DEVELOPMENT CONTRACT
(Developer Installed Improvements)
PHEASANT RUN OF LAKEVILLE FOURTH ADDITION
CONTRACT dated ____________________, 2018, by and between the CITY OF LAKEVILLE, a
Minnesota municipal corporation (“City”), and KJ WALK, INC., a Florida corporation (the “Developer”).
1. REQUEST FOR PLAT APPROVAL. The Developer has asked the City to approve a plat
for Pheasant Run of Lakeville Fourth Addition (referred to in this Contract as the "plat"). The land is situated
in the County of Dakota, State of Minnesota, and is legally described as:
Outlot D, Pheasant Run of Lakeville Third Addition, Dakota County Minnesota,
according to the recorded plat thereof.
2. CONDITIONS OF PLAT APPROVAL. The City hereby approves the plat on condition that
the Developer enter into this Contract, furnish the security required by it, and record the plat with the County
Recorder or Registrar of Titles within 100 days after the City Council approves the final plat.
3. RIGHT TO PROCEED. Within the plat or land to be platted, the Developer may not grade or
otherwise disturb the earth or remove trees, unless a grading permit has been approved by the City
Engineer following approval of a preliminary plat by the City Council, construct sewer lines, water lines,
streets, utilities, public or private improvements, or any buildings until all the following conditions have been
satisfied: 1) this agreement has been fully executed by both parties and filed with the City Clerk, 2) t he
197186v2 2
necessary security has been received by the City, 3) the necessary insurance for the Developer and its
construction contractors has been received by the City, and 4) the plat has been filed with the Dakota
County Recorder or Registrar of Titles’ office.
4. PHASED DEVELOPMENT. If the plat is a phase of a multi-phased preliminary plat, the City
may refuse to approve final plats of subsequent phases if the Developer has breached this Contract and the
breach has not been remedied. Development of subsequent phases may not proceed until Development
Contracts for such phases are approved by the City. Park dedication charges referred to in this Contract are
not being imposed on outlots, if any, in the plat that are designated in an approved preliminary plat for future
subdivision into lots and blocks. Such charges will be calculated and imposed when the outlots are final
platted into lots and blocks.
5. PRELIMINARY PLAT STATUS. If the plat is a phase of a multi-phased preliminary plat, the
preliminary plat approval for all phases not final platted shall lapse and be void unless final platted into lots
and blocks, not outlots, within two (2) years after preliminary plat approval.
6. CHANGES IN OFFICIAL CONTROLS. For two (2) years from the date of this Contract, no
amendments to the City’s Comprehensive Plan, except an amendment placing the plat in the current
metropolitan urban service area, or official controls shall apply to or affect the use, development density, lot
size, lot layout or dedications of the approved plat unless required by state or federal law or agreed to in
writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the contrary,
to the full extent permitted by state law, the City may require compliance with any amendments to the City’s
Comprehensive Plan, official controls, platting or dedication requirements enacted after the date of this
Contract.
7. DEVELOPMENT PLANS. The plat shall be developed in accordance with the following
plans. The plans shall not be attached to this Contract. With the exception of Plans A, B, C, and F the plans
may be prepared, subject to the City Engineer’s approval, after entering the Contract, but before
commencement of any work in the plat. The City Engineer may approve minor amendments to Plan B
without City Council approval. The erosion control plan may also be approved by the Dakota County Soil
197186v2 3
and Water Conservation District. If the plans vary from the written terms of this Contract, the written terms
shall control. The plans are:
Plan A - Plat
Plan B - Final Grading, Drainage, and Erosion Control Plan
Plan C - Tree Preservation Plan
Plan D - Plans and Specifications for Public Improvements
Plan E - Street Lighting Plan
Plan F - Landscape Plan
8. IMPROVEMENTS. The Developer shall install and pay for the following:
A. Sanitary Sewer System
B. Water System
C. Storm Sewer System
D. Streets
E. Concrete Curb and Gutter
F. Street Lights
G. Site Grading, Stormwater Treatment/Infiltration Basins, and Erosion Control
H. Underground Utilities
I. Setting of Iron Monuments
J. Surveying and Staking
K. Sidewalks and Trails
L. Retaining Walls
The improvements shall be installed in accordance with the City subdivision ordinance; City standard
specifications for utility and street construction; and any other ordinances including Section 11-16-7 of the
City Code concerning erosion and drainage and Section 4-1-4-2 prohibiting grading, construction activity,
and the use of power equipment between the hours of 10 o’clock p.m. and 7 o’clock a.m. The Developer
shall submit plans and specifications which have been prepared by a competent registered professional
197186v2 4
engineer to the City for approval by the City Engineer. The Developer shall instruct its engineer to provide
adequate field inspection personnel to assure an acceptable level of quality control to the extent that the
Developer’s engineer will be able to certify that the construction work meets the approved City standards as
a condition of City acceptance. In addition, the City may, at the City’s discretion and at the Developer’s
expense, have one or more City inspectors and a soil engineer inspect the work on a full or part-time basis.
