Loading...
HomeMy WebLinkAboutLA146545 Permit Plans DESIGN BY: Paul Thomas Design 612-250-9400 1 ! " ! # $ % ! & ' ( & ! ) * $ + * DLM CONSTRUCTION 7 12 Concept Approval ONLY Subject to Field Inspection Inspector Date2015MN Bldg Code 04/01/2016 dmathews 5036 5036 26 2 0 50 2 0 26 2 0 5 0 3 6 S S S S S S UP UP UP 13 ' - 6 " x 1 3 ' - 7 " 10 ' - 8 " x 3 ' - 1 1 " 24 ' - 5 " x 2 8 ' - 7 " 9' - 1 " x 1 1 ' - 1 1 " 10 ' - 8 " x 1 8 ' - 4 " 26 ' - 6 " x 3 6 ' - 6 " 5' x 1 1 ' - 1 1 " 26 ' x 1 9 ' - 5 " , - . / & 8' - 0 " 9' - 9 " 5' - 0 " 1 4 ' - 5 " 2 9 ' - 2 " 3 7 ' - 5 " 1 0 ' - 9 " 3 ' - 8 " 63 ' - 6 " 11 ' - 7 " 26 ' - 6 " 4' - 5 " 6' - 2 " 14 ' - 9 " 3'-9" 7' - 9 " 2' - 6 " 4' - 9 " 4' - 9 " 14 ' - 7 " 6 ' - 0 " 1 2 ' - 0 " 2 0 ' - 0 " 5 ' - 5 " 4 ' - 7 " 33'-0" 9'-6" 4'-4" 19'-2" 15'-5" 3'-9" 7'-1" 2'-5" 1' - 4 " 9' - 6 " 5' - 3 " 11 ' - 8 " 11 ' - 8 " 3 ' - 7 " 6 ' - 0 " 8' - 0 " 16 ' - 0 " 9'-0" 5 ' - 1 " 25 ' - 5 " 11 ' - 0 " 10 ' - 1 0 " 11 ' - 0 " 3' - 6 " 2 0 ' - 3 " WE T B A R BE D R O O M RE F BA T H FU R N A C E R O O M ST O R A G E RE C R O O M UN E X C A V A T E D CL O S E T BE D R O O M PA R T I A L WI N D O W W E L L - 0 1 , - 0 2 3 & / & $ 45 FI N I S H E D 6 - ) 3 # ) / & $ 70 ) 3 # ) % * * 6 & ( & " 8 3 ! & 7 0 3 ) 6 - ) 3 # ) / & $ 70 ) 3 # ) % * * 6 - ) 3 # ) / & $ 1 7 & 9 " 7 0 WI N D O W S C H E D U L E NU M B E R L A B E L Q T Y F L O O R W I D T H H E I G H T D E S C R I P T I O N W0 1 5 0 3 6 1 0 6 0 " 4 2 " D B L C A S E M E N T - L H L W0 2 5 0 2 0 1 0 6 0 " 2 4 " F I X E D G L A S S W0 3 2 6 2 0 2 0 3 0 " 2 4 " S N G L C A S E M E N T - H L W0 5 5 0 3 6 2 0 6 0 " 4 2 " D B L C A S E M E N T - L H L / R H R , 6 - ) 3 # ) / & $ 0 ) 3 # ) % * * 6 - ) 3 # ) / & $ -0 ) 3 # ) % * * 6 - ) 3 # ) / & $ 70 ) 3 # ) % * * - 0 - 0 - 0 : ; = 6 " ( = 6 " ( = 6 " ( = 6 "( = 6 "( = 1 DO O R S C H E D U L E LA B E L Q T Y F L O O R W I D T H H E I G H T 28 6 8 7 0 3 2 " 8 0 " 30 6 8 1 0 3 6 " 8 0 " 50 6 8 1 0 6 0 " 8 0 " 1 - @ 7 0 - 0 1 , - 0 2 3 & / & $ 76 7 2 3 & = 6 " ( = 6 " ( DESIGN BY: Paul Thomas Design 612-250-9400 2 DLM CONSTRUCTION Mi n . ( 3 ) 2 x 1 2 S o u t h e r n P i n e f o r s p a n Mi n . 2 1 " d i a m e t e r a t bo t t o m . Sm o k e CO Sm o k e Sm o k e CO Sm o k e 3' 3' m i n i m u m f o r e g r e s s wi n d o w w e l l d e p t h Ne e d l a n d i n g a n d st a i r s s o s t a i r d o e s n o t ru n i n t o d o o r t o g a r a g e on m a i n l e v e l -M a x 8 0 s q u a r e f e e t o f b a s e m e n t ce i l i n g c a n b e l e f t w i t h o u t s h e e t r o c k an d m u s t b e f i r e b l o c k e d f r o m sh e e t r o c k e d a r e a . (2 ) 1 4 " 2 . 0 e L V L Mi n 2 6 " x 2 6 " x 1 2 " p a d fo o t i n g f o r p o i n t l o a d Tr a n s f e r p o i n t l o a d fr o m a b o v e UFER Ground -Provide 20' Rebar in footing and stub up near electrical service panel. Pr o v i d e f o o t i n g s u p p o r t f o r bu m p o u t i n f l o o r a b o v e o r ha v e f l o o r s y s t e m d e s i g n e d to c a n t i l e v e r o u t . B u m p o u t in g a r a g e c a n n o t b e a r o n ga r a g e s l a b . DN DN 1 6 3 6 60 4 0 26 5 0 50 5 0 26 5 0 4836 6116 48 3 6 5050 3036 36 2 9 36 6 0 6068 6068 3628 3660 5050 UP V i l l a g e S c o n c e V i l l a g e S c o n c e V i l l a g e S c o n c e -5 = - 0 6 5 = 0 5 = 0 6 5 = 0 5 = 0 6 - 5 = 0 5 6 5 = 0 5= 0 6 <5=70 < 5 = 4 0 6 - 5 = - 0 < 5 6 5 = 4 0 5=,0 6 5= 0 26 ' - 6 " x 3 6 ' - 6 " . /& 4' - 0 " 12 ' - 4 " 4 ' - 3 " 8 ' - 4 " 6' - 3 " 9' - 4 " 