Loading...
HomeMy WebLinkAboutBETHLEHEM FIRST ADDITION1 2 3 4 5 6 7 ±DODDBLVD(CSAH9)IPAVAAVEBethlehem First Addition plat area ING L E SI DECTINNDALE DR192NDST 194TH STIREDELL CT City of Lakeville Bethlehem First Add Preliminary/Final Plat Comp Plan Amend Zoning Map Amend EXHIBIT A IRELAND WAY 1 9 4 T H S T ± P/QP RD RD RD MDR MDR LDR LDR LDR L/MDR M/HDR MDR Proposed change from MDR to HDR 1 9 4 T H ST DODDBLVD(CSAH9)1 9 2ND ST 194TH STIPAVAAVE (Lakeville North High School) 190TH ST Bethlehem First Addition plat area City of Lakeville Bethlehem First Add Comp Plan Amend Proposed Land UseEXHIBIT B ± P/OS P/OS P/OS P/OS RM-1 RM-1 RS-2 RS-3 PUD RST-2 RM-2 PUD Proposed change from RM-1 to RH-2 1 9 4 T H ST DODDBLVD(CSAH9)1 9 2ND ST 194TH STIPAVAAVE (Lakeville North High School) 190TH ST Bethlehem First Addition plat area PUD RS-3 City of Lakeville Bethlehem First Add Proposed Zoning Map AmendEXHIBIT CIRELANDWAYINNDA L E D R IN G L E SIDECTINNDALE DR BENCHMARK - TOP NUT HYDRANT ELEVATION = 1002.38 FUTURE WORSHIP FUTURE FUTURE 205 STALLS 120 FUTURE STALLS PONDING LOT 1 BLOCK 1 20 20 1919 1919 15 16 16 1415 13 122 FUTURE STALLS 31.5 9.0 18.0STOP SIGN AND STOP BAR STOP SIGN AND STOP BAR STOP SIGN AND STOP BAR 24.0NWL=1003.0 10-YR=1003.8 100-YR=1005.9 LOT 2 BLOCK 1 EXISTING LEGEND LOT LINE RIGHT-OF-WAY LINE EASEMENT LINE WATER MAIN SANITARY SEWER STORM SEWER WATER SERVICE SANITARY SERVICE CHAIN LINK FENCE VINYL/WOOD FENCE LIGHT POLE POWER POLE XFMR. TRANSFORMER CBLX. CABLE BOX TEL. TELEPHONE BOX E.M. ELECTRIC METER G.M. GAS METER A.C. AIR CONDITIONER HYDRANT WATER VALVE P.I.V. POST INDICATOR VALVE SANITARY MANHOLE C.O. CLEANOUT STORM MANHOLE AREA CATCH BASIN CATCH BASIN CONIFEROUS TREE DECIDUOUS TREE CONTOUR LINE SPOT ELEVATION DRAINAGE ARROW DETAIL NOTE NOTES 1. UTILITIES SHOWN ARE APPROXIMATE LOCATION. LOCATIONS OF UNDERGROUND UTILITIES COMPILED FROM VISUAL EVIDENCE (FLAGGING & PAINT MARKS) AND RECORD DRAWINGS (DESIGN & AS-BUILT). CALL GOPHER STATE ONE CALL AT 811 FOR ALL UTILITY, GAS LINE, AND ELECTRICAL LINE LOCATIONS PRIOR TO EXCAVATION. 2. PROPERTY CURRENTLY ZONED RM-1 (MEDIUM DENSITY RESIDENTIAL DISTRICT). 3. SURVEY COMPLETED IN DECEMBER, 2016. 