Signs. The property is in the Freeway Corridor District which allows up to 100 square feet of
building wall signage for the C-3 District. A corner lot is allowed two wall signs facing public right-
of-way. One freestanding sign is allowed up to 150 square feet in area and 30 feet in height. All
signs require approval of a sign permit prior to installation.
Snow Storage. Snow storage may not take place in required parking spaces.
6
RECOMMENDATION
Planning Department staff recommends approval of the Muller Family Theatre Second Addition
preliminary and final plat subject to the following stipulations:
1. Implementation of the recommendations listed in the July 26, 2017 engineering report.
2. A site plan shall be submitted for staff review in conjunction with a building permit for Lot 2.
3. The site shall be developed consistent with the approved preliminary and final plat plans.
4. An agreement for shared driveway access and cross parking shall remain in full force and effect
at all times for Lots 1 and 2, Block 1, Muller Theatre Second Addition.
P/OS
RM-2 PUD
C-3
C-3
§¨¦35
C-3
RM-1
RM-1
RS-2
RA
PUD
RST-2
C-3
210TH ST W KENRICK AVE205TH ST W
207TH ST W KENRICK AVEKEYSTONEAVEKEOKUKAVEMULLER FAMILY THEATRE SECOND ADDITION
Ü
EXHIBIT A
MULLER FAMILY THEATRE SECOND ADDITION
Property Information
June 28, 2017
0 450 900225 ft
0 130 26065 m
1:4,800
Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification.
EXHIBIT B
EXHIBIT C
EXHIBIT D
EXHBIIT E
EXHIBIT F
EXHIBIT G
EXHBIT H
EXHIBIT I
City of Lakeville
Public Works – Engineering Division
Memorandum
To: Frank Dempsey, Associate Planner
From: Matt Decur, Senior Project Engineer
McKenzie L. Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Daryl Morey, Planning Director
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
Date: July 26, 2017
Subject: Muller Family Theatre Second Addition
• Preliminary Plat Review
• Final Plat Review
• Grading and Erosion Control Plan Review
• Utility Plan Review
• Tree Preservation Plan Review
• Site Plan Review
BBAACCKKGGRROOUUNNDD
Muller Family Theatres Partnership has submitted a preliminary and final plat named Muller
Family Theater Second Addition. The proposed subdivision is located west of and adjacent to
Keokuk Avenue and south of and adjacent to 205th Street. The parent parcel is Lot 1, Block 1,
Muller Family Theatre Addition, except the south 305.57 feet of the east 248.78 feet. The
parent parcel zoned C-3, General Commercial District.
The final plat consists of 2 lots within 1 block on 11.88 acres.
The proposed development will be completed by:
Developer: Muller Family Theatres Partnership
Engineer/Surveyor: Otto Associates
MMUULLLLEERR FFAAMMIILLYY TTHHEEAATTRREE SSEECCOONNDD AADDDDIITTIIOONN
JJUULLYY 2266,, 22001177
PPAAGGEE 22 OOFF 66
SSIITTEE CCOONNDDIITTIIOONNSS
The Muller Family Theatre Second Addition site was developed with the Muller Family
Theatre Addition plat. The site contains the Emagine Lakeville Theatre and parking lots.
EEAASSEEMMEENNTTSS
The proposed 10-foot-wide drainage and utility easements along all lot lines meets City
requirements.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
Keokuk Avenue
Muller Family Theatre Second Addition is located west of and adjacent to Keokuk Avenue, a
major collector roadway as identified in the City’s Transportation Plan. Keokuk Avenue
adjacent to the site is a 44-foot-wide three-lane undivided urban roadway with a continuous
center turn lane.
205th Street
Muller Family Theatre Second Addition is located south of and adjacent to 205th Street, a
major collector roadway as identified in the City’s Transportation Plan. 205th Street is
designed as a two-lane rural roadway with dedicated turn lanes at Keokuk Avenue. The
required half right-of-way for 205th Street was dedicated with the Lakeville Commerce Center
plat. The Future Upgrade Fee for 205th Street was satisfied with the Muller Family Theatre
Addition plat.