The Developer, its contractors and subcontractors, shall follow all instructions received from the City’s
inspectors. The Developer’s engineer shall provide for on-site project management. The Developer’s
engineer is responsible for design changes and contract administration between the Developer and the
Developer’s contractor. The Developer or its engineer shall schedule a pre-construction meeting at a
mutually agreeable time at the City with all parties concerned, including the City staff, to review the program
for the construction work. Within thirty (30) days after the completion of the improvements and before the
security is released, the Developer shall supply the City with a complete set of reproducible “as constructed”
plans and an electronic file of the “as constructed” plans in an AutoCAD .DWG file or a .DXF file, all
prepared in accordance with City standards.
In accordance with Minnesota Statutes 505.021, the final placement of iron monuments for all lot
corners must be completed before the applicable security is released. The Developer’s surveyor shall also
submit a written notice to the City certifying that the monuments have been installed following site grading,
utility and street construction.
9. CONTRACTORS/SUBCONTRACTORS. City Council members, City employees, and City
Planning Commission members, and corporations, partnerships, and other entities in which such
individuals have greater than a 25% ownership interest or in which they are an officer or director may not
act as contractors or subcontractors for the public improvements identified in Paragraph 8 above.
10. PERMITS. The Developer shall obtain or require its contractors and subcontractors to
obtain all necessary permits, which may include:
A. Dakota County for County Road Access and Work in County Rights-of-Way
B. MnDot for State Highway Access
C. MnDot for Work in Right-of -Way
197186v2 5
D. Minnesota Department of Health for Watermains
E. MPCA NPDES Permit for Construction Activity
F. MPCA for Sanitary Sewer and Hazardous Material Removal and Disposal
G. DNR for Dewatering
H. City of Lakeville for Building Permits
I. MCES for Sanitary Sewer Connections
J. City of Lakeville for Retaining Walls
11. DEWATERING. Due to the variable nature of groundwater levels and stormwater flows, it
will be the Developer’s and the Developer’s contractors and subcontractors responsibility to satisfy
themselves with regard to the elevation of groundwater in the area and the level of effort needed to
perform dewatering and storm flow routing operations. All dewatering shall be in accordance with all
applicable county, state, and federal rules and regulations. DNR regulations regarding appropriations
permits shall also be strictly followed.
12. TIME OF PERFORMANCE. The Developer shall install all required public improvements by
November 30, 2018, with the exception of the final wear course of asphalt on streets. The final wear course
on streets shall be installed between August 15th and October 15th the first summer after the base layer of
asphalt has been in place one freeze thaw cycle. The Developer may, however, request an extension of
time from the City. If an extension is granted, it shall be conditioned upon updating the security posted by
the Developer to reflect cost increases and the extended completion date. Final wear course placement
outside of this time frame must have the written approval of the City Engineer.
13. LICENSE. The Developer hereby grants the City, its agents, employees, officers and
contractors a license to enter the plat to perform all work and inspections deemed appropriate by the City in
conjunction with plat development.