4. TOTAL AREA OF PROPERTY AS SHOWN: A. AREA OF PROPERTY TO BE PLATTED: 810,599 SQ. FT. (18.609 AC.) B. PROPOSED LOT 1, BLOCK 1 = 181,566 SQ. FT. (4.168 AC.) C. PROPOSED LOT 2, BLOCK 1 = 629,033 SQ. FT. (14.440 AC.) BENCHMARK - TOP NUT OF HYDRANT ON SOUTHEAST CORNER OF SITE, ELEVATION = 1002.38 OUTLOT ALOT 1BLOCK 1DEPARTMENT OF PROPERTY TAXATION AND RECORDSCOUNTY RECORDER, COUNTY OF DAKOTA, STATE OF MINNESOTACITY COUNCIL, CITY OF LAKEVILLE, MINNESOTACOUNTY SURVEYOR, DAKOTA COUNTY, MINNESOTASURVEYORS CERTIFICATEBETHLEHEM FIRST ADDITION 120 FUTURE1012.731010.001012.651000.40999.801000.401000.501001.001001.001002.801001.00FF=1002.90FF=1013.231002.901001.001002.401002.901012.731010.00997.001000.401001.001001.00999.40B-1B-2B-3B-6B-5B-4B-7B-8B-9B-14B-13B-12B-11B-15B-101002.601002.361002.401001.001002.161002.16995.701002.601001.001001.08999.001000.751001.00LOT 1BLOCK 1SILT FENCESILT FENCEHYDCOPIV31.59.018. 0 STOP SIGN AND STOP BARSTOP SIGN AND STOP BARSTOP SIGN AND STOP BARGUTTER-OUT CURB ALONGPARKING/BUILDING AREA24.0 NOTES:1. TOTAL NUMBER OF TREES ON SITE = 952. NUMBER OF TREES TO BE SAVED = 49 = 51.6%3. NUMBER OF TREES TO BE REMOVED =46 = 48.4% BENCHMARK - TOP NUT HYDRANTELEVATION = 1002.38FUTUREWORSHIPFUTUREFUTURE205STALLS120 FUTURESTALLSPONDING1021.50 1021.0 1 0 2 3 . 0 0 1 0 2 2 . 0 0 1023 . 0 0 1 0 2 2 . 0 0 1009.001 0 0 2 . 0 0 1028.50 FF=1023.501029.10 1028.50 1012.731010.001012.651000.40999.801000.401000.501001.001001.001002.801001.00FF=1002.90FF=1013.231002.901001.001002.401002.901012.731010.00997.001000.401001.001001.00HYD999.40DTDTDTDTDTDTDTDTB-1B-2B-3B-6B-5B-4B-7B-8B-9B-14B-13B-12B-11B-15B-101002.601002.361002.401001.001002.161002.16995.701002.601001.001001.08999.001000.75DTDTDT DTDT1001.00OUTLOT ALOT 1BLOCK 1202019191919151616141513122 FUTURESTALLSDTDTDTDTDTDTDTDTDTDTINV=1000.97 C.Y. RIP-RAPSILT FENCESILT FENCEHYDCOPIVB-1B-2B-3B-4B-5B-6B-7B-8B-9B-10B-11B-12B-13B-14B-15B-16B-1731.59.018. 0 STOP SIGN AND STOP BARSTOP SIGN AND STOP BARSTOP SIGN AND STOP BARGUTTER-OUT CURB ALONGPARKING/BUILDING AREA24. 0 NWL=1000.810-YR=1003.3100-YR=1005.6EXISTING LEGENDLOT LINERIGHT-OF-WAY LINEEASEMENT LINEWATER MAINSANITARY SEWERSTORM SEWERWATER SERVICESANITARY SERVICECHAIN LINK FENCEVINYL/WOOD FENCELIGHT POLEPOWER POLEXFMR. TRANSFORMERCBLX. CABLE BOXTEL. TELEPHONE BOXE.M. ELECTRIC METERG.M. GAS METERA.C. AIR CONDITIONERHYDRANTWATER VALVEP.I.V. POST INDICATOR VALVESANITARY MANHOLEC.O. CLEANOUTSTORM