2 ' - 0 " 5' - 1 0 " 6' - 1 " 2' - 1 0 " 4' - 7 " 4' - 7 " 2' - 9 " 8' - 1 0 " 1 3 ' - 7 " 2 ' - 0 " 8 ' - 3 " 1 9 ' - 4 " 8 ' - 8 " 7 ' - 5 " 4 ' - 5 " 3' - 3 " 3'-3" 4' - 7 " 4'-6" 5'-0" 5'-0" 3' - 5 " 3'-5" 6'-0" 6' - 0 " 3'-10" 3'-9" 5 ' - 0 " 2 5 '-7 " 4'-11" 4'-11" 33'-0" 31 ' - 7 " 1' - 5 " 6' - 0 " 6 ' - 0 " 3' - 6 " 14 ' - 6 " 16'-4" 12'-0" 6'-0" 3' - 6 " 8'-0" 8'-0" 1 2 ' - 0 " 2 0 ' - 0 " 1 0 ' - 0 " 4 2 ' - 0 " 24 ' - 0 " ga r a g e m u d be n c h VA U L T E D VAULTED DI N I N G A : GA R A G E ; A 3 % ( 9' C E I L I N G ; WINDOW SCHEDULE NUMBER QTY FLOOR WIDTH HEIGHT EGRESS DESCRIPTION W01 1 1 72 " 48 " TRIPLE CASEMNT-LHL/RHR W02 2 1 72 " 80 " FIXED GLASS W04 1 1 18 " 42 " SNGL CASEMENT-HR W05 1 1 42 " 31 11/16 " FIXED GLASS W06 1 1 24 " 48 " SNGL CASEMENT-HR W07 2 1 56 " 42 " DBL CASEMENT-LHL/RHR W08 1 1 42 " 32 7/8 " FIXED GLASS W09 2 1 60 " 60 " DBL CASEMENT-LHL/RHR W10 2 1 42 " 72 " FIXED GLASS W11 1 1 36 " 42 " FIXED GLASS W12 1 1 60 " 60 " SNGL CASEMENT-HR W13 1 1 73 " 18 " FIXED GLASS W14 2 1 30 " 60 " SNGL CASEMENT-HR /( B ( ; *! # # 9' C E I L I N G 9' C E I L I N G ' 9*& " A 3'-0" < > , 1 , - < > , = > - 0 * # " ! # $ 9' CEILING 2 0 3 0 S C 26 3 6 S C 4 0 ' - 9 " 6' - 0 " 12 ' - 0 " : DESIGN BY: Paul Thomas Design 612-250-9400 3 9' CEILING BO N U S R O O M O V E R G A R A G E SI P M A I N F L O O R E X T E R I O R W A L L S DLM CONSTRUCTION Gi r d e r Girder Girder Gi r d e r Gi r d e r Gi r d e r Gi r d e r Girder In s u l - B e a m In s u l - B e a m In s u l - B e a m Insul-BeamInsul-Beam Insul-Beam Insul-Beam Insul-Beam In s u l - B e a m I n s u l - B e a m I n s u l - B e a m I n s u l - B e a m Sm o k e CO Sm o k e FANCL -Min. 15" clearance to any obstruction from center of W.C.,24" in front(typ). (2 ) 2 x 8 m i n . (2) 2x8 min C L FA N FA N Te m p e r e d G l a s s -STHD Straps per SIP Engineering -Super Spline per SIP Engineering ( 3 ) 1 8 " L V L DESIGN BY: Paul Thomas Design 612-250-9400 4 20X8 CONCRETE FOOTING 2x6 TREATED MUDSILL 2x6 STUDS SPACED IN ALIGNMENT w/ JOISTS DOUBLE 2x TOP PLATE VAPOR BARRIER DLM CONSTRUCTIONBLOCKING In t e r i o r F o o t i n g FINISH FLOOR & TRIM 18" FLOOR TRUSSES BATT INSULATION CAST-IN-PLACE ANCHOR BOLT WOOD SUBFLOOR If sill plate is to be held out over insulation, a 2x8 min sill may be required to maintain anchor bolt clearance to face of wall and face of sill plate. -6 m i l p o l y r e q u i r e d o n i n s u l a t i o n p r i o r t o ba c k f i l l i f u s i n g N o n - D r a i n i n g i n s u l a t i o n . DESIGN BY: Paul Thomas Design 612-250-9400 5 2" I N S U L A T I O N DLM CONSTRUCTION 2x 4 T O P P L A T E 2x 4 W A L L S T U D S 2" I N S U L A T I O N DR Y W A L L 2x 4 T R E A T E D B O T T O M P L A T E CO N C R E T E S L A B RE I N F O R C I N G S T E E L A S R E Q U I R E D VA P O R B A R R I E R 4" G R A V E L B A S E 2x 6 T R E A T E D M U D S I L L CA S T - I N - P L A C E A N C H O R B O L T SI L L S E A L CO N C R E T E F O U N D A T I O N W A L L CO N C R E T E F O O T I N G RE I N F O R C I N G S T E E L A S R E Q U I R E D Ba s e m e n t F o u n d a t i o n : F i n i s h e d 4 " W a l l s (p r i n t a t 1 " = 1 ' ) DR A I N A G E S Y S T E M EQ U A L L Y S P A C E D R I S E R S 7 1 / 2 " M A X (c h e c k l o c a l c o d e f o r r e q u i r e m e n t s ) In t e r i o r S t a i r (p r i n t a t 1 " = 1 ' ) BA S E M O L D I N G FI N I S H F L O O R I N G PL Y W O O D S U B F L O O R AT T R E A D A N D R I S E R FU L L S T R I N G E R SO F F I T BL O C K I N G NO T C H E D ST R I N G E R -6 m i l p o l y r e q u i r e d o n i n s u l a t i o n p r i o r t o ba c k f i l l i f u s i n g N o n - D r a i n i n g i n s u l a t i o n . 