14. EROSION CONTROL. Prior to initiating site grading, the erosion control plan, Plan B, shall
be implemented by the Developer and inspected and approved by the City or Dakota County Soil and Water
Conservation District. The City or Dakota County Soil and Water Conservation District may impose
additional erosion control requirements if they would be beneficial. All areas disturbed by the grading
197186v2 6
operations shall be stabilized per the MPCA Stormwater Permit for Construction Activity. Seed shall be in
accordance with the City’s current seeding specification which may include temporary seed to provide
ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as
necessary for seed retention. The parties recognize that time is of the essence in controlling erosion. If the
Developer does not comply with the MPCA Stormwater Permit for Construction Activity or with the erosion
control plan and schedule or supplementary instructions received from the City or the Dakota County Soil
and Water Conservation District, the City may take such action as it deems appropriate to control erosion.
The City will endeavor to notify the Developer in advance of any proposed action, but failure of the City to do
so will not affect the Developer’s and City’s rights or obligations hereunder. If the Developer does not
reimburse the City for any cost the City incurred for such work within ten (10) days, the City may draw down
the letter of credit to pay any costs. No development, utility or street construction will be allowed and no
building permits will be issued unless the plat is in full compliance with the approved erosion control plan.
15. GRADING. The plat shall be graded in accordance with the approved grading development
and erosion control plan, Plan “B”. The plan shall conform to City of Lakeville specifications. Within thirty
(30) days after completion of the grading and before the City approves individual building permits (except
two (2) model home permits on lots acceptable to the Building Official), the Developer shall provide the City
with an “as constructed” grading plan certified by a registered land surveyor or engineer that all storm water
treatment/infiltration basins and swales, have been constructed on public easements or land owned by the
City. The “as constructed” plan shall include field verified elevations of the following: a) cross sections of
storm water treatment/infiltration basins; b) location and elevations along all swales, wetlands, wetland
mitigation areas if any, locations and dimensions of borrow areas/stockpiles, and installed “conservation
area” posts; and c) lot corner elevations and house pads, and all other items listed in City Code Section 10-
3-5.NN. The City will withhold issuance of building permits until the approved certified grading plan is on file
with the City and all erosion control measures are in place as determined by the City Engineer. The
Developer certifies to the City that all lots with house footings placed on fill have been monitored and
constructed to meet or exceed FHA/HUD 79G specifications. The soils observation and testing report,
197186v2 7
including referenced development phases and lot descriptions, shall be submitted to the Building Official for
review prior to the issuance of building permits.
Before a building permit is issued, a cash escrow of $1,000.00 per lot shall be furnished to the City
to guarantee compliance with the erosion control and grading requirements and the submittal of an as -
built certificate of survey. Prior to the release of the required individual lot grading and erosion control
security that is submitted with the building permit, an as-built certificate of survey for single family lots must
be submitted to verify that the final as-built grades and elevations of the specific lot and all building setbacks
are consistent with the approved grading plan for the development, and amendments thereto as approved
by the City Engineer, and that all required property monuments are in place. If the final grading, erosion
control and as-built survey is not timely completed, the City may enter the lot, perform the work, and apply
the cash escrow toward the cost. Upon satisfactory completion of the grading, erosion control and as-built
survey, the escrow funds, without interest, less any draw made by the City, shall be returned to the person
who deposited the funds with the City.
16. CLEAN UP. The Developer shall clean dirt and debris from streets that has resulted from
construction work by the Developer, home builders, subcontractors, their agents or assigns. Prior to any
construction in the plat, the Developer shall identify in writing a responsible party and schedule for erosion
control, street cleaning, and street sweeping.
17. OWNERSHIP OF IMPROVEMENTS. Upon completion of the work and construction
required by this Contract and final acceptance by the City, the improvements lying within public easements
shall become City property without further notice or action.
18. CITY ENGINEERING ADMINISTRATION AND CONSTRUCTION OBSERVATION. The
Developer shall pay a fee for in-house engineering administration. City engineering administration will
include monitoring of construction observation, consultation with Developer and its engineer on status or
problems regarding the project, coordination for final inspection and acceptance, project monitoring during
the warranty period, and processing of requests for reduction in security. Fees for this service shall be three
percent (3%) of construction costs identified in the Summary of Security Requirements if using a letter of
197186v2 8
credit, assuming normal construction and project scheduling. The Developer shall pay for construction
observation performed by the City’s in-house engineering staff or consulting engineer. Construction
observation shall include part or full time inspection of proposed public utilities and street construction and
will be billed on hourly rates estimated to be five percent (5%) of the estimated construction cost.
