FIRST PARK LAKEVILLE 4TH ADDITION FINAL PLAT AND EASEMENT VACATION
PROPOSED ACTION
Staff recommends adoption of the following motion: Move to approve: 1) a resolution approving
the final plat of First Park Lakeville 4th Addition and, 2) a resolution approving the vacation of a
drainage and utility easement.
OVERVIEW
Gulnar, LLC representatives have submitted an application for the final plat of one lot and one
block to be known as First Park Lakeville 4th Addition. Gulnar, LLC (a/k/a Globus Transport) is a
trucking and transport company now located in Savage, MN. In conjunction with the proposed
final plat, the vacation of a public drainage and utility easement is also being requested. The
easement to be vacated will be replaced by a new easement with the final plat of First Park
Lakeville 4th Addition. The preliminary plat of First Park Lakeville, consisting of 10 industrial
lots, was approved in 2008.
The Planning Commission held a public hearing in consideration of the easement vacation at
their August 17, 2017 meeting. There was no public comment at the public hearing. The
Planning Commission recommended unanimous approval of the easement vacation subject to
two stipulations.
PRIMARY ISSUES TO CONSIDER
Is the final plat consistent with the approved preliminary plat? The final plat of First Park
Lakeville 4th Addition is consistent with the preliminary plat in 2008.
SUPPORTING INFORMATION
◊ Final plat resolution
◊ Vacation resolution
◊ Signed development contract
◊ August 17, 2017 draft Planning Commission minutes
◊ August 11, 2017 planning report and August 4, 2017 engineering report
Financial Impact: $ None Budgeted: Y/N ____ Source: ___________________________________
Related Documents (CIP, ERP, etc.): Subdivision Ordinance_____________________________________________
Community Values: Diversified Economic Development _______________________________________________
Report Completed By: Frank Dempsey, AICP, Associate Planner_________________________________________
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. 17-____
RESOLUTION APPROVING THE FINAL PLAT
OF FIRST PARK LAKEVILLE 4TH ADDITION
WHEREAS, the owner of the plat described as FIRST PARK LAKEVILLE 4TH
ADDITION has requested approval of a final plat; and
WHEREAS, the final plat is consistent with the approved preliminary plat, and
WHEREAS, the final plat is acceptable to the City.
NOW THEREFORE BE IT RESOLVED by the Lakeville City Council:
1. The FIRST PARK LAKEVILLE 4TH ADDITION final plat is approved
subject to the developer’s execution of the development contract and security
requirements.
2. The Mayor and City Clerk are hereby authorized to sign the development contract
and the final plat mylars.
3. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
ADOPTED by the Lakeville City Council this 5th day of September 2017
CITY OF LAKEVILLE
_______
Douglas P. Anderson, Mayor
ATTEST:
______________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _________is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 5th day of September 2017 as shown by the
minutes of said meeting in my possession.
______________________________
Charlene Friedges
City Clerk
(SEAL)
Drafted By:
City of Lakeville
20195 Holyoke Avenue
Lakeville, MN 55044
1
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. 17-_____
RESOLUTION VACATING A PUBLIC DRAINAGE AND UTILITY EASEMENT
WHEREAS, the Planning Commission has conducted a public hearing preceded by two (2)
weeks published notice, to consider the vacation of the following described public drainage and
utility easement; and
WHEREAS, the City Council has determined that it is in the public interest to vacate said
public drainage and utility easement.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The following public drainage and utility easement is hereby vacated:
All Drainage and Utility Easements lying within Outlot E, as created by and dedicated in
the plat of FIRST PARK LAKEVILLE according to the recorded plat thereof, Dakota
County, Minnesota.
2. The City Clerk is directed to file a certified copy of this resolution with the Dakota
County Recorder.
ADOPTED by the Lakeville City Council this 5th day of September 2017
CITY OF LAKEVILLE
BY:________________________________
Douglas P. Anderson, Mayor
2
ATTEST:
BY:___________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. 17-___ is a true and correct copy of the
resolution presented to and adopted by the City Council of the City of Lakeville at a duly
authorized meeting thereof held on the 5th day of September 2017 as shown by the minutes of
said meeting in my possession.