6'-11" 1'-6" 1 ' - 7 " 9 ' ( ! )*3 & /*33( +3' & !( -0 7 DESIGN BY: Paul Thomas Design 612-250-9400 6 ; N RA D O N D E T A I L DLM CONSTRUCTION DESIGN BY: Paul Thomas Design 612-250-9400 1 ! " ! # $ % ! & ' ( & ! ) * $ + * DLM CONSTRUCTION 7 12 S S S S S S D/W UP UP UP , - . & / / - . & 87 8 s q f t 10 7 s q f t 24 0 s q f t 85 9 s q f t 59 s q f t 0 - . & 5 ' - 5 " 1 ' - 4 " 7' - 3 " 0' - 8 " 6 ' - 7 " 2 ' - 2 " 3' - 1 0 " 1' - 9 " 1 2 ' - 8 " 25 ' - 4 " 1 5 ' - 6 " 1 3 ' - 4 " 37 ' - 8 " 4'-9" 1 0 ' - 9 " 6 ' - 0 " 8' - 0 " 16 ' - 0 " 9'-0" 4 ' - 2 " 11 ' - 0 " 10 ' - 1 0 " 11 ' - 0 " 3'-9" 33'-0" 3' - 6 " 2 0 ' - 6 " WE T B A R BE D R O O M BA T H FU R N A C E R O O M RE C R O O M UN E X C A V A T E D 1 PA R T I A L WI N D O W W E L L / 2 3 4 / 2 5 6 & . & $ 78 FI N I S H E D 9 & ( & " : 6 ! & , 2 6 ) 1 WI N D O W S C H E D U L E NU M B E R Q T Y F L O O R W I D T H H E I G H T D E S C R I P T I O N W0 2 1 0 6 0 " 2 4 " F I X E D G L A S S W0 3 3 0 6 0 " 4 2 " D B L C A S E M E N T - L H L / R H R W0 5 2 0 3 0 " 2 4 " S N G L C A S E M E N T - H R 4 9 / ) 6 # ) . & $ 2 ) 6 # ) % * * 9 / ) 6 # ) . & $ 9 / ) 6 # ) . & $ ,2 ) 6 # ) % * * / 2 , 0;4 9 4 0;4 , 0 ; 4 9 4 0 ; 4 0 0 ; 4 9 4 0 ; 4 0 0 ; 4 9 , 0 ; 4 9 DESIGN BY: Paul Thomas Design 612-250-9400 2 NE W L O W E R L E V E L P L A N DLM CONSTRUCTION Sm o k e Sm o k e CO Sm o k e Sm o k e CO FA N ( 4 ) 1 1 - 7 / 8 L V L (2 ) 1 4 " L V L Mi n 2 6 " x 2 6 " x 1 2 " p a d fo o t i n g f o r p o i n t l o a d Tr a n s f e r p o i n t l o a d fr o m a b o v e DN DN D / W UP 3 0 X 2 2 A T T I C A C C E S S 30X22 ATTIC ACCESS , - . & 0/ - . & 0 - . & - . & 7 - .& - . & - . & /, - .& 7 / - . & 88 3 s q f t 3'-3" 7' - 6 " 3'-0" 2 ' - 3 " 7' - 7 " 2'- 1 1 " 2 ' - 5 " 3 ' - 0 " 52 ' - 0 " 16'-0" 1 2 ' - 0 " 7 ' - 1 " 17'-0" 9'-0" 5'-9" 3 ' - 1 0 " 4' - 8 " 3 ' - 2 " 3' - 5 " 3' - 5 " 2'-8" 4'-4" 3 ' - 1 0 " 2' - 7 " 7 ' - 2 " 7 ' - 4 " 7'-3" 5'- 6 " 1'-0" 3'-7" 2 ' - 7 " 6 ' - 1 1 " 10 ' - 9 " 5'-3" 6 ' - 9 " 1 ' - 1 0 " 12 ' - 7 " 1 6 ' - 4 " 4' - 5 " 4' - 0 " 12 ' - 4 " 4 ' - 3 " 8 ' - 4 " 6' - 3 " 9' - 4 " 2 ' - 1 " 5' - 1 0 " 6' - 1 " 1 3 ' - 7 " 2 ' - 0 " 8 ' - 3 " 1 9 ' - 4 " 8 ' - 8 " 7 ' - 5 " 4 ' - 5 " 5'-0" 5'-0" 3' - 5 " 3'-5" 5 ' - 0 " 25 ' - 2 " 4'-11" 4' - 1 1 " 33'-0" 6 ' - 0 " 3' - 6 " 14 ' - 6 " 16'-4" 6'-0" 3' - 6 " 8'-0" 8'-0" 1 2 ' - 0 " 2 0 ' - 0 " 1 0 ' - 0 " ga r a g e m u d be n c h VA U L T E D VAULTED DI N I N G < 1 GA R A G E = < 6 % ( 9' C E I L I N G WINDOW SCHEDULE NU M B E R Q T Y F L O O R W I D T H H E I G H T E G R E S S D E S C R I P T I O N W0 1 1 1 7 2 " 4 8 " T R I P L E C A S E M N T - L H L / R H R W0 2 2 1 7 2 " 8 0 " F I X E D G L A S S W0 3 1 1 3 8 3 / 8 " 6 0 " S N G L C A S E M E N T - H R W0 4 1 1 1 8 " 4 2 " S N G L C A S E M E N T - H R W0 5 1 1 4 2 " 3 1 1 1 / 1 6 " F I X E D G L A S S W0 6 1 1 2 4 " 4 8 " S N G L C A S E M E N T - H R W0 7 2 1 5 6 " 4 2 " D B L C A S E M E N T - L H L / R H R W0 8 1 1 4 2 " 3 2 7 / 8 " F I X E D G L A S S W0 9 2 1 6 0 " 6 0 " D B L C A S E M E N T - L H L / R H R W1 0 2 1 4 2 " 7 2 " F I X E D G L A S S W1 1 1 1 3 6 " 4 2 " F I X E D G L A S S W1 2 1 1 6 0 " 6 0 " S N G L C A S E M E N T - H R W1 4 2 1 3 0 " 6 0 " S N G L C A S E M E N T - H R .( > ( = *! # # 9' C E I L I N G ? / ' @*& " < ? / 3'-0" ? 