MANHOLEAREA CATCH BASINCATCH BASINCONIFEROUS TREEDECIDUOUS TREECONTOUR LINESPOT ELEVATIONDRAINAGE ARROWDETAILNOTE 120 FUTURE1012.731010.001012.651000.40999.801000.401000.501001.001001.001002.801001.00FF=1002.90FF=1013.231002.901001.001002.401002.901012.731010.00997.001000.401001.001001.00CBCB999.40B-1B-2B-3B-6B-5B-4B-7B-8B-9B-14B-13B-12B-11B-15B-101002.601002.361002.401001.001002.161002.16995.701002.601001.001001.08999.001000.75DTDTDTDTDTDTDTDT DTDTDTDT1001.00LOT 1BLOCK 1DTDTDTDTDTDTDTDTDTDTDTDTDTDTDTDTDTDTDTDTDTAREA CB-6 AND 100 L.F. OF 12" PVCSTORM PIPE AT 3.9% SLOPE.TC=1010.0INV=999.9200 L.F. OF 8" PVC SLOTTED DRAIN TILE AT 0.5%SLOPE. SEE DETAIL ON SHEET C-10180 L.F. OF 8" PVC SLOTTED DRAIN TILE AT 0.5%SLOPE. SEE DETAIL ON SHEET C-10INV=1000.9AREA CB-1 AND 118 L.F. OF 12" PVCSTORM PIPE AT 1.86% SLOPE.TC=1010.0INV=1000.0STORM MH-4 AND 270 L.F. OF 15"PVC STORM PIPE @ 0.3% SLOPE.TC=1000.60INV=996.95SUMP INV=994.95CURB INLET CB-5 AND 49 L.F. OF 18"PVC STORM PIPE AT 0.3% SLOPE.TC=999.40INV=996.14SUMP INV=994.14FE=996.0FE=996.0FE=995.0CURB INLET CB-3 AND 154 L.F. OF5" PVC STORM PIPE @ 0.3% SLOPE.TC=999.80INV=997.41SUMP INV=995.41CURB INLET CB-2 AND 163 L.F. OF 12"PVC STORM PIPE AT 0.3% SLOPE.TC=1000.50INV=997.80SUMP INV=995.80SKIMMER STRUCTURE AND 127 L.F. OF 12" PVCSTORM PIPE AT 2.76% SLOPE.OVERFLOW=999.00INV=996.00SUMP INV=994.07 C.Y. RIP-RAPSILT FENCESILT FENCEHYDCOWET-TAP 16" WATER MAIN AND INSTALL123L.F. OF 6" DIP PIPE AND HYDRANT/VALVEEXTEND 8" WATER MAIN 100 L.F. TOBUILDING AND INSTALL PIVPIV31.59.018. 0 STOP SIGN AND STOP BARSTOP SIGN AND STOP BARSTOP SIGN AND STOP BARGUTTER-OUT CURB ALONGPARKING/BUILDING AREA24.0 NWL=996.010-YR=997.4100-YR=999.2EOF=999.5EOF=1001.08EXISTING LEGENDLOT LINERIGHT-OF-WAY LINEEASEMENT LINEWATER MAINSANITARY SEWERSTORM SEWERWATER SERVICESANITARY SERVICECHAIN LINK FENCEVINYL/WOOD FENCELIGHT POLEPOWER POLEXFMR. TRANSFORMERCBLX. CABLE BOXTEL. TELEPHONE BOXE.M. ELECTRIC METERG.M. GAS METERA.C. AIR CONDITIONERHYDRANTWATER VALVEP.I.V. POST INDICATOR VALVESANITARY MANHOLEC.O. CLEANOUTSTORM MANHOLEAREA CATCH BASINCATCH BASINCONIFEROUS TREEDECIDUOUS TREECONTOUR LINESPOT ELEVATIONDRAINAGE ARROWDETAILNOTE 120 FUTURELOT 1BLOCK 1NEW EDGE OF WOODED AREA(2) THORNLESSHAWTHORN(5) NORWAYSPRUCECEDAR MULCH(MIN. 3' AT BLDG.)