Loading...
HomeMy WebLinkAbout0991ORDINANCE NO. 991 CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA AN ORDINANCE ADOPTING FEES THE CITY COUNCIL OF THE CITY OF LAKEVILLE, MINNESOTA ORDAINS: I. LICENSES A. Dynamic Display Sign: 1. Application fee 2. Annual renewal fee 11. PERMITS A. Building Permits TOTAL VALUATION $1.00 to $500.00 $501.00 to 2,000.00 $2,001.00 to $25,000.00 $25,001.00 to $50,000.00 $50,001.00 to $100,000.00 $ 100.00 $ 50.00 FEE $30.00 $30.00 for the first $500.00 plus $3.25 for each additional $100.00, or fraction thereof, to and including $2,000.00 $73.75 for the first $2,000.00 plus $14.75 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 $413.00 for the first $25,000.00 plus $10.75 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 $681.75 for the first $50,000.00 plus $7.50 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 $100,001.00 to $500,000.00 $1,056.75 for the first $100,000.00 plus $6.00 for each additional $1,000.00, or fraction thereof, to and including $500,00.00 $500,001.00 to $1,000,000.00 $3,456.75 for the first $500,000.00 plus $5.00 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $1,000,001.00 and up $5,956.75 for the first $1,000,000.00 plus $4.00 for each additional $1,000.00, or fraction thereof B. Plan Check Fees 65% of building permit fee for permits with valuations greater than $10,000. 25% of building permit fee for permits issued for similar buildings as required by State Building Code. C. Building Permits. Landscaping $1000 escrow for landscaping to be collected with the building permit. D. Building Permits, Erosion Control $1000 escrow for erosion control/grading certification to be collected with the building permit. E. Plumbing Permits Requirement: Master License Number or pipe layers certificate, $25,000 license bond and current Certificate of Liability insurance to be filed with City. Note: State Department of Health Bond and Insurance Certificate will satisfy this requirement. Residential - Minimum (repairs and alterations, lawn sprinkler systems) Complete installation.............................................................................. Commercial —1.5% of contract/valuation price up to $10,000 and 1.0% of contract/valuation price above $10,000 ........... . . 0.0 .... • ......... ... ...... Commercial - Minimum........................................................................... RPZValve (new)....................................................................... RPZ Valve (replacement or rebuild)........................................................ Water Softener/Water Heater................................................................. F. Heatina Permits Residential - Minimum repairs and alterations .................................. Complete installation.................................................................. Commercial -1.5% of contract/valuation price up to $10,000 and 1.0% Of contract/valuation price above $10,000 Commercial minimum............................................................................ $ 40.00 $ 90.00 $ 40.00 $ 40.00 $ 40.00 $ 40.00 $ 40.00 $ 90.00 $ 40.00 G. Sewer and Water Permits Requirement: Master License Number, $25,000 License Bond and current Certificate of Liability Insurance to be filed with City. Note. State Department of Health Bond and insurance Certificate will satisfy this requirement. Residential - Minimum repairs and alterations ....................................... $ 40.00 City water and sewer including conversion ...................................... $ 90.00 Commercial - One percent (1 %) of contract/valuation price ................ Commercial - minimum.......................................................................... $ 40.00 Private sewer systems: New installation ............................................. $ 200.00 Private sewer system repair................................................................... $ 200.00 H. Electrical Permits Requirement: State License from Board of Electricity. Note: An owner who actually occupies or intends to occupy a single family residence is exempt from the licensing requirement. Residential - Minimum repairs and alterations .................................. $ 40.00 2 Residential - Additions, remodels, lower levels (two trips) ................... $70.00 Residential - New installation (up to three trips) ................................ $135.00 Commercial -1.5% of contract/valuation price up to $10,000 and 1.0% of contract/valuation price above $10,000 Commercial minimum................................................................. $ 40.00 Additional trip charge.................................................................. $35.00 I. Well Permits Effective February 1, 1989, all well permits are issued by Dakota County. J. Manufactured Home Inspections Installation permit (foundation, sewer, water, gas) ................................. $ 90.00 Separate permit for electrical hookup ............................................ $ 40.00 K. Swimming Pools All in -ground pools, regardless of capacity, and above -ground pools that exceed 5,000 gallons............................................................ $ 50.00 L. Zoning Permit...................................................................... $ 30.00 M. Signs Permanent installation....................................................................... $ 75.00 Temporary installation 00 days only) .................................................. $ 50.00 N. Moving Structure (plus letter of credit or cash escrow) ............................................... $125.00 O. Demolition 1. Residential Accessory structures ................................................... No Charge 2. All structures other than residential accessory .............................. $ 50.00 P. Fire System Fire Line - One percent of contract/valuation price Q. Sprinkler Fire Protection Requirement: State Fire Protection Contractor License to be filed with the City. Commercial. 1.5% of contract/valuation price up to $10,000 and 1.0% of contract/valuation price above $10,000 plus surcharge (.0005 times contract/valuation). Minimum........................................................................................... $ 45.00 Residential - New Construction.................................................................. $90.00 Residential - Remodel.............................................................................. $45.00 3 R. Miscellaneous Commercial Mechanical Refrigeration, piping, fuel tanks, etc. - 1.5% of contract/valuation price up to $10,000 and 1 % of the con tract/valuation price in excess of $10,000 Minimum................................................................................................. $ 40.00 S. Miscellaneous (re -inspections) Inspections $55.00/hr., minimum 1 hour T. Re -_Roof, Re -Side, Re -deck, and Retaining Walls over 4 feet high Residential.............................................................................................. $ 50.00 Commercial............................................................................................ $ 150.00 U. Windows - Comprehensive or Egress 1. Residential......................................................... $ 50.00 2. Commercial.......................................................................................... $ 150.00 V. Inspections after hours (weekends. Holidays) $ 110.00/hr. Only if an Inspector is available for requested inspection ....................... Minimum 1 hour W. Investigation Fee Whenever any work for which a permit is required by Code has been commenced without first obtaining said permit, the investigation fee shall be equal to the amount of permit fee. III. PLANNING AND ZONING A. Platting (Also refer to Section IV) Dote: Services performed by City personnel will be billed at 2.5 times actual payroll hourly rate. Services provided by City consultant will be billed at current consultant rates. Sketch Plan Review - $2,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants. Preliminary Plat - $500.00 per addition. In addition to the fee, a $2,000.00 escrow is to be paid for legal notices, planning, engineering and legal services provided by staff and/or consultants. Final Plat - $200.00 per addition. In addition to the fee, a $2,000.00 escrow is to be paid for planning, engineering and legal services provided by staff and/or consultants. B. Planned Unit Development - $500.00 plus $2,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants. C. PUD Amendment 4 $500.00 plus $2,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants. D. Variance 1) Single family (includes legal notice publications) ........................... $ 500.00 2) All others, plus $1,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants...... $ 500.00 E. Conditional Use Permit/CUP Amendment 1) Single family (includes legal notice publications) ........................... $ 500.00 2) All others, plus $1000.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants..... $ 500.00 F. Conditional Use Permit, Interim Use Permit and Variance Extension 11 extension $ 50.00 Additional extensions $ 250.00 G. Home Occupation Permit ..................................................... $ 100.00 H. Interim Use Permit/IUP Amendment 1) Single family (includes legal notice publications) ........................... $ 500.00 2) All others, plus $1,000.00 escrow for legal notices, $ 500.00 planning, engineering and legal services provided by staff and/or consultants............................................................................................ . I. Rezoning 500.00 plus $1,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants. J. Administrative Subdivision $ 500.00 plus all applicable dedication requirements and $1,000.00 escrow for planning, engineering and legal services provided by staff and/or consultants. K. Street and Easement Vacations $200.00 plus $1,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants. L. Zoning Ordinance Text Amendment $500.00 plus $2,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants. M. Lot Release 5 $500.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants. N. Parking Deferment $100.00 plus $ 1,000.00 escrow for planning, engineering and legal services provided by staff and/or consultants. 0. Comprehensive Plan Amendment $500.00 plus $2,000.00 escrow for legal notices, planning, engineering and legal services provided by staff and/or consultants. P. Site Plan $100.00 plus $1,000.00 escrow for planning, engineering and legal services provided by staff and/or consultants. Q. Administrative Permit (per City Ordinance 11-8-3) ................... $100.00 R. Cost Recovery Fee (For code enforcement activities) $70.00 per re- inspection S. Zoning Letter...................................................................... $ 100.00 T. Notice of Appeal................................................................... $ 100.00 IV. ENGINEERING A. Platting Sketch plan review Services performed by City personnel will be hourly and billed ot2.S times actual payroll hourly rate applied to the Planning and Zoning escrows. Preliminary Plat - ...............................................