Loading...
HomeMy WebLinkAboutItem 09 October 16, 2017 Item No. PUBLIC HEARING FOR THE PROPOSED 2018-2022 CAPITAL IMPROVEMENT PLAN AND STREET RECONSTRUCTION PLAN AND THE INTENT TO ISSUE GENERAL OBLIGATION STREET RECONSTRUCTION BONDS AND GENERAL OBLIGATION CAPITAL IMPROVEMENT BONDS Proposed Action Conduct a public hearing for the proposed 2018-2022 Capital Improvement Plan (CIP) and Street Reconstruction Plan and the intent to issue general obligation street reconstruction bonds and general obligation capital improvement bonds. Following the public hearing, Staff recommends adoption of the following motions: 1. Move to approve the Resolution Adopting the 5-Year Capital Improvement Plan (2018- 2022) and Approving the Issuance of General Obligation Capital Improvement Bonds; 2. Move to approve the Resolution Adopting the 5-Year Street Reconstruction Plan (2018- 2022) and Approving the Issuance of General Obligation Street Reconstruction Bonds; 3. Move to approve the Resolution Declaring the Official Intent of the City of Lakeville to Reimburse Certain Expenditures from the Proceeds of Bonds to be Issued by the City; 4. Move to approve the Resolution Amending the 2017 General Fund Budget. Approval of these motions will result in adoption of the 2018-2022 CIP and Street Reconstruction Plan, provides the City the flexibility to issue bonds for the projects listed in the resolution and provides funding for the Equipment Fund. Approval on the Street Reconstruction Plan requires an affirmative vote of ALL council members present. Overview The Capital Improvement Plan (CIP) for 2018-2022 provides the financial framework for our community’s infrastructure improvements for the next five years. The CIP was discussed at the July 24, 2017; August 28, 2017; and September 25, 2017 work sessions. Below are the changes to the CIP document as directed by the Council: • Movement of Central Maintenance Facility expansion project and the related anticipated bond proceeds from 2019 to 2020 (with bond payments beginning in 2021). • Movement of the Police Shooting Range from 2019 to 2020, with planned funding changed from bonds to “other/partnership.” • The corresponding charts/tables were updated to reflect the above changes. In addition, staff made some corrections to the debt service charts and some minor narrative changes. The Planning Commission reviewed the CIP at their October 5, 2017 meeting. A motion was passed recommending adoption of the CIP by the City Council and finding that the capital improvements identified in the 2018-2022 CIP were consistent with the Comprehensive Plan. A copy of the draft Planning Commission meeting minutes is attached to this report. The Internal Revenue Service has issued Treasury Reg. 1.150-2 which provides that proceeds of tax-exempt bonds used to reimburse prior expenditures will not be deemed spent unless certain requirements are met. In order to meet these requirements, the City should annually declare its intent to bond for certain projects. The resolution includes projects that may use bonds as a funding source. Primary Issues to Consider • Does the plan adequately address the City of Lakeville’s infrastructure requirements? • Does this resolution require the City to issue bonds for the projects? Approval of this resolution only approves the City’s intent to bond. It does not approve the sale of bonds or the projects. This declaration does not obligate the City to issue bonds for the projects. Supporting Information • Resolutions (4) • Capital Improvement Plan 2018-2022 (includes Street Reconstruction Plan 2018-2022) • Draft Planning Commission 10/05/2017 Meeting Minutes Financial Impact: $ Budgeted: Y☐ N☐ Source: Related Documents: (CIP, ERP, etc.): Envision Lakeville Community Values: Good Value for Public Services Report Completed by: Jerilyn Erickson, Finance Director 148million Various 2018-2022 CIP CITY OF LAKEVILLE RESOLUTION NO. ___ RESOLUTION ADOPTING THE 5-YEAR CAPITAL IMPROVEMENT PLAN (2018-2022) AND APPROVING THE ISSUANCE OF GENERAL OBLIGATION CAPITAL IMPROVEMENT BONDS WHEREAS, the purpose of the Capital Improvement Plan (CIP) is to protect the infrastructure and capital assets of the City of Lakeville by establishing a replacement plan for existing infrastructure and capital assets and by identifying those improvements necessary to accommodate the growth of the community; and WHEREAS, the CIP is a flexible planning document that attempts to balance the financial resources of the City with its needs; and WHEREAS, the CIP covers a five-year period of 2018 - 2022; sets forth the estimated schedule, timing, and details of specific capital improvements by year, together with the estimated costs, the need for the improvements, and sources of revenue to pay for the improvements; and WHEREAS, during the preparation and review of the Capital Improvement Plan, the Council has considered, for each capital improvement: the condition of the City’s existing infrastructure, including the projected need for repair or replacement; the likely demand for the improvements; the estimated cost of the improvements; the available public resources; the relative benefits and costs of alternative uses of the funds; operating costs of the proposed improvements; and WHEREAS, on October 16, 2017, the Lakeville City Council conducted a public hearing on the 2018-2022 CIP and offered opportunity for public testimony on the capital spending priorities of the City Council. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Lakeville Minnesota as follows: 1. The recitals set forth above are incorporated herein. 2. The 2018-2022 Capital Improvement Plan is hereby adopted. 3. AUTHORIZATION OF BONDS. The City hereby gives preliminary approval to the issuance of the Bonds in the approximate principal amount of $78 million, the proceeds of which will be used, together with additional funds of the City to finance costs of various Capital Improvement Plan Projects and to pay costs of issuance of the Bonds. The City staff is hereby authorized, in consultation with the City's financial advisor and legal counsel, to take all necessary action to call for the sale of the Bonds and to present proposals to this Council for approval at a subsequent meeting. 4. VOTER REFERENDUM CONTINGENCY. Pursuant to State Statute 475.521, if a petition requesting a vote on the question of issuing the Capital Improvement Bonds, signed by voters equal to five percent of the votes cast in the last municipal general election, is filed within thirty days of the public hearing, the City may issue the Capital Improvement Bonds only after obtaining the approval of a majority of the voters voting on the question of the issuance of the Capital Improvement Bonds. The authorizations and approvals contained herein are subject to and contingent upon not receiving such a petition, or, in the event such a petition is filed, the approving vote of a majority of the voters voting on the question of the issuance of the Capital Improvement Bonds. ADOPTED by the Lakeville City Council this 16th day of October 2017 CITY OF LAKEVILLE ___________________________ Douglas P. Anderson, Mayor ATTEST: _____________________________ Charlene Friedges, City Clerk VOTE Anderson Davis Hellier LaBeau Wheeler Aye ☐ ☐ ☐ ☐ ☐ Nay ☐ ☐ ☐ ☐ ☐ Abstain ☐ ☐ ☐ ☐ ☐ Absent ☐ ☐ ☐ ☐ ☐ CITY OF LAKEVILLE RESOLUTION NO. ___ RESOLUTION ADOPTING A 5-YEAR STREET RECONSTRUCTION PLAN (2018-2022) AND APPROVING THE ISSUANCE OF GENERAL OBLIGATION STREET RECONSTRUCTION BONDS WHEREAS, pursuant to Minnesota Statutes, Section 475.58, subd. 3b (the "Street Reconstruction Act"), the City has prepared a 2018-2022 street reconstruction plan dated October 16, 2017 (the "Street Reconstruction Plan") which sets forth various street reconstruction plan projects to be undertaken in the City within the next five years (the "Street Reconstruction Plan Projects"). The Street Reconstruction Plan recommends the issuance of general obligation street reconstruction bonds under the Street Reconstruction Act in the approximate principal amount of $34.8 million (the "Street Reconstruction Bonds") to finance a portion of the costs of the Street Reconstruction Plan Projects; and WHEREAS, pursuant to the Street Reconstruction Act, the City is authorized to issue and sell obligations for street reconstruction under the circumstances and within the limitations set forth in the Street Reconstruction Act. The Street Reconstruction Act provides that a street reconstruction plan may be financed with bonds issued by the City, following a public hearing and the adoption of such plan, and other proceedings conducted in accordance with the requirements of the Street Reconstruction Act; and WHEREAS, on October 16, 2017 the City Council held a public hearing on the adoption of the Street Reconstruction Plan and the issuance of the Bonds after publication of the notice of public hearing for the Street Reconstruction Plan not less than 10 days nor more than 28 days prior to the date thereof in the City's official newspaper; and WHEREAS, all parties who appeared at the hearing were given an opportunity to express their views with respect to the proposal to adopt the Street Reconstruction Plan and to undertake and finance a portion of the Street Reconstruction Plan Projects with Street Reconstruction Bonds and any written comments submitted prior to the hearing were considered. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Lakeville Minnesota as follows: 1. CITY POLICIES AND GOALS. The financing of the Street Reconstruction Plan Projects and the issuance of the Street Reconstruction Bonds will further the policies and goals of the City as set forth in the Street Reconstruction Plan. 2. ADOPTION OF STREET RECONSTRUCTION PLAN. Based on information received at the public hearing, such written comments (if any) and such other facts and circumstances as the City Council deems relevant, it is hereby found, determined and declared that: (a) the Street Reconstruction Plan Projects proposed in the Street Reconstruction Plan will allow the City to construct and finance various street reconstruction projects; (b) the Street Reconstruction Plan is hereby approved and adopted in the forms presently on file with the City. 3. AUTHORIZATION OF BONDS. The City hereby gives preliminary approval to the issuance of the Bonds, the proceeds of which will be used, together with additional funds of the City to finance costs of various Street Reconstruction Plan Projects and to pay costs of issuance of the Bonds. The City staff is hereby authorized, in consultation with the City's financial advisor and legal counsel, to take all necessary action to call for the sale of the Bonds and to present proposals to this Council for approval at a subsequent meeting. 4. VOTER REFERENDUM CONTINGENCY. Pursuant to the Street Reconstruction Act, if a petition requesting a vote on the question of issuing the Street Reconstruction Bonds, signed by voters equal to five percent of the votes cast in the last municipal general election, is filed within thirty days of the public hearing, the City may issue the Street Reconstruction Bonds only after obtaining the approval of a majority of the voters voting on the question of the issuance of the Street Reconstruction Bonds. The authorizations and approvals contained herein are subject to and contingent upon not receiving such a petition, or, in the event such a petition is filed, the approving vote of a majority of the voters voting on the question of the issuance of the Street Reconstruction Bonds. ADOPTED by the Lakeville City Council this 16th day of October, 2017. CITY OF LAKEVILLE ___________________________ Douglas P. Anderson, Mayor ATTEST: _____________________________ Charlene Friedges, City Clerk VOTE Anderson Davis Hellier LaBeau Wheeler Aye ☐ ☐ ☐ ☐ ☐ Nay ☐ ☐ ☐ ☐ ☐ Abstain ☐ ☐ ☐ ☐ ☐ Absent ☐ ☐ ☐ ☐ ☐ CITY OF LAKEVILLE RESOLUTION NO. ___ RESOLUTION DECLARING THE OFFICIAL INTENT OF THE CITY OF LAKEVILLE TO REIMBURSE CERTAIN EXPENDITURES FROM THE PROCEEDS OF BONDS TO BE ISSUED BY THE CITY WHEREAS, the Internal Revenue Service has issued Treasury Reg. 1.150-2 (the “Reimbursement Regulations”) providing that proceeds of tax-exempt bonds used to reimburse prior expenditures will not be deemed spent unless certain requirements are met; and WHEREAS, the City expects to incur certain expenditures that may be financed temporarily from sources other than bonds, and later reimbursed from the proceeds of tax- exempt bonds; and WHEREAS, the City has determined to make this declaration of official intent (“Declaration”) to reimburse certain costs from proceeds of bonds in accordance with the Reimbursement regulations; and WHEREAS, the total estimated general obligation bonds for 2018 is $12,068,000. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lakeville, Minnesota as follows: 1. The recitals set forth above are incorporated herein. 2. The City proposes to undertake the following projects (the “Projects”): a. #18-02 2018 Street Reconstruction b. #18-03 Kenrick Avenue: 173rd St – N City Limit c. #19-03 172nd St/Kodiak Ave/175th St/Judicial Rd/168th St d. #19-04 Klamath Tr (West of Kenwood Trl) e. #19-05 Hamburg Ave (Lakeville Blvd-202nd St/CSAH 50) 3. The City reasonably expects to reimburse the expenditures made for certain costs of the Projects from the proceeds of bonds in an estimated maximum principal amount of the following (note these are 2018 costs only; projects 19-03, 19-04 and 19-05 each have significant costs planned for 2019 that are expected to be paid from bond proceeds in 2019): a. #18-02 2018 Street Reconstruction- $8,991,000 b. #18-03 Kenrick Avenue: 173rd St – N City Limit- $2,787,000 c. #19-03 172nd St/Kodiak Ave/175th St/Judicial Rd/168th St - $133,000 d. #19-04 Klamath Tr (West of Kenwood Trl) - $91,000 e. #19-05 Hamburg Ave (Lakeville Blvd-202nd St/CSAH 50) - $66,000 The City may declare other separate statements of reimbursement intent in connection with specific public improvements projects as they are initiated under Minnesota Statutes, Chapters 429 and 444, or for other capital projects, with the understanding that such additional declarations of reimbursement intent will supplement this resolution. All reimbursed expenditures will be capital expenditures, costs of issuance of the bonds, or other expenditures eligible for reimbursement under Section 1.150-2(d)(3) of the Reimbursement Regulations. 4. This Declaration has been made no later than 60 days after payment of any original expenditure to be subject to a reimbursement allocation with respect to the proceeds of bonds, except for the following expenditures: a) costs of issuance of bonds; b) costs in an amount not in excess of $100,000 or five percent of the proceeds of an issue; or c) “preliminary expenditures” up to an amount not in excess of 20 percent of the aggregate issue price of the issue or issues that are reasonably expected by the City to finance the project for which the preliminary expenditures were incurred. The term preliminary expenditures” includes architectural, engineering, surveying, bond issuance, and similar costs that are incurred prior to commencement of acquisition, construction or rehabilitation of a project, other than land acquisition, site preparation, and similar costs incident to commencement of construction. 5. This Declaration is an expression of the reasonable expectations of the City based on the facts and circumstances known to the City as the date hereof. The anticipated original expenditures for the Projects and the principal amount of the bonds described in paragraph 3 are consistent with the City’s budgetary and financial circumstances. No sources other than proceeds of bonds to be issued by the City are, or are reasonably expected to be, reserved, allocated on a long term basis, or otherwise set aside pursuant to the City’s budget or financial policies to pay such Project expenditures. 6. This Declaration is intended to constitute a declaration of the official intent for the purposes of the Reimbursement Regulations. ADOPTED by the Lakeville City Council this 16th day of October 2017 CITY OF LAKEVILLE ___________________________ Douglas P. Anderson, Mayor ATTEST: _____________________________ Charlene Friedges, City Clerk VOTE Anderson Davis Hellier LaBeau Wheeler Aye ☐ ☐ ☐ ☐ ☐ Nay ☐ ☐ ☐ ☐ ☐ Abstain ☐ ☐ ☐ ☐ ☐ Absent ☐ ☐ ☐ ☐ ☐ CITY OF LAKEVILLE RESOLUTION NO. ________ RESOLUTION AMENDING THE 2017 GENERAL FUND BUDGET WHEREAS, the 2017 General Fund budget was adopted on December 5, 2016; and WHEREAS, the City Council discussed utilizing $500,000 of 2017 General Fund reserves in 2017 for funding capital purchases associated with the 2018-2027 Equipment Plan. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lakeville, Minnesota as follows: 1. The recitals set forth above are incorporated herein. 