(10)EMERALDARBORVITAE(2) HONEYLOCUST(5) WHITE PINE(3) NORTHERNRED OAK(8) EXISTING 15' TO 20'SPRUCE TREES(3) EXISTING 15' TO 20'SPRUCE TREES(1) FALL FIESTASUGAR MAPLEPLASTIC EDGING ATALL MULCH (TYP)(10) DECLARATIONLILAC(3) THORNLESSHAWTHORN(2)FALLFIESTASUGARMAPLE(3) FALLFIESTASUGARMAPLE(2) SERVICEBERRY"AUTUMN BRILLIANCE"(3)COLUMNERWHITEPINE(3) BLUE NEST SPRUCE31.59.018. 0 STOP SIGN AND STOP BARSTOP SIGN AND STOP BARSTOP SIGN AND STOP BAR24.0 1. SOD ALL AREAS WITHIN CONSTRUCTION LIMITS LINE UNLESS OTHERWISE NOTED.2. SHRUBS/PERENIAL BEDS2.1 LANDSCAPE EDGING SHALL BE SPADED EDGE2.2 MULCH SHALL BE SHREDDED HARDWOOD MULCH, CLEAN AND FREE OF NOXIOUS WEEDS OR OTHER DELETERIOUS MATERIAL. DELIVER MULCH ON DAY OF INSTALLATION.USE 4" FOR TREES, 3" FOR SHRUB BEDS, AND 2" FOR PERENNIAL/GROUND COVER BEDS, UNLESSOTHERWISE DIRECTED. FOR TREES WITHIN SOD AREAS, PROVIDE 6' DIAMETER CIRCLE OFMULCH. APPLY PELLET WEED PREVENTER UNDER MULCH BEDS IN PERENNIAL AREAS.3. PROVIDE IRRIGATION SYSTEM FOR ALL LAWN AND PLANTING AREAS. PROVIDE A DRAWINGWITH HEAD LAYOUT, SPACING, TYPE, BACKFLOW PREVENTER LOCATION, VALVE BOX LOCATIONS,ZONES AND PIPE SIZING.4. MINIMUM HEIGHT OF CONIFEROUS TREES IS MEASURED FROM THE TOP OF THE ROOT BALLTO THE BOTTOM OF THE LEADER.SEE SHEET C-8 FOR PLANTINGS ATPERIMETER OF BUILDING C A R S T A . CA R S T A .LOT 1BLOCK 1NEW EDGE OF WOODED AREA(2) THORNLESS HAWTHORNCEDAR MULCH(MIN. 3' AT BLDG.)(10) EMERALDARBORVITAE(2) HONEY LOCUST(5) WHITE PINE(3) NORTHERN RED OAK(3) EXISTING 15' TO 20'SPRUCE TREES(1) FALL FIESTASUGAR MAPLE(3) THORNLESS HAWTHORN(2) FALL FIESTASUGAR MAPLE(3) FALL FIESTA SUGARMAPLEBD(3) COLUMNERWHITE PINE16AD6BD16BD16BD16BD16BD16AD3AD3BD16(3) BLUE NEST SPRUCEJH9BN2AD6BN2BD12AD2BV6BD12BD12TY3TY2TY1AD7BV2BD14JH9TY2BV8BV5AD4AD4BV3AD8JH9BD16BN2TY3JH17BD16AD3BD16JH17BN3BV5JH11BN2NOTES:1. SOD ALL AREAS WITHIN CONSTRUCTION LIMITS LINE UNLESS OTHERWISE NOTED.2. SHRUBS/PERENIAL BEDS2.1 LANDSCAPE EDGING SHALL BE SPADED EDGE2.2 MULCH SHALL BE SHREDDED HARDWOOD MULCH, CLEAN AND FREE OFNOXIOUS WEEDS OR OTHER DELETERIOUS MATERIAL. DELIVER MULCHON DAY OF INSTALLATION. USE 4" FOR TREES, 3" FOR SHRUB BEDS, AND 2" FOR PERENNIAL/GROUND COVER BEDS, UNLESS OTHERWISEDIRECTED. FOR TREES WITHIN SOD AREAS, PROVIDE 6' DIAMETER CIRCLE OF MULCH. APPLY PELLET WEED PREVENTER UNDER MULCHBEDS IN PERENNIAL