__________________________
Charlene Friedges, City Clerk
(Seal)
1
City of Lakeville
Planning Department
Memorandum
To: Planning Commission, Mayor and City Council
From: Frank Dempsey, AICP, Associate Planner
Date: August 11, 2017
Subject: Packet Material for the August 17, 2017 Planning Commission Meeting
Agenda
Item: First Park Lakeville 4th Addition
1) Easement Vacation
2) Final Plat
Application
Action Deadline: Final Plat (September 4, 2017) – Easement Vacation (September 25, 2017)
INTRODUCTION
Gulnar, LLC representatives submitted an application for the final plat of one lot and one block
to be known as First Park Lakeville 4th Addition. Gulnar, LLC (a/k/a Globus Transport) is a
trucking and transport company now located in Savage, MN. In conjunction with the proposed
final plat, the vacation of a public drainage and utility easement is required. The easement to be
vacated will be replaced by a new easement with the final plat of the First Park Lakeville 4th
Addition. The Planning Commission is charged with conducting the easement vacation public
hearing and forwarding a recommendation to the City Council. The City Council will act on the
final plat application and easement vacation. The site plan will be reviewed and approved
administratively by Planning Department staff.
The easement vacation and final plat plans have been reviewed by Planning Department,
Engineering Division and Parks and Recreation Department staff.
2
EXHIBITS
A. Location and Zoning Map
B. Aerial Photo Map
C. Easement Vacation Sketch
D. Final Plat – First Park Lakeville 4th Addition
E. Site Plan
PLANNING ANALYSIS
Existing Conditions. The First Park Lakeville preliminary and final plat was approved in 2008.
The preliminary plat consisted of 10 lots and seven outlots and the final plat consisted of one lot
and six outlots. The subject property, Outlot E, First Park Lakeville, totals 4.75 acres, was
preliminary graded in 2008 and includes modest topography that drains from west to east over
the site. The First Park Lakeville preliminary and final plat totaled 140 acres and abuts 215th
Street (CSAH 70) to the north, Dodd Bouelvard (CSAH 9) to the west, Dick’s Sanitation and
Metropolitan Airports Commission property to the east and Eureka Township to the south.
Easement Vacation. A 50 foot wide public drainage and utility easement runs parallel to the
south boundary of the subject property that was platted with the First Park Lakeville final plat in
2008. This easement must be vacated upon final plat of Outlot E and reestablished with the final
plat of First Park Lakeville 4th Addition. All utility companies with a potential interest in the
easement vacation have been notified. No utility companies have responded with opposition.
Zoning. The zoning of the property is I-1, Light Industrial District which allows industrial land
uses such as that proposed by Globus Transport. The proposed use of the property as a trucking
and warehouse facility is a permitted use in the I-1 District.
Lot Area. The proposed Lot 1, Block 1, First Park Lakeville 4th Addition totals 4.75 acres which
meets the minimum 30,000 square feet for a lot in the I-1 District.
Lot Width. The proposed Lot 1, Block 1, First Park Lakeville 4th Addition includes a lot width of
519 feet which meets the minimum 100 foot lot width in the I-1 District.
Outlots. There are no outlots proposed with the First Park Lakeville 4th Addition final plat.
Access. Lot 1, Block 1, First Park Lakeville will be accessed from Humboldt Road.
3
Streets & Right-of-Way. All streets adjacent to First Park Lakeville 4th Addition are constructed
and no further right-of-way dedication is required.
Park Dedication and Trails. The City’s Parks, Trails and Open Space Plan does not identify any
park land or trail development in the vicinity of the First Park Lakeville 4th Addition final plat.
The developer must pay a cash fee in lieu of park land with the final plat. The park dedication fee
is $4,558 per acre for a total park dedication cash fee of $21,650.50.
Tree Preservation. There are no significant trees in the First Park Lakeville 4th Addition final plat
area.
Wetlands. There are no wetlands identified in the First Park Lakeville 4th Addition final plat.
Grading, Drainage and Erosion Control. The final plat plans include grading, drainage and
erosion control plans. Grading, drainage and erosion control is discussed in more detail in the
August 4, 2017 engineering memo.
Building. The building is proposed to be 48,000 square feet in area and 30 feet in height. The
building will be constructed of pre-cast concrete exposed aggregate wall panels. The proposed
exterior materials meet zoning ordinance requirements.
Setbacks. Setback requirements for an industrial lot in the I-1 District are noted below:
Yard Front Side Interior Rear
Setbacks 40 feet 10 feet 30 feet
The proposed office/warehouse building meets the I-1 District setback requirements.
Loading Docks. The building proposes 14 loading docks and three drive-through doors on the
south side of the building.