207th Street
Muller Family Theatre Second Addition is north of and adjacent to 207th Street, a minor
collector roadway as identified in the City’s Transportation Plan. 207th Street is a 38-foot-wide
two-lane roadway. The required 60-feet of right-of-way was dedicated with the Lakeville
Commerce Center plat.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility and site construction shall be from a
rock construction entrance at the proposed new driveway access on Keokuk Avenue.
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS
Park Dedication was collected on the parent parcel with the Muller Family Theatre Addition
plat.
The City’s current Parks, Trails, and Open Space Plan identifies a trail along the south side of
205th Street adjacent to the plat. The Developer shall construct the trail from the west plat
boundary to Keokuk Avenue with the proposed site improvements. The Developer will
MMUULLLLEERR FFAAMMIILLYY TTHHEEAATTRREE SSEECCOONNDD AADDDDIITTIIOONN
JJUULLYY 2266,, 22001177
PPAAGGEE 33 OOFF 66
receive a credit to the plat cash fees for the City’s 3/8 share of trail construction costs. The
Trail Construction credit is calculated as follows:
$4,000.00 x 3/8 = $1,500.00
205th Street Trail Construction Cost adjacent
to Muller Family Theatre Second Addition
(excluding grading and restoration)
City’s Cost Share Total
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR
Muller Family Theatre Second Addition is located within subdistricts SC-13400 of the South
Creek sanitary sewer district, as identified in the City’s Sewer Plan. Wastewater will be
conveyed to the MCES Farmington Interceptor and continue to the Empire Wastewater
Facility. Downstream facilities are monitored for capacity constraints based on future
residential development west of Muller Family Theatre Second Addition. Downstream
facilities are adequate to serve the proposed development.
The Sanitary Sewer Availability Charge was paid with the parent parcel.
The Developer proposes to install new services to the site from existing sanitary sewer in 205th
Street. A $10,000 security will be collected to ensure proper connection to the sanitary sewer
and restoration of 205th Street.
WWAATTEERRMMAAIINN
Development of Muller Family Theatre Second Addition includes a connection to existing
public watermain. Watermain service will be extended from the existing sixteen-inch trunk
watermain in 205th Street into the development to provide water service to the proposed site.
A $10,000 security will be collected to ensure proper connection to the public watermain and
restoration of 205th Street.
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
Muller Family Theatre Second Addition is located within subdistricts ML-7 and ML-10 of the
Lake Marion stormwater district as identified in the City’s Water Resources Management Plan.
Stormwater runoff generated from the Muller Family Theatre Second Addition site is collected
and treated by stormwater management basins constructed with the previous development.
The basins provide water quality treatment and rate control of the stormwater runoff
generated from the existing development. No additional impervious surface is proposed with
the Muller Family Theatre Second Addition development and no additional stormwater
management is required.
The final grading plan shall identify all fill lots in which the building footings will be placed on
fill material. The grading specifications shall also indicate that all embankments meet
MMUULLLLEERR FFAAMMIILLYY TTHHEEAATTRREE SSEECCOONNDD AADDDDIITTIIOONN
JJUULLYY 2266,, 22001177
PPAAGGEE 44 OOFF 66
FHA/HUD 79G specifications. The Developer shall certify to the City that all lots with footings
placed on fill material are appropriately constructed. Building permits will not be issued until
a soils report and an as-built certified grading plan have been submitted and approved by
City staff.
Muller Family Theatre Second Addition contains more than one acre of site disturbance. A
National Pollution Discharge Elimination System General Stormwater Permit for construction
activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre
being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be
submitted to the City upon receipt from the MPCA.
SSTTOORRMM SSEEWWEERR
Development of Muller Family Theatre Second Addition includes connection to and
modifications of private storm sewer owned by the developer. No public storm sewer will be
impacted by the development.