AREAS.3. PROVIDE IRRIGATION SYSTEM FOR ALL LAWN AND PLANTING AREAS. PROVIDE A DRAWING WITH HEAD LAYOUT, SPACING, TYPE, BACKFLOW PREVENTER LOCATION, VALVE BOX LOCATIONS, ZONES AND PIPE SIZING. STORAGE RESIDENT STORAGE RESIDENT Residential 28,518 SF SECOND FLOOR 28,518 SF SECOND FLOOR PLAN 1/16" = 1'-0" STORAGE RESIDENT STORAGE RESIDENT Residential 28,518 SF THIRD FLOOR PLAN 1/16" = 1'-0" THIRD FLOOR 28,518 SF STAIR STAIR STAIR STAIR ELEV.ELEV. ELEV.ELEV. STAIR STAIR CORRIDOR CORRIDOR STAIR STAIR 1414 UNDERWOOD AVE. WAUWATOSA, WI 53213 414.431.3131 414.431.0531 FAX TEL WWW.AGARCH.COM Kingsway Lakeville Lakeville, MN Senior Living Facility 02 Feb 2017 DN DN DN DN S.F.28,518AREA THIRD LEVEL DN UP S.F.28,518AREA SECOND LEVEL DN UP 1/8" EXTERIOR ELEVATIONS AI500 DRN 2ELEVATION = 100-0 TOP OF CONCRETE FIRST FLOOR 1/8" = 1'-0" EXTERIOR ELEVATION 2 AI 500 1/8" = 1'-0" EXTERIOR ELEVATION 1 AI 500 ELEVATION = 122-10 5/8 TOP OF SLAB THIRD FLOOR ELEVATION = 131-11 3/4 TRUSS BEARING ELEVATION = 111-10 3/4 TOP OF SLAB SECOND FLOOR ELEVATION = 89-8 TOP OF SLAB 1 SHOWN FOR CLARITY PORTE COHERE NOT A AI600 B AI604 A AI601 A AI602 ELEVATION = 89-8 TOP OF SLAB ELEVATION = 100-0 TOP OF CONCRETE FIRST FLOOR ELEVATION = 111-10 3/4 TOP OF SLAB SECOND FLOOR ELEVATION = 122-10 5/8 TOP OF SLAB THIRD FLOOR ELEVATION = 131-11 3/4 TRUSS BEARING A A A A A A A A A A A A G G G G B B B B B B I F F F FF F F FF H E E E H H E E E G G G G G G DDDDDDDDD D 1/8" = 1'-0" EXTERIOR ELEVATION 3 AI 500 E G EE E E HH H H HH 3GENERAL NOTES COPING PREFINISHED ALUMINUM w/ STRUTS ALUMINUM CANOPY BRICK @ JAMBS DOUBLE STACK BOND F5 F7 FP1 F5 FP1FP1 BBB FP1FP1 B BBB B B B F7 F5 F5 w/ STRUTS ALUMINUM CANOPY 10" CAST STONE HEAD FP1FP1 CAST STONE SILL FP1FP1 FP1 F5F5 CAST STONE SILL 8" CAST STONE HEAD CAP AND BASE TRIM PVC COUMN WRAP w/ CEMENT TRIM 5/4" x 8" FIBER TRIM CEMENT FIBER 5/4" x 4" TRIM CEMENT FIBER 5/4" x 6" B BB B B B B B B B B CEMENT TRIM BOARD 5/4" x 8" FIBER ALUMINUM RAILING PRE FINISHED 2 12 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 B B B B F7 F7 F7 F5 F5 F7 F5 F5F5 F7 BB FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 B B TRIM, FIELD PAINTED 5/4" X 6" PVC BASE TRIM, FIELD PAINTED 5/4" X 6" PVC BASE CEMENT TRIM BOARD 5/4" x 6" FIBER CEMENT TRIM BOARD 5/4" x 10" FIBER BOARD w/ ALUMINUM