19. STORM SEWER AREA CHARGE. Development of Pheasant Run of Lakeville Fourth
Addition includes the construction of a public storm sewer system. Storm sewer will be installed within the
subdivision to collect and convey stormwater runoff generated from within the public right-of-way and lots
to the public stormwater management basins located within Outlots A and B.
Draintile construction is required in areas of non-granular soils within Pheasant Run of Lakeville
Fourth Addition for the street sub-cuts and lots. Any additional draintile construction, including perimeter
draintile required for building footings, which is deemed necessary during construction shall be the
Developer’s responsibility to install and finance.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcel, and must be
paid upon final plat approval and is calculated as follows:
Gross Area of Pheasant Run of Lakeville Fourth 498,827.00 s.f.
Less Area of Outlot A (Stormwater Management Basin) (-) 57,034.00 s.f.
Less Area of Outlot B (Stormwater Management Basin) (-) 20,500.00 s.f.
Less Area of Outlot C (Future Development) (-) 15,357.00 s.f.
Total = 405,936.00 s.f.
405,936.00 s.f. x $0.178/s.f. = $72,256.61
Net Area of Pheasant
Run of Lakeville Fourth Addition
Single Family
Area Charge
Total Trunk
Storm Sewer Area Charge
The Trunk Storm Area Charge will be collected at the time Outlot C is final platted into lots and
blocks, at the rate in effect at the time of final plat approval
The Developer will receive a credit to the Trunk Storm Sewer Area Charge for deeding Outlots A
and B to the City, consistent with City policy. The credit is based on the area of the outlots and is
197186v2 9
calculated at the rate of $5,500 per acre, and will be applied to the final plat cash fees, calculated as
follows:
1.78 acres x $5,500/acre = $9,790.00
Total Area of Outlots A and B Per Acre Credit Total
20. SANITARY SEWER AVAILABILITY CHARGE.
The Sanitary Sewer Availability Charge has not been collected on the parent parcel and shall be
paid upon final plat approval. The fee will be based on the rate in effect at the time of final plat approval
and is calculated as follows:
29 units x $327.00 = $9,483.00
Total Units In Pheasant Run
of Lakeville Fourth Addition
Sanitary Sewer Availability Charge
Per Unit
Sanitary Sewer
Availability Charge required
21. WATERMAIN. Development of Pheasant Run of Lakeville Fourth Addition includes the
extension of public watermain. Watermain shall be extended within the development from watermain
constructed with the first phase of the development to provide water service to the subdivision.
Consistent with the City’s Water Plan, the Developer shall extend 12-inch watermain through the
development from existing watermain within Pilot Knob Road to connect to the existing distribution
system. The Developer will receive a $98,975.00 credit to their cash fees with the final plat for the
oversizing of the trunk watermain, calculated as the cost difference between 8-inch watermain and the 12-
inch watermain that will be installed. The 12-inch watermain will be installed along Essex Lane to Embers
Avenue.
The Lateral Watermain Access Charge is due for the portion of 12-inch watermain within Pilot
Knob Road right-of-way adjacent the parent parcel. The Lateral Watermain Access Charge is based on
the rate in effect at the time of final plat approval and is calculated as follows:
389.97 x $41.00/Front Foot = $15,988.77
Front Footage along
Pilot Knob Road
Lateral Watermain Access Charge
Total
197186v2 10
22. CONSTRUCTION ACCESS. Construction traffic access and egress for grading, utility and
street construction shall be from Embers Avenue, by way of 179th Street.