2. The 2017 General Fund budget is amended in the amount of $500,000 for transferring funds to the Equipment Fund. ADOPTED by the Lakeville City Council this 16th day of October 2017. CITY OF LAKEVILLE ___________________________ Douglas P. Anderson, Mayor ATTEST: _____________________________ Charlene Friedges, City Clerk CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 1 of 25 CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 2 of 25 Table of Contents 2018-2022 Capital Improvement Plan Page Introduction 3-6 Debt Analysis & Tax Impact Narrative 7-13 14-25 Projects & Funding Sources by Category 26-32 Projects by Funding Source 33-37 Street Reconstruction Plan (2018-2022) 38 Facility Plan (2018-2027) 39 Equipment Plan (2018-2027) 40 Map of Major Projects 41 CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 3 of 25 Introduction The Capital Improvement Plan provides a long range framework to meet the infrastructure needs and development objectives of our community. It provides policy makers and the community with a strategic (documented) approach to implementation and administration of improvement projects and equipment acquisitions. The Plan identifies the allocation of the City’s financial resources and maximizes the use of non- tax revenues to finance the improvements. Municipal State Aid Street Funds (MSA), connection charges, special assessments and other revenue sources are vital elements to financing City improvements. The use of these revenue sources reduces the reliance on property taxes to finance these improvements. The City should pursue the financing strategy as presented, but future events may require changes in both costs and revenues. The Capital Improvement Plan represents a significant financial, engineering and development undertaking for the City in the years ahead. The Capital Improvement Plan is consistent with the City’s Comprehensive Plan and takes into consideration projects identified in the Dakota County Capital Improvement Plan. Categories Transportation includes all roads, streets, street lights, bridges and traffic signals within the City with the exception of Interstate I-35 and routine maintenance of County roads. Major funding sources include Municipal State Aid Street funds, special assessments and property taxes. Utility infrastructure includes the construction and major maintenance of all water systems such as wells, towers and the water treatment facility. Utilities also include sanitary sewer and storm sewer systems. The primary source of financing for developing new systems is connection charges when property develops or with the issuance of a building permit. Maintenance projects are financed with user fees. Natural Resources system includes lakes, wetlands, streams, prairies and woodlands. Maintenance project are financed with user fees. Parks system includes regional, community and neighborhood parks as well as trails and recreation facilities such as the Arts Center and Heritage Center. Major resources include park dedication fees collected when property develops and grants. Maintenance projects are financed with property taxes and other revenue sources. Facilities include the city hall, police station, fire stations, central maintenance facility and other municipal buildings. Primary revenue sources include, but not limited to, property taxes, General CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 4 of 25 Fund, Water Fund, and planned bond proceeds in 2019 primarily for a planned expansion of the central maintenance facility. Equipment includes all major equipment acquisitions and replacement. Primary revenue sources include, but not limited to, Liquor Fund contributions, General Fund, Utility Funds, sale of assets and property taxes. Program Summary The overwhelming majority of capital investments are in transportation for the next five years. The total budgeted capital expenditures by category are shown below. The projects are financed from diverse revenues sources. A summary is shown below. Details are shown on subsequent pages. Total Cost Type: 2018 2019 2020 2021 2022 2018-2022 Transportation 17,135,017 20,496,635 17,535,806 8,574,284 11,883,543 75,625,285 Utility/Environmental Resources 3,734,564 4,442,837 6,464,247 2,747,334 3,918,818 21,307,800 Parks 4,239,181 8,176,875 2,639,822 6,219,534 2,878,959 24,154,371 Facilities 711,277 1,330,420 11,194,123 312,700 61,000 13,609,520 Equipment 2,492,980 3,390,606 3,001,109 2,279,446 2,320,118 13,484,259 28,313,019 37,837,373 40,835,107 20,133,298 21,062,438 148,181,235 Project Cost Summary Transportation,  75,625,285  Utility/Environmental  Resources,  21,307,800  Parks,  24,154,371  Facilities,  13,609,520  Equipment,  13,484,259  2018‐2022 Project Costs‐ $148,181,235 CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 5 of 25 Total Funding Source 2018 2019 2020 2021 2022 2018-2022 General Fund 158,981 169,450 171,300 173,775 173,100 846,606 Communications Fund 175,000 - - - - 175,000 Escrow 696,337 632,397 - - - 1,328,734 Property Taxes & Fund Balance Reserve 1,361,155 1,397,775 1,450,486 1,505,306 1,562,318 7,277,040 G.O. Improvement Bonds -Property Tax Levy 7,065,720 6,507,922 5,675,425 4,241,762 5,679,179 29,170,008 G.O. Improvement Bonds - Special Assessments 3,956,078 4,459,563 3,673,279 2,577,216 3,902,046 18,568,182 Municipal State Aid 3,247,227 6,398,978 6,175,393 250,000 740,000 16,811,598 Dakota County 633,500 1,100,000 561,223 - - 2,294,723 Water Trunk Fund 300,000 813,914 1,550,250 250,000 1,068,750 3,982,914 Storm Sewer Trunk Fund 315,204 537,808 1,166,140 205,000 205,000 2,429,152 Sanitary Sewer Trunk Fund 230,875 257,100 513,500 140,875 119,000 1,261,350 Park Dedication Fund 3,492,000 7,455,000 1,825,000 5,454,000 2,167,000 20,393,000 Park Improvement Fund 190,000 222,500 225,000 262,500 175,000 1,075,000 Trail Improvement Fund 294,200 329,925 318,522 329,259 363,859 1,635,765 Utility- Water 1,748,485 1,589,015 1,519,357 886,459 1,261,068 7,004,384 Utility- Sanitary Sewer 670,000 705,000 1,175,000 725,000 725,000 4,000,000 Utility- Environmental Resources 470,000 540,000 540,000 540,000 540,000 2,630,000 Equipment Fund- Bond Proceeds - 1,230,000 1,220,000 669,000 - 3,119,000 Facilities F und- Bond Proceeds - - 7,720,000 - - 7,720,000 Facilities F und- Other/Partnership - - 3,000,000 - - 3,000,000 Tax Levy- Equipment & Facilities 995,000 1,050,000 1,050,000 1,050,000 1,050,000 5,195,000 Equipment/Facilities Fund Balance use 743,548 1,213,759 (20,466) (387,094) 51,499 1,601,246 Liquor Fund 269,912 445,677 571,035 572,392 520,029 2,379,045 Other Equipment/Facility funding 970,797 556,590 429,663 462,848 534,590 2,954,488 Equipment sale proceeds 225,000 225,000 225,000 225,000 225,000 1,125,000 Other- Donations 104,000 - 100,000 - - 204,000 28,313,019 37,837,373 40,835,107 20,133,298 21,062,438 148,181,235 Funding Source Summary CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 6 of 25 Unscheduled Projects The following projects are currently not included in the 2018-2022 Capital Improvement Plan:  Dodd Blvd (Cedar Ave- Pilot Knob Rd) Expansion- Estimate total cost of $5.04 Million  Holyoke Ave/Highview Ave & 190th St Roundabout- Estimate total cost of $1.4 Million  Kenrick Ave (181st St- CP RR R/W) Extension- Estimate total cost of $2.5 Million  Kenyon Ave (185th St/CSAH 60- Queen Anne) Rehabilitation- Estimate total cost of $1.2 Million  Indoor Athletic Facility- Estimate total cost of $5.0 Million  CR 9 (Dodd Blvd)/CSAH 50 Roundabout- Estimate total cost of $2 Million CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 7 of 25 Debt Analysis and Tax Impact In reviewing the 2018-2022 Capital Improvement Plan, the City Council should consider the level of debt, the commitment of funds to repay that debt, as well as the annual tax impact associated with the scheduled projects. As of 12/31/2017, the City of Lakeville will have $123,855,000 in debt. The following chart reflects the type of debt that comprises the $123.8M. Bond Type Amount Purpose G.O. Capital improvement $22,795,000 Various capital projects (Central Maintenance Facility, Police Station) G.O. Street Reconstruction $16,060,000 Street reconstruction projects G.O. Improvement $52,220,000 Various capital improvement projects G.O. State-aid Street Revenue $6,205,000 Various street improvement projects G.O. Water Revenue $7,940,000 Holyoke Water Tower and Water Treatment Facility improvements G.O. Tax increment $1,240,000 Tax increment projects G.O. Arena Revenue $335,000 Ames Ice Arena HRA Lease Revenue $6,795,000 Hasse Ice Arena Liquor Revenue $2,525,000 Construction of liquor store (2007) Water Revenue $6,910,000 2016 watermain replacement (in conjunction with 2016 street reconstruction project) Sewer Revenue $495,000 Lift Station #6 replacement Street Light Revenue $335,000 Street light -Holyoke Improvement project It should be noted that the 12/31/2017 balance shown above does not reflect the refunding of the liquor revenue bonds that is planned for November 2017. The 2018-2022 CIP includes projects that are funded by bond proceeds. Bonds are issued for the project costs that the City is funding through tax levies as well as the costs that are specially assessed to property owners. The City anticipates $78,122,000 in bonding for projects in the CIP plan for 2018-2022, including $7,720,000 for major facility repairs in 2020, and $3,119,000 for equipment replacement in 2019 through 2021. The anticipated bonding amount for 2018 is $12,068,000, which assumes no bonding is needed in 2018 for planned equipment and facilities expenditures. Major projects scheduled for 2018, which are planned to be funded with bonds are listed below (note that these amounts also include any bonds which will be repaid by special assessments): CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 8 of 25 Project Description Anticipated bond funding: Street reconstruction project 18-02 (street and storm sewer portions of project) $7,945,000 Street reconstruction project 18-02 (watermain portion of project) $1,046,000 Kenrick Ave (173rd St-N City Limit) project 18-03 $2,787,000 172nd St/Kodiak Ave/175th St/Judicial Rd/168th St project 19-03 $133,000 Klamath Tr (West of Kenwood Trl) project 19-04 $91,000 Hamburg Ave (Lakeville Blvd-202nd St/CSAH 50) project 19-05 $66,000 TOTAL $12,068,000 Some of the above projects are only beginning in 2018, and will have additional costs in future years, as portrayed in the CIP document. Major projects which involve a property tax levy component in 2018 are listed below: Project Description Tax Levy Street Reconstruction project 19-02 $50,000 Pavement maintenance project 18-01 (Pavement Management Fund) $1,191,550 Parks major maintenance (General Fund) $158,981 Trail projects (Trail Improvement Fund) $111,200 Aronson building upgrades (Park Improvement Fund) $175,000 Equipment purchases (Equipment Fund) $575,000 Facilities expenditures (Building Fund) $420,000 Project costs are higher in some cases due to planned spending of fund balance in lieu of higher tax levy amounts. CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 9 of 25 The following chart reflects the cumulative effect of new debt issued as indicated in the CIP and the retirement of existing debt. The top line is the resulting debt balance at the end of the year. CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 10 of 25 The following charts reflect the cumulative effect of new debt issued as indicated in the proposed CIP and the retirement of existing debt on a per capita basis, and on a per household basis, respectively. CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 11 of 25 CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 12 of 25 The impact of the 2018-2022 CIP and other anticipated bond payment adjustments on the debt service property tax levy are reflected in the following table: Each year, certain bond issues mature and the corresponding debt service payments are eliminated. As noted in the CIP, the City initiated a Pavement Management Program starting in 2009, which increased the scope of the annual street reconstruction projects, which in turn has increased the amount of debt related to such street reconstruction projects. The amount of debt service dropping off each year as payments are made is less than the amount that we are adding for new CIP projects. This results in an increase in the debt service property tax levy. The proposed CIP projects will impact the debt service beginning in 2019. The anticipated bond payments on debt issued in conjunction with these projects will result in an increased debt service levy of approximately $787,000 for 2019, $2,184,000 for 2020, $3,670,000 for 2021, and $4,518,000 for 2022. The $78.1M of bonding for projects in the 2018-2022 CIP will require significant bond payments beginning in 2019 from the following sources: tax levy, special assessments, Water Operating Fund, and Municipal State Aid (MSA) Fund. The estimated annual payments by source are shown in the table and chart below. Projected Change in Debt Levy 2018 2019 2020 2021 2022 Total 2018- 2022 Annual Debt Levy 5,809,865 5,594,416 6,720,235 6,530,847 6,452,174 31,107,537 Change from: Existing Debt 834,551 1,125,819 (189,388) (78,674) 16,629 1,708,937 One-time Adjustments (1,050,000) - - - - (1,050,000) New CIP: Street projects - 786,602 1,511,106 2,142,931 2,615,152 7,055,791 Equipment - - 241,357 526,852 601,329 1,369,538 Facilities - - - 568,051 568,051 1,136,102 Parks - - 431,717 431,717 733,020 1,596,454 Change from New CIP: - 786,602 2,184,180 3,669,551 4,517,552 11,157,885 Total Change (215,449) 1,912,421 1,994,792 3,590,877 4,534,181 11,816,822 Revised Debt Levy 5,594,416 7,506,837 8,715,027 10,121,724 10,986,355 42,924,359 % Change in Debt Levy 34% 16% 16% 9% CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 13 of 25 *Each year reflects a cumulative total of the funding that would be needed from each of the sources for that year (for example, the obligations shown in 2020 include the change from new CIP in 2019 as well as 2020). Impact of the Capital Improvement Plan on the Operating Budget The City’s Operating Budget is affected by the Capital Improvement Plan. Capital improvements typically result in ongoing expenses for routine operation, repair and maintenance upon completion or acquisition. Existing City facilities and equipment will eventually require rehabilitation, renovation or upgrades to accommodate new uses or address needed improvements. Older facilities usually involve higher maintenance and repair costs as well. Generally speaking, capital improvements make a positive contribution to the economic vitality, quality of life and fiscal well-being of our community in spite of potential recurring operating costs. Capital projects such as the redevelopment of under-performing or under-used areas of the City, and the infrastructure expansion needed to support new development, help promote the economic development and growth that generates additional operating revenues. These new revenue sources provide the funding needed to maintain, improve and expand the City’s infrastructure. Funding of New Debt from CIP 2019 2020 2021 2022 Tax Levy 786,602 2,184,180 3,669,551 4,517,552 Special Assessments 440,416 963,594 1,372,527 1,659,440 Water Fund 122,591 235,096 342,714 342,714 MSA Fund - 213,362 1,000,768 1,000,768 Total $1,349,610 $3,596,232 $6,385,560 $7,520,473* CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 14 of 25 Narrative Highlights of the capital improvement projects and revenue sources are included below. TRANSPORTATION PROJECTS PAVEMENT MANAGEMENT (XX-01) Annual maintenance program designed to manage, preserve and protect investment in public roadway infrastructure assets. Best management practices (i.e. bridge inspections, crack sealing, curb/gutter/guardrail/roadway/sidewalk repairs, draintile, safety improvements and velocity patching) are implemented to maintain/extend life and minimize total lifecycle costs. LOCAL STREET RECONSTRUCTION (XX-02) Annual reconstruction program designed to improve local public streets that are at the end of their lifecycle or those where routine maintenance costs exceed the cost-benefit of the investment. Approximately 25% of public streets are inspected each year and pavements are rated based on surface condition (Overall Condition Index/OCI). The OCI helps guide the selection of streets for reconstruction. Best management practices include reclamation, edge mill and overlay, and spot curb/gutter replacement. The adopted overall City-wide OCI goal for local streets is 75-80. The City initiated a Pavement Management Program in 2009, and accelerated the Program in 2013 when the OCI by 2020 was anticipated to be in the mid-60s. The OCI is currently 77 (City-wide). The City’s goal is to include approximately eight miles of streets in the street reconstruction project each year, with the intent of meeting an average system OCI of 79 by 2020. Funding is based on adopted policy where 40% of street and storm sewer costs are assessed to benefitting properties and 60% of the street and storm sewer costs are financed by the City through property taxes. COLLECTOR ROAD REHABILITATION Annual rehabilitation program designed to improve public collector roads that are at the end of their lifecycle or those where routine maintenance costs exceed the cost-benefit of the investment. Approximately 25% of public roads are inspected each year and pavements are rated based on surface condition (Overall Condition Index/OCI). The OCI helps guide the selection of CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 15 of 25 collector roads for reconstruction. Best management practices include reclamation, edge mill and overlay, and spot curb/gutter replacement. The adopted overall City-wide OCI goal for local streets is 75-80. The City initiated a Pavement Management Program in 2009, and accelerated the Program in 2013 when the OCI by 2020 was anticipated to be in the mid-60s. The OCI is currently 77 (City-wide). Funding is based on adopted policy where 40% of street and storm sewer costs are assessed to benefitting properties and 60% of street and storm sewer costs are financed by the City through property taxes.  18-03- Kenrick Avenue (173rd Street to North City Limits)- Programmed for construction in 2018. Proposed improvements include reclamation with spot curb/gutter replacement.  19-03- 172nd Street/Kodiak Avenue/175th Street/Judicial Road/168th Street (Orchard Lake loop)- Programmed for construction in 2019. Proposed improvements include reclamation, edge mill and overlay, and spot curb/gutter replacement.  19-04- Klamath Trail (west of Kenwood Trail)- Programmed for construction in 2019. Proposed improvements include reclamation, edge mill and overlay, and spot curb/gutter replacement.  19-05- Hamburg Avenue (Lakeville Boulevard to 202nd Street/CSAH 50)- Programmed for construction in 2019. Proposed improvements include reclamation, widening with concrete curb/gutter and sidewalk along the east side, spot curb/gutter replacement along the west side, and watermain extension. Project includes assessments for the majority of the watermain extension.  20-03- Ipava Avenue (Kenwood Trail/CSAH 50 to 185th Street/CSAH 60)- Programmed for construction in 2020. Proposed improvements include reclamation, edge mill and overlay, and spot curb/gutter replacement.  20-04- Heritage Drive (Dodd Boulevard to Highview Avenue) & Iberia Avenue (202nd Street to Heritage Drive) & Holyoke Avenue (202nd Street to Heritage Drive)- Programmed for construction in 2020. Proposed improvements include reclamation, edge mill and overlay, and spot curb/gutter replacement. CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 16 of 25  21-03- 205th Street (Keystone Avenue to Dodd Boulevard/CSAH 9)- Programmed for construction in 2021. Proposed improvements include reclamation, edge mill and overlay, and spot curb/gutter replacement.  22-03- 170th Street (Flagstaff Avenue to Pilot Knob Road/CSAH 31)- Programmed for construction in 2022. Proposed improvements include reclamation, edge mill and overlay, and spot curb/gutter replacement.  22-04- Highview Avenue (175th Street to 160th Street/CSAH 46)- Programmed for construction in 2022. Proposed improvements include reclamation, edge mill and overlay, and spot curb/gutter replacement. CITY/COUNTY COLLECTOR/ARTERIAL ROADWAY IMPROVEMENTS Roadway improvement program designed to improve City/County collector/arterial roadways. Projects may be led by the County or led by the City. If CIP projects are led by the City, all project costs are included in the CIP with a contribution shown from the County for their estimated share of the costs. If CIP projects are led by the County, only the City’s share of the costs are shown in the CIP.  14-10- Kenwood Trail/CSAH 50 (185TH Street to Dodd Boulevard): Expansion/Reconstruction- Programmed for construction in 2017/2018. City and County partnering to reconstruct Kenwood Trail to a 4-lane divided highway to improve roadway operations, make safety improvements and provide for increasing traffic levels. Includes local road construction, including Icenic Way (between Kenwood Trail and Icenic Trail). County will advance fund $3 million of the City’s share of the project costs, with equal $1 million payments made in 2018-2020.  15-12- 202nd Street/CSAH 50 (Holyoke Avenue to Cedar Avenue/CSAH 23): Expansion/Reconstruction- Programmed for construction in 2019. City and County partnering to reconstruct 202nd Street to a 2-lane divided highway to alleviate congestion, make safety improvements and provide for increasing traffic levels. Includes roundabout at 202nd Street/Holyoke Avenue intersection, traffic signal at 202nd Street/Cedar Avenue intersection, dedicated turn lanes at intersections, a pedestrian underpass and trails. County awarded Federal FAST Act funding in the amount of $3.2M for 2020. Roadway construction impacts grades along CSAH 50, allowing us to re-orient existing park CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 17 of 25 playfields to maximize the use of the property, as well as to address existing drainage, access, and parking issues. Bond funding is anticipated for this project.  