Parking. The 48,000 square foot building will include approximately 3,000 square feet of office
space and 45,000 square feet of warehouse space. Total required parking spaces for the building
will be 55. The developer is proposing to defer 28 of the 56 proposed parking spaces as allowed
by the Zoning Ordinance. The parking aisles, spaces and dimensions meet Zoning Ordinance
requirements. The parking deferment will be reviewed and approved administratively.
4
RECOMMENDATION
Planning Department staff will review and is authorized to approve the site plan and parking
deferment applications administratively. The Planning Commission is charged with conducting
the easement vacation public hearing and forwarding a recommendation to the City Council.
The City Council will act on the final plat application and easement vacation at a future date.
The First Park Lakeville 4th Addition easement vacation and final plat are consistent with the
approved preliminary plat and comply with the requirements of the Zoning and Subdivision
Ordinances. Planning Department staff recommends approval subject to the following
conditions:
1. The easement vacation is subject to the recording of the final plat of First Park Lakeville 4th
Addition.
2. The recommendations listed in the August 4, 2017 engineering report.
RM-1
RS-3
I-1
RST-2
OP
P/OS
RS-3 RS-2 RS-2
PUD
I-1
I-1DODD BLVDIDAHOAVE212TH ST W
215TH ST W HYTRAILCIRINDEPENDENCEAVEHYACINTHAVE217TH ST W IBIS AVE214TH ST WINSEL LNIMBLER TRL HYA LITEDRHYTRAIL CI R
220TH ST W HUMBOLDTRDHUMBOLDT RDILAVISTA WAY
215TH ST W
ZONING MAP
Ü
EXHIBIT A
FIRST PARK LAKEVILLE 4TH ADDITION
Property Information
August 9, 2017
0 875 1,750437.5 ft
0 270 540135 m
1:9,600
Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification.
EXHIBIT B
EXHIBIT C
EXHIBIT E
City of Lakeville
Public Works – Engineering Division
Memorandum
To: Frank Dempsey, Associate Planner
From: Alex Jordan, Senior Project Engineer
McKenzie L. Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
Dave Olson, Community and Economic Development Director
Date: August 4, 2017
Subject: First Park Lakeville 4th Addition
• Final Plat Review
• Grading and Erosion Control Plan Review
• Utility Plan Review
• Site Plan Review
BBAACCKKGGRROOUUNNDD
RJ Ryan Construction, Inc. has submitted a final plat to be known as First Park Lakeville 4th
Addition. This is the fourth phase of the First Park Lakeville preliminary plat that was
approved by the City Council on June 16, 2008. The Developer has submitted a site plan for a
proposed warehouse building and parking lot to be constructed on Lot 1, Block 1. The
proposed development is located east of and adjacent to Humboldt Road, west of and
adjacent to Outlot D, First Park Lakeville, and north of the south City limits. The site is zoned I-
1, Light Industrial District.
The final plat consists of one lot within one block and one outlot on 4.75 acres.
The proposed development will be completed by:
Developer: RJ Ryan Construction, Inc.
Engineer/Surveyor: Plowe Engineering, Inc.
FFIIRRSSTT PPAARRKK LLAAKKEEVVIILLLLEE 44TTHH AADDDDIITTIIOONN FFIINNAALL PPLLAATT
AAUUGGUUSSTT 44,, 22001177
PPAAGGEE 22 OOFF 66
SSIITTEE CCOONNDDIITTIIOONNSS
First Park Lakeville 4th Addition site is undeveloped cultivated agricultural land. The land
generally slopes from the south to the north to the existing stormwater management basins
located in Outlot D, First Park Lakeville. The site was mass graded with the development of
First Park Lakeville in 2008.
EEAASSEEMMEENNTTSS
The parent parcel contains the following existing public easement that will be vacated,
contingent upon approval of the final plat:
• 50-ft wide Drainage and Utility Easement, per the plat of First Park Lakeville, in favor of
the City of Lakeville. The easement will be re-dedicated as shown on the First Park
Lakeville 4th Addition final plat.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
Humboldt Road
First Park Lakeville 4th Addition is located east of and adjacent to Humboldt Road, a local
industrial roadway as identified by the City’s Transportation Plan. Humboldt Road is currently
constructed as a 40-foot wide rural roadway within 80-feet of right-of-way.
SITE PLAN REVIEW
A site plan was submitted for Lot 1, Block 1, First Park Lakeville 4th Addition. The site plan
features a 48,000 square foot warehouse with office space and parking lot.
Parking for 28 automobiles, including 2 designated handicapped spaces, and 32 proof of
parking spaces, has been provided in a paved parking lot. Two access drives from Humboldt
Road will be constructed for access to the parking lot. The parking lot includes parking areas
for 226 semi-trailers.
A final site plan must be submitted and reviewed prior to the issuance of a Building Permit for
Lot 1, Block 1, First Park Lakeville 4th Addition.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
There shall be one construction traffic access from Humboldt Road at the location of the
southerly driveway access.
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS
No future park or trail needs within this development are indicated in the City’s Parks, Trails,
and Open Space Plan. The Park Dedication Fee has not been collected on the parent parcel
and will be satisfied through a cash contribution with the final plat, calculated as follows:
FFIIRRSSTT PPAARRKK LLAAKKEEVVIILLLLEE 44TTHH AADDDDIITTIIOONN FFIINNAALL PPLLAATT
AAUUGGUUSSTT 44,, 22001177
PPAAGGEE 33 OOFF 66
4.75 acres x $4,558.00 = $21,650.50
Area of Lot 1, Block 1 Park Dedication Rate Park Dedication Requirement
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR
First Park Lakeville 4th Addition is located in sub-district SC-10160 of the South Creek sanitary
sewer district, as identified in the City’s Comprehensive Sewer Plan. The wastewater from the
proposed site will be conveyed to the Elko/New Market interceptor and then to the Empire
Wastewater Treatment Plant. The existing MCES-owned downstream facilities are adequate to
convey the wastewater generated by the proposed development.
The Elko/New Market interceptor is located within an existing drainage and utility easement
along the south 30-feet of the parcel. The Developer proposes to extend an existing private
sanitary sewer service that connects to the Elko/New Market interceptor to provide sewer
service to the development. The Developer shall apply for a direct connection permit from
the METC for the connection to the sanitary sewer and any casting adjustments necessary to
the existing manholes located within the parent parcel.
Consistent with the First Park Lakeville Development Contract, the lateral sanitary sewer
access charge for the Elko/New Market Interceptor is required with the final plat, calculated as
follows:
617.37 lf x $41.50 = $25,620.86 +$418.00 = $26,038.86
Frontage along
MCES Interceptor
Lateral Sanitary Sewer
Access Charge Lateral Sewer Access Charge
Requirement
Service Fee Lateral Sanitary Sewer
Access Charge Due
The Sanitary Sewer Availability Charge has not been collected on the parent parcel and shall
be paid for Lot 1, Block 1 with the Building Permit Application. The Sanitary Sewer Availability
Charge will be calculated at the rate in effect at the time of approval of the Building Permit
Application, as determined by the City’s Building Official.
WWAATTEERRMMAAIINN
Development of First Park Lakeville 4th Addition includes the extension of a private water
service constructed with the First Park Lakeville development improvements. The private
water service will be extended through the site to provide domestic and fire suppression
service for the proposed building.
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
First Park Lakeville 4th Addition is located within subdistrict SC-8A, of the South Creek District
of the City’s Comprehensive Water Resources Management Plan. The First Park Lakeville
stormwater management plan included the runoff generated from the proposed
development of the parent parcel. The plan was designed to meet the water quality, water
quantity, and on-site infiltration requirements of the City of Lakeville in 2008. The original
FFIIRRSSTT PPAARRKK LLAAKKEEVVIILLLLEE 44TTHH AADDDDIITTIIOONN FFIINNAALL PPLLAATT
AAUUGGUUSSTT 44,, 22001177
PPAAGGEE 44 OOFF 66
stormwater model for the site utilized pre-Atlas 14 rainfall data. Due to more accurate rainfall
data, the Developer has updated the stormwater management model to ensure that the
downstream stormwater management basins still have sufficient storage to treat the runoff
generated from the development. The City has completed a review of the updated model and
has determined that the existing system was constructed to treat the stormwater runoff
generated from the site, and therefore no additional stormwater improvements are required
by the Developer.
The grading specifications shall indicate that all embankments meet FHA/HUD 79G
specifications. The Developer shall certify to the City that footings placed on fill material are
appropriately constructed. A footing and foundation inspection permit will not be issued
until a soils report and an as-built certified building pad survey have been submitted and
approved by City staff.
A National Pollution Discharge Elimination System General Stormwater Permit for
construction activity is required by the Minnesota Pollution Control Agency for areas
exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit
Coverage must be submitted to the City upon receipt from the MPCA.