4 ; / 2 0 ? ; / 2 * # " ! # $ ? / ? / ? / ?/ ?, ?/9' CEILING 4? 0, 2 & * * &( 5@ * * 6 @ & %! # UP UP 4 0 ' - 9 " 6' - 0 " 12 ' - 0 " 1 DESIGN BY: Paul Thomas Design 612-250-9400 3 9' CEILING BO N U S R O O M O V E R G A R A G E SI P M A I N F L O O R E X T E R I O R W A L L S DLM CONSTRUCTION R3 0 5 . 2 . 1 . 1 B a t h r o o m p l u m b i n g f i x t u r e c l e a r a n c e . B a t h r o o m s s h a l l ha v e a m i n i m u m c e i l i n g h e i g h t o f 6 f e e t 4 i n c h e s a t t h e c e n t e r o f th e f r o n t c l e a r a n c e a r e a f o r w a t e r c l o s e t s , b i d e t s , o r s i n k s . A sh o w e r o r t u b w i t h a s h o w e r h e a d s h a l l h a v e a m i n i m u m c e i l i n g he i g h t o f 6 f e e t 4 i n c h e s a b o v e a m i n i m u m a r e a 3 0 i n c h e s b y 3 0 in c h e s a t t h e w a l l w h e r e t h e s h o w e r h e a d i s p l a c e d . T h e c e i l i n g ma y h a v e s l o p e s o r s o f f i t t h a t d o n o t i n f r i n g e o n t h e h e i g h t re q u i r e d f o r t h e p l u m b i n g f i x t u r e . 3 / 2 4 / 2 0 1 6 3 / 2 4 / 2 0 1 6 3 / 2 4 / 2 0 1 6 3 / 2 4 / 2 0 1 6 3 / 2 4 / 2 0 1 6 Project Name: Job#: Shipping Client Description: BeamA 2.0E WS-LAM LVL 1.750" X 14.000" 2-Ply - PASSED Quantity 1 (2pcs.) Powered by iStruct  15.6.062 12' 12' 1 SPF 2 SPF 3 1/2" 1'2" User Inputs Design Method: ASD Type: Girder Application: Floor Plies: 2 Material Type: LVL Material Name: 2.0E WS-LAM LVL Depth: 14 Width: 1.75 Load Sharing: No Importance: Normal Temperature: Temp <= 100°F Decking: Not Checked Defl. LL Span: L / 480 Defl. LL Cant: L / 180 Defl. TL Span: L / 360 Defl. TL Cant: L / 180 Spans Span 1: 12-0-0 Bearings Brg 1: 5.3125" SPF Brg 2: 5.3125" SPF Analysis Details Material Properties Name E Fb Fcp Fv Density 2.0E WS-LAM LVL 2E6 3100 850 285 37.4 Resistance Factors Moment Factor Shear Factor Comp Perp Factor Cr-Bending Cr-Shear Load Sharing Ct Ct (E) 0.907379487127757 1 1 1 1 No 1 1 EI (including Ct (E)) Bare EI Composite EI Ct (E) (temp. factor for E) 1.600667E+009 1.600667E+009 1 Load Combinations Checked for Strength (Factors include importance factor) Comb. No. Description Pattern Count Cd-Duration D L S W C 1 D 1 0.9 1 0 0 0 0 2 D+L 1 1 1 1 0 0 0 Load Combinations Checked for Deflection (Total Loads: Dead + Live Loads) Comb. No. Description Pattern Count Cd-Duration D L S W C 1 D 1 0.9 1 0 0 0 0 2 D+L 1 1 1 1 0 0 0 Load Combinations Checked for Deflection (Live Loads) Comb. No. Description Pattern Count Cd-Duration D L S W C 1 L 1 1 0 1 0 0 0 4/1/2016 10:01 AM Page 1 of 2 Designer: Project Name: Job#: Shipping Client Description: BeamA 2.0E WS-LAM LVL 1.750" X 14.000" 2-Ply - PASSED Quantity 1 (2pcs.) Powered by iStruct  15.6.062 Bearing Calculation (MR: Max Reaction) Brg. No. Input Length Req'ed Length Reaction MR Load Comb. MR Load Case MR Dead MR Live Uplift 1 5.3125 5.25 7501.5 D+L L 2551.5 4950 0 2 5.3125 5.25 7501.5 D+L L 2551.5 4950 0 Maximum Moment at Each Member Mem No. Span No. Combination Load Case Cd CL Resist. Factors Moment Span-X Mr Mr_orig Ratio 1 Spn 1 D+L L 1 0.907 0.907 20864 5-9-5 28639 14320 0.7285 Maximum Shear at Each Member Mem No. Span No. Brg No. Max Combination Load Case Cd Res Fac Max Shear Vr Ratio 1 Spn 1 1 Yes D+L L 1 1 5765 9310 0.6192 Maximum Deflection on Span and Cantilever for Total Load (Dead + Live) Def. Span Desc. Combination Load Case Max Deflection Span ID Span-X Span Analog Length L / Allowable L / Actual Ratio