18-06- Kenyon Avenue (¼-mile South of 162nd Street to 162nd Street): Expansion- Programmed for construction in 2018. Proposed improvements include expanding Kenyon Avenue to an urban 2-lane undivided roadway to make safety improvements and provide for increasing traffic levels.  18-09- 179th Street (½-mile West of Pilot Knob Road to Pilot Knob Road/CSAH 31): Extension- Programmed for construction in 2018. The Dakota County East-West Corridor Preservation Study, Phase II – refinement of Preferred System Plan (East-West Plan), identifies preservation corridor alignments for future east-west roadway connections. The Pleasant Hills development includes the construction of 179th Street (future CSAH 9). This roadway is identified as Alignment “B” in the East-West Plan. The Dakota County 2030 Transportation Plan includes a policy in which the County will participate in the engineering and construction costs for constructing future County transportation facilities to County standards.  20-05- 210th and 215th Street/CSAH 70 (E. of Kensington Blvd to Holyoke Avenue): Expansion- Programmed for construction in 2020. City and County partnering to expand 210th/215th Street to a 4-lane divided highway to alleviate congestion, make safety improvements and provide for increasing traffic levels. The current estimates are based upon a 55%-45% cost split with Dakota County. Proposed improvements and potential funding (i.e. City share of total project costs capped at 25% if reclassified as principal arterial) subject to results of Countywide principal arterial system planning study (2018 completion date), and future grant opportunities. Bond funding is anticipated for this project.  20-06- Kenrick Avenue (1/8th-mile West of Kensington Boulevard to Kenrick Avenue): Realignment- Programmed for construction in 2020. Proposed improvements include realigning Kenrick Avenue from existing 210th Street intersection to existing Kenrick Avenue termini 1/8th mile west of Kensington Boulevard to improve intersection geometrics and operations, make safety improvements and provide for increasing traffic CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 18 of 25 levels. The proposed improvements are anticipated to be completed in conjunction with adjacent development. CITY/COUNTY TRAFFIC SIGNAL/ROUNDABOUT/ATMS/INTERSECTION IMPROVEMENTS  15-12- 202nd Street/CSAH 50 (Holyoke Avenue to Cedar Avenue/CSAH 23)- See above description under City/County Collector/Arterial Roadway Improvements section.  16-17- 162nd Street and Kenyon Avenue/Buck Hill Road: Traffic Signal- Construction in 2017. County advanced City’s share of the project costs; payment due in 2018.  17-03- 160th Street and Pilot Knob Road: Advanced Traffic Management Systems- Programmed for construction in 2018. City and County partnering to install advanced traffic management systems (ATMS) along the 160th Street (CSAH 46) and Pilot Knob Road (CSAH 31) corridors to improve traffic signal operations. Project includes a) fiber installation (interconnectivity); b) traffic signal modification (flashing yellow arrows); and c) traffic monitoring camera installation. CSAH 46 intersections include Ipava Ave., Lac Lavon Rd., Highview Ave., Galaxie Ave., Foliage Ave. and Flagstaff Ave. CSAH 31 intersections include 170th St. and Dodd Blvd. Federal Funding provides 80% of construction cost. The remaining cost is split 55/45 between the County and the cities of Apple Valley and Lakeville.  18-04- Dodd Boulevard and Heritage Drive/Icenic Trail- Programmed for construction in 2020. City and County partnering to construct a ¾ intersection at Dodd Boulevard and Heritage Drive/Icenic Trail intersection to improve intersection operations, alleviate congestion, make safety improvements and provide for increasing traffic levels.  18-05- Dodd Boulevard/CSAH 9 and Flagstaff Avenue: Roundabout- Programmed for construction in 2019. City and County partnering to construct a roundabout at Dodd Boulevard/Flagstaff intersection to improve intersection operations, alleviate congestion, make safety improvements and provide for increasing traffic levels.  18-08- Dodd Boulevard/CSAH 9 and Glacier Way: Traffic Signal- Programmed for construction in 2018. Proposed improvements include a traffic signal to improve CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 19 of 25 intersection operations, alleviate congestion, make safety improvements and provide for increasing traffic levels. The proposed improvements are anticipated to be completed in conjunction with adjacent development.  22-06- Ipava Avenue and 165th Street: Traffic Signal- Programmed for construction in 2022. Proposed improvements include a traffic signal to improve intersection operations, alleviate congestion, make safety improvements and provide for increasing traffic levels. Project includes a traffic signal, dedicated turn lanes and pedestrian ramp improvements. UTILITY PROJECTS U-1- Sanitary Sewer Trunk System Improvements- The Comprehensive Sanitary Sewer Plan anticipates the extension of sanitary sewer trunk facilities to accommodate anticipated growth. Timing of future sanitary sewer trunk facilities depends on the growth rate and location of planned community development. U-2- Lift Station Rehabilitation- The City has 20 sanitary sewer lift stations which pump sewage from low lying areas to gravity lines. The pumps, motors, and other equipment within each lift station are periodically inspected and rehabilitated to ensure uninterrupted service. The expected service life for a lift station is approximately 15-20 years but can vary. Each lift station is scheduled for inspection and rehabilitation every 15 years. Lift station #10 rehabilitation is scheduled for 2020 and total costs are estimated at $500,000. U-3- Sanitary sewer system inflow/infiltration repairs- Several miles of the sanitary sewer system are inspected each year for damage to the pipes that would result in inflow (direct entry of storm water) and infiltration (ground water seeping into the sewer) within the sanitary sewer system. This additional water increases stress on the wastewater treatment facilities thereby resulting in higher sanitary sewer rates for Lakeville customers. Additionally, exceeding the City’s calculated peak flow can result in the imposition of surcharge by MCES, the minimum surcharge would be $216,000 per year for five years. The Utilities Division endeavors to reduce the inflow and infiltration by initiating repairs such as manhole structure sealing, cured in place pipe lining, and the replacement of manhole covers. U-4/U-5- Well Construction/Well Collection Pipe- The construction of wells to provide adequate water supply to accommodate existing and anticipated growth is based on the City’s Water Supply Plan. Final decisions on construction timing will depend on population demand CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 20 of 25 and water needs. Locations will be based on data provided in the Water Supply Plan. The Minnesota Department of Health requires the City to amend its Wellhead and Source Water Protection Plan in order to receive permits to construct future wells. New wells are planned to be constructed in 2020 (well #23) and 2022 (well #24). There is also a well collection pipe planned for 2020. U-6- Watermain Trunk System Improvements- The Comprehensive Water Plan anticipates the extension of watermain trunk facilities to accommodate anticipated growth. Timing of future watermain trunk facilities depends on the growth rate and location of planned community development. U-7- Well & Pump Rehabilitation- The City’s wells provide water for the distribution system which operates on demand, 24 hours a day, 7 days a week. Starts and stops based on demand puts the motors and pump components under tremendous stress. Additionally, being constantly exposed to water can corrode pipes and other well components. Periodic inspection and maintenance, with replacement as needed, ensures the efficient operation of the wells and water system at maximum pumping capacity. Rehabilitation is scheduled every 8 to 10 years for each well depending on its type. The year with the highest estimated costs is 2020, which includes $360,000 for well and pump rehabilitation on six different wells. U-8- Tower & Reservoir Maintenance- Inspections of the interior and exterior of water towers are used to determine the timing and extent of any required maintenance. Periodic cleaning of the tower exteriors removes dust and dirt that collects over time that can reduce the life of the coating system. Interior and exterior coatings on water towers protect the metal structure from corrosion and maintain the quality of the treated water passing through to residential, industrial, commercial, and institutional customers. The service life of the towers and reservoirs can be extended through periodic inspection and necessary maintenance. The 2019 estimated costs include repainting of the tower by the Central Maintenance Facility (CMF). The 2022 estimated costs include cleaning and inspection of the following towers: Michaud Park, Holyoke, Dakota Heights, Fairfield, Airlake and CMF. U-9- Water meter replacement- The Utilities Division replaces residential and commercial water meters that reach the end of their service life. The Utilities Division currently schedules approximately 1,000 meter replacements per year based on the age of the meter and to stay on a 20 year replacement schedule. Being able to change out water meters at the end of their service CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 21 of 25 life is important to managing the water system and monitoring water use for reporting to the Department of Natural Resources. Replacement of meters is done by Utilities Division staff. XX-02- Sanitary Sewer Rehabilitation- The sanitary sewer system in areas around the City is subject to breaks, root intrusion, and cracking. Rehabilitating these portions of the sewer infrastructure is important to maintaining a closed system and reducing the potential for inflow and infiltration. Specific sections of the sanitary sewer system will be evaluated in conjunction with planned street reconstruction projects and repairs or replacement will be programmed based on that evaluation. XX-02- Water Main Replacement- Portions of the City’s distribution system will be evaluated in conjunction with street reconstruction projects. All water main replacement is based on the history of breaks in a particular area, quality of the pipe, and an evaluation of soils. This may mean replacing up to 10% of the water main in each reconstruction area annually, installing corrosion protection, and replacing bolts elsewhere within the project area. ENVIRONMENTAL RESOURCES PROJECTS NR-1- Water Quality Assessments: Management program designed to promote and protect public water resources including lakes, streams and wetlands. Annual assessment strategies include, but are not limited to, aquatic plant surveys, fish surveys and water monitoring/sampling. NR-1- Water Quality Treatments: Management program designed to manage, promote and protect public water resources including streams and wetlands. Best management practices implemented, based on Water Quality Assessment results, include are not limited to, barley straw, chemical treatments to control curlyleaf pondweed, Eurasian milfoil and nutrients, mechanic removal of non-native aquatic plants and fish management. NR-2- Storm Water Infrastructure: Maintenance program designed to manage, preserve and protect public storm sewer infrastructure assets. Annual best management practices (i.e. inlet/outlet repair, sediment removal, pipe improvements) implemented to maintain storm water conveyance and extend life/minimize life-cycle costs. Focus on Minnesota Pollution Control Agency (MPCA) Municipal Separate Storm Sewer System (MS4) permit compliance. CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 22 of 25 NR-3- Storm Water Basins: Rehabilitation program designed to manage, preserve and protect public storm water basin system assets. Annual best management practices (i.e. emergency overflow/easement maintenance, sediment removal, slope restoration) implemented to extend life/minimize life-cycle costs. Focus on Minnesota Pollution Control Agency (MPCA) Municipal Separate Storm Sewer System (MS4) permit compliance. NR-4-Storm Sewer Trunk System Infrastructure: Extension of new storm sewer trunk facilities to accommodate anticipated growth. Construction dependent on the growth rate and location of planned community development. NR-5- Water Quality Best Management Practices: Construction of new storm water management facilities consistent with Black Dog Watershed Water Management Organization (BDWMO), Dakota County Soil and Water Conservation District (DCSWCD) and Vermillion River Watershed Join Powers Organization (VRWJPO) watershed restoration and protection strategies. Funding intended as cost-share to meet BDWMO, DCSWCD, VRWJPO partnership or grant matching requirements. Best management practices include, but are not limited to, filtration/infiltration systems, mechanical storm water/sediment separators, rain gardens and water conservation/reuse strategies. Federal Clean Water Act, Minnesota Pollution Control Agency (MPCA) Municipal Separate Storm Sewer System (MS4) and Total Maximum Daily Load (TMDL) compliance. NR-6- Forestry: Maintenance program designed to manage, preserve and protect public prairie, upland and woodland assets. Annual best management practices (i.e. chemical treatments for emerald ash borer and oak wilt, controlled/prescribed burns, harvesting) implemented to extend life/minimize life-cycle costs. XX-02- Storm Water Infrastructure – Street Reconstruction: Construction of new storm sewer facilities, coordinated with City’s Street Reconstruction and Collector Rehabilitation projects, to provide storm water rate control, storm water volume reduction or storm water quality improvements. Best management practices include, but are not limited to, filtration/infiltration systems, mechanical storm water/sediment separators, rain gardens and water conservation strategies. CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 23 of 25 PARKS PROJECTS P-1- Parks Major Maintenance Projects- Includes general maintenance projects, maintenance of buildings, park shelters and ground, fields and open spaces (examples- re-shingle park shelters, replace signs, replace rubber floors, seal park parking lots, resurface basketball and tennis courts, etc). P-2- Parks Administrative Projects- The Park Dedication Fund budget provides appropriations for a number of activities including planning, design and feasibility reports for park projects such as Antlers Park Master Plan, East Community Park Master Plan, Legacy Park, Cedar Crossing Park and Avonlea Master Plan. It also includes appraisal and professional fees for the review of park dedication fee analysis for commercial and industrial properties. P-3- Park Development Developer credits: Represents credits associated with new development when the park dedication requirement is fulfilled through a land dedication. P-4- Future Park Land Acquisition- Park dedication funds are used to purchase future park land. P-5- Trail Improvements- The City retained a third party to evaluate the condition of all trail segments and provide recommendations for maintenance. Based on these recommendations, staff has developed a plan for either overlaying or reclaiming trail segments, along with crack filling and fog sealing of trails. P-5- Trail Lighting – Currently there are a number of segments that do not have trail lighting. The proposed CIP includes trail lighting in areas such as East Lake Community Park Trail system, Donnelly Greenway, Summerlyn Park/Greenway along with Cherry Hill Greenway. P-5- Trail Connectivity – Park dedication funds are used to cover the costs of connecting trail segments that are currently not connected. P-6- Park Improvements- The Park Improvement Fund provides funding for replacement and upgrades to items such as Aronson building (restroom expansion), playgrounds and other park amenities. P-7- Avonlea Community Park- The Parks, Trails and Open Space Plan identifies the acquisition of land along the Cedar Ave corridor for community play fields. Currently the City owns 40.98 acres of property that was acquired through the development of the Avonlea Development. The CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 24 of 25 City has until June of 2020 to purchase an additional 26.06 acres from the developer at a secured fixed price per acre. The specific amenities for the community park will be identified through the Master Planning process that is proposed to be completed in 2018. The purchase of this land will be partially offset by the $950,000 of 2016 land sale proceeds, which were put into the park dedication fund specifically for this purpose. P-8- Avonlea Lineal Park/Trail/Lights Phase I – The Parks, Trails and Open Space Plan calls for a neighborhood park in the Avonlea Development and surrounding areas. This park is proposed to be lineal in nature with pockets of amenities following a trail/greenway area. P-9- Antlers Community Park Improvements – City Staff is currently working with WSB and Associates regarding the creation of the Antlers Park Master Plan proposed to be completed in the fall of 2017. Once completed, the Master Plan will identify the improvements and additional amenities proposed to be included in the community park. Construction of the park is proposed to be completed in 2019 pending available funding. Bond funding is anticipated for phase I of the project. P-10- Cedar Crossing Park- The Parks, Trails, and Open Space Plan calls for a neighborhood park in the area serving Cedar Crossing, Cedar Landing, and Linden Ridge neighborhoods along with the Country Lane Townhomes. The park will be approximately 6-7 acres in size. P-11- Pleasant Hill Park – The Parks, Trails and Open Space Plan calls for a neighborhood park in the area serving Kenridge, Autumn Meadows and Pleasant Hill developments. The park will be approximately seven acres in size. P-12- Ritter Farm Park Cabin Improvements – Currently, a relocated log cabin exists on a foundation at Ritter Farm Park. Plans are to demolish the existing two story Environmental Learning Center on site and convert the cabin into the new Environmental Learning Center in 2020. P-13- Outdoor Performance Stage – The Parks, Trails and Open Space Plan identifies an amphitheater/outdoor performance stage that should be considered constructed as a park destination amenity. The Parks, Recreation and Natural Resources Committee also recommends the construction of an outdoor performance stage in our parks system. An outdoor performance stage may be identified as part of the master planning process for one of the community parks. However, if this doesn’t occur, a placeholder for the construction of the outdoor performance stage is proposed in 2021. CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2018-2022 PAGE 25 of 25 P-14 Fitness Challenge Course- The Parks, Recreation and Natural Resources Committee recommends the construction of a Fitness Challenge Course in the parks system where participants could complete against one another or against a clock. A Fitness Challenge Course may be identified as part of the master planning process for one of the community parks or could possibly be constructed into a neighborhood park. P-15- King Park Improvements- Improvements to King Park include installation of irrigation systems on four fields along with field and trail lighting, and installation of a drain tile system. The project will increase the playability, safety and overall quality of the fields and will allow for additional games to be played at the facility. Lakeville Baseball Association (LBA) has and will continue to donate funds for the lighting project. P-16- East Community Park Phase II – Plans are to complete a Master Plan for the park in 2018 with the construction proposed to be completed in 2021 pending available funding. Once completed, the Master Plan will identify the improvements and additional amenities proposed to be in the community park. Bond funding is anticipated for this project. P-17- Legacy Park- The Parks, Trails and Open Space Plan calls for a neighborhood park in the area serving the Legacy, Crescent Ridge and Berres Ridge Developments. P-18- Steve Michaud Soccer field drain tile installation- Improvements to Steve Michaud Park include the installation of drain tile system in soccer fields 8 and 9. The project will increase the playability, safety and overall quality of the fields. The fields are prone to becoming saturated and unplayable during periods of continued or heavy rains. These conditions have forced the closure of the fields during tournaments and regularly scheduled games. In addition, the increase in soil moisture has had a negative impact on the turf conditions and an increase in turf stress. The installation of a sport field drain tile system will minimize or eliminate these negative conditions and allow for consistent field conditions and playability. TotalCIP # ProjectFunding Source Project Type Status* 2018 2019 2020 2021 2022 2018‐2022STREET PROJECTSXX‐01 Pavement Management ‐ MaintenanceMaintenance RTaxes1,311,155             1,347,775             1,400,486             1,455,306             1,512,318             7,027,040                 Municipal State Aid120,000                120,000                120,000                120,000                120,000                600,000                    1,431,155             1,467,775             1,520,486             1,575,306             1,632,318             7,627,040                 XX‐02 Street ReconstructionReconstruction RProperty Tax Levy50,000                  50,000                  50,000                  50,000                  50,000                  250,000                    G.O. Improvement Bonds ‐ Taxes 4,581,238             3,683,065             3,831,660             3,490,074             4,246,169             19,832,206              G.O. Improvement Bonds ‐ Sp. Assess. 3,363,556             2,502,359             2,619,506             2,298,206             2,924,368             13,707,995              Water Operating Fund1,045,728             959,690                918,002                506,459                723,268                4,153,147                 Sanitary Sewer Operating Fund 250,000                250,000                250,000                250,000                250,000                1,250,000                 Storm Sewer Trunk Fund105,000                105,000                105,000                105,000                105,000                525,000                    9,395,522             7,550,114             7,774,168             6,699,739             8,298,805             39,718,348              14‐10 Kenwood Tr/CSAH 50 (185th St‐Dodd Blvd)Expansion IPMunicipal State Aid1,000,000             1,000,000             1,000,000             ‐                         ‐                         3,000,000                 1,000,000             1,000,000             1,000,000             ‐                         ‐                         3,000,000                 15‐12 202nd St/CSAH 50 (Holyoke Ave ‐ Cedar Ave/CSAH 23)Expansion IPMunicipal State Aid991,872                1,642,515             ‐                         ‐                         ‐                         2,634,387                 Escrow fund‐                         337,557                ‐                         ‐                         ‐                         337,557                    Water Trunk Fund‐                         300,000                ‐                         ‐                         ‐                         300,000                    Storm Sewer Trunk Fund‐                         152,808                ‐                         ‐                         ‐                         152,808                    991,872                2,432,880             ‐                         ‐                         ‐                         3,424,752                 15‐12 202nd St/CSAH 50 (Holyoke Ave ‐ Cedar Ave/CSAH 23)Roundabout NMunicipal State Aid‐                         675,000                ‐                         ‐                         ‐                         675,000                    Storm Sewer Trunk Fund‐                         90,000                  ‐                         ‐                         ‐                         90,000                      ‐                         765,000                ‐                         ‐                         ‐                         765,000                    15‐12 202nd St/CSAH 50 (Holyoke Ave ‐ Cedar Ave/CSAH 23)Park Mitigation NMunicipal State Aid‐                         135,000                ‐                         ‐                         ‐                         135,000                    Dakota County165,000                165,000                    Park Dedication Fund‐                         300,000                ‐                         ‐                         ‐                         300,000                    ‐                         600,000                ‐                         ‐                         ‐                         600,000                    16‐17 162nd St/CSAH 46 and Buck Hill Road/Kenyon Avenue Traffic Signal IPEscrow Fund68,472                  ‐                         ‐                         ‐                         ‐                         68,472                      Municipal State Aid128,403                ‐                         ‐                         ‐                         ‐                         128,403                    196,875                ‐                         ‐                         ‐                         ‐                         196,875                    17‐03 160th St/CSAH 46 and Pilot Knob Rd/CSAH 31ATMS IPCommunications Fund175,000                ‐                         ‐                         ‐                         ‐                         175,000                    175,000                ‐                         ‐                         ‐                         ‐                         175,000                    18‐03 Kenrick Ave (173rd St‐ N City Limit)Collector Rehabilitation IPProperty Tax Levy2,194,526             ‐                         ‐                         ‐                         ‐                         2,194,526                 Special Assessments592,522                ‐                         ‐                         ‐                         ‐                         592,522                    Water Operating Fund215,900                ‐                         ‐                         ‐                         ‐                         215,900                    3,002,948             ‐                         ‐                         ‐                         ‐                         3,002,948                 City of Lakeville, MinnesotaCapital Improvements PlanProjects & Funding Sources by Category2018‐2022Page 26 TotalCIP # ProjectFunding Source Project Type Status* 2018 2019 2020 2021 2022 2018‐202218‐04 Dodd Blvd/CSAH 9 & Heritage Drive/Icenic Trail 3/4 Intersection IPMunicipal State Aid‐                         ‐                         225,000                ‐                         ‐                         225,000                    ‐                         ‐                         225,000                ‐                         ‐                         225,000                    18‐05 Dodd Blvd/CSAH 9 & Flagstaff AveRoundabout IPMunicipal State Aid144,000                675,000                ‐                         ‐                         ‐                         819,000                    Dakota County176,000                935,000                ‐                         ‐                         ‐                         1,111,000                 Storm Sewer Trunk Fund‐                         90,000                  ‐                         ‐                         ‐                         90,000                      320,000                1,700,000             ‐                         ‐                         ‐                         2,020,000                 18‐06 Kenyon Ave (Celebration Church‐ S of 162nd St)Expansion NMunicipal State Aid268,949                ‐                         ‐                         ‐                         ‐                         268,949                    Escrow fund305,540                ‐                         ‐                         ‐                         ‐                         305,540                    Water Operating Fund50,000                  ‐                         ‐                         ‐                         ‐                         50,000                      Storm Sewer Trunk Fund110,204                ‐                         ‐                         ‐                         ‐                         110,204                    734,693                ‐                         ‐                         ‐                         ‐                         734,693                    18‐08 Dodd Blvd/CSAH 9 and Glacier WayTraffic Signal NMunicipal State Aid165,490                ‐                         ‐                         ‐                         ‐                         165,490                    Escrow fund156,510                ‐                         ‐                         ‐                         ‐                         156,510                    322,000                ‐                         ‐                         ‐                         ‐                         322,000                    18‐09 179th St (Flagstaff Ave‐Pilot Knob Rd/CSAH 31)Extension NDakota County457,500               457,500                    Escrow fund165,815                ‐                         ‐                         ‐                         ‐                         165,815                    623,315                ‐                         ‐                         ‐                         ‐                         623,315                    19‐03 172nd St/Kodiak Ave/175th St/Judicial Rd/168th StCollector Rehabilitation IPProperty Tax Levy132,877                1,212,503             ‐                         ‐                         ‐                         1,345,380                 Special Assessments‐                         896,920                ‐                         ‐                         ‐                         896,920                    132,877                2,109,423             ‐                         ‐                         ‐                         2,242,300                 19‐04 Klamath Tr (West of Kenwood Trl)Collector Rehabilitation IPProperty Tax Levy90,910                  829,552                ‐                         ‐                         ‐                         920,462                    Special Assessments‐                         613,641                ‐                         ‐                         ‐                         613,641                    90,910                  1,443,193             ‐                         ‐                         ‐                         1,534,103                 19‐05 Hamburg Ave (Lakeville Blvd ‐ 202nd St/CSAH 50)Collector Rehabilitation IPProperty Tax Levy66,169                  603,795                ‐                         ‐                         ‐                         669,964                    Special Assessments‐ street portion ‐                         446,643                ‐                         ‐                         ‐                         446,643                    Water Trunk fund‐ Special Assessment ‐                         239,922                ‐                         ‐                         ‐                         239,922                    Water Trunk fund‐ City Cost‐                         23,992                  ‐                         ‐                         ‐                         23,992                      Escrow‐                         294,840                ‐                         ‐                         ‐                         294,840                    66,169                  1,609,192             ‐                         ‐                         ‐                         1,675,361                 20‐03 Ipava Ave (Kenwood Tr/CSAH 50 ‐ 185th St/CSAH 60)Collector Rehabilitation IPProperty Tax Levy‐                         84,914                  774,839                ‐                         ‐                         859,753                    Special Assessments‐                         ‐                         573,169                ‐                         ‐                         573,169                    ‐                         84,914                  1,348,008             ‐                         ‐                         1,432,922                 20‐04 Heritage Dr/Iberia Ave/Holyoke AveCollector Rehabilitation IPProperty Tax Levy‐                         94,093                  1,013,124             ‐                         ‐                         1,107,217                 Special Assessments‐                         ‐                         480,604                ‐                         480,604                    ‐                         94,093                  1,493,728             ‐                         ‐                         1,587,821                 20‐05 CSAH 70/210th St (E of Kensington Blvd ‐ Holyoke Ave)Expansion IPMunicipal State Aid428,513                2,066,400             4,371,210             ‐                         ‐                         6,866,123                 Storm Sewer Trunk Fund‐                         ‐                         771,390                ‐                         ‐                         771,390                    428,513                2,066,400             5,142,600             ‐                         ‐                         7,637,513                 Page 27 TotalCIP # ProjectFunding Source Project Type Status* 2018 2019 2020 2021 2022 2018‐202220‐06 Kenrick Ave (Kenrick Ave ‐ Kensington Blvd)Extension NMunicipal State Aid‐                         85,063                  459,183                ‐                         ‐                         544,246                    Dakota County‐                         ‐                         561,223                ‐                         ‐                         561,223                    Water Trunk Fund‐                         ‐                         181,500                ‐                         ‐                         181,500                    Sanitary Sewer Trunk Fund‐                         ‐                         181,500                ‐                         ‐                         181,500                    Storm Sewer Trunk Fund‐                         ‐                         189,750                ‐                         ‐                         189,750                    ‐                         85,063                  1,573,156             ‐                         ‐                         1,658,219                 21‐03 205th St (Keystone Ave ‐ Dodd Blvd/CSAH 9)Collector Rehabilitation NProperty Tax Levy‐                         ‐                         55,802                  606,847                ‐                         662,649                    Special Assessments‐                         ‐                         ‐                         279,010                ‐                         279,010                    ‐                         ‐                         55,802                  885,857                ‐                         941,659                    22‐03 170th St (Flagstaff Ave ‐ PKR/CSAH 31)Collector Rehabilitation IPProperty Tax Levy‐                         ‐                         ‐                         91,195                  832,157                923,352                    Special Assessments‐                         ‐                         ‐                         ‐                         615,568                615,568                    ‐                         ‐                         ‐                         91,195                  1,447,725             1,538,920                 22‐04 Highview Ave (175th St ‐ 160th St/CSAH 46)Collector Rehabilitation IPProperty Tax Levy‐                         ‐                         ‐                         53,646                  489,519                543,165                    Special Assessments‐                         ‐                         ‐                         ‐                         362,110                362,110                    ‐                         ‐                         ‐                         53,646                  851,629                905,275                    22‐06 Ipava Ave & 165th StTraffic Signal IPMunicipal State Aid‐                         ‐                         ‐                         130,000                620,000                750,000                    ‐                         ‐                         ‐                         130,000                620,000                750,000                    23‐03 210th Street (Kensington Blvd. ‐ Holyoke Ave.)Collector Rehabilitation NProperty Tax Levy‐                         ‐                         ‐                         ‐                         111,334                111,334                    Special Assessments‐                         ‐                         ‐                         ‐                         ‐                         ‐                             ‐                         ‐                         ‐                         ‐                         111,334                111,334                    Total Transportation Projects* 18,911,849$        23,008,047$        20,132,948$        9,435,743$          12,961,811$        84,450,398$            UTILITY PROJECTS*(Includes utility replacements done with street reconstruction projects)Sanitary Sewer Trunk ExtensionsU‐1Sanitary Sewer Trunk Fund ‐ Fees 230,875                257,100                332,000                