Z-FLASHING 5/4" x 10" FIBER CEMENT TRIM ALUMINUM BALCONY PREFABRICATED PROJECT 3/8" BRICK SOLIDER COURSE AND DOWN SPOUTS ALUMINUM GUTTERS PRE FINISHED STOREFRONT WINDOW 15-6 x 7-6 ALUMINUM B BB B B B BB B B B B B B B B B B B B B B B F7 F7 B BRICK FP1 FIBER CEMENT PANEL SMOOTH FINISH, w/ 5/4" X 4" TRIM F7 FIBER CEMENT SIDING w/ 7" EXPOSURE F5 FIBER CEMENT SIDING w/5" EXPOSURE PAINTED TO MATCH ADJACENT SURFACE. - ALL CONDUIT, METERS, VENTS, ETC. TO BE ONTO GRADE OR ROOFS. AT ALL DOWNSPOUTS WHICH SPILL - PROVIDE CONCRETE SPLASH BLOCKS STAIRS1.1.5 DELUXE B1.1.5 DELUXE BSTAIRS 1.1 TRADITIONAL B1.1.5 DELUXE B1.1.5 DELUXE B1.1 TRADITIONAL CSTAIRS2.2 DELUXE B 2.2 DELUXE B2.2 DELUXE B 90-4 89-8 89-089-0 89-8 90-4 91-0 91-8 92-4 93-0 93-8 94-4 95-0 95-8 96-4 97-0 97-8 98-4 92-4 L:\XMworkspace\Standards\pltcfg\agpdf.pltcfgPLOT PARAMETERS:FILE:K:\163101\CadDGN\AI500.dgn5:36:10 PM5/21/2017PLOTTED ON:8:0 ':" / in.LAST SAVE:5/21/2017MODEL:Plot SheetAT SCALE:USING DRIVER:DATE THIS DRAWING, ITS DESIGN CONCEPT AND ITS DETAIL ARE THE SOLE PROPERTY OF AG ARCHITECTURE, INC. AND SHALL NOT BE COPIED IN ANY FORM OR MANNER WITHOUT WRITTEN AUTHORIZATION OF ITS DESIGNER/CREATOR DRAWN BY SHEET NO. PROJECT 163101 Senior Living FacilityLakevilleMinnesotamamBY USER:A Kingsway LakevilleB C 21 MAY 2017CONSTRUCTIONNOT FORPROGRESS SET 1/8" EXTERIOR ELEVATIONS AI501 DRN 3 ELEVATION = 100-0 TOP OF CONCRETE FIRST FLOOR 1/8" = 1'-0" EXTERIOR ELEVATION 3 AI 501 1/8" = 1'-0" EXTERIOR ELEVATION 1 AI 501 ELEVATION = 122-10 5/8 TOP OF SLAB THIRD FLOOR ELEVATION = 131-11 3/4 TRUSS BEARING ELEVATION = 111-10 3/4 TOP OF SLAB SECOND FLOOR ELEVATION = 89-8 TOP OF SLAB 2 A AI600 ELEVATION = 89-8 TOP OF SLAB ELEVATION = 100-0 TOP OF CONCRETE FIRST FLOOR ELEVATION = 111-10 3/4 TOP OF SLAB SECOND FLOOR ELEVATION = 122-10 5/8 TOP OF SLAB THIRD FLOOR ELEVATION = 131-11 3/4 TRUSS BEARING 1/8" = 1'-0" EXTERIOR ELEVATION 4 AI 501 411/8" = 1'-0" EXTERIOR ELEVATION 2 AI 501 H H H E EE E E EG G GG G G F F FF F F F FF F F F G GG G F G G G GG G GE E EE E EE E EE E E H H H H H H D H H H F F F F F F B B B BBBBBBBB B B BBBBB B B B B B B B B BBBBB B B BB B B B B B B BBB B B B B FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 F7 F7 F7 F7 F7 F7F7F7 F7F7 F7F7F7F7F7 2 12 ALUMINUM COPING PRE FINISHED SILL 4" CAST STONE PROJECT 