$150.00/acre $ 500.00 minimum $ 3,200.00 maximum Final Plat -........................................................$150.00/acre $ 500.00 maximum B. Construction and Asbuilt Construction Plan Review Site, grading, erosion control, drainage, utility and street plan and specifications review. Services performed by City Personnel will be hourly. A cash escrow may be required (if not collected through Planning and Zoning). C. Wetland Conservation Act Administration (platting or non -platting action) A A minimum fee of $250.00 will be required and additional staff time will be billed hourly (if not collected through Planning and Zoning actions). in addition to the above fees, a deposit will be required to fund special studies such as environmental assessment worksheets, transportation, drainage, noise impacts, indirect source permits, etc. The amount of deposit to be based on the site, complexity, diversity and location of the project Wetland Delineation............................................................... $250.00 WetlandApplication.................................................................. $250.00 Wetland Appeal of Notice of Decision .......................................... $300.00 D. General Engineering 1. Developer Installed Improvements: A. Engineering administration - 3.0% of project construction cost* or 3.25% if security in the form of a cash disbursement agreement. Assumes normal construction conditions and project scheduling. B. Construction, grading/erosion control, final acceptance and warranty inspection (hourly as charged by City's consultant). Services performed by City personnel will be hourly and billed at 2.5 times actual payroll hourly rate. C. Property Data and Asset/Infrastructure management fee (GIS fee)- $ 90.00 parcel/lot preparation of record construction drawings and city base map updating. for PDF files $60.00 parcel/lot For SHP files 2. City Installed Improvements (non -development): A. Engineering contract administration - 2.0%-3.0% of project construction cost (depending on project) B. Feasibility report - as charged by consultants or 20% of design fee if performed by City staff C. Design - as charged by consultants or as per standard ASCE fee curve if performed by City staff D. Construction observation and final inspection - hourly as charged by City's consultant. Services performed by City personnel will be hourly and billed at 2.5 times actual payroll hourly rate. 7 V. CONNECTION CHARGES AND OTHER DEVELOPMENT FEES A. Storm Sewer Area Charge (new storm water management infrastructure) 1. Single Family Residential $ 0.178/sq. ft. 2. Multi -Family Residential $ 0.198/sq. ft. 3. Commercial and Industrial $ 0.250/sq. ft. B. Crystal Lake Surcharge for Crystal Lake Drainage Areas Only (for new stormwater management) 1. Single Family Residential $ 0.0134/sq. ft. 2. Multi -Family Residential $ 0.0153/sq. ft. 3. Commercial and Industrial $ 0.0195/sq. ft. C. Lateral Watermain Access Charge (for adjacent watermain previously unassessed) 1. Residential 2. Non -Residential D. Lateral Sanitary Sewer Access Charge (for adjacent sanitary sewer previously unassessed) 1. Residential and Non -Residential E. Sanitary Sewer Availability Charge F. Sanitary Sewer Unit $ 41.00 per front foot plus $ 408.00 per service $ 48.00 per front foot plus $ 408.00 per service $ 41.50 per front foot plus $ 418.00 per service $ 327.00 per unit $ 825.00 per unit G. Watermain Unit Charge (paid with building permit- funds new water infrastructure) 1. Residential $ 4,100.00 per unit 2. High Density, Commercial, Industrial $ 2,050.00 per unit H. Cash Fee for Future Improvements to Adjacent Streets 1. Residential Urban Section 2. Residential Rural Section 3. Commercial Urban Section 4. Commercial Rural Section I. Park Dedication Fees 1. High Density Residential 2. Medium Density Residential 3. Low Density Residential $ 107.00 per front foot $ 62.00 per front foot $ 160.00 per front foot $ 94.00 per front foot $ 2,134.00 per dwelling unit $ 2,783.00 per dwelling unit $ 4,090.00 per dwelling unit 4. Commercial $ 7,693.00 per acre 5. Industrial $ 4,558.00 per acre Ordinance shall be effective January 1, 2018. Adopted by the Lakeville City Council this 4th day of December 2017 E CITY OF LAKEVILLE By: Doug as P. Anderson, Mayor SUMMARY OF ORDINANCE NO. 991 CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA AN ORDINANCE ADOPTING A FEE SCHEDULE This ordinance prescribes fees sufficient to defray the costs incurred by the City of Lakeville in reviewing, investigating and administering applications from the amendment to an official control established pursuant to Minnesota Statutes Sections 462.351 to 462.364 and applications for permits or approvals required under an official control established pursuant to those sections. A printed copy of the ordinance is available for inspection by any person during regular office hours at the office of the City Clerk. APPROVED FOR PUBLICATION by the Lakeville City Council this 4t" day of December 2017 CITY OF LAKEVILLE By: Doug as P. Anderson, Mayor ATTEST: