Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout4732 165th St Survey1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6.Grading plan date/revision date: 6/13/16.7.Plan No. SBF17.05.02-THE CHATHAM-ELEVATION A016'5Lot= 10,451 sq. ft.House/Garage= 2,893 sq. ft.Porch= 180 sq. ft.Driveway= 815 sq. ft.Total Impervious= 3,888 sq. ft. or 37.2 % of lot*#4&%18'4%#.%7.#6+105ProposedGarage Floor @ Front= 937.7Garage Top of Block= 938.4House Top of Block= 938.4Lowest Floor= 930.4Top of Block at Egress Window= 933.6Lot 5, Block 2, SPIRIT OF BRANDTJEN FARM 17TH ADDITION, Dakota County,Minnesota2412'46;&'5%4+26+104732 165th Street West, Lakeville, Minnesota2412'46;#&&4'55I hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 9th day of October, 2017Marcus F. Hampton, MN L.S. No. 474815748';145%'46+(+%#6'(.114'.'8#6+105Top nut of hydrant located at Lots 6 and 7, Block 2 = 937.79$'0%*/#4-Denotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________10/12/2017corlowsky*Maintain 6" between bottom of siding and sod.*No structures in easements.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONPlanning DepartmentApprovedDate:__________________10/16/2017dmorey