SSTTOORRMM SSEEWWEERR
Development of First Park Lakeville 4th Addition includes the construction of privately owned
and maintained storm sewer systems, which will collect and convey stormwater runoff
generated from within the development to the existing stormwater management basin in
Outlot D, First Park Lakeville.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcel and must be
paid with the final plat. The Trunk Storm Sewer Area Charge is calculated as follows:
207,188.00 s.f. x $0.250/s.f. = $51,797.00
Area of Lot 1, Block 1
Industrial
Area Charge
Total Trunk
Storm Sewer Area Charge
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
FFEEMMAA FFLLOOOODDPPLLAAIINN AANNAALLYYSSIISS
First Park Lakeville 4th Addition is shown on the Flood Insurance Rate Map (FIRM) as Zone X by
the Federal Emergency Management Agency (FEMA). Based on this designation, there are no
areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA.
WWEETTLLAANNDDSS
There are no wetland within the First Park Lakeville 4th Addition site.
FFIIRRSSTT PPAARRKK LLAAKKEEVVIILLLLEE 44TTHH AADDDDIITTIIOONN FFIINNAALL PPLLAATT
AAUUGGUUSSTT 44,, 22001177
PPAAGGEE 55 OOFF 66
TTRREEEE PPRREESSEERRVVAATTIIOONN
There are no trees within the site.
EERROOSSIIOONN CCOONNTTRROOLL
The Developer is responsible for obtaining a MPCA Construction Permit for the site as well as
developing a SWPPP for the site prior to construction. The permit requires that all erosion and
sediment BMPS be clearly outlined in a site’s SWPPP. Changes made throughout construction
must be documented in the SWPPP.
Additional erosion control measures may be required during construction as deemed
necessary by City staff. Any additional measures required shall be installed and maintained
by the Developer.
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to First Park Lakeville 4th Addition.
CONSTRUCTION COSTS
Driveway Culverts
Sanitary Sewer Connection and Adjustments
Grading, Erosion Control, and Restoration
$8,500.00
$2,000.00
$15,000.00
SUBTOTAL - CONSTRUCTION COSTS $ 25,500.00
OTHER COSTS
Developer’s Design (3.0%) $ 765.00
Developer’s Construction Survey (2.5%) 637.50
City’s Legal Expense (0.5%) 127.50
City Construction Observation (5.0%) 1,275.00
Developer’s Record Drawing (0.5%) 127.50
Landscaping 11,000.00
Street Lights 2,800.00
Lot Corners/Iron Monuments 100.00
SUBTOTAL - OTHER COSTS $16,832.50
TOTAL PROJECT SECURITY $ 42,332.50
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
$100.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all
irons have been placed following site grading, street and utility construction.
CCAASSHH FFEEEESS
FFIIRRSSTT PPAARRKK LLAAKKEEVVIILLLLEE 44TTHH AADDDDIITTIIOONN FFIINNAALL PPLLAATT
AAUUGGUUSSTT 44,, 22001177
PPAAGGEE 66 OOFF 66
A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat
approval and is calculated as follows:
517.39 f.f. x $.2451/f.f/qtr. x 4 qtrs. = $507.25
Lot 1, Block 1, Humboldt Rd Frontage Streetlight Operating Fee Total
A cash fee for one-year of the Environmental Resources Fee shall be paid at the time of final
plat approval and is calculated as follows:
4.75 acres x 4.20 x $9.30/unit/qtr. x 4 qtrs. = $742.14
Lot 1, Block 1,
First Park Lakeville 4th Addition
Commercial/Industrial
Residential Equivalent Utility Factor
Environmental Resources Fee Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
1 units x $90.00/unit = $90.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be in either .dwg (AutoCAD) or .dxf format.
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction cost, or $765.00.
CASH REQUIREMENTS
Sanitary Sewer Availability Charge to be paid with building permit
Park Dedication Fee $ 21,650.50
Lateral Sanitary Sewer Charge
Trunk Storm Sewer Area Charge
26,038.86
51,797.00
Streetlight Operating Fee 507.25
Environmental Resources Fee 742.14
City Base Map Updating Fee 90.00
City Engineering Administration (3.00%) 765.00
TOTAL - CASH REQUIREMENTS $ 101,590.75
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the final plat, grading and erosion control plan, utility
plan, and site plan for First Park Lakeville 4th Addition, subject to the requirements and
stipulations within this report.