140,875                119,000                1,079,850                 U‐2 Sanitary Sewer Lift Station RehabilitationSanitary Sewer Operating Fund ‐ User Fees 45,000                  30,000                  500,000                ‐                         ‐                         575,000                    XX‐02 Sanitary Sewer Rehabilitation Sanitary Sewer Operating Fund ‐ User Fees (included above with transportation projects) ‐                         ‐                         ‐                         ‐                         ‐                         ‐                             U‐3 Sanitary Sewer Inflow/Infiltration RepairsSanitary Sewer Operating Fund ‐ User Fees 375,000                425,000                425,000                475,000                475,000                2,175,000                 XX‐02 Watermain ReplacementWater Operating Fund ‐ User Fees (included above with transportation projects) ‐                         ‐                         ‐                         ‐                         ‐                         ‐                             Special assessments‐                         ‐                         ‐                         ‐                         ‐                         ‐                             19‐05 Watermain Extensions ‐ Hamburg Ave: 202nd ‐ HartfordSpecial assessments (included above with transportation projects) ‐                         ‐                         ‐                         ‐                         ‐                        Water Trunk Fund - Fees (included above with transportation projects)‐                         ‐                         ‐                         ‐                         ‐                         ‐                             U‐4 Well ConstructionWater Trunk Fund ‐ Fees100,000                50,000                  868,750                50,000                  868,750                1,937,500                 U‐5 Well Collection PipeWater Trunk Fund ‐ Fees‐                         ‐                         300,000                ‐                         ‐                         300,000                    U‐6 Watermain Trunk ExtensionsWater Trunk Fund ‐ Fees200,000                200,000                200,000                200,000                200,000                1,000,000                 U‐7 Well and Pump RehabilitationPage 28 TotalCIP # ProjectFunding Source Project Type Status* 2018 2019 2020 2021 2022 2018‐2022Water Operating Fund ‐ User Fees 105,000                120,000                360,000                120,000                120,000                825,000                    U‐8 Tower and Reservoir MaintenanceWater Operating Fund ‐ User Fees ‐                         275,000                ‐                         ‐                         150,000                425,000                    U‐9 Water meter replacementWater Operating Fund ‐ User Fees 331,857                234,325                241,355                260,000                267,800                1,335,337                 ‐                        ‐                        ‐                        ‐                        ‐                       Total Utility Projects* 1,387,732$          1,591,425$          3,227,105$          1,245,875$          2,200,550$          9,652,687                NATURAL RESOURCES PROJECTS*(Excludes utility replacements done with street reconstruction projects)NR‐1 Lake ManagementEnvironmental Resources ‐ User Fees (water quality assessment) 65,000                  65,000                  65,000                  65,000                  65,000                  325,000                    Environmental Resources ‐ User Fees (water quality treatment) 50,000                  50,000                  50,000                  50,000                  50,000                  250,000                    115,000                115,000                115,000                115,000                115,000                575,000                    NR‐2 Maintenance ‐ Natural Resources and Storm Water InfrastructureEnvironmental Resources ‐ User Fees (storm water infrastructure) 75,000                  75,000                  75,000                  75,000                  75,000                  375,000                    75,000                  75,000                  75,000                  75,000                  75,000                  375,000                    NR‐3 Storm Water Basin RehabilitationEnvironmental Resources ‐ User Fees 100,000                150,000                150,000                150,000                150,000                700,000                    100,000                150,000                150,000                150,000                150,000                700,000                    NR‐4 Storm Water Management‐ New ConstructionStorm Sewer Trunk Fund ‐ Fees 100,000                100,000                100,000                100,000                100,000                500,000                    100,000                100,000                100,000                100,000                100,000                500,000                    NR‐5 Water Quality BMPsEnvironmental Resources ‐ User Fees 100,000                100,000                100,000                100,000                100,000                500,000                    100,000                100,000                100,000                100,000                100,000                500,000                    NR‐6 ForestryEnvironmental Resources ‐ User Fees 80,000                  100,000                100,000                100,000                100,000                480,000                    80,000                  100,000                100,000                100,000                100,000                480,000                    Total Environmental Resources Projects 570,000$              640,000$              640,000$              640,000$             640,000$              3,130,000$              P‐1 Parks Major MaintenanceGeneral Fund RGeneral Maintenance37,750                  37,750                  38,750                  38,750                  38,750                  191,750                    Buildings/Shelters/Grounds80,731                  59,700                  80,200                  86,200                  88,300                  395,131                    Field Improvements/Maintenance6,500                     6,500                     6,500                     6,500                    6,500                     32,500                      Open space improvement and maintenance34,000                  65,500                  45,850                  42,325                  39,550                  227,225                    RAAA Donation for Parkview improvements4,000                    4,000                        162,981                169,450                171,300                173,775                173,100                850,606                    Page 29 TotalCIP # ProjectFunding Source Project Type Status* 2018 2019 2020 2021 2022 2018‐2022P‐2 Park Development ‐ Adminstrative ProjectsRPark Dedication Fund ‐ Fees (future park projects) ‐                         ‐                         10,000                  10,000                  15,000                  35,000                      Park Dedication Fund ‐ Fees (comm./industrial park fee analysis)‐                         10,000                  ‐                         ‐                         ‐                         10,000                      ‐                         10,000                  10,000                  10,000                  15,000                  45,000                      P‐3 Park Development ‐ Developer CreditsRPark Dedication Fund435,000                435,000                435,000                435,000                435,000                2,175,000                 435,000                435,000                435,000                435,000                435,000                2,175,000                 P‐4 Future Park Land AcquisitionRPark Dedication Fund ‐ Fees350,000                ‐                         100,000                1,000,000             100,000                1,550,000                 350,000                ‐                         100,000                1,000,000             100,000                1,550,000                 P‐5 Trail Improvements (Various Trails)RTrail Improvement Fund294,200                329,925                318,522                329,259                363,859                1,635,765                 Park Dedication Fund (trail connectivity) 100,000                100,000                100,000                100,000                100,000                500,000                    Park Dedication Fund (new trail lighting) 67,000                  173,000                ‐                         137,000                157,000                534,000                    461,200                602,925                418,522                566,259                620,859                2,669,765                 P‐6 Park Improvements  (Various Parks)RPark Improvement Fund190,000                222,500                225,000                262,500                175,000                1,075,000                 190,000                222,500                225,000                262,500                175,000                1,075,000                 P‐7 Avonlea  Community ParkIPPark Dedication Fund ‐ Fees (master plan) 45,000                  ‐                         ‐                         ‐                         ‐                         45,000                      Park Dedication Fund ‐ Fees (land acquisition) ‐                         1,500,000             ‐                         ‐                         ‐                         1,500,000                 Park Dedication Fund ‐ Fees (planning/design) ‐                         ‐                         ‐                         ‐                         845,000                845,000                    45,000                  1,500,000             ‐                         ‐                         845,000                2,390,000                 P‐8 Avonlea Lineal ParksIPPark Dedication Fund ‐ Fees (planning/design)‐ Phase 1 ‐                         ‐                         22,000                  22,000                  ‐                         44,000                      Park Dedication Fund ‐ Fees (construction)‐Phase 1 ‐                         ‐                         ‐                         450,000                ‐                         450,000                    ‐                         ‐                         22,000                  472,000                ‐                         494,000                    P‐9 Antlers Community ParkNPark Dedication Fund ‐ Fees (phase 1‐ planning/design) 520,000                280,000                ‐                         ‐                         ‐                         800,000                    Park Dedication Fund ‐ Fees (phase 1‐ construction) ‐                         4,000,000             ‐                         ‐                         ‐                         4,000,000                 Park Dedication Fund ‐ Fees (phase 2‐ planning/design) ‐                         ‐                         ‐                         15,000                  15,000                  30,000                      Park Dedication Fund ‐ Fees (phase 2‐ construction) ‐                         ‐                         ‐                         ‐                         250,000                250,000                    520,000                4,280,000             ‐                         15,000                  265,000                5,080,000                 P‐10 Cedar Crossing ParkIPPark Dedication Fund ‐ Fees (planning/design) 20,000                  20,000                  ‐                         ‐                         ‐                         40,000                      Park Dedication Fund ‐ Fees (construction) ‐                         425,000                ‐                         ‐                         ‐                         425,000                    20,000                  445,000                ‐                         ‐                         ‐                         465,000                    P‐11 Pleasant Hill ParkNPark Dedication Fund ‐ Fees (planning/design) ‐                         22,000                  22,000                  ‐                         ‐                         44,000                      Park Dedication Fund ‐ Fees (construction) ‐                         ‐                         450,000                ‐                         ‐                         450,000                    ‐                         22,000                  472,000                ‐                         ‐                         494,000                    P‐12 Ritter Farm ParkNPark Dedication Fund ‐ Fees (cabin arch design) ‐                         25,000                  ‐                         ‐                         ‐                         25,000                      Park Dedication Fund ‐ Fees (cabin improvements) ‐                         ‐                         250,000                ‐                         ‐                         250,000                    Park Dedication Fund ‐ Fees (ELC building demolition) ‐                         ‐                         50,000                  ‐                         ‐                         50,000                      ‐                         25,000                  300,000                ‐                         ‐                         325,000                    Page 30 TotalCIP # ProjectFunding Source Project Type Status* 2018 2019 2020 2021 2022 2018‐2022P‐13 Outdoor Performance Stage (Site to be determined)NPark Dedication Fund ‐ Fees‐                         ‐                         ‐                         325,000                ‐                         325,000                    ‐                         ‐                         ‐                         325,000                ‐                         325,000                    P‐14 Fitness Challenge Course (Site to be determined)NPark Dedication Fund ‐ Fees‐                         ‐                         ‐                         ‐                         250,000                250,000                    ‐                         ‐                         ‐                         ‐                         250,000                250,000                    P‐15 King Park ImprovementsIPPark Dedication Fund ‐ Fees (field drainage system 1, 2, 5+9) 195,000                ‐                         ‐                         ‐                         ‐                         195,000                    Park Dedication Fund ‐ Fees (irrigate fields 4, 6‐8) 212,000                ‐                         ‐                         ‐                         ‐                         212,000                    Park Dedication Fund ‐ Fees (lighting) 1,100,000             ‐                         (100,000)               ‐                         ‐                         1,000,000                 Miracle League/LBA Lighting Donation 100,000                ‐                         100,000                ‐                         ‐                         200,000                    Park Dedication Fund ‐ Fees (field drainage system 4, 6‐8) ‐                         165,000                ‐                         ‐                         ‐                         165,000                    1,607,000             165,000                ‐                         ‐                         ‐                         1,772,000                 P‐16 East Community ParkNPark Dedication Fund ‐ Fees (master plan) 28,000                  ‐                         ‐                         ‐                         ‐                         28,000                      Park Dedication Fund ‐ Fees (planning/design) ‐                         ‐                         390,000                210,000                ‐                         600,000                    Park Dedication Fund ‐ Fees (construction) ‐                         ‐                         ‐                         2,750,000             ‐                         2,750,000                 28,000                  ‐                         390,000                2,960,000             ‐                         3,378,000                 P‐17 Legacy ParkIPPark Dedication Fund ‐ Fees (planning/design) 20,000                  ‐                         ‐                         ‐                         ‐                         20,000                      Park Dedication Fund ‐ Fees (construction) 400,000                ‐                         ‐                         ‐                         ‐                         400,000                    420,000                ‐                         ‐                         ‐                         ‐                         420,000                    P‐18 Steve Michaud Park (Soccer Field Drain tile installation)IPPark Dedication Fund ‐ Fees‐                         ‐                         96,000                  ‐                         ‐                         96,000                      ‐                         ‐                         96,000                  ‐                         ‐                         96,000                      Total Parks Projects 4,239,181$          7,876,875$          2,639,822$          6,219,534$          2,878,959$          23,854,371$            Equipment Plan‐ Totals by department included below, various funding sourcesElections44,112                  ‐                         ‐                         ‐                         ‐                         44,112                      Information Systems744,018                608,308                571,733                406,611                875,835                3,206,505                 Inspections‐                         ‐                         25,101                  25,791                  26,482                  77,374                      Police542,902                1,438,744             366,799                450,497                798,579                3,597,521                 Fire178,152                620,100                708,500                182,119                ‐                         1,688,871                 Streets579,646                483,652                883,580                802,911                388,206                3,137,995                 Parks261,210                172,886                368,515                388,826                164,623                1,356,060                 Environmental Resources57,118                  ‐                         ‐                         ‐                         ‐                         57,118                      Forestry‐                         ‐                         ‐                         22,691                  ‐                         22,691                      Utilities85,822                  66,916                  76,881                  ‐                         66,393                  296,012                    Total Planned Equipment Purchases 2,492,980$          3,390,606$          