3/8" COURSE BRICK SOLDIER ALUMINUM RAILING PRE FINISHED BRICK AT JAMBS DOUBLE STACK BOND CEMENT TRIM BOARD 5/4" X 4" FIBER MAGIC PAK GRILL W/ ALUMINUM RAILING PRE FINISHED CEMENT TRIM BOARD 5/4" x 8" FIBER CEMENT TRIM BOARD 5/4" x 4" FIBER A AI601 F7F7F7F7 F7 F7 F7 F7 F7 F7 8" CAST STONE HEAD THROUGH WALL FIREPLACE FLUE 8" CAST STONE HEAD PROJECT 3/8" BRICK SOLIDER COURSE 2.2 DELUXE B1.1 TRADITIONAL A1.1.5 DELUXE A1.1.5 DELUXE A1.1 TRADITIONAL A1.1.5 DELUXE C1.1 TRADITIONAL D1.1.5 DELUXE C 2.2 DELUXE B2.2 DELUXE B 1.1 TRADITIONAL A1.1.5 DELUXE A1.1.5 DELUXE A1.1 TRADITIONAL A2.2 DELUXE B FP1 FP1 B FFF 89-0 97-0 96-4 97-8 98-4 99-0 99-099-0 L:\XMworkspace\Standards\pltcfg\agpdf.pltcfgPLOT PARAMETERS:FILE:K:\163101\CadDGN\AI501.dgn5:36:11 PM5/21/2017PLOTTED ON:8:0 ':" / in.LAST SAVE:5/21/2017MODEL:Plot SheetAT SCALE:USING DRIVER:DATE THIS DRAWING, ITS DESIGN CONCEPT AND ITS DETAIL ARE THE SOLE PROPERTY OF AG ARCHITECTURE, INC. AND SHALL NOT BE COPIED IN ANY FORM OR MANNER WITHOUT WRITTEN AUTHORIZATION OF ITS DESIGNER/CREATOR DRAWN BY SHEET NO. PROJECT 163101 Senior Living FacilityLakevilleMinnesotamamBY USER:A Kingsway LakevilleB C 21 MAY 2017CONSTRUCTIONNOT FORPROGRESS SET80-0 1/8" EXTERIOR ELEVATIONS AI502 DRN 1/8" = 1'-0" EXTERIOR ELEVATION 1 AI 502 1 ELEVATION = 122-10 5/8 TOP OF SLAB THIRD FLOOR ELEVATION = 131-11 3/4 TRUSS BEARING ELEVATION = 89-8 TOP OF SLAB ELEVATION = 100-0 TOP OF CONCRETE ELEVATION = 111-10 3/4 TOP OF SUB FLOOR SECOND FLOOR F F F F F F F F FG G G D G G G E E E E E E H H H DDDDDFDDDDDD 2 3 1/8" = 1'-0" EXTERIOR ELEVATION 2 AI 502 ELEVATION = 114-0 LOWEST POINT OF STRUCTURE 1/8" = 1'-0" EXTERIOR ELEVATION 3 AI 502 A AI502 24" DEEP BEAM 2x10 RAFTERS 4" TRIM FOOTING BY STRUCTURE 8x8 BEAM BRICK BRICK SOLDIER COURSE STONE CAP 3/8" = 1'-0" A AI502 PORTE COCHERE SECTION 1/4" = 1'-0"3 AI 502 WINDOW ELEVATION 6-63-0 FIXED 6-03-0 3-0 3-0 6-08-0 8-05-0 9-0 2-8 2-8 2-8 2-8 2-8 2-82-6 2-6 3-0 3-0 3-0 FIXEDFIXED FIXED 2-04-66-62-04-66-62-04-66-03-03-06-03-03-06-03-03-0ABC DEF G SINGLE -HUNG SINGLE -HUNG SINGLE -HUNG H SINGLE -HUNG 6-03-03-06-0 3-0 3-0 FP1 FP1 FP1 FP1 FP1 FP1FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 ELEVATION = 100-0 TOP OF SLAB B B B F7 B B F7 B B B B F7 F7 F7 F7 BB B B B BBBB B BB BB BB B F5 F5 F5 F5 F5F5 F5 B B B B 2 12 