23. PARK, TRAILS AND SIDEWALKS. Development of Pheasant Run of Lakeville Fourth
Addition includes the construction of public trails and sidewalks. The Developer shall install a 5-foot wide
concrete sidewalk, with pedestrian curb ramps, along one side of the local roadways. The Developer
shall install a bituminous trail along the north side of 179th Street and west side of Pilot Knob Road
adjacent to the plat. The Developer is responsible for 100% of the grading and restoration of the
bituminous trail. The Developer shall receive a credit to the Park Dedication Fee for the City’s 45% of
3/8th share of the trail construction costs along 179th Street and Pilot Knob Road, calculated as follows:
$34,625.00 X 3/8 X 45% = $5,842.97
179th Street and Pilot Knob Road
Estimated Trail Construction Cost
City’s Share Total Credit to Cash Fees
56.83% (109.68/193 lots) of the Park Dedication requirement was satisfied with previous phases of
the Pheasant Run of Lakeville preliminary plat, through a combination of land dedication for a future
greenway corridor and a cash contribution. The remainder of the Park Dedication requirement will be
satisfied through a cash contribution. The Park Dedication requirement for Pheasant Run of Lakeville
Fourth Addition is calculated as follows:
29 lots x $4,090.00 = $118,610.00
Lots in Pheasant Run of
Lakeville Fourth Addition
Park Dedication Rate Park Dedication Requirement
24. TRAFFIC CONTROL SIGNS. The Developer shall pay a cash fee for traffic control signs
due upon final plat approval. Street signing consists of: three stop and street blade combinations at $450
each, two stop signs at $350 each, one one-way arrow sign at $125, six nine button delineators at $125
each, two future thru street signs at $75 each and a mobilization fee of $150 for a total of $3,225. If the
street signs are installed during frost conditions, the developer shall pay an additional $150 for each street
sign location. A cash fee for one-year of streetlight operating expenses shall be paid at the time of final
plat approval and is calculated as follows:
197186v2 11
29 units x $35.40/unit = $1,026.60
Dwelling Units Streetlight Operating Fee Total
25. ENVIRONMENTAL RESOURCES EXPENSES. The Developer shall pay to the City
$1,333.76 in payment of the first year environmental resources expenses for the subdivision due upon final
plat approval. The fee is calculated as follows:
29 units x $10.42/unit/qtr. x 4 qtrs. = $1,208.72
Dwelling Units Environmental Resources Fee Total
26. LANDSCAPING. Unless the lot already has two (2) trees on it, the Developer or lot
purchaser shall plant sufficient trees so that there are at least two (2) trees on every lot in the plat, one of
which must be planted in the front yard. Trees that are chosen by the Developer or property owner cannot
cause a public nuisance, such as cotton producing trees, or trees that may become a public hazard due to
insect infestation or weak bark. The minimum deciduous tree size shall be two and one-half (2½) inches
caliper, balled and burlapped. Evergreen trees must be at least eight feet (8’) tall. The trees may not be
planted in the right-of-way. The Developer or lot purchaser shall sod the front yard, boulevard, and side
yards to the rear of the structure on every lot. Weather permitting, the trees, sod, and seed shall be
planted within sixty (60) days after a home has received a certificate of occupancy. Before a building
permit is issued, a cash escrow of $1,000.00 per lot shall be furnished the City to guarantee compliance
with the landscaping requirements. If the landscaping is not completed in a timely manner, the City may
enter the lot, perform the work, and apply the cash escrow toward the cost. Upon satisfactory completion
of the landscaping the escrow funds, without interest, less any draw made by the City, shall be returned to
the person who deposited the funds with the City. All trees shall be warranted to be alive, of good quality,
and disease free for twelve (12) months after planting. Any replacements shall be warranted for twelve
(12) months from the time of planting. The Developer or property owner is responsible for contacting the
City when all the landscaping has been installed to set up an inspection. Fifty percent (50%) of the
security will be released when all the landscaping has been installed and inspected by City staff and the
197186v2 12
remaining fifty percent (50%) will be released one year after the landscaping inspection and any warranty
work has been completed.
27. BUFFER YARD BERM/LANDSCAPE SCREEN. A buffer yard containing earth berms
and/or plantings of a sufficient density to provide a visual screen and a reasonable buffer a minimum of
ten feet in height shall be provided adjacent to 179th Street and Pilot Knob Road. A certified as-built
grading plan of the buffer yard berm must be submitted and approved by City staff prior to the installation
of any buffer yard plantings. The Developer shall provide a security in the amount of $15,600.00 for
installation of the landscaping at the time of final plat approval.