3,001,109$          2,279,446$          2,320,118$          13,484,259$            Facilities Plan‐ Totals by facility included below, various funding sourcesArt Center321,635                79,700                  15,500                  ‐                         10,000                  426,835                    Central Maintenance Facility46,000                  370,800                7,785,000             36,000                  ‐                         8,237,800                 City Hall51,500                  484,000                204,123                57,500                  2,500                     799,623                    Page 31 TotalCIP # ProjectFunding Source Project Type Status* 2018 2019 2020 2021 2022 2018‐2022Fire Station #1‐                         ‐                         31,000                  27,000                  ‐                         58,000                      Fire Station #210,000                  ‐                         10,000                  ‐                         5,500                     25,500                      Fire Station #36,850                     ‐                         ‐                         ‐                         11,000                  17,850                      Fire Station #423,500                  115,000                52,500                  ‐                         ‐                         191,000                    Heritage Center44,000                  75,000                  96,000                  ‐                         ‐                         215,000                    Galaxie Liquor Store‐                         35,000                  ‐                         65,000                  ‐                         100,000                    Kenrick Liquor Store7,300                     4,500                     ‐                         ‐                         ‐                         11,800                      Police Station113,486                166,420                ‐                         60,000                  ‐                         339,906                    Police Shooting Range‐                         ‐                         3,000,000             ‐                         ‐                         3,000,000                 Water Treatment Facility87,006                  ‐                         ‐                         67,200                  32,000                  186,206                    Total Planned Facility Expenditures 711,277$              1,330,420$          11,194,123$        312,700$             61,000$                13,609,520$            TOTAL‐ ALL PROJECTS 28,313,019$        37,837,373$        40,835,107$        20,133,298$        21,062,438$        148,181,235$          PRIOR YEAR CIP (2017‐2021) 29,501,543$        33,862,529$        19,847,375$        27,276,401$       CHANGE (1,188,524)$         3,974,844$           20,987,732$        (7,143,103)$        *Status KeyR These are recurring annual projects. The costs may have changed slightly from the prior year CIP due to revised estimates, and a subsequent year added to the CIP.IP These projects were included in a prior year CIP. The costs and funding sources may have been revised due to more accurate estimates since the prior CIP.N These projects are new to the CIP this year. Page 32 TotalCIP #Financing / ProjectStatus* 2018 2019 2020 2021 2022 2018‐2022Communications Fund17‐03160th St/CSAH 46 and Pilot Knob Rd/CSAH 31IP 175,000                   ‐                            ‐                            ‐                        ‐                        175,000               Total Communiciations Fund 175,000                   ‐                            ‐                            ‐                        ‐                        175,000               Escrow15‐12202nd St/CSAH 50 (Holyoke Ave‐Cedar Ave/CSAH 23)IP ‐                            337,557                   ‐                            ‐                        ‐                        337,557               16‐17162nd St/CSAH 46 and Buck Hill Road/Kenyon Avenue IP 68,472                    ‐                            ‐                            ‐                        ‐                       68,472                  18‐06Kenyon Ave (Celebration Church‐ S of 162nd St)N305,540                   ‐                            ‐                            ‐                        ‐                       305,540               18‐08Dodd Blvd/CSAH 9 and Glacier WayN 156,510                   ‐                            ‐                            ‐                        ‐                        156,510               18‐09179th St (Flagstaff Ave‐Pilot Knob Rd/CSAH 31)N 165,815                   ‐                            ‐                            ‐                        ‐                        165,815               19‐05Hamburg Ave (Lakeville Blvd ‐ 202nd St/CSAH 50)IP‐                           294,840                   294,840               ‐                            ‐                            ‐                            ‐                        ‐                        ‐                        Total Escrows 696,337                   632,397                   ‐                            ‐                        ‐                        1,328,734            G.O. Improvement Bonds ‐ Special AssessmentsXX‐02 Street Reconstruction  R 3,363,556                2,502,359                2,619,506                2,298,206            2,924,368            13,707,995          18‐03 Kenrick Ave (173rd St‐ N City Limit)  IP 592,522                  ‐                            ‐                            ‐                        ‐                       592,522               19‐03 172nd St/Kodiak Ave/175th St/Judicial Rd/168th St  IP‐                           896,920                  ‐                            ‐                        ‐                       896,920               19‐04 Klamath Tr (West of Kenwood Trl)  IP‐                           613,641                  ‐                            ‐                        ‐                       613,641               19‐05 Hamburg Ave (Lakeville Blvd ‐ 202nd St/CSAH 50)  IP‐                           446,643                  ‐                            ‐                        ‐                       446,643               20‐03 Ipava Ave (Kenwood Tr/CSAH 50 ‐ 185th St/CSAH 60)  IP‐                            ‐                           573,169                  ‐                        ‐                       573,169               20‐04 Heritage Dr/Iberia Ave/Holyoke Ave  IP‐                            ‐                           480,604                  ‐                        ‐                       480,604               21‐03 205th St (Keystone Ave ‐ Dodd Blvd/CSAH 9)  N‐                            ‐                            ‐                           279,010              ‐                       279,010               22‐03 170th St (Flagstaff Ave ‐ PKR/CSAH 31)  IP‐                            ‐                            ‐                            ‐                       615,568               615,568               22‐04 Highview Ave (175th St ‐ 160th St/CSAH 46)  IP‐                            ‐                            ‐                            ‐                       362,110               362,110               Total G.O. Improvement Bonds ‐ Special Assessments 3,956,078                4,459,563                3,673,279                2,577,216            3,902,046            18,568,182          G.O. Improvement Bonds ‐Property Tax LevyXX‐02 Street Reconstruction  R 4,581,238                3,683,065                3,831,660                3,490,074            4,246,169            19,832,206          18‐03 Kenrick Ave (173rd St‐ N City Limit)  IP 2,194,526               ‐                            ‐                            ‐                        ‐                       2,194,526            19‐03 172nd St/Kodiak Ave/175th St/Judicial Rd/168th St  IP 132,877                   1,212,503               ‐                            ‐                        ‐                       1,345,380            19‐04 Klamath Tr (West of Kenwood Trl)  IP 90,910                     829,552                  ‐                            ‐                        ‐                       920,462               19‐05 Hamburg Ave (Lakeville Blvd ‐ 202nd St/CSAH 50)  IP 66,169                     603,795                  ‐                            ‐                        ‐                       669,964               20‐03 Ipava Ave (Kenwood Tr/CSAH 50 ‐ 185th St/CSAH 60)  IP‐                           84,914                     774,839                  ‐                        ‐                       859,753               20‐04 Heritage Dr/Iberia Ave/Holyoke Ave  IP‐                           94,093                     1,013,124               ‐                        ‐                       1,107,217            21‐03 205th St (Keystone Ave ‐ Dodd Blvd/CSAH 9)  N‐                            ‐                           55,802                     606,847              ‐                       662,649               22‐03 170th St (Flagstaff Ave ‐ PKR/CSAH 31)  IP‐                            ‐                            ‐                           91,195                 832,157               923,352               22‐04 Highview Ave (175th St ‐ 160th St/CSAH 46)  IP‐                            ‐                            ‐                           53,646                 489,519               543,165               23‐03 210th Street (Kensington Blvd. ‐ Holyoke Ave.)  N ‐                            ‐                            ‐                            ‐                       111,334              111,334               Total G.O. Improvement Bonds ‐ Taxes 7,065,720                6,507,922                5,675,425                4,241,762            5,679,179            29,170,008          G.O. Improvement Bonds‐ Total 11,021,798             10,967,485             9,348,704                6,818,978            9,581,225            47,738,190          City of Lakeville, MinnesotaCapital Improvements PlanProjects by Funding Source2018‐2022Page 33 TotalCIP #Financing / ProjectStatus* 2018 2019 2020 2021 2022 2018‐2022Municipal State Aid/Municpal State Aid BondsXX‐01Pavement Management ‐ MaintenanceR 120,000                   120,000                   120,000                   120,000               120,000               600,000               14‐10Kenwood Tr/CSAH 50 (185th St‐Dodd Blvd)IP 1,000,000                1,000,000                1,000,000                ‐                        ‐                        3,000,000            15‐12202nd St/CSAH 50 (Holyoke Ave‐Cedar Ave/CSAH 23)‐ Note 1IP 991,872                   2,452,515                ‐                            ‐                        ‐                        3,444,387            16‐17162nd St/CSAH 46 and Buck Hill Road/Kenyon Avenue IP 128,403                  ‐                            ‐                            ‐                        ‐                       128,403               18‐04Dodd Blvd/CSAH 9 & Heritage Drive/Icenic Trail IP‐                            ‐                           225,000                  ‐                        ‐                       225,000               18‐05Dodd Blvd/CSAH 9 & Flagstaff AveIP 144,000                   675,000                  ‐                            ‐                        ‐                       819,000               18‐06Kenyon Ave (Celebration Church‐ S of 162nd St)N 268,949                  ‐                            ‐                            ‐                        ‐                       268,949               18‐08Dodd Blvd/CSAH 9 and Glacier WayN 165,490                  ‐                            ‐                            ‐                        ‐                       165,490               20‐05CSAH 70/210th St (E of Kensington Blvd ‐ Holyoke Ave)‐Note 1IP 428,513                   2,066,400                4,371,210               ‐                        ‐                       6,866,123            20‐06Kenrick Ave (Kenrick Ave ‐ Kensington Blvd)N‐                            85,063                     459,183                  ‐                        ‐                       544,246               22‐06Ipava Ave & 165th StIP ‐                            ‐                            ‐                            130,000               620,000               750,000               Total Municipal State Aid 3,247,227                6,398,978                6,175,393                250,000               740,000               16,811,598          Property Taxes and Fund Balance ReservesXX‐02 Street Reconstruction  R 50,000                     50,000                     50,000                     50,000                 50,000                 250,000               XX‐01 Pavement Management ‐ Maintenance  R 1,311,155                1,347,775                1,400,486                1,455,306            1,512,318            7,027,040            Total Property Taxes and Fund Balance Reserves 1,361,155                1,397,775                1,450,486                1,505,306            1,562,318            7,277,040            Dakota County15‐12 202nd St/CSAH 50 (Holyoke Ave ‐ Cedar Ave/CSAH 23)‐ Park Mitigation  N ‐                            165,000                   ‐                            ‐                        ‐                        165,000               18‐05 Dodd Blvd/CSAH 9 & Flagstaff Ave  IP 176,000                   935,000                   ‐                            ‐                        ‐                        1,111,000            18‐09 179th St (Flagstaff Ave‐Pilot Knob Rd/CSAH 31)  N 457,500                   ‐                            ‐                            ‐                        ‐                        457,500               20‐06 Kenrick Ave (Kenrick Ave ‐ Kensington Blvd)  N ‐                            ‐                            561,223                   ‐                        ‐                        561,223               Total Dakota County 633,500                   1,100,000                561,223                   ‐                        ‐                        2,294,723              Total Transportation Projects  17,135,017             20,496,635             17,535,806             8,574,284            11,883,543         75,625,285          Water Trunk Fund ‐ Fees15‐12202nd St/CSAH 50 (Holyoke Ave‐Cedar Ave/CSAH 23)IP ‐                            300,000                   ‐                            ‐                        ‐                        300,000               20‐06Kenrick Ave (Kenrick Ave ‐ Kensington Blvd)N‐                            ‐                            181,500                   ‐                        ‐                        181,500               U‐4Well ConstructionR100,000                   50,000                     868,750                   50,000                 868,750               1,937,500            U‐5Well Collection PipeR‐                                ‐                                300,000                   ‐                            ‐                            300,000               U‐6Watermain Trunk ExtensionsR200,000                   200,000                   200,000                   200,000               200,000               1,000,000            19‐05Hamburg Ave (Lakeville Blvd‐ 202nd St/CSAH 50)IP23,992                     ‐                                ‐                            ‐                            23,992                  Total 300,000                   573,992                   1,550,250                250,000               1,068,750            3,742,992            Water Trunk Fund ‐ Fees ‐Special Assessments19‐05Hamburg Ave (Lakeville Blvd‐ 202nd St/CSAH 50)IP ‐                            239,922                   ‐                            ‐                        ‐                        239,922               Total ‐                                239,922                   ‐                                ‐                            ‐                            239,922                Total Water Trunk Fund 300,000                   813,914                   1,550,250                250,000               1,068,750            3,982,914            Page 34 TotalCIP #Financing / ProjectStatus* 2018 2019 2020 2021 2022 2018‐2022Water Operating Fund ‐ FeesU‐9Water Meter ReplacementR331,857                   234,325                   241,355                   260,000               267,800               1,335,337            XX‐02Watermain Replacement (Street Reconstruction)R 1,045,728                959,690                   918,002                   506,459              723,268              4,153,147            18‐03Watermain Replacement‐(Collector Road Reconstruction)IP 215,900                  ‐                            ‐                            ‐                        ‐                        215,900               18‐06Watermain Replacement‐Kenyon Ave (Celebration Church ‐ 162nd St/CSAH 46)N50,000                     ‐                            ‐                            ‐                        ‐                        50,000                  U‐7Well and Pump RehabilitationR105,000                   120,000                   360,000                   120,000               120,000               825,000               U‐8Tower and Reservoir MaintenanceR‐                            275,000                   ‐                            ‐                        150,000               425,000                Total Water Operating Fund 1,748,485                1,589,015                1,519,357                886,459               1,261,068            7,004,384            Total Water System 2,048,485                2,402,929                3,069,607                1,136,459            2,329,818            10,987,298          Sanitary Sewer Trunk Fund ‐ Fees20‐06Kenrick Ave (Kenrick Ave ‐ Kensington Blvd)N‐                            ‐                            181,500                   ‐                        ‐                        181,500               U‐1Sanitary Sewer Trunk ExtensionsR230,875                   257,100                   332,000                   140,875               119,000               1,079,850             Total Sanitary Sewer Trunk Fund 230,875$                 257,100$                 513,500$                 140,875$             119,000$             1,261,350$          Sanitary Sewer Operating Fund ‐ User FeesU‐3Sanitary Sewer Inflow/Infiltration RepairsR375,000                   425,000                   425,000                   475,000               475,000               2,175,000            XX‐02Sanitary Sewer RehabilitationR 250,000                   250,000                   250,000                   250,000               250,000               1,250,000            U‐2Sanitary Sewer Lift Station RehabilitationR45,000                     30,000                     500,000                   ‐                        ‐                        575,000                Total Sanitary Sewer Operating Fund 670,000$                 705,000$                 1,175,000$              725,000$             725,000$             4,000,000$          Total Sewer System 900,875                   962,100                   1,688,500                