w/ STRUTS ALUMINUM CANOPY CAST STONE SILL PROJECT 3/8" BRICK SOLIDER COURSE 2 12 CEMENT TRIM BOARD 5/4" x 4" FIBER ALUMINUM COPING PRE FINISHED B B B B B B B SINGLE -HUNG I 4-69-0 3-0 3-0 3-0 F7 F7 F7 F7 F7 CEMENT TRIM BOARD 5/4" x 8" FIBER STONE HEAD 8" CAST VINYL RAILING PAINTED FINISH CAP AND BASE TRIM PVC COUMN WRAP w/ 1.1 TRADITIONAL B 1.1.5 DELUXE B 1.1.5 DELUXE B 1.1 TRADITIONAL B STAIR 2.2 DELUXE B 89-0 L:\XMworkspace\Standards\pltcfg\agpdf.pltcfgPLOT PARAMETERS:FILE:K:\163101\CadDGN\AI502.dgn5:36:12 PM5/21/2017PLOTTED ON:8:0 ':" / in.LAST SAVE:5/21/2017MODEL:Plot SheetAT SCALE:USING DRIVER:DATE THIS DRAWING, ITS DESIGN CONCEPT AND ITS DETAIL ARE THE SOLE PROPERTY OF AG ARCHITECTURE, INC. AND SHALL NOT BE COPIED IN ANY FORM OR MANNER WITHOUT WRITTEN AUTHORIZATION OF ITS DESIGNER/CREATOR DRAWN BY SHEET NO. PROJECT 163101 Senior Living FacilityLakevilleMinnesotamamBY USER:A Kingsway LakevilleB C 21 MAY 2017CONSTRUCTIONNOT FORPROGRESS SET SMY 19 MAY 17 163101 1414 UNDERWOOD AVE. WAUWATOSA, WI 53213 414.431.3131 414.431.0531 FAX TEL WWW.AGARCH.COM 1 LAKEVILLE 745 SQ FT SIDING AREA 1,607 SQ FT BRICK AREA 1,526 SQ FT BRICK AREA 1,207 SQ FT SIDING AREA 1,494 SQ FT BRICK AREA 2,660 SQ FT SIDING AREA 1,663 SQ FT BRICK AREA 744 SQ FT SIDING AREA 3,133 SQ FT BRICK AREA 2,731 SQ FT SIDING AREA 2,142 SQ FT BRICK AREA 3,129 SQ FT BRICK AREA 2,628 SQ FT SIDING AREA 2,176SQ FT SIDING AREA 1,495 SQ FT BRICK AREA 2,662 SQ FT SIDING AREA TOTAL BRICK AREA = 16,189 SQ FT (51%) TOTAL SIDING AREA = 15,553 SQ FT (49%) EXTERIOR VENEER AREA CALCULATION (31,742 SQ FT) TOTAL ELEVATION EXCLUDING WINDOWS EXTERIOR VENEER MATERIAL AREA CALCULATION 4/AI501 1/AI5002/AI500 3/AI5001/AI5012/AI501 3/AI501 1/AI502 1 • • 2 • • • • • • • • • BBEETTHHLLEEHHEEMM FFIIRRSSTT AADDDDIITTIIOONN AAUUGGUUSSTT 99,, 22001177 PPAAGGEE 22 OOFF 77 BBEETTHHLLEEHHEEMM FFIIRRSSTT AADDDDIITTIIOONN AAUUGGUUSSTT 99,, 22001177 PPAAGGEE 33 OOFF 77 BBEETTHHLLEEHHEEMM FFIIRRSSTT AADDDDIITTIIOONN AAUUGGUUSSTT 99,, 22001177 PPAAGGEE 44 OOFF 77 BBEETTHHLLEEHHEEMM FFIIRRSSTT AADDDDIITTIIOONN AAUUGGUUSSTT 99,, 22001177 PPAAGGEE 55 OOFF 77 BBEETTHHLLEEHHEEMM FFIIRRSSTT AADDDDIITTIIOONN AAUUGGUUSSTT 99,, 22001177 PPAAGGEE 66 OOFF 77 BBEETTHHLLEEHHEEMM FFIIRRSSTT AADDDDIITTIIOONN AAUUGGUUSSTT 99,, 22001177 PPAAGGEE 77 OOFF 77