28. SPECIAL PROVISIONS. The following special provisions shall apply to plat development:
A. Implementation of the recommendations listed in the April 9,2018 Engineering Report.
B. Before the City signs the final plat, the Developer shall convey Outlots A and B to the City by
Warranty Deed free and clear of any and all encumbrances other than public utility and right of
way easements.
C. The Developer shall pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction cost, or $17,708.52. The Developer will receive a credit to the cash fees for City
Engineering Administration of oversized public improvements.
D. The Developer shall place a “Future Street Extension” sign and barricade at the north termini
of Embers Avenue and English Avenue until extended in the future.
E. A $1,000 cash escrow must be submitted with the building permit applications for Lots 2-9, Block
3, and Lot 2, Block 4 to guarantee installation of the buffer side/rear yard sod to the edge of the
trail to be constructed on the north side of 179th Street. This escrow will be in addition to the 2
(two) trees/lot and front yard sod escrow required at the time of building permit.
F. Prior to City Council approval of the final plat, the Developer shall furnish a boundary survey of
the proposed property to be platted with all property corner monumentation in place and marked
with lath and a flag. Any encroachments on or adjacent to the property shall be noted on the
197186v2 13
survey. The Developer shall post a security to ensure the final placement of interior subdivision
iron monuments at property corners. The security was calculated as follows: 32 lots/outlots at
$100.00 per lot/outlots. The security will be held by the City until the Developer's land surveyor
certifies that all irons have been set following site grading and utility and street construction. In
addition, the certificate of survey must also include a certification that all irons for a specific lot
have either been found or set prior to the issuance of a building permit for that lot.
G. The Developer shall pay a cash fee for the preparation of record construction drawings and City
base map updating. This fee is $90.00 per lot/outlot for a total charge of $2,880.00.
H. The Developer shall be responsible for the cost of street light installation consistent with a street
lighting plan approved by the City. Before the City signs the final plat, the Developer shall post a
security for street light installation consistent with the approved plan. The estimated amount of
this security is $10,800.00 and consists of nine (9) post top lights at $1,200.00 each.
I. The Developer is required to submit the final plat in electronic format. The electronic format shall
be either AutoCAD.DWG file or a .DXF file. All construction record drawings (e.g., grading,
utilities, streets) shall be in electronic format in accordance with standard City specifications.
29. SUMMARY OF SECURITY REQUIREMENTS. To guarantee compliance with the terms of
this Contract, payment of real estate taxes including interest and penalties, payment of special
assessments, payment of the costs of all public improvements, and construction of all public improvements,
the Developer shall furnish the City with a cash escrow, letter of credit or alternate security, in the form
attached hereto, from a bank ("security") for $687,766.66. If an alternate security is furnished, the
Developer shall also furnish a letter of credit for twenty-five percent (25%) of the alternate security amount to
cover any contract increases. The amount of the security was calculated as follows:
CONSTRUCTION COSTS:
A. Sanitary Sewer $61,592.00
B. Watermain 194,810.00
C. Storm Sewer/Draintile 64,076.00
D. Streets 229,806.00
197186v2 14
E. Erosion Control/Stormwater Basins,
Restoration, Grading Certification 40,000.00
CONSTRUCTION SUB-TOTAL $590,284.00
OTHER COSTS:
A. Developer’s Design (3.0%) $17,708.52
B. Developer’s Construction Survey (2.5%) 14,757.10
C. City Legal Expenses (Est. 0.5%) 2,951.42
D. City Construction Observation (Est. 5.0%) 29,514.20
E. Developer’s Record Drawings (0.5%) 2,951.42
F. Landscaping 15,600.00
G. Street Lights 10,800.00
H. Lot Corners/Iron Monuments 3,200.00
OTHER COSTS SUB-TOTAL $ 97,482.66
TOTAL SECURITIES: $687,766.66
This breakdown is for historical reference; it is not a restriction on the use of the security. The bank
shall be subject to the approval of the City Administrator. The City may draw down the security, on five (5)
business days written notice to the Developer, for any violation of the terms of this Contract or without notice
if the security is allowed to lapse prior to the end of the required term. If the required public improvements
are not completed at least thirty (30) days prior to the expiration of the security, the City may also draw it
down without notice. If the security is drawn down, the proceeds shall be used to cure the default. Upon
receipt of proof satisfactory to the City that work has been completed and financial obligations to the City
have been satisfied, with City approval the security may be reduced from time to time by ninety percent
(90%) of the financial obligations that have been satisfied. Ten percent (10%) of the amounts certified by the
Developer's engineer shall be retained as security until all improvements have been completed, all financial
obligations to the City satisfied, the required "as constructed" plans have been received by the City, a
warranty security is provided, and the public improvements are accepted by the City Council. The City’s
standard specifications for utility and street construction outline procedures for security reductions.