Critical Span D+L L 0.3131 Spn 1 5-9-5 11-6-10 360 442.7 0.81 Maximum Deflection on Span and Cantilever for Live Load Only Def. Span Desc. Combination Load Case Max Deflection Span ID Span-X Span Analog Length L / Allowable L / Actual Ratio Critical Span L L 0.2065 Spn 1 5-9-5 11-6-10 480 671.2 0.72 4/1/2016 10:01 AM Page 2 of 2 Designer: Project Name: Job#: Shipping Client Description: BeamB D FIR-L #1 2.000" X 10.000" 2-Ply - PASSED Quantity 1 (2pcs.) Powered by iStruct  15.6.062 8' 8' 1 SPF 2 SPF 3" 9 1/4" User Inputs Design Method: ASD Type: Girder Application: Roof Slope: 0 Plies: 2 Material Type: Lumber Material Name: D FIR-L Lumber Grade: #1 Depth: 9.25 Width: 1.5 Load Sharing: No Importance: Normal Temperature: Temp <= 100°F Decking: Not Checked Defl. LL Span: L / 240 Defl. LL Cant: L / 180 Defl. TL Span: L / 240 Defl. TL Cant: L / 180 Spans Span 1: 8-0-0 Bearings Brg 1: 5.3125" SPF Brg 2: 5.3125" SPF Analysis Details Material Properties Name Lumber Grade Depth E Fb Fcp Fv D FIR-L #1 9.25 1.7E6 1000 625 180 Resistance Factors Moment Factor Shear Factor Comp Perp Factor Cr-Bending Cr-Shear Load Sharing Ct Ct (E) 0.988950823018317 1 1 1 1 No 1 1 EI (including Ct (E)) Bare EI Composite EI Ct (E) (temp. factor for E) 3.363676E+008 3.363676E+008 1 Load Combinations Checked for Strength (Factors include importance factor) Comb. No. Description Pattern Count Cd-Duration D L S W C 1 D 1 0.9 1 0 0 0 0 2 D+L 1 1 1 1 0 0 0 Load Combinations Checked for Deflection (Total Loads: Dead + Live Loads) Comb. No. Description Pattern Count Cd-Duration D L S W C 1 D 1 0.9 1 0 0 0 0 2 D+L 1 1 1 1 0 0 0 Load Combinations Checked for Deflection (Live Loads) Comb. No. Description Pattern Count Cd-Duration D L S W C 1 L 1 1 0 1 0 0 0 4/1/2016 10:00 AM Page 1 of 2 Designer: Project Name: Job#: Shipping Client Description: BeamB D FIR-L #1 2.000" X 10.000" 2-Ply - PASSED Quantity 1 (2pcs.) Powered by iStruct  15.6.062 Bearing Calculation (MR: Max Reaction) Brg. No. Input Length Req'ed Length Reaction MR Load Comb. MR Load Case MR Dead MR Live Uplift 1 5.3125 1.5 1568 D+L L 728 840 0 2 5.3125 1.5 1568 D+L L 728 840 0 Maximum Moment at Each Member Mem No. Span No. Combination Load Case Cd CL Resist. Factors Moment Span-X Mr Mr_orig Ratio 1 Spn 1 D+L L 1 0.989 0.989 2568 3-7-7 3922 1961 0.6549 Maximum Shear at Each Member Mem No. Span No. Brg No. Max Combination Load Case Cd Res Fac Max Shear Vr Ratio 1 Spn 1 2 Yes D+L L 1 1 1117 3330 0.3354 Maximum Deflection on Span and Cantilever for Total Load (Dead + Live) Def. Span Desc. Combination Load Case Max Deflection Span ID Span-X Span Analog Length L / Allowable L / Actual Ratio Critical Span D+L L 0.072 Spn 1 3-7-8 7-2-14 240 1206.1 0.2 Maximum Deflection on Span and Cantilever for Live Load Only Def. Span Desc. Combination Load Case Max Deflection Span ID Span-X Span Analog Length L / Allowable L / Actual Ratio Critical Span L L 0.0386 Spn 1 3-7-8 7-2-14 240 2251.4 0.11 4/1/2016 10:00 AM Page 2 of 2 Designer: Project Name: Job#: Shipping Client Description: BeamC 2.0E WS-LAM LVL 1.750" X 9.500" 2-Ply - PASSED Quantity 1 (2pcs.) Powered by iStruct  15.6.062 8' 8' 1 SPF 2 SPF 3 1/2" 9 1/2" User Inputs Design Method: ASD Type: Girder Application: Roof Slope: 0 Plies: 2 Material Type: LVL Material Name: 2.0E WS-LAM LVL Depth: 9.5 Width: 1.75 Load Sharing: No Importance: Normal Temperature: Temp <= 100°F Decking: Not Checked Defl. LL Span: L / 240 Defl. LL Cant: L / 180 Defl. TL Span: L / 