HomeMy WebLinkAboutSBF 3RD ADDITION
MEMORANDUM
TO: Daryl Morey
FROM: D. Daniel Licht, AICP
DATE: 9 August 2017
RE: Lakeville – SPBF 3rd Addition
TPC FILE: 135.01
BACKGROUND
River’s Edge Dental has submitted plans for Spirit Place at Brandtjen Farm (SPBF) 3rd Addition to
be platted from Outlot B, SPBF. The proposed preliminary and final plat consists of one lot.
Lot 1, Block 1 is proposed for development of multiple tenant commercial building of 10,620
square feet. The proposed development requires applications for a PUD Development Stage
Plan for Lot 1, Block 1, preliminary plat, final plat, and vacation of existing drainage and utility
easements. A public hearing to consider the applications has been noticed for the Planning
Commission meeting on 17 August 2017.
Exhibits:
A. Site location map
B. SBF Land Use Plan map
C. Title Sheet
D. Preliminary Plat
E. Final Plat
F. Grading & Drainage Plan
G. Utility Plan
H. Paving & Dimensional Plan
I. Truck Turning Exhibit
J. Site Plan
K. Building Elevations
L. Landscape Plan
M. Easement Vacation Sketch
N. Dakota Co. Plat Commission Letter
2
ANALYSIS
SBF Land Use Plan. The SBF Land Use Plan guides the subject site for mixed use development
based on the uses allowed in the O-R District and C-3 District. An amendment to the SBF PUD
Booklet was approved in 2010 to allow for development of general retail, service and office
uses within this area of SBF, which is consistent with the proposed multiple tenant building.
Uses. The proposed use will include a medical office for the developer, which is a permitted
use. The building floor plan shows two other suites planned for multiple occupancy.
Surrounding Uses. The subject site is surrounded by the following existing and planned land
uses:
Direction Land Use Map Zoning Map Existing Use
East Commercial SBF PUD District Undeveloped
South Commercial SBF PUD District Taco Bell
West Commercial SBF PUD District PetSmart
North Apple Valley n/a CSAH 46
Lot Requirements. The SBF PUD District does not establish minimum lot area or width
requirements. A 30 foot setback for buildings and a 15 foot setback for parking from public
rights-of-way is required at the perimeter of the PUD District. The site plan also provides a 50
foot building setback and 25 foot reserve area from the 160th Street (CSAH 46) right-of-way to
allow for future roadway expansion. The proposed building and parking areas comply with
required setbacks.
Building Materials. Section 11-17-9.D.1 of the Zoning Ordinance requires the proposed
building to use a minimum of three Grade A materials listed in Section 11-17-9.B of the Zoning
Ordinance for a minimum of 65 percent of the area of the building elevation. The proposed
building uses four Grade A materials for a total of 69 percent of the wall area. EIFS, a Grade B
material, makes up the balance of the exterior finish. The proposed exterior finish complies
with the requirements of the Zoning Ordinance.
Building Height. The proposed building is a one-story structure measuring 21.33 feet in height
to the roof and 27.5 feet in height to the top of the parapet at the south façade of the building.
The proposed building height is within the allowances of the C-3 District, which allows buildings
up to 35 feet.
Landscape Plan. A landscape plan has been submitted for perimeter landscaping and plantings
at the foundation of the proposed building. The landscape plan along Elmhurst Lane is
consistent with landscaping in SBF. Shade trees in the yard north of the proposed building
should be moved outside of the 25 foot reserve area for 160th Street (CSAH 46). The proposed
plantings are appropriate for the site and the sizes comply with the requirements of Section 11-
21-7.C.1 of the Zoning Ordinance.
3
Access. Lot 1, Block 1 is accessed via the shared private drive within Outlot A, SPBF 1st Addition.
The submitted plans include an illustration of turning movements to show adequate access for
semi-trucks and/or delivery vehicles through Lot 1, Block 1.
Off-Street Parking. Section 11-19-13 of the Zoning Ordinance requires one stall per 160
square feet for multiple tenant buildings with three or more tenants. Based on the estimated
area of the building of 10,620 square feet, 60 off-street parking stalls are required. The site
plan provides 62 off-street parking stalls, exceeding the Zoning Ordinance requirement. The
design and construction of the parking lot complies with Section 11-19-7.I of the Zoning
Ordinance.
Sidewalks. There is a planned trail along 160th Street (CSAH 46) and sidewalks on the west side
of Elmhurst Lane abutting the subject site. The submitted plans illustrate a sidewalk on the
south, east and portions of the north and west sides of the proposed building. A sidewalk in
line with the south wall of the building is extended east of the parking area to connect to the
public sidewalk on Elmhurst Lane.