197186v2 15
30. SUMMARY OF CASH REQUIREMENTS. The following is a summary of the cash
requirements under this Contract which must be furnished to the City prior to the City Council signing the
final plat:
A. Park Dedication 118,610.00
B. Sanitary Sewer Availability Charge 9,483.00
C. Trunk Storm Sewer Area Charge 72,256.61
D. Lateral Watermain Access Charge 15,988.77
E. Traffic Control Signs 3,225.00
F. Streetlight Operating Fee 1,026.60
G. Environmental Resource Expenses 1,208.72
H. City Base Map Updating Fee 2,880.00
I. City Engineering Administration
(3% for letters of credit or 3.25% for alternate disbursement 17,708.52
SUBTOTAL CASH REQUIREMENTS $242,387.22
CREDITS TO THE CASH REQUIREMENTS
Watermain Oversizing (Water Fund)
Deeding Outlot A and B (Trunk Storm)
Trail Construction along 179th Street (Park Dedication
$ 98,975.00
9,790.00
5,842.97
SUBTOTAL - CREDITS TO THE CASH REQUIREMENTS $ 114,607.97
TOTAL CASH REQUIREMENTS WITH THE FINAL PLAT $127,779.25
31. WARRANTY. The Developer warrants all improvements required to be constructed by it
pursuant to this Contract against poor material and faulty workmanship. The warranty period for streets is
one year. The warranty period for underground utilities is two years and shall commence following
completion and acceptance by City Council. The one year warranty period on streets shall commence after
the final wear course has been installed and accepted by the City Council. The Developer shall post
maintenance bonds in the amount of twenty-five percent (25%) of final certified construction costs to secure
the warranties. The City shall retain ten percent (10%) of the security posted by the Developer until the
maintenance bonds are furnished to the City or until the warranty period expires, whichever first occurs. The
197186v2 16
retainage may be used to pay for warranty work. The City’s standard specifications for utility and street
construction identify the procedures for final acceptance of streets and utilities.
32. RESPONSIBILITY FOR COSTS.
A. Except as otherwise specified herein, the Developer shall pay all costs incurred by it or the City
in conjunction with the development of the plat, including but not limited to Soil and Water
Conservation District charges, legal, planning, engineering and construction observation
inspection expenses incurred in connection with approval and acceptance of the plat, the
preparation of this Contract, review of construction plans and documents, and all costs and
expenses incurred by the City in monitoring and inspecting development of the plat.
B. The Developer shall hold the City and its officers, employees, and agents harmless from claims
made by itself and third parties for damages sustained or costs incurred resulting from plat
approval and development. The Developer shall indemnify the City and its officers, employees,
and agents for all costs, damages, or expenses which the City may pay or incur in consequence
of such claims, including attorneys' fees.
C. The Developer shall reimburse the City for costs incurred in the enforcement of this Contract,
including engineering and attorneys' fees.
D. The Developer shall pay, or cause to be paid when due, and in any event before any penalty is
attached, all special assessments referred to in this Contract. This is a personal obligation of the
Developer and shall continue in full force and effect even if the Developer sells one or more lots,
the entire plat, or any part of it.
E. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under
this Contract within thirty (30) days after receipt. If the bills are not paid on time, the City may halt
plat development and construction until the bills are paid in full. Bills not paid within thirty (30)
days shall accrue interest at the rate of eighteen percent (18%) per year. Additionally, the
Developer shall pay in full all bills submitted to it by the City prior to any reductions in the security
for the development.