240 Defl. TL Cant: L / 180 Spans Span 1: 8-0-0 Bearings Brg 1: 5.3125" SPF Brg 2: 5.3125" SPF Analysis Details Material Properties Name E Fb Fcp Fv Density 2.0E WS-LAM LVL 2E6 3100 850 285 37.4 Resistance Factors Moment Factor Shear Factor Comp Perp Factor Cr-Bending Cr-Shear Load Sharing Ct Ct (E) 0.975170781879591 1 1 1 1 No 1 1 EI (including Ct (E)) Bare EI Composite EI Ct (E) (temp. factor for E) 5.001354E+008 5.001354E+008 1 Load Combinations Checked for Strength (Factors include importance factor) Comb. No. Description Pattern Count Cd-Duration D L S W C 1 D 1 0.9 1 0 0 0 0 2 D+L 1 1 1 1 0 0 0 Load Combinations Checked for Deflection (Total Loads: Dead + Live Loads) Comb. No. Description Pattern Count Cd-Duration D L S W C 1 D 1 0.9 1 0 0 0 0 2 D+L 1 1 1 1 0 0 0 Load Combinations Checked for Deflection (Live Loads) Comb. No. Description Pattern Count Cd-Duration D L S W C 1 L 1 1 0 1 0 0 0 4/1/2016 9:59 AM Page 1 of 2 Designer: Project Name: Job#: Shipping Client Description: BeamC 2.0E WS-LAM LVL 1.750" X 9.500" 2-Ply - PASSED Quantity 1 (2pcs.) Powered by iStruct  15.6.062 Bearing Calculation (MR: Max Reaction) Brg. No. Input Length Req'ed Length Reaction MR Load Comb. MR Load Case MR Dead MR Live Uplift 1 5.3125 2 2847.4 D+L L 1167.4 1680 0 2 5.3125 2 2847.4 D+L L 1167.4 1680 0 Maximum Moment at Each Member Mem No. Span No. Combination Load Case Cd CL Resist. Factors Moment Span-X Mr Mr_orig Ratio 1 Spn 1 D+L L 1 0.975 0.975 4723 3-7-11 14251 7125 0.3314 Maximum Shear at Each Member Mem No. Span No. Brg No. Max Combination Load Case Cd Res Fac Max Shear Vr Ratio 1 Spn 1 1 Yes D+L L 1 1 2030 6318 0.3214 Maximum Deflection on Span and Cantilever for Total Load (Dead + Live) Def. Span Desc. Combination Load Case Max Deflection Span ID Span-X Span Analog Length L / Allowable L / Actual Ratio Critical Span D+L L 0.0901 Spn 1 3-7-12 7-3-6 240 969.6 0.25 Maximum Deflection on Span and Cantilever for Live Load Only Def. Span Desc. Combination Load Case Max Deflection Span ID Span-X Span Analog Length L / Allowable L / Actual Ratio Critical Span L L 0.0531 Spn 1 3-7-12 7-3-6 240 1645.2 0.15 4/1/2016 9:59 AM Page 2 of 2 Designer: Project Name: Job#: Shipping Client Description: BeamD 2.0E WS-LAM LVL 1.750" X 9.500" 2-Ply - PASSED Quantity 1 (2pcs.) Powered by iStruct  15.6.062 9' 9' 1 SPF 2 SPF 3 1/2" 9 1/2" User Inputs Design Method: ASD Type: Girder Application: Floor Plies: 2 Material Type: LVL Material Name: 2.0E WS-LAM LVL Depth: 9.5 Width: 1.75 Load Sharing: No Importance: Normal Temperature: Temp <= 100°F Decking: Not Checked Defl. LL Span: L / 480 Defl. LL Cant: L / 180 Defl. TL Span: L / 360 Defl. TL Cant: L / 180 Spans Span 1: 9-0-0 Bearings Brg 1: 5.3125" SPF Brg 2: 5.3125" SPF Analysis Details Material Properties Name E Fb Fcp Fv Density 2.0E WS-LAM LVL 2E6 3100 850 285 37.4 Resistance Factors Moment Factor Shear Factor Comp Perp Factor Cr-Bending Cr-Shear Load Sharing Ct Ct (E) 0.97029713696748 1 1 1 1 No 1 1 EI (including Ct (E)) Bare EI Composite EI Ct (E) (temp. factor for E) 5.001354E+008 5.001354E+008 1 Load Combinations Checked for Strength (Factors include importance factor) Comb. No. Description Pattern Count Cd-Duration D L S W C 1 D 1 0.9 1 0 0 0 0 2 D+L 1 1 1 1 0 0 0 Load Combinations Checked for Deflection (Total Loads: Dead + Live Loads) Comb. No. Description Pattern Count Cd-Duration D L S W C 1 D 1 0.9 1 0 0 0 0 2 D+L 1 1 1 1 0 0 0 Load Combinations Checked for Deflection (Live