Signs. Signs for the subject site are allowed as provided for in the C-3 District. The submitted
plans illustrate one 100 square foot, 15 foot high freestanding sign at the northeast corner of
Lot 1, Block 1. The proposed area and height of the freestanding sign complies with the
provisions of Section 11-23-19.E.1.a of the Zoning Ordinance. The sign is setback 25 feet from
Pilot Knob Rob Road and 64 feet from Elmhurst Lane in compliance with Section 11-23-21 of
the Zoning Ordinance. The submitted building elevations show three tenant signs (one for each
tenant space) on the north and south elevations as allowed by Section 11-23-15.R and Section
11-23-19.E.1.b(1) of the Zoning Ordinance for multiple occupancy buildings. The wall signs are
limited to 100 square feet in area.
The site plan identifies that the freestanding sign includes electronic messaging. Dynamic
display signage is allowed on the freestanding sign subject to Section 11-23-15.T of the Zoning
Ordinance. The dynamic display is proposed as 40 square feet, which meets Zoning Ordinance
requirements. The proposed sign incorporating dynamic display complies with the
requirements that the structure be constructed as a monument sign with a stone or brick base
equal to 40% of the total sign area and the 15 foot height limit. Operation of the dynamic
display is subject to the provisions of Section 3-22-7 of the City Code and requires issuance of
an annual license in accordance with Section 3-22-3 of the City Code.
Trash Enclosure. The site plan identifies a trash enclosure at the northwest corner of the
proposed building. Details regarding construction of the trash enclosure indicate that it will be
constructed of concrete block with brick facing consistent the brick used on the principal
building. The proposed trash enclosure complies with the requirements of Section 11-18-11.B
of the Zoning Ordinance.
4
Exterior Lighting. The developer has submitted a photometric lighting plan for proposed
exterior lighting. The location, height, and intensity of proposed exterior lighting complies with
Section 11-16-17 of the Zoning Ordinance.
Utility Plan. The applicant has submitted plans for extension of public utilities to serve the
proposed SPBF 3rd Addition. These plans are subject to review and approval by the City
Engineer.
Grading Plan. The applicant has submitted grading plans for the proposed SPBF 3rd Addition.
The grading, drainage, and erosion control plan is subject to review and approval by the City
Engineer.
Easements. Section 10-4-4 of the Subdivision Ordinance requires a 10 foot wide drainage and
utility easement at the perimeter of all lots, which are shown as required. Existing drainage and
utility easements platted within Outlot B, SPBF are to be vacated. All easements are subject to
review and approval of the City Engineer.
Park Dedication. Lots 1, Block 1 is subject to park dedication requirements at the time of final
plat approval. The park dedication requirements will be met as a cash fee in lieu of land at
$5,400 per acre for commercial uses in accordance with the SBF Development Agreement. Lot
1, Block 1 is 1.31 acres in area, which calculates to a park dedication fee of $7,074.00.
CONCLUSION
The proposed Spirit Place at Brandtjen Farm 3rd Addition PUD Development Stage Plan,
preliminary plat, final plat, and vacation of existing drainage and utility easements are
consistent with the SBF Land Use Plan and the requirements of the SBF PUD District, Zoning
Ordinance, and Subdivision Ordinance. City staff and our office recommend approval of the
applications subject to the following conditions:
1. The landscape plan shall be revised to locate shade trees north of the principal building
parallel to 160th Street (CSAH 46) outside of the 25 foot reserve area.
2. All utility plans shall be subject to review and approval of the City Engineer.
3. All grading, drainage, and erosion control plans shall be subject to review and approval
of the City Engineer.
4. All easements shall be subject to review and approval of the City Engineer.
5. The developer shall pay $7,074.00 as a cash fee in lieu of land for park dedication
requirements in accordance with the SBF Master Development Agreement.
5
c. Justin Miller, City Administrator
Alex Jordon, Senior Project Engineer
John Hennen, Parks and Recreation Director
Andrea McDowell-Poehler, City Attorney
Dakota County GIS±
PetSmar t
160th St (CSAH 46)ELMHURST LNHyVee Grocer y
Sto re
Taco Bell
Proposed
River's Edge
Dental bldg.
City of LakevilleAerial MapSpirit Place at BrandtjenFarm 3rd A dditionPreliminary & Final PlatEasement VacationEXHIBIT A
Dakota County Surveyor’s Office
Western Service Center 14955 Galaxie Avenue Apple Valley, MN 55124
952.891 -7087 Fax 952.891 -7127 www.co.dakota.mn.us
July 25, 2017
City of Lakeville
20195 Holyoke Ave.
Lakeville, MN 55044
Re: SPIRIT PLACE AT BRANDTJEN FARM 3RD ADDITION
The Dakota County Plat Commission met on July 24, 2017, to consider the preliminary plat of the above
referenced plat. The plat is adjacent to County State Aid Highway (CSAH) 46 (160th St.), and is therefore
subject to the Dakota County Contiguous Plat Ordinance.