865,875               844,000               5,261,350            Storm Sewer Trunk Fund‐ Fees15‐12202nd St/CSAH 50 (Holyoke Ave‐Cedar Ave/CSAH 23)IP ‐                            242,808                   ‐                            ‐                        ‐                        242,808               18‐05Dodd Blvd/CSAH 9 & Flagstaff AveIP ‐                            90,000                     ‐                            ‐                        ‐                        90,000                  18‐06Kenyon Ave (Celebration Church ‐ 162nd St/CSAH 46)N 110,204                   ‐                            ‐                            ‐                        ‐                        110,204               20‐05CSAH 70/210th St (E of Kensington Blvd ‐ Holyoke Ave)IP ‐                            ‐                            771,390                   ‐                        ‐                        771,390               20‐06Kenrick Ave (Kenrick Ave ‐ Kensington Blvd)N 189,750                  ‐                        ‐                       189,750               XX‐02Storm Water Management Improvements ‐ Street ReconstructionR105,000                   105,000                   105,000                   105,000               105,000               525,000               NR‐4Storm Water Management‐New ConstructionR100,000                   100,000                   100,000                   100,000               100,000               500,000                Total Storm Sewer Trunk Fund  315,204                   537,808                   1,166,140                205,000               205,000               2,429,152            Environmental Resources ‐ FeesNR‐1Lake ManagementR115,000$                 115,000$                 115,000$                 115,000$             115,000$             575,000$             NR‐2Maintenance ‐ Natural Resources and Storm Water InfrastructureR75,000                     75,000                     75,000                     75,000                 75,000                 375,000               NR‐3Storm Water Basin RehabilitationR100,000                   150,000                   150,000                   150,000               150,000               700,000               NR‐5Water Quality BMPsR100,000                   100,000                   100,000                   100,000               100,000               500,000               NR‐6ForestryR80,000                     100,000                   100,000                   100,000               100,000               480,000                Total Environmental Resources Fund 470,000$                 540,000$                 540,000$                 540,000$             540,000$             2,630,000$          Total Utility System Projects 3,734,564$             4,442,837$             6,464,247$             2,747,334$         3,918,818$         21,307,800$        Page 35 TotalCIP #Financing / ProjectStatus* 2018 2019 2020 2021 2022 2018‐2022General FundP‐1Park Major MaintenanceR 158,981                   169,450                   171,300                   173,775               173,100               846,606                    Total General Fund 158,981                   169,450                   171,300                   173,775               173,100               846,606               OtherP‐14King Park Improvements ‐ LBA Lighting DonationIP 100,000                   ‐                            100,000                   ‐                        ‐                        200,000               P‐1 RAAA Donation for Parkview ImprovementsIP 4,000                       ‐                            ‐                            ‐                        ‐                        4,000                    Total Other 104,000                   ‐                            100,000                   ‐                        ‐                        204,000               Park Improvement Fund ‐ TaxesP‐6Park Improvements (Various Parks)R 190,000                   222,500                   225,000                   262,500               175,000               1,075,000                 Total Park Improvement Fund 190,000                   222,500                   225,000                   262,500               175,000               1,075,000            P‐5 Trail Improvement Fund ‐ TaxesTrail improvementR 294,200                   329,925                   318,522                   329,259               363,859               1,635,765                 Total Trail Improvement Fund  294,200                   329,925                   318,522                   329,259               363,859               1,635,765            Park Dedication Fund ‐ Fees/BondsP‐2Park Development ‐ Adminstrative ProjectsR‐                            10,000                     10,000                     10,000                 15,000                 45,000                  P‐3Park Development ‐ Developer CreditsR 435,000                   435,000                   435,000                   435,000               435,000               2,175,000            P‐4Future Park Land AcquisitionR 350,000                   ‐                            100,000                   1,000,000            100,000               1,550,000            P‐5Trail ConnectivityR 100,000                   100,000                   100,000                   100,000               100,000               500,000               P‐5New Trail LightingR 67,000                     173,000                   ‐                            137,000               157,000               534,000               P‐7Avonlea Community ParkIP 45,000                     1,500,000                ‐                            ‐                        845,000               2,390,000            P‐8Avonlea Lineal ParksIP ‐                            ‐                            22,000                     472,000               ‐                        494,000               P‐9Antlers Community Park (Note 1)N 520,000                   4,280,000                ‐                            15,000                 265,000               5,080,000            P‐10Cedar Crossing ParkIP 20,000                     445,000                   ‐                            ‐                        ‐                        465,000               P‐11Pleasant Hill ParkN‐                            22,000                     472,000                   ‐                        ‐                        494,000               P‐12Ritter Farm ParkN‐                            25,000                     300,000                   ‐                        ‐                        325,000               P‐13Outdoor Performance StageN‐                            ‐                            ‐                            325,000               ‐                        325,000               P‐14Fitness Challenge CourseN‐                            ‐                            ‐                            ‐                        250,000               250,000               P‐15King Park ImprovementsIP 1,507,000                165,000                   (100,000)                  ‐                        ‐                        1,572,000            P‐16East Community Park (Note 1)N 28,000                     ‐                            390,000                   2,960,000            ‐                        3,378,000            P‐17Legacy ParkIP420,000                   ‐                            ‐                            ‐                        ‐                       420,000               P‐18Steve Michaud Park IP ‐                            ‐                            96,000                     ‐                        ‐                        96,000                  15‐12202nd St/CSAH 50 (Holyoke Ave‐Cedar Ave/CSAH 23)IP ‐                            300,000                   ‐                            ‐                        ‐                        300,000               Total Park Dedication Fund 3,492,000                7,455,000                1,825,000                5,454,000            2,167,000            20,393,000          Total‐ Parks Projects  4,239,181$             8,176,875$             2,639,822$             6,219,534$         2,878,959$         24,154,371$        Equipment Plan‐ Totals by funding source belowEquipment Fund Balance use (surplus)/Interest Earnings846,577                   572,839                   (44,589)                    (167,594)              422,499               1,629,732            Page 36 TotalCIP #Financing / ProjectStatus* 2018 2019 2020 2021 2022 2018‐2022Environmental Resources Fund contribution31,000                     31,000                     31,000                     31,000                 31,000                 155,000               Communications Fund2,407                       2,403                       2,753                       6,505                   6,282                   20,350                  Utility Fund244,505                   123,487                   147,796                   98,511                 158,448               772,747               Liquor Fund12,612                     6,177                       71,035                     7,392                   20,029                 117,245               Arenas3,351                       5,330                       527                           5,688                   8,846                   23,742                  Auction/Sale Proceeds225,000                   225,000                   225,000                   225,000               225,000               1,125,000            Bond Proceeds‐                            1,230,000                1,220,000                669,000               ‐                        3,119,000            ‐                        Total Planned Equipment Purchases 2,492,980$             3,390,606$             3,001,109$             2,279,446$         2,320,118$         13,484,259$        Facilities Plan‐ Totals by funding source belowFacilities Fund Balance use/(surplus)/interest earnings(103,029)                  640,920                   24,123                     (219,500)              (371,000)              (28,486)                Tax Levy‐ Facilities420,000                   450,000                   450,000                   400,000               400,000               2,120,000            General Fund contribution300,000                   200,000                   ‐                            ‐                        ‐                        500,000               Liquor Fund7,300                       39,500                     ‐                            65,000                 ‐                        111,800               Water Fund87,006                     ‐                            ‐                            67,200                 32,000                 186,206               Bond Proceeds‐                            ‐                            7,720,000                ‐                        ‐                        7,720,000            Other/Partnership‐                           ‐$                         3,000,000$              ‐$                     ‐$                    3,000,000            Total Planned Facility Expenditures 711,277$                 1,330,420$             11,194,123$           312,700$             61,000$               13,609,520$        TOTAL‐ ALL PROJECTS 28,313,019$           37,837,373$           40,835,107$           20,133,298$       21,062,438$       148,181,235$     *Status KeyR These are recurring annual projects. The costs may have changed slightly from the prior year CIP due to revised estimates, and a subsequent year added to the CIP.IP These projects were included in a prior year CIP. The costs and funding sources may have been revised due to more accurate estimates since the prior CIP.N These projects are new to the CIP this year. Note 1‐ The majority of this project is anticipated to be funded with bonds. Page 37 CITY OF LAKEVILLE STREET RECONSTRUCTION PLANProject description: 2018 2019 2020 2021 2022 TotalCollector Road Reconstruction:Kenrick Ave (173rd St- N City Limit)3,002,948$ -$ -$ -$ -$ 3,002,948$ 172nd St/Kodiak Ave/175th St/Judicial Rd/168th St132,877 2,109,423 - - - 2,242,300 Klamath Tr (West of Kenwood Trl)90,910 1,443,193 - - - 1,534,103 Hamburg Ave (Lakeville Blvd - 202nd St/CSAH 50)66,169 1,609,192 - - - 1,675,361 Ipava Ave (Kenwood Tr/CSAH 50 - 185th St/CSAH 60)- 84,914 1,348,008 - - 1,432,922 Heritage Dr/Iberia Ave/Holyoke Ave- 94,093 1,493,728 - - 1,587,821 205th St (Keystone Ave - Dodd Blvd/CSAH 9)- - 55,802 885,857 - 941,659 170th St (Flagstaff Ave - PKR/CSAH 31)- - - 91,195 1,447,725 1,538,920 Highview Ave (175th St - 160th St/CSAH 46)- - - 53,646 851,629 905,275 210th Street (Kensington Blvd. - Holyoke Ave.)- - - - 111,334 111,334 - - - - - Street Reconstruction (Tax Portion only) 4,581,238 3,683,065 3,831,660 3,490,074 4,246,169 19,832,206 - - - - - - 7,874,142$ 9,023,880$ 6,729,198$ 4,520,772$ 6,656,857$ 34,804,849$ CITY OF LAKEVILLE 2018 - 2027 FACILITY PLAN2016 CF +2018 - 20272017 2017 Est'd 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 TotalsUse of Funds:Art Center 291,792$ 129,957$ 321,635$ 79,700$ 15,500$ -$ 10,000$ 13,750$ -$ 220,000$ 20,000$ -$ 680,585$ Central Maintenance Facility 100,700 93,576 46,000 370,800 7,785,000 36,000 - 97,000 - 75,000 - - 8,409,800 City Hall 190,000 165,337 51,500 484,000 204,123 57,500 2,500 - - 1,500 135,000 - 936,123 Fire Station #1 - - - - 31,000 27,000 - 23,500 - - 6,000 - 87,500 Fire Station #2 10,900 5,600 10,000 - 10,000 - 5,500 - - 25,900 12,000 - 63,400 Fire Station #3 - - 6,850 - - - 11,000 5,000 - 20,000 - - 42,850 Fire Station #4 18,300 19,784 23,500 115,000 52,500 - - - - - 5,500 - 196,500 Heritage Center 14,000 13,481 44,000 75,000 96,000 - - - - - - - 215,000 Galaxie Liquor Store15,000 15,000 - 35,000 - 65,000 - 60,000 - - - - 160,000 Kenrick Liquor Store185,000 43,000 7,300 4,500 - - - - - - - - 11,800 Police Station 41,500 41,960 113,486 166,420 - 60,000 - - - - 75,000 - 414,906 Police Shooting Range - - - - 3,000,000 - - - - - - - 3,000,000 Public Works Storage Facility - - - - - - - - - - - - - Radio Communications Building - - - - - - - - - - - - - Water Treatment Barn - - - - - - - - - - - - - Water Treatment Facility28,500 28,500 87,006 - - 67,200 32,000 - 11,000 - - - 197,206 Total Use of Funds 895,692$ 556,195$ 711,277$ 1,330,420$ 11,194,123$ 312,700$ 61,000$ 199,250$ 11,000$ 342,400$ 253,500$ -$ 14,415,670$ Source of Funds:Interest Earnings (2%) 15,092$ 15,092$ 14,076$ 16,419$ 3,929$ 3,525$ 7,985$ 15,565$ 21,091$ 29,513$ 31,255$ 34,810$ 178,168$ Annual Levy (Building Fund) 150,000 150,000 420,000 450,000 450,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 4,120,000 General Fund Contribution - - 300,000 200,000 - - - - - - - - 500,000 Unencumbered 2016 GF 200,000 200,000 - - - - - - - - - - - Liquor Fund 200,000 58,000 7,300 39,500 - 65,000 - 60,000 - - - - 171,800 Water Fund28,500 28,500 87,006 - - 67,200 32,000 - 11,000 - - - 197,206 Other/Partnership 3,000,000 Bond Proceeds - - - - 7,720,000 - - - - - - - 7,720,000 Other - - - - - - - - - - - - - Total Source of Funds 593,592$ 451,592$ 828,382$ 705,919$ 11,173,929$ 535,725$ 439,985$ 475,565$ 432,091$ 429,513$ 431,255$ 434,810$ 12,887,174$ Change in Fund Balance(302,100)$ (104,603)$ 117,105$ (624,501)$ (20,194)$ 223,025$ 378,985$ 276,315$ 421,091$ 87,113$ 177,755$ 434,810$ (1,528,496)$ Beginning Fund Balance754,589$ 808,425$ 703,822$ 820,927$ 196,426$ 176,232$ 399,257$ 778,242$ 1,054,557$ 1,475,648$ 1,562,761$ 1,740,516$ Ending Fund Balance452,489$ 703,822$ 820,927$ 196,426$ 176,232$ 399,257$ 778,242$ 1,054,557$ 1,475,648$ 1,562,761$ 1,740,516$ 2,175,326$ 2017-2021 CIP Adopted 11.21.2016 895,692 786,825 7,149,600 397,500 215,200 55,500 199,250 11,000 342,400 253,500 - 9,410,775 Variance (75,548) (5,819,180) 10,796,623 97,500 5,500 - - - - - 5,004,895 CITY OF LAKEVILLE 2018 - 2027 EQUIPMENT PLAN2017 2016 CF +2018 - 2027(as amended)2017 Est'd 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 TotalsUse of Funds:Elections 29,685$ 29,685$ 44,112$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 44,112$ Information Systems 625,521 564,942 744,020 608,308 571,733 406,611 875,837 729,981 749,436 630,610 806,606 482,645 6,605,786 Facilities - - - - - - - 30,879 35,383 - - - 66,262 Inspections - - - - 25,101 25,791 26,482 27,173 - - - - 104,547 Police 241,933 254,779 542,902 1,438,744 366,799 450,497 798,579 289,612 453,527 985,608 484,546 493,585 6,304,398 Fire 310,843 308,949 178,152 620,100 708,500 182,119 - 107,630 189,970 772,031 47,760 - 2,806,262 Engineering - - - - - - - - - - 31,812 32,869 64,681 Construction Services 27,485 27,460 - - - - - 31,860 32,670 - - 35,100 99,630 Streets 816,831 828,718 579,646 483,652 883,580 802,911 388,206 1,690,180 887,206 755,666 721,283 1,762,979 8,955,308 Parks 262,505 241,542 261,210 172,886 368,515 388,826 164,623 201,052 176,004 321,098 324,786 784,696 3,163,695 Environmental Resources- - 57,118 - - - - - - - - - 57,118 Forestry- - - - 22,691 - - - - - - 22,691 Utilities440,188 459,142 85,822 66,916 76,881 - 66,393 75,266 667,729 634,917 109,428 96,710 1,880,061 Liquor237,775 99,774 - - - - - - - - - - - - - - - - - - - - - - - - Total Use of Funds 2,992,766$ 2,814,991$ 2,492,980$ 3,390,606$ 3,001,109$ 2,279,446$ 2,320,118$ 3,183,634$ 3,191,925$ 4,099,930$ 2,526,220$ 3,688,584$ 30,174,552$ Source of Funds:Interest Earnings (2%) 33,578$ 59,347$ 36,404$ 19,721$ 8,658$ 9,723$ 13,270$ 5,085$ 7,051$ (4,313)$ (1,717)$ (7,087)$ 86,795$ Annual Levy 350,000 350,000 575,000 600,000 600,000 650,000 650,000 750,000 850,000 950,000 1,050,000 1,150,000 7,825,000 General Fund Contribution 945,000 1,445,000 - - - - - - - - - - - Liquor Fund Contribution - - 250,000 400,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 4,650,000 Pavement Mgmt Fund Contribution 100,000 100,000 85,000 - - - - - - - - - 85,000 Environmental Res Fund Contribution 31,000 31,000 31,000 31,000 31,000 31,000 31,000 31,000 31,000 31,000 - - 248,000 Funding outside Equipment FundGeneral Fund193,006 166,225 193,528 194,370 247,587 253,944 298,014 255,265 237,834 234,489 254,302 70,257 2,239,591 Communications Fund- - 2,407 2,403 2,753 6,505 6,282 3,008 4,896 2,869 7,779 4,392 43,294 Utility Fund440,188 459,142 244,505 123,487 147,796 98,511 158,448 152,818 739,726 707,548 189,172 126,062 2,688,074 Liquor Fund237,775 99,774 12,612 6,177 71,035 7,392 20,029 55,860 15,979 81,345 28,823 14,668 313,920 Arenas3,351 5,330 527 5,688 8,846 14,921 12,209 1,802 4,357 15,282 72,312 Auction/Sale Proceeds 207,728 227,995 225,000 225,000 225,000 225,000 225,000 225,000 225,000 225,000 225,000 225,000 2,250,000 Bond Proceeds - - - 1,230,000 1,220,000 669,000 - 1,289,000 - 1,500,000 - 1,500,000 7,408,000 Total Source of Funds 2,553,275$ 2,938,483$ 1,658,806$ 2,837,489$ 3,054,356$ 2,456,764$ 1,910,889$ 3,281,956$ 2,623,696$ 4,229,739$ 2,257,717$ 3,598,574$ 27,909,985$ Change in Fund Balance(439,491)$ 123,492$ (834,174)$ (553,117)$ 53,247$ 177,318$ (409,229)$ 98,322$ (568,229)$ 129,809$ (268,503)$ (90,010)$ (2,264,567)$ Beginning Fund Balance$1,678,922 $1,696,715 $1,820,207 $986,033 $432,916 $486,163 $663,480 $254,251 $352,573($215,656) ($85,847) ($354,350)Ending Fund Balance$1,239,431 $1,820,207 $986,033 $432,916 $486,163 $663,480 $254,251 $352,573($215,656) ($85,847) ($354,350) ($444,360)- 