Loads) Comb. No. Description Pattern Count Cd-Duration D L S W C 1 L 1 1 0 1 0 0 0 4/1/2016 9:59 AM Page 1 of 2 Designer: Project Name: Job#: Shipping Client Description: BeamD 2.0E WS-LAM LVL 1.750" X 9.500" 2-Ply - PASSED Quantity 1 (2pcs.) Powered by iStruct  15.6.062 Bearing Calculation (MR: Max Reaction) Brg. No. Input Length Req'ed Length Reaction MR Load Comb. MR Load Case MR Dead MR Live Uplift 1 5.3125 3.75 5476.9 D+L L 1800.4 3676.5 0 2 5.3125 3.75 5476.9 D+L L 1800.4 3676.5 0 Maximum Moment at Each Member Mem No. Span No. Combination Load Case Cd CL Resist. Factors Moment Span-X Mr Mr_orig Ratio 1 Spn 1 D+L L 1 0.97 0.97 10809 4-2-9 14251 7125 0.7585 Maximum Shear at Each Member Mem No. Span No. Brg No. Max Combination Load Case Cd Res Fac Max Shear Vr Ratio 1 Spn 1 1 Yes D+L L 1 1 4167 6318 0.6595 Maximum Deflection on Span and Cantilever for Total Load (Dead + Live) Def. Span Desc. Combination Load Case Max Deflection Span ID Span-X Span Analog Length L / Allowable L / Actual Ratio Critical Span D+L L 0.2763 Spn 1 4-2-10 8-5-2 360 366 0.98 Maximum Deflection on Span and Cantilever for Live Load Only Def. Span Desc. Combination Load Case Max Deflection Span ID Span-X Span Analog Length L / Allowable L / Actual Ratio Critical Span L L 0.1854 Spn 1 4-2-10 8-5-2 480 545.5 0.88 4/1/2016 9:59 AM Page 2 of 2 Designer: Project Name: Job#: Shipping Client Description: BeamE 2.0E WS-LAM LVL 1.750" X 9.500" 2-Ply - PASSED Quantity 1 (2pcs.) Powered by iStruct  15.6.062 9' 9' 1 SPF 2 SPF 3 1/2" 9 1/2" User Inputs Design Method: ASD Type: Girder Application: Floor Plies: 2 Material Type: LVL Material Name: 2.0E WS-LAM LVL Depth: 9.5 Width: 1.75 Load Sharing: No Importance: Normal Temperature: Temp <= 100°F Decking: Not Checked Defl. LL Span: L / 480 Defl. LL Cant: L / 180 Defl. TL Span: L / 360 Defl. TL Cant: L / 180 Spans Span 1: 9-0-0 Bearings Brg 1: 5.3125" SPF Brg 2: 5.3125" SPF Analysis Details Material Properties Name E Fb Fcp Fv Density 2.0E WS-LAM LVL 2E6 3100 850 285 37.4 Resistance Factors Moment Factor Shear Factor Comp Perp Factor Cr-Bending Cr-Shear Load Sharing Ct Ct (E) 0.970669516819777 1 1 1 1 No 1 1 EI (including Ct (E)) Bare EI Composite EI Ct (E) (temp. factor for E) 5.001354E+008 5.001354E+008 1 Load Combinations Checked for Strength (Factors include importance factor) Comb. No. Description Pattern Count Cd-Duration D L S W C 1 D 1 0.9 1 0 0 0 0 2 D+L 1 1 1 1 0 0 0 Load Combinations Checked for Deflection (Total Loads: Dead + Live Loads) Comb. No. Description Pattern Count Cd-Duration D L S W C 1 D 1 0.9 1 0 0 0 0 2 D+L 1 1 1 1 0 0 0 Load Combinations Checked for Deflection (Live Loads) Comb. No. Description Pattern Count Cd-Duration D L S W C 1 L 1 1 0 1 0 0 0 4/1/2016 9:58 AM Page 1 of 2 Designer: Project Name: Job#: Shipping Client Description: BeamE 2.0E WS-LAM LVL 1.750" X 9.500" 2-Ply - PASSED Quantity 1 (2pcs.) Powered by iStruct  15.6.062 Bearing Calculation (MR: Max Reaction) Brg. No. Input Length Req'ed Length Reaction MR Load Comb. MR Load Case MR Dead MR Live Uplift 1 5.3125 2.75 3744 D+L L 1494 2250 0 2 5.3125 2.75 3744 D+L L 1494 2250 0 Maximum Moment at Each Member Mem No. Span No. Combination Load Case Cd CL Resist. Factors Moment Span-X Mr Mr_orig Ratio 1 Spn 1 D+L L 1 0.971 0.971 7246 4-2-1 14251 7125 0.5085 Maximum Shear at Each Member Mem No. Span No. Brg No. Max Combination Load Case Cd Res Fac Max Shear Vr Ratio 1 Spn 1 1 Yes D+L L 1 1 2814 6318 0.4455 Maximum Deflection on Span and