The preliminary plat includes a replat of Outlot B, Spirit Place at Brandjen Farm Addition. Restricted access is
shown along all of CSAH 46. The right-of-way needs of 100 feet of half right of way have been met. In
addition, the property includes a reserve area (Doc. 3033791) to protect right-of-way to 125 feet of half right
of way (25-foot reserve area) for a future compact urban interchange according to the Transportation Study.
The Plat Commission has approved the preliminary plat and reviewed the final plat and recommends
approval to the County Board of Commissioners.
Traffic volumes on CSAH 46 are 23,200 ADT and are anticipated to be 35,000 ADT by the year 2030.
No work shall commence in the County right of way until a permit is obtained from the County
Transportation Department and no permit will be issued until the plat has been filed with the County
Recorder’s Office. The Plat Commission does not review or approve the actual engineering design of
proposed accesses or other improvements to be made in the right of way. Nothing herein is intended to
restrict or limit Dakota County’s rights with regards to Dakota County rights of way or property. The Plat
Commission highly recommends early contact with the Transportation Department to discuss the permitting
process which reviews the design and may require construction of highway improvements, including, but not
limited to, turn lanes, drainage features, limitations on intersecting street widths, medians, etc. Please
contact Gordon McConnell regarding permitting questions at (952) 891-7115 or Todd Tollefson regarding Plat
Commission or Plat Ordinance questions at (952) 891-7070.
Sincerely,
Todd B. Tollefson
Secretary, Plat Commission
c: Joel Cooper (James R. Hill)
City of Lakeville
Public Works – Engineering Division
Memorandum
To: Daryl Morey, Planning Director
From: Alex Jordan, Senior Project Engineer
McKenzie L. Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
Dave Olson, Community and Economic Development Director
Date: August 9, 2017
Subject: Spirit Place at Brandtjen Farm 3rd Addition
• Preliminary and Final Plat Review
• Grading and Erosion Control Plan Review
• Utility Plan Review
• Site Plan Review
BBAACCKKGGRROOUUNNDD
River’s Edge Dental has submitted a preliminary and final plat named Spirit Place at Brandtjen
Farm 3rd Addition and site plans to construct a multiple tenant retail building on Lot 1, Block
1. This is the third phase of the Spirit Place at Brandtjen Farm commercial development. The
proposed development is located south of 160th Street (CSAH 46), north of 162nd Street, east
of Pilot Knob Road (CSAH 31), and west of and adjacent to Elmhurst Lane. The parent parcel
consists of Outlot B, Spirit Place at Brandtjen Farm. The development is zoned PUD, Planned
Unit Development.
The preliminary and final plats consist of one lot within one block on 1.31 acres.
The proposed development and site plan will be completed by:
SSPPIIRRIITT PPLLAACCEE AATT BBRRAANNDDTTJJEENN FFAARRMM 33RRDD AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAUUGGUUSSTT 99,, 22001177
PPAAGGEE 22 OOFF 77
Developer: River’s Edge Dental
Engineer/Surveyor: James R. Hill, Inc.
SSIITTEE CCOONNDDIITTIIOONNSS
The Spirit Place at Brandtjen Farm 3rd Addition site consists of 1.31 acres of undeveloped land.
The property is north of and adjacent to existing parking lots and a shared private driveway
that serves as access for Petsmart and Taco Bell. There are no wetlands or trees on the
property.
EEAASSEEMMEENNTTSS
The parent parcel contains existing public Drainage and Utility Easements dedicated with the
Spirit Place at Brandtjen Farm plat, which will be vacated with the final plat. The Drainage and
Utility Easement will be re-dedicated with the final plat over the area containing existing
public utilities located on the parent parcel.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
Elmhurst Lane
Spirit Place at Brandtjen Farm 2nd Addition is located west of and adjacent to Elmhurst Lane, a
local commercial street. The street is designed as a 44-foot wide, two lane urban roadway with 8-
foot wide concrete sidewalks within an 80-foot wide right-of-way. No additional right-of-way
dedication is required with the final plat.
The Developer proposes to construct a private sidewalk from the site to the public sidewalk
within Elmhurst Lane. The Developer shall be responsible for the maintenance of the private
sidewalk extending to the public sidewalk.