2017-2021 CIP Adopted 11.21.2016 2,121,797 3,845,216 3,017,498 1,952,268 1,678,885 1,922,316 2,389,866 3,432,368 2,612,657 2,500,017 25,472,888 Variance (1,352,236) 373,108 1,048,841 600,561 397,802 793,769 (240,443) 1,487,273 26,203 4,701,664 #I #I #I #I #I #I #I #I #I #I #I #I #I !H "J "J #I "J "J "J "J "J #I "J #I #I GALLEO N C IR ICEFALLT R L SHIRLEYLN KINGSCT JAGUARAV E 208THSTW 195TH ST W BRUTUS D RKALEWAYJASPERCT HUDSONCT 162ND ST W IDAHOCTKENOR A C T JASMINECIRJORDANCIRCOUNTRYVIEWTRL F A I R H A V E N C T FALKIRKCIRJASPERCIR HYLANDCIR G LENCO ECIR212TH ST W HYTRAIL CIR §¨¦35 ISTRIACTHAVELOCK CT EXCELSIORCIRFR A N C H IS E C T163RDCTW FULDACIR170TH ST W166THCTW UPPER 196THW AYW H A V E L O C KWAY 208THSTREETCTORCHARDTRL EAGLEVIEWDR HYTRAILCT FRASERPATHISMAYCIR163RDST W 183RDCTW HAZELNUTCT GLENCOECTI N G L E W O O D C T EAST L AKE DR 165TH ST W FAIRGREENAVEKETCHIKANCTK I NGS WOODCI RJEFFREYRDIRONS T O N E W A YKENRICKAVE I RENI CAVE JUPITERPATH 16 7 T H ST W JACANACT ST EVENLNJACKPINECT 188TH ST W IN D IA C IR 20 3 R D S TW IXONIAPATHISLECIR2 07TH ST WHILLSCTHOPEW ELLCTKAL MAR TRL JAGUARCIR IVORYLN 1 90TH ST W HAVER H IL LCIRFISH E RCTGAUNT L E T CT 173RD ST W FREEPORTWAY I RETON WAY UPPER 209TH ST W 172ND ST W 1 76THCIRWJORDANCT LOWER 17 0THCTW JAVACTN172ND ST WCRYSTALHILLSDRENDEAVORCT GOODHUEAVE §¨¦35 §¨¦35 456750 209TH ST W JAGUARCTJU D IC IALW AYN209THSTW 206TH ST W FLINTAVEJOPLINAVEI NNSBROOKCIRINLAND CIR HILLSID ECTJASPERCTEASTWOODAVEI T H A CAC TJAGUAR T E R JUNC O CTFARADAYCTI R WI N T ONCI R166THSTWGRINNEL L CIR GUNFLINTCTGERDINEPATH1 7 4 T H C T W FIELDCREST CT 169TH ST W FLAIRCIRHOLBROOKCTJUPITERCIR KLAMATHTE RJADECT1 7 0 T H S T W IDLEWOOD CIR J OY A VEJASPERPATHUPP E R 162 N D ST W JACQUA R DPATHEMBER SAVEHOMINYCIR JU R A T R L179TH ST WHUTCHINSONCTJACKPINEWAY GAND ERLNFORTUNE TRL 1 83RD ST W FIRE L I G HTWAYJORDANCTSJ AMAICAPATH IMPALA PAT HEXCELSIOR CT IDAHOAVEIBERIACIRIDAWOODPATHHY DRANGEALN162NDCTWHAZEL NUT AV E JURY CTKINDREDCIRIRWIND ALECTJAMBEAUCTINGRIDCT GODS ON CIR FREIBURGCIR173RDCIRJUN C OTRLIN L A N DCTIDLEWOODCTJA S MIN E P A T H167TH CTW HOLTCTHARWELL CTJUSTIC ECTDREAMLNHYACINTHAVEDRAFTH ORSE BLVDFIRMANCTHAVENAVEIRVINE TRLJURELWAY GEORGETOWNCTFIRESTONE PATH JUNOCTKEOKUKAVEEAGLEVIEWDREVENTIDE WAYHURLEYCTGANNONCT JAMESTOWNAVEIONIAPATH172ND ST FOXBOROLNU PPER178THSTW GATEWA YD RHONEYSUCKLEAVELAKEVILLE BLVDLAKEOAKCIRHIBISCUSAVEIXONIACTJASMINECTGODSON DR 166THCTW GAGECTJACQUARDCT ITALY A V E IDAHOAV EF R A N CHISE WAY KENRICKAVE1 7 7 T H C I R W 165TH CT W JAY BELLCT166THST W 199 T H STW 172ND ST W H U N TSVILLET RLICELAND T R LEXCELSIORDRGLENGARYCTF I NE S S E WA Y F A R C R Y W A Y FAIRGREE N A V E KINGSLEYCTEVENTIDEWAYHOMINYCT INDEPENDENCECTIR EDELLCT ISANTICTJ A S MINEWAYJ E F F E R S O N CT FINESSE TR L FAIRH ILLAVE210TH ST W FAIRHAVENAVEITENCTNJASPERCTJAVELINAVELANGLEYAVE INTERLACH E N B LVDFREEPORTCTGATEWAY CT FLORALPAR K C IR FAIRFAXAVEFIRESTONE CIR 166TH S T WIRISCT GOLDENRODAVEN O RT HC R E E K D R EVELETH CT EUROPAAVEW GRIFFON TR L H A R R O W C T EVELETHAVEWKALMEA D O W C T FERNANDOWAYJARRETTCIR183RD ST W E A S TLAKETRL HICKORY CT 164TH S T WKEY WESTCT KENMOREDRGROV E A VEIDALIAAVEJEWELAVEKENMORE CT FAIRHILLAVE166TH ST W FRANCONIACT1 6 9 THSTW167THSTW IRALN IMPATIENSWAYJORDANCTNLAKECOVECIRKEYS T ONE PATH HAYESAVEHORNBEAMAVEKINGSWAYPAT H JADECIR172ND ST W SHIRLEYCIRIR ELANDCTFLAGSTAFFCTSFORMOSAAVEHURONCTLANESBORO CT GREENVIEWCIRGOODLANDCTLANCASTERCT171ST ST W IVY WOODCTH Y A C INTHCT161S T S T W HARBORCTICEFALLWAY K E NRIC K A V EFL ORIDACTHARVARD L N 1 7 5 T H C TW OAKCURV ILLINOISAVE167THSTW FIELDCRESTAVEKENRICKCIR2 0 2 NDSTW JAVELINCIR168TH ST W GEORGETOW N WAY170TH ST W GAGEAVEIS M AYCT 198THCTW INNDALE D RKINGSBURYCIR FORBESAVEJASMINEAVEHEARTHS IDECT167THCTW ITERILNISOSCELES AVE205TH ST W ISLETO NCT213TH ST W GRIFFONCTIPSWI C H W A YGOODVIEW TRL ITAMI TRL 1 74TH ST W 175TH ST W INSPIRATIONPATHKODIAKCT GLENOAKSRD 194TH ST WIXONIAAVE LOWER 161ST ST W ITHACACIRJUNOTRLKLAMATHCT163RDSTW 212TH ST W JACQUARDAVEJANNEVA RCTJONESBORO CT 169TH ST WFIRESTONECT 173RD S T W 205TH ST W 167TH ST W 171STCTW1 62ND ST W FLOUNDERAVEFRANCHISEAVEGROVETRLHARMONYPATHGREENTREE PATH FRENCHAVEJAT O SCIRLO G A R T O L NOAKSHOREDR GLENWOODAVEISO T OPETRLFOLSOM PATH IKARIACTHA R V A R D DR KODIAKAVE JALIS COCTDUPONTAVE FORFARCTGLASG O W A V EIN LANDLOOPF A L L BROOKCT HEYWOODCTHARVARDCTGUNFLINTCIR ITASCATRLK E N N A R D C TG UNFLINT T RL HEA RTHCTJONQUILTRL HI CKOR Y C T JASMINEAVEIKARIATRLFIRE SID E LNJALISCOWAYGLADEAVEKI NDREDC T H O M E STEADTR L JORDANTRL HAYESAVEJASPERCT ANITALN KACHINAC T INDIAAVEFOREST ST 456760 205TH ST W UPPER 206TH ST W HOLLINSAVE214TH ST WHOLIDAYAVEHUGHESAVEJONATHANCT197THSTW 167THSTW JONQUILAVEGLENOAKSCT 165TH ST W RICKYLN KETTLERI VERCTHAMILTONCT HAMBURGAVE1 9 1 S T S T W GREENTREEAVEITA S CALN HYLANDCTHANNIBALCTENCINAPAT H UPPER 164T H ST W FIELDC R E S TAVE220TH ST WHONEYCOMBPATHIRELANDPL GENESEE A V E W 208TH ST WJALISCOTERW F RA NCHISEAVE GOLDENVIEWAVE204TH ST WJUDICIALRD HOLLYBROOK TRL 209TH ST WLAKEFORESTDRJASPERLN 210TH ST W HOLIDAYAVEFLORINAVEKEYSTONEAVEHURLEY AVE180THSTW UPPER208THSTW GREENBRIARLNJAEGERPATHJACQUARAAVEOAKSHOREDRS 176TH ST W GREISENAVEHOLTAVE208THSTW HEATHCTI CELANDCT HOLY O K E A VEHOWLANDAVEI NMANCT163RDSTW 161ST ST W IDEALIC A VECRYSTA LHILLSLNFIREBIRD CT KALMA RP ATH 169TH ST W 177TH S T W J A DETERISLAND AV E FURYCTIDALIAPATH FALLBROOKDRJONRAYCTFULL E R T ON CT UPPER 173RD CT W INTERLACHENCT1 7 3 R D ST W INDIO PA THLAKEVIEWCT198THSTW JUNECTH A R W E L L AVE FULDATRL HERSH E YAVEJAGUARA V EICON T R LO R C H A R D C T JAMAIC A CT KANA BECCTHOMESTEADCTHERSHEYCT GALLECTHIL LSBORO CT JOP L I NP ATHK E N RICK AV EHEMLOCKCT176TH STW 206THSTW JUBILEE W A YJAMESWOODCTI R E DA LE CT GOODVIEW CIR HUMBO L D T CT UPP ER205THST WJAMAICAAVEJAVACIR U PPER167THST WKENRICKLOOP 203RDSTW HURONPATH 169THCTW JAVELINCT FLAGSTAFFAVEW1 6 3RD STW HUMMING BIRD LN ICOSA ST UPPER 163RD CT W GLASGOWWA YF O L I A GECT 162ND CT UPPER 167TH CT W HOU STONAVEKABERA TRL F O LIA G E A V E1 88 TH ST W JONQUI L AVE HUNTINGTON P ATHFI VEOAKSDR 167TH ST W 164THSTW ITALYAVE215TH ST W IMPERIALCIR HUTCHINSONDRHI L L WO O DAVEH E L E NALNIN G L E W O ODDRG A L A X I E WA Y 20 5THCT W HAZELWOO D TRL175TH ST W 177THSTW 195TH ST W EAGLEVIEW WAY FIN DLAY WAY 210TH ST W J A SPER PATH JER S EYAVEMACBETH CIRGLACIERAVEJASPERTRLFINLANDAVE214TH ST W JARREAU CT208 TH ST W 211TH ST W ITEA AVE 168THST W 203RDST W LAYTON PATH KALMARCTHYDRA CTJOYCT HALLMARKPATHFALCONAVEFRAZERPATHIDESCIR HALIFAXPATH FIELDFAREW A Y HYTRAIL CIRTHOMASRD EVERESTPATH ITENCTSJA G U A R P L KENSINGTONCT KENRIC K A V E GER MA NECTFOR M OSA CT IBERIAAVEI RWINDA LEWAYLANDFORDPATH165TH S T W 179TH STW G ERDINE PATH KENSFIELDTRL1 8 2N D S T W JUP ITERWAY 16 8T HCTW IRONRIDGEPATH JUPI T E RCT IT E R IC T W 2 17TH ST W DO D D LN HYACINTH WAY SHAKES P E A R E B LVDISLETONAVELANDMARKCT H I LLDALEAVE219TH ST WLINCHAVE 456723 GARRI S ONLNJAVAPATH HARMO NYTRL FESTAL AVE INDIGORD H O Y A C T GATEWAYDRGRENADIERAVEHARD I N G LNINNSBROOK D R HIGHVIEWAVE175THSTW JA V ACTSLOWER169THSTWJAVARICT KEYSTONE A V EGOODVI EWCTJU N E BERRYCT 194 T H ST W GLENCOEAVE178THSTW 16 5 TH ST W ITERI A V E FAR ADAYLN GR I N N E L L C T E 177THS T W MICHEALRD193RDSTW 176TH ST WGRENOBLEAVEJOSIERD JUPITERAVEJASM I NE CT JACOBITECTGARLANDWAYGRINNELLWAY JUBILEECIR ISTRIAPA THJA C KD AWPATHJARLCT JERSEYAVEANNELN EAGLEVIEW LN FROSTCTJACAMARWAY KENBRIDGE CT 157 T H S TEITHACALN16 5 TH ST W INDEPENDENCEAVEKAFTAN CT173RDSTW JOPLIN A VE173RDCT W L A MARCTFANN IN G C T 198TH S T W ETHELTONAVEEUCLIDAVEFIREBIRD PATH JULIET D R INSELLNGRINELLAVEHYLANDAVEHURONCIR IRONWOO D C IRHUNTERCT HOLTAVEILLINOISCTEXIRAAVEJONQUILAVEG EMI N ITRLFIESTAAVEIPAVAAVE213THST W 1 71ST ST W ELM C R EEKLNJACKPINE T RLFIELDCRESTAVE176T H STW HAZE LCTKI NGSW O O D D R IT ALY P A THIMBLERTRL IRE DALEPAT H218TH ST W CAESAR ST EVENFALLAVEWJACKRABBITPATH IR V INEWAYJUREL CT GAR N E R AVE 174TH ST WJA C K S O NTRLLIONSCT 161ST ST W KENYON AVE 207TH ST W HYSONPATHI NUITLN HOLLANDAVEFLORIDA WAY 169 THSTW KIRBENAVELINC HPATH175TH ST W KINDLE C THUBBARD TR LG R E E N LANDP AT HKENTTRL UPPER 163RD ST W J ASPE R TERIMPERIALCT170THSTWKENOSHAAVEHUDSONAVE207T H CT W174THST W J A V ELINCTIROQUOISLNFONTANAPATHINDEPENDENCE AVEJAGUARPATH HEMLOCKAVEH OLISTER LN 178TH STW KENRICKAVEKE N D A L E DR HIGHVIEWAVEHOMINYPAT H164TH ST W KENYONAVEA S TERBILTL NKEYSTONE CT J ALISCOLNHERITA G E D R194TH ST W ITERIPL JAVAL N FONTINA PATH J U S TICEPATHI NLETROADEXLEYAVEKATRIN ECT204T H S T WKRAFTONAVEICEN IC TRL201STSTW 181ST ST WIBERIAAVEK E N R E E L A V E KENWOO D WAYJAL ISCOTEREJ UDIC I ALWA YSG RIFFON L N KENORA WAY 170TH ST W E N FIELDWAYINGL ESIDECTCLEOPATR ADRINMANTRL220TH ST W IM AGERY L NILLINOISPATH177TH ST W H UDSONCIR168THSTW J OPLINAVEUPPER167THST W KEARNEYPATHF L AGSTAFFWAYWL A MARLNF RUI TWOODPATHIRVONAAVEICELANDAVEISMAYPATH 207TH ST W IBISAVE173RDST W GALERY D R 205TH ST W ISL E A VEIBEXAVEINCA AVE IDLEWOOD WAY 17 8THSTW G R I NNELLAVE172ND ST W 176THC T W 204TH ST W FAIRISLE PATH KERRVILLETRLK NOLLS PATHFOLIAGEAVEIMPERIA L WAY 1 73RD STW FAIRMONTAVEHARRINGT O NWAYJUT L A N D PLUPPER 171ST ST W FINCHWAYHEMLOCKAVEJAVA TRL 161ST S T W HORIZONAVEUPPER 161ST ST W GOODLANDPATH 192ND ST W ID E A L WAY EVENING TER KABOTCOVE LN 16 6TH ST W KE N S I N G TON W AY IROQUOI SWAYHULLAVEHAMPSH IRE WAYJERSEYWAY GAGE W AYFINCHPATH 176TH ST WHORSESHOEWAY IBERISAVEIXONIALNFISHINGAVE1 6 3RDST W IR V INELNKENYONAV E J AMISONPATHKE NWORTH L N FAIRMEADOW WAY FR AZERWAY UPPER 167TH ST WG ILLETT EWAYISLE T O N A VE16 1 S T ST W 456723 UPPER205THSTW ITERIAVEITALYAVEITERIAVEINCAAVE17 8 T HSTW JAGUARPATH 175TH ST W JACKSONV ILLE C T HYACINTH CT I TALYAVEJ A C Q U A R DPATH173RD ST W HERSH E Y C T HARVA R DDR KANABECTRLU P P E R 1 6 4TH ST W LANSFORDPATHGETTYSBUR G W AYGL A DIO L A AVEHEIDELBERG WAY KEO K U K AVEJASPER WAY 456750 JUSTI C E WA Y JAY C THAMILTON DR FI S HINGWAY1 9 6 THSTW JOP LINWAY1 6 8 T H ST W LAKEFORES T CIR ISLA NDTER168TH ST W 45679 INVER NESSWAYNORTHCRE E KLN179TH TRL W IRELAND WA YJADELN 16 2 N DS T W LOWER208THST W JENKINSWAY 162NDSTW JACARANDAWAYHICK O R Y T R L 163RD STW JAG U ARAVEHIG H VIEW AV EHAWTHORNP ATH KENSINGTONBLVDIPAVAAVEL OWER 167TH ST WHOMEFIRE WAYKE T CHI KANTRL214 T H ST WKESWICK LOOP S 197TH ST W FANTASIAAVEISLANDVIEWCIR HEARTHSIDE WAYROMEO DR IXONIAAVEITERIAVEISLEAVEED INB URGWAYIRANAVEEX C ELW AYHANOVERAVELIBERTYBEA C H C T JOPLINW A YL AIG L EAVEHUMBOLDTRDGRE N ADAAVEILAVISTAWAY ITTABENA WAY GOODVIE W WAYBUCKHILLRD 163RDSTW 181ST ST W L U C E R N E T R L JUNIPER PAT H HIGHVIEWAVE175TH ST W G A N NON A V E G ARCIA WAYHOLBROOKAVE HEYWOODAVEFIRESTON E W AY GAGE AVE JUNELLEPATH JEWELPAT H HYDE P A R K AVEICALEE P A T H HART F ORD WAYIREGLENPATH KENRICK CT KEOKUKAVEA NTHONYDR RITTERT RLLAFA Y E TTE W A YLAREDOPA T HINDIANA AV E 202ND ST WITALYAVE LAREDOAVEKE T T ERIN G T R L GANNON WAY IXONIAAVEHERON W A Y190TH ST W 215TH ST W 200TH ST W KAPARIAAVELAIGLEAVE175TH ST W KN O LLW OOD CIR 168 THSTWHIGHVIEWAVEDODDBLVD202ND ST W D ODD BLVD162NDSTW K E N WO O D T R L KENWOODTRL 456746 210TH ST W ISLE T O N W A Y 160TH ST W CEDARAVECEDARAVEKENRICKAVEJUNIPERWAY 185TH ST W 185TH ST W 215TH ST W 215TH ST W 16 1 S T S T W CRYSTAL GANNONWAYDODDBLVD173RD ST W HIBISCUSAVEORCHARD T R LKINGSPL DYNAMI C D RHARAPPAAVEIRONRIVERTRLIRO NRIVER CT 190TH ST W HOLYOKEAVEHOLYOKEAVEIMPALAPATHICONTRLINTERLACHENBLVDJUDICIALRD173RD ST W 175TH ST W 17 3 R DSTW1 7 0 T H STW 1 7 5 T HSTW FORTUNETRL183RDSTW 190TH ST W 214TH ST W EARLY DAWN TRL 16 8THSTW 170TH ST WJUDICIALRD JU DICIALR DK ENY O N A V E KENRICKAVEKENWOODTRLHAMBURGAVE2 0 5 T H S T W 207THST W 211TH ST W FESTALAVE FOXBOROCTKENYONAVEJAGUARPATHHUMMINGBIRD JUNOTRL UPPER206THST W HON EYCOMBWAYF I R T R EE PL LAYT O N CT JAMAICACIRIRONSCTIONIACT169TH ST HALOAVE170THCTW 1 6 7 TH STWKENTU CKYAVE456731 45675 45679 45675 456746 456770 456770 1 8 8 T H S T W JAVELIN AVE JAVELIN WAY HU N TINGTONAVEHILLCRESTAVEHILLDALEAVE HIMALAYAAVEHYDE P A R K AVE 1 7 9 T H ST W HY D RA CT HYD RA CIRENGLISHPATHENDEAVORLN16 6 T H STW EAS T LAKEDR2 1 1 TH ST W HAMPTONAVEFIELDING W A Y FIELDCRESTAVE179T H S T W FLINT A V E UPPER179THSTW F I E LDFAREWAY1 7 9 T H ST W GLACIE R WAYGLAC I E R WAYGERDINEPATHGERD I N E P AT H GANN O N A V E HAYESAVEGENESEECTGARRETTPATHFISHINGAVEFIRESTONEPATHFAIRMEADOW WAY FAIRHILLCTEXPERTCTDODDLNFAR RAGOTRLG RIFFONTRL INTERL A C H E N B L V D HAVELOCKWAY G R E E N B RIAR C T HAMILTONDRGLADIOLAAVEG A L E N A A V E FLORINAVEH E ID E L B E R G W A Y 175TH ST W H I C K ORYTRLPILOTKNOBRDPILOTKNOBRDCEDARAVE167TH C T W FLUSHINGHILLSCTFORBESCTFL O U N D E R C T W 167TH ST 1 6 2 N D S T EXETERAVEENFIELDPATH DRAFTH O R SE CT K N OLLSPATH 162NDS T W DODDBLVDDODDBLVDCEDARAVEE Q U ES TR IANTRLENVOYW AY ENCHANTEDCTC T ELMCREEKCTLNF A L K IRKTRLFALKIRKTRL 178THST W178THSTW DIAMONTE HUXLEY AVE IBARRATRLHYLAAVE189TH ST WHUX LEYAVEIDENAVEI DENWAY HUXLEYAVEIMPALAAVEINDORATRL1 9 8 TH ST W IRISWAYJEWE L C T GROMMETAVECTGREENWOODGOODHUE WAY GREENWOODAVE KAISER CIR KAISER CT KAISERWAYINNDALE DR I DEALICAVEITEAAVEHAZ ELNUTAVEIRELANDWAYJAYHAWKCTKENRICKAVEIPAVAAVEIPAVAAVELI NCHAVEKLAMATHTRLK LAMATHTRL KLAMATHTRL LAKE HILLSCT JACKPINETRL 1 7 0 T H S T W HOLLYH O C K C T AVE170TH ST W KENRICKAVEJUSTICEWAY H A R TFORDWAY 210TH ST W HAMBURGAVE456750 HYA LITEDR162ND ST W ELMHURSTLNEAGLEVIEWDRUPP E R 1 7 9 T H ST W GLASSFERNLNGLANSHAWAVEG LADSTONETRLGLACIERWAYGLEAMING CT GLENBRIDG E AVE GOLDFIN CH WAY182ND ST W GREYHAVE NPATHGR EENGABLESTRL 1 97TH ST W HOLDI NGFORDWAYHOLLOWAYLN 200TH ST W HARVESTDRH ARNESSAVEC IR CTHEATHAVEICICL E AVEHARTFORDWAYGU THRIEDR GLADEAVEJUREL CIR JULY CT187TH ST W 1 6 5TH S T W CT DRAFTHORSEBLVDDUL U T HT RL DIAMONTEPATHHI B B IN G W AY197TH S T W HIGHVIEWAVEHENNING AVE HEXHAMWAY1 9 9 T H CT W HIAWATHACTHOUSTON WAY 188TH ST W HUNTLEY TRLHUNTLEYTRLHOLL A N D D RICONCT HUMBOLDTRDELKHORNTR L EQUESTRIAN T R L 162ND ST WESTATELN ESTATELNESTATECT 179TH S T W EQUINOX AVE E N I G MA WAY EMBERSAVEDIAMOND PATH162ND S T W 205TH ST W GUNNI S ONDR JAZZCT C r y s t a lLake K i n g s l e y L a k e L e eLake O r c h a r d L a k e Vall e yLak e E a s tLake G o o s eLake L a k e M a r i o n 1 6 0 th S tre e t &P ilo t K n o b R o a d T ra fficSignal Im p ro v e m e n ts 1 6 0 th S t re e t & P ilo tKnob R o a d Tr a ffic S ig n a lImprovements 1 6 0 th S tre e t & P ilo tKnob R o a d T ra fficSignal Im p ro v e m e n ts T r a ff icSignal L e g a c y P a rk 1 6 0 th S tre e t & P ilo tKnob R o a d T ra fficSignal Im p ro v e m e n ts K in g P a r kImprovem e n t s 1 6 0 th S tre e t & P ilo tKnob R o a d T ra ffic S ig n a lImprovements D o d d B lv d . a n dFlagstaff A v e n u eIntersection Im p r o v e m e n t C e d a rCrossin gPark 2 0 2 n d S t W &H o ly o k e A v eRoundabout P a r kMitig a ti o n A n t le r 'sCommunity P a r k C e d a r A v e /C R 5 0Traffic S i g n a lIntersection Im p r o v e m e n t L i ft S t a t io n #1 0Rehabilitation P le a s a n tHill P a r k A v o n le a P a r k E a s tCom m u n it yPark Ip a v a A v e n u e a n d 1 6 5 thStreet In te rs e c tio nImprovement R i t t e rFarm P a r k M ic h a u dPark 2 0 1 8 - 2 0 2 2Capital I m p r o v e m e n t P r o j e c t s ² 0 1 20.5 Miles P:\Projects\2017\Engineering\CIP (2018-2023).mxd Date: 9/25/2017 2018 2019 2020 2021 2022 Collector Rehabilitation Parks & Recreation"J Transportation#I Utility!H Local Street Reconstruction Road Expansion/Extension CITY OF LAKEVILLE PLANNING COMMISSION MEETING MINUTES October 5, 2017 Chair Swenson called the meeting to order at 6:00 p.m. in the Council Chambers at City Hall. The pledge of allegiance to the flag was given. Members Present: Chair Jason Swenson, Vice Chair Pat Kaluza, Brooks Lillehei, Paul Reuvers, Scott Einck, Karl Drotning, Jason Kelvie, Ex-officio Member Mike Lamm Members Absent: None Others Present: Daryl Morey, Planning Director; Kris Jenson, Associate Planner; Brent Jones, Planning Assistant/Code Enforcement Technician; and Zach Johnson, City Engineer 3. Approval of the Meeting Minutes The September 21, 2017 Planning Commission meeting minutes were approved as presented. The September 21, 2017 Planning Commission work session minutes were approved as presented. 4. Announcements Mr. Morey stated that the following items were distributed at tonight’s meeting: • Updated findings of fact for the Hampton Inn CUP (Agenda Item #7) • Dakota County open house flyer for the Metro Orange Line Extension Study 5. City of Lakeville Chair Swenson opened the public hearing to consider the request of the City of Lakeville for the adoption of the 2018-2022 Capital Improvement Plan (CIP). City Engineer Zach Johnson presented the draft 2018-2022 CIP. Mr. Johnson reviewed the objectives of the CIP and indicated that the CIP includes future transportation, utility, parks and recreation, facilities and equipment improvements for the years 2018-2022. Mr. Johnson highlighted the more noticeable transportation projects in the proposed 2018-2022 CIP. Minnesota State Statute provides that capital improvements are reviewed by the Planning Commission for consistency with the Comprehensive Plan and report their findings in writing to the City Council. Mr. Johnson stated that staff Planning Commission Meeting Minutes, October 5, 2017 Page 2 has reviewed the 2018-2022 CIP and finds it to be consistent with the Comprehensive Plan and therefore recommends approval as presented. Chair Swenson opened the hearing to the public for comment. There were no comments from the audience. Motion was made by Lillehei, seconded by Kelvie to close the public hearing at 6:06 p.m. Voice vote was taken on the motion. Ayes – unanimous Chair Swenson asked for comments from the Planning Commission. Discussion points included: • Chair Swenson commented that he was pleased to see the transportation projects in the CIP, especially the CSAH 50 improvement projects • Commissioner Drotning commented that the CIP provides a good road map for future City improvements so there will be no surprises Motion was made by Drotning, seconded by Kelvie to recommend to City Council adoption of the 2018-2022 Capital Improvement Plan as presented, which is consistent with the Comprehensive Plan. Ayes: Kelvie, Einck, Lillehei, Swenson, Kaluza, Reuvers, Drotning Nays: 0 6. Independent School District 196 Chair Swenson opened the public hearing to consider the application of ISD 196 for a Conditional Use Permit amendment to allow the construction of an addition to the Parkview Elementary School building, located at 6795 Gerdine Path. Scott McQueen from Wold Architects presented an overview of the request. Associate Planner Kris Jenson presented the planning report. Ms. Jenson stated that ISD #196 is requesting a conditional use permit (CUP) amendment for a 6,000-square foot expansion to the southwest corner of their existing Parkview Elementary School building. The addition will expand the school building over a portion of the existing hard surface playground area and will provide an additional four classrooms. Ms. Jenson indicated that the interior remodeling will relocate the office to be adjacent to the front entrance doors to improve building security, and the former office space will be converted to classrooms. Ms. Jenson stated that the proposed building addition meets all setback requirements of the RS-3 District, and the building height will match the existing building height. The