Loading...
HomeMy WebLinkAbout17-177CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA RESOLUTION NO. 17-177 RESOLUTION APPROVING THE PRELIMINARY PLAT OF PLEASANT HILL WHEREAS, KJ Walk, Inc. requested approval of the preliminary plat of 113 single family lots to be known as PLEASANT HILL, legally described as follows: The South Half (S 1/z) of the Southeast Quarter (SE %) of Section 11, Township 114, Range 20, Dakota County, Minnesota WHEREAS, the Planning Commission held a public hearing at their November 2, 2017 meeting, preceded by notice as required by the Subdivision Ordinance; and WHEREAS, the Planning Commission and the Parks, Recreation and Natural Resources Committee unanimously recommended approval of the preliminary plat; and WHEREAS, the preliminary plat is acceptable to the City; NOW THEREFORE BE IT RESOLVED by the Lakeville City Council: The PLEASANT HILL preliminary plat is approved subject to the following conditions: 1. Implementation of the recommendations listed in the October 26, 2017 engineering report. 2. The rezoning from RS -3, Single Family Residential District to RS -4, Single Family Residential District shall become effective upon recording of the Pleasant Hill final plat. 3. Park dedication shall be satisfied with a combination of land dedication and cash contribution paid with the final plat for each development phase. 4. The developer shall construct five foot wide concrete sidewalks along one side of all streets, except the cul-de-sacs. The developer shall construct a 10 foot wide bituminous trail on both sides of 1791 Street, from the west plat boundary to the bituminous trails on the west side of Pilot Knob Road. 5. Outlots A, B, and C shall be deeded to the City with the final plat. 6. Buffer yard landscaping shall be installed according to the approved landscape plan. A security for the buffer yard landscaping shall be submitted with the final plat. The lots abutting 179' Street must install sod to the trail and a $1,000 per lot security will be required with the building permit. 7. Landscape plans for the stormwater basins within Outlots A, B, and C are required to be submitted with the final plat. 8. If a subdivision monument sign is proposed for the development, it must be maintenance free and located on a private property. A sign permit is required prior to installation of the sign. ADOPTED by the Lakeville City Council this 20th day of November 2017 ATTEST: -N, Charlene Friedges, CityWk Drafted By: City of Lakeville 20195 Holyoke Avenue Lakeville, MN 55044 2 CITY OF LAKEVILLE Douglas .Anderson, Mayor