HomeMy WebLinkAbout16585 Duluth Tr Survey1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6.Grading plan date/revision date: 8/28/2015.7.Plan No. SBF15.10.01-BALEY016'5Lot= 13,711 sq. ft.House/Garage= 2,571 sq. ft.Porch= 120 sq. ft.Driveway= 1,063 sq. ft.Total Impervious= 3,754 sq. ft. or 27.4 % of lot*#4&%18'4%#.%7.#6+105ProposedGarage Floor @ Front= 934.4Garage Top of Block= 935.1House Top of Block= 935.1Lowest Floor= 927.1Lot 10, Block 1, SPIRIT OF BRANDTJEN FARM 15TH ADDITION, Dakota County,Minnesota2412'46;&'5%4+26+1016585 Duluth Trail, Lakeville, Minnesota2412'46;#&&4'55I hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 23rd day of February, 2018Marcus F. Hampton, MN L.S. No. 474815748';145%'46+(+%#6'(.114'.'8#6+105Top nut of hydrant located at Lots 10 and 11, Block 1 = 930.30$'0%*/#4-Denotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationPlanning DepartmentApprovedDate:__________________03/07/2018dmoreyENGINEERING REVIEWEDDate:__________________03/08/2018ibradshawThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.