Cantilever for Total Load (Dead + Live) Def. Span Desc. Combination Load Case Max Deflection Span ID Span-X Span Analog Length L / Allowable L / Actual Ratio Critical Span D+L L 0.1815 Spn 1 4-2-2 8-4-2 360 551.5 0.65 Maximum Deflection on Span and Cantilever for Live Load Only Def. Span Desc. Combination Load Case Max Deflection Span ID Span-X Span Analog Length L / Allowable L / Actual Ratio Critical Span L L 0.109 Spn 1 4-2-2 8-4-2 480 918.4 0.52 4/1/2016 9:58 AM Page 2 of 2 Designer: 18" FLOOR TRUSSES SPACING AS NOTED ON LAYOUT 18" Floors @ 19.2" OC 1/2" SheathingALL DIMENSIONS ARE FROM SHEATHING TO SHEATHING.YOU WILL SEE A "X" ON ONE END OF EACH TRUSS SHOWN ON THE LAYOUT. THIS DENOTES THE LEFT END OF THE TRUSS. THIS CORRESPONDS TO THE LEFT SIDE OF THE INDIVIDUAL TRUSS DRAWING.THE "X" ALSO DENOTES PAINTED END FOR FLOOR TRUSSES.IF YOU HAVE ANY QUESTION ABOUT WHICH DIRECTION THE TRUSS IS TO BE PLACED,PLEASE CALL KEVIN @ 763-280-0888. Be a m A F l u s h L V L F l u s h H d r F l u s h H d r (7 ) L U S 4 1 0 H g r s H d r f o r s t a i r s 4 4 ' 0 " 14 ' 9 " 48 ' 8 " 6' 0" 33' 0" 5' 0" 24 ' 0 " 39 ' 5 " 4' 0 " 12 ' 4 " 7' 8 " SALES REP: DD DUE DATE: 03/01/16 DSGNR/CHKR: KHH / TC Live TC Dead BC Live BC Dead Total 40.00 psf 15.00 psf 0.00 psf 5.00 psf 60.00 psfWO#: 273470 SCALE: 1/8" = 1’Date: 4/1/2016 10:33 DurFac-Lbr : 1.00 DurFac-Plt : 1.00 O.C. Spacing: 1- 7- 3 Design Spec: IRC-2012 #Tr/#Cfg: 0 / 0 A l l i e d / S c h u m a c h e r P r o - B u i l d 1 0 0 2 5 2 0 5 t h S t W L a k e v i l l e , M N A1 A A A E E E E E E E E E E E E E E E E E E E E E F F F F1 G G G G1 B H1 H H H H H H H K K K K K K K M M M M M M M M M L L L L L L L (2 ) 1 4 " L V L Br g @ c e n t e r o f " M 1 " Ha n d F r a m e B e a m D F l u s h L v l B e a m B F l u s h H d r B e a m C @ r i d g e Ma y c h a n g e p r o f i l e i n t h i s a r e a . Ma y H F t h i s a r e a . At t i c s h a v e 2 X 1 2 B C Op e n i n g f o r s t a i r s a n d l a n d i n g ne e d s v e r i f i c a t i o n . " A 5 " a n d " A 6 " ar e l o a d e d f o r w o r s e c a s e B e a m E F l u s h L v l @ r i d g e ALL DIMENSIONS ARE FROM SHEATHING TO SHEATHING.YOU WILL SEE A "X" ON ONE END OF EACH TRUSS SHOWN ON THE LAYOUT. THIS DENOTES THE LEFT END OF THE TRUSS. THIS CORRESPONDS TO THE LEFT SIDE OF THE INDIVIDUAL TRUSS DRAWING.IF YOU HAVE ANY QUESTION ABOUT WHICH DIRECTION THE TRUSS IS TO BE PLACED,PLEASE CALL KEVIN @ 763-280-0888. Hanger Schedule "K" Series attached to "L" with LUS24 "M" Series attached to "G3" and "A6" with MUS28 "F" Series attached to "K2" with LUS24 HF 12' 9" 5 ' 9 " 1 7 ' 7 - 1 / 2 " 8 ' 4 - 1 / 2 " 7 ' 7 - 1 / 2 " 8 ' 0 " 14 ' 9 " 48 ' 8 " 8' 1 - 1 / 2 " 7' 9 " 7' 8 " 3' 1 1 - 1 / 2 " SALES REP: DD DUE DATE: 03/01/16 DSGNR/CHKR: KHH / TC Live TC Dead BC Live BC Dead Total 35.00 psf 7.00 psf 0.00 psf 10.00 psf 52.00 psfWO#: 273469 SCALE: 1"=12' 0"Date: 4/1/2016 10:27 DurFac-Lbr : 1.15 DurFac-Plt : 1.15 O.C. Spacing: 2 Design Spec: IRC-2012 #Tr/#Cfg: 99 / 57 A l l i e d / S c h u m a c h e r P r o - B u i l d 1 0 0 2 5 2 0 5 t h S t W L a k e v i l l e , M N G1 G2 G2 G3 A3A3 A4A2A2A2A2A2A1A7A8A9A10 A1A5 BBBB FF1F1F2 A6 L H 2 H H H H H 1 H 5 H 4 H 4 H 4 H 4 H 4 H 4 H 4 H 1 H 1 H 1 H 1 H 1 K K K K K K M1 M M M M M M M M VV1V2V3V4V5V6 V7 V8 V9 M K B1B1B1 V 1 0 R V 1 1 R V 1 2 R V 1 3 R V 1 4 R V 1 5 R V 1 7 L V 1 8 L V 1 9 L V 2 0 L V 2 1 L V 2 2 L M K 2 F3F4F5F6F7F8 N ( 2 ) 2 x 1 0 ( 2 ) 9 - 1 / 2 " L V L ( 2 ) 9 - 1 / 2 " L V L ( 2 ) 9 - 1 / 2 " L V L