The Trunk Storm Sewer Area Charge for the parent parcel was satisfied with the Muller Family
Theatre Addition plat.
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
FEMA FLOODPLAIN ANALYSIS
Muller Family Theatre Second Addition is shown on the Flood Insurance Rate Map (FIRM) as
Zone X by the Federal Emergency Management Agency (FEMA). Based on this designation,
there are no areas in the plat located within a Special Flood Hazard Area (SFHA), as
determined by FEMA.
WWEETTLLAANNDDSS
There are no wetlands on site.
TTRREEEE PPRREESSEERRVVAATTIIOONN
There are no significant trees within the site.
EERROOSSIIOONN CCOONNTTRROOLL
The developer is responsible for obtaining a MPCA Construction Permit for the site as well as
developing a SWPPP for the site prior to construction. The permit requires that all erosion and
sediment BMPS be clearly outlined in a site’s SWPPP. Changes made throughout construction
must be documented in the SWPPP.
MMUULLLLEERR FFAAMMIILLYY TTHHEEAATTRREE SSEECCOONNDD AADDDDIITTIIOONN
JJUULLYY 2266,, 22001177
PPAAGGEE 55 OOFF 66
Additional erosion control measures may be required during construction as deemed
necessary by City staff. Any additional measures required shall be installed and maintained by
the Developer.
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to Muller Family Theatre Second Addition
CONSTRUCTION COSTS
Connection to Sanitary Sewer $ 10,000.00
Watermain 10,000.00
Driveway Construction/Street Connection and Trail Construction 10,000.00
Erosion Control, Grading and Grading Certification 20,000.00
SUBTOTAL - CONSTRUCTION COSTS $50,000.00
OTHER COSTS
Developer’s Design (3.0%) $1,500.00
Developer’s Construction Survey (2.5%) 1,250.00
City’s Legal Expense (0.5%) 250.00
City Construction Observation (5.0%) 2,500.00
Developer’s Record Drawing (0.5%) 250.00
Landscaping 12,000.00
Street Lights 2,800.00
Lot Corners/Iron Monuments 200.00
SUBTOTAL - OTHER COSTS $20,750.00
TOTAL PROJECT SECURITY $70,750.00
The street light security totals $2,800 which consists of two (2) mast arm street lights at $1,400
each.
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
$200.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all
irons have been placed following site grading, street and utility construction
CCAASSHH FFEEEESS
A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat
approval and is calculated as follows:
1167.91 x $0.2451/front foot/quarter x 4 = $1,145.02
Front Footage, Muller Family Theatre Second Addition Streetlight Operating Fee quarters Total
A cash fee for one-year of environmental resources expenses shall be paid at the time of final
plat approval and is calculated as follows:
MMUULLLLEERR FFAAMMIILLYY TTHHEEAATTRREE SSEECCOONNDD AADDDDIITTIIOONN
JJUULLYY 2266,, 22001177
PPAAGGEE 66 OOFF 66
11.88 acres X 4.2 x $37.20/unit = $1,856.13
Acreage of Muller Family Theatre Second Addition Utility Factor Environmental Resources Fee Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
2 units x $90.00/unit = $180.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be in either .dwg (AutoCAD) or .dxf format.
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction cost, or $1,500.00.
CASH REQUIREMENTS
Streetlight Operating Fee 1,145.02
Environmental Resources Fee 1,856.13
City Base Map Updating Fee 180.00
City Engineering Administration (3.00%) 1,500.00
SUB TOTAL - CASH REQUIREMENTS $4,681.15
CREDITS TO THE CASH REQUIREMENTS
Trail Construction Credit $1,500.00
SUBTOTAL - CREDITS TO THE CASH REQUIREMENTS =
$1,500.00
TOTAL CASH REQUIREMENTS $3,181.15
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the preliminary plat, final plat, grading and erosion
control plan, utility plan, tree preservation plan, and site plan for Muller Family Theatre
Second Addition subject to the requirements and stipulations within this report.