SSIITTEE PPLLAANN RREEVVIIEEWW
Spirit Place at Brandtjen Farm 3rd Addition includes the construction of an approximately
10,620-square foot multiple tenant retail building and parking lot on Lot 1, Block 1, with
concrete sidewalks to allow pedestrian access from the parking areas and Elmhurst Lane.
Access to the site will be from a shared private drive within Outlot A, Spirit Place at Brandtjen
Farm, constructed with the Spirit Place at Brandtjen Farm development improvements. A
private cross access easement and maintenance agreement is memorialized on the parent
parcel for the shared driveway within Outlot A. The parking lot is adequately sized to allow
truck circulation into and out of the site, and will provide capacity to meet the requirements
of the City’s Zoning Ordinance.
The landscaping plan provides for several types of trees and shrubs in landscaped areas
around the building and parking lot. Landscaping areas around the building will be sodded.
SSPPIIRRIITT PPLLAACCEE AATT BBRRAANNDDTTJJEENN FFAARRMM 33RRDD AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAUUGGUUSSTT 99,, 22001177
PPAAGGEE 33 OOFF 77
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility and site construction shall be from
the private access drive in the location of the proposed driveway within Outlot A.
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS
Development of Spirit Place at Brandtjen Farm 3rd Addition includes the construction of
private sidewalks. Private sidewalks will be installed along the east, south, and west sides of
the proposed building providing a connection to the existing sidewalk network along
Elmhurst Lane.
The Park Dedication fee has not been collected on the parent parcel and will be satisfied
through a cash contribution with the final plat. The Park Dedication fee for commercial areas
in Spirit of Brandtjen Farm is $5,400.00 per acre, consistent with the Spirit of Brandtjen Farm
Master PUD Agreement.
1.31 acres x $5,400/acre = $7,074.00
Gross Area of Final Plat Park Dedication Charge Required Park Dedication
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR
Spirit Place at Brandtjen Farm 3rd Addition is located within subdistrict NC-20060 of the North
Creek sanitary sewer district, as identified in the City’s Comprehensive Sewer Plan.
Wastewater will be conveyed to the MCES Farmington Interceptor and continue to the
Empire Wastewater Treatment Facility. The downstream facilities have sufficient capacity to
serve the proposed commercial development.
A private sanitary sewer service will be extended from the existing service stub located on the
parent parcel to provide sanitary sewer service to the Development.
The Sanitary Sewer Availability Charge has not been collected on the parent parcel and shall
be collected with the Building Permit Application. The Sanitary Sewer Availability Charge will
be calculated at the rate in effect at the time of approval of the Building Permit Application, as
determined by the City’s Building Official.
WWAATTEERRMMAAIINN
Development of Spirit Place at Brandtjen Farm 3rd Addition includes the extension of an
existing private watermain. Private watermain will be extended within the development to
provide water service to the development.
SSPPIIRRIITT PPLLAACCEE AATT BBRRAANNDDTTJJEENN FFAARRMM 33RRDD AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAUUGGUUSSTT 99,, 22001177
PPAAGGEE 44 OOFF 77
Final locations and sizes of all sanitary sewer and watermain facilities will be reviewed by City
staff with the final construction plans submitted with the building permit application. A cross
access easement and maintenance agreement is memorialized on the parent parcel for the
private utilities extending across multiple properties.
OOVVEERRHHEEAADD LLIINNEESS
There are no overhead utilities located adjacent to or within the parent parcel.
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
Spirit Place at Brandtjen Farm 3rd Addition is located within subdistrict NC-14B and NC-14A of
the North Creek Stormwater District as identified in the City’s Water Resources Management
Plan.
Stormwater runoff generated from the Spirit Place at Brandtjen Farm 3rd Addition
development will be conveyed via a proposed private storm sewer system to the existing
public storm sewer system within the private access street along the south side of the
property. The stormwater management requirements for the parent parcel were satisfied
through stormwater management basins constructed with Spirit of Brandtjen Farm
Commercial 2nd Addition.
The final grading plan must indicate any proposed borrow areas in which the building
footings will be placed on fill material. The grading specifications must indicate that all
embankments meet FHA/HUD 79G specifications. A final certificate of occupancy shall not be
issued until an as-built certified grading plan has been submitted and approved by the City
Engineer.
Spirit Place at Brandtjen Farm 3rd Addition contains more than one acre of site disturbance
and therefore a National Pollution Discharge Elimination System General Stormwater Permit
for construction activity is required from the Minnesota Pollution Control.
SSTTOORRMM SSEEWWEERR
The development of Spirit Place at Brandtjen Farm 3rd Addition includes the construction of a
private storm sewer system. The privately-owned and maintained storm sewer will be located
within Lot 1, Block 1 and will collect and convey stormwater runoff generated from within the
development to the public storm sewer system located within the private access street along
the south side of the property and within Elmhurst Lane. A private cross access and
maintenance agreement is memorialized on the parent parcel for the private utilities
extending across multiple properties.
SSPPIIRRIITT PPLLAACCEE AATT BBRRAANNDDTTJJEENN FFAARRMM 33RRDD AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAUUGGUUSSTT 99,, 22001177
PPAAGGEE 55 OOFF 77
The Trunk Storm Sewer Area Charge has not been collected on the parent parcel and must be
paid with the final plat. The Trunk Storm Sewer Area Charge for Lot 1, Block 1 is calculated as
follows:
56,929.00 s.f. x $0.250/s.f. = $14,232.25
Gross Area of Final Plat Commercial
Area Charge
Total Trunk
Storm Sewer Area Charge
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
FEMA FLOODPLAIN ANALYSIS
Spirit Place at Brandtjen Farm 3rd Addition is shown on the Flood Insurance Rate Map (FIRM)
as Zone X by the Federal Emergency Management Agency (FEMA). Based on this designation,
there are no areas in the plat located within a Special Flood Hazard Area (SFHA), as
determined by FEMA.
WWEETTLLAANNDDSS
There are no existing wetlands on the site.
TTRREEEE PPRREESSEERRVVAATTIIOONN
No significant trees are located on the property.
EERROOSSIIOONN CCOONNTTRROOLL
The Developer is responsible for obtaining a MPCA Construction Permit for the site as well as
developing and maintaining the SWPPP throughout construction phase. The permit requires
that all erosion and sediment BMPs must be clearly outlined in a site’s SWPPP. Changes made
throughout construction should be documented in the SWPPP.
Additional erosion control measures may be required during construction as deemed
necessary by City staff or the Dakota County Soil and Water District. Any additional measures
required shall be installed and maintained by the Developer.
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to Spirit Place at Brandtjen Farm 3rd Addition.
CONSTRUCTION COSTS
Grading, Erosion Control, and Restoration 10,000.00
SSPPIIRRIITT PPLLAACCEE AATT BBRRAANNDDTTJJEENN FFAARRMM 33RRDD AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAUUGGUUSSTT 99,, 22001177
PPAAGGEE 66 OOFF 77
SUBTOTAL - CONSTRUCTION COSTS $ 10,000.00
OTHER COSTS
Developer’s Design (3.0%) $ 300.00
Developer’s Construction Survey (2.5%) 250.00
City’s Legal Expense (0.5%) 50.00
City Construction Observation (5.0%) 500.00
Developer’s Record Drawing (0.5%) 50.00
Landscaping 35,000.00
Lot Corners/Iron Monuments 100.00
SUBTOTAL - OTHER COSTS $36,250.00
TOTAL PROJECT SECURITY $ 46,250.00
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
$100.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all
irons have been placed following site grading, street and utility construction.
CCAASSHH FFEEEESS
A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat
approval and is calculated as follows:
196.00 f.f. x $.2451/f.f./qtr. x 4 qtrs. = $192.16
Lot 1, Block 1, Elmhurst Lane
Front Footage
Streetlight Operating Fee Total
A cash fee for one-year of the Environmental Resources Fee shall be paid at the time of final
plat approval and is calculated as follows:
1.31 acres x 4.20 x $9.30/unit/qtr. x 4 qtrs. = $204.67
Lot 1, Block 1
Spirit Place and Brandtjen Farm
2nd Addition
Commercial/Industrial
Residential Equivalent Utility
Factor
Environmental Resources
Fee Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
1 units x $90.00/unit = $90.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be in either .dwg (AutoCAD) or .dxf format.
SSPPIIRRIITT PPLLAACCEE AATT BBRRAANNDDTTJJEENN FFAARRMM 33RRDD AADDDDIITTIIOONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAUUGGUUSSTT 99,, 22001177
PPAAGGEE 77 OOFF 77
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction cost, or $600.00.
CASH REQUIREMENTS
Sanitary Sewer Availability Charge to be paid with building permit
Park Dedication Fee $ 7,074.00
Trunk Storm Sewer Area Charge 14,232.25
Streetlight Operating Fee 192.16
Environmental Resources Fee 204.67
City Base Map Updating Fee 90.00
City Engineering Administration (3.00%) 300.00
TOTAL - CASH REQUIREMENTS $ 22,093.08
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the Spirit Place at Brandtjen Farm 3rd Addition
preliminary and final plat, grading and erosion control plan and utility plan subject to the
requirements and stipulations within this report.