197186v2 17
F. In addition to the charges and special assessments referred to herein, other charges and special
assessments may be imposed such as but not limited to sewer availability charges ("SAC"), City
water connection charges, City sewer connection charges, and building permit fees.
33. DEVELOPER’S DEFAULT. In the event of default by the Developer as to any of the work to
be performed by it hereunder, the City may, at its option, perform the work and the Developer shall prompt ly
reimburse the City for any expense incurred by the City, provided the Developer, except in an emergency as
determined by the City, is first given notice of the work in default, not less than forty-eight (48) hours in
advance. This Contract is a license for the City to act, and it shall not be necessary for the City to seek a
Court order for permission to enter the land. When the City does any such work, the City may, in addition to
its other remedies, assess the cost in whole or in part.
34. MISCELLANEOUS.
A. The Developer represents to the City that the plat complies with all city, county, metropolitan,
state, and federal laws and regulations, including but not limited to: subdivision ordinances,
zoning ordinances, and environmental regulations. If the City determines that the plat does not
comply, the City may, at its option, refuse to allow construction or development work in the plat
until the Developer does comply. Upon the City's demand, the Developer shall cease work until
there is compliance.
B. Third parties shall have no recourse against the City under this Contract.
C. Breach of the terms of this Contract by the Developer shall be grounds for denial of building
permits, including lots sold to third parties.
D. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this Contract is for
any reason held invalid, such decision shall not affect the validity of the remaining portion of this
Contract.
E. Grading, curbing, and one lift of asphalt shall be installed on all public and private streets prior to
issuance of any building permits, except two (2) model homes on lots acceptable to the Building
197186v2 18
Official. Approval of an administrative permit in compliance with Chapter 27 of the City’s zoning
ordinance is required prior to the construction of any model homes.
F. If building permits are issued prior to the acceptance of public improvements, the Developer
assumes all liability and costs resulting in delays in completion of public improvements and
damage to public improvements caused by the City, Developer, its contractors, subcontractors,
material men, employees, agents, or third parties. No sewer and water connections or
inspections may be conducted and no one may occupy a building for which a building permit is
issued on either a temporary or permanent basis until the streets needed for access have been
paved with a bituminous surface and the utilities are accepted by the City Engineer.
G. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of
this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties
and approved by written resolution of the City Council. The City's failure to promptly take legal
action to enforce this Contract shall not be a waiver or release.
H. This Contract shall run with the land and may be recorded against the title to the property. In the
event this Contract is recorded, the City covenants to provide a recordable Certificate of
Completion promptly upon the completion of the work and responsibilities required herein,
payment of all costs and fees required and compliance with all terms of the Contract. The
Developer covenants with the City, its successors and assigns, that the Developer is well seized
in fee title of the property being final platted and/or has obtained consents to this Contract, in the
form attached hereto, from all parties who have an interest in the property; that there are no
unrecorded interests in the property being final platted; and that the Developer will indemnify and
hold the City harmless for any breach of the foregoing covenants.
I. Insurance. Prior to execution of the final plat, Developer and its general contractor shall furnish
to the City a certificate of insurance showing proof of the required insurance required under
this Paragraph. Developer and its general contractor shall take out and maintain or cause to
be taken out and maintained until six (6) months after the City has accepted the public
197186v2 19
improvements, such insurance as shall protect Developer and its general contractor and the
City for work covered by the Contract including workers’ compensation claims and property
damage, bodily and personal injury which may arise from operations under this Contract,
whether such operations are by Developer and its general contractor or anyone directly or
indirectly employed by either of them. The minimum amounts of insurance shall be as follows:
Commercial General Liability (or in combination with an umbrella policy)
$2,000,000 Each Occurrence
$2,000,000 Products/Completed Operations Aggregate
$2,000,000 Annual Aggregate
The following coverages shall be included:
Premises and Operations Bodily Injury and Property Damage
Personal and Advertising Injury
Blanket Contractual Liability
Products and Completed Operations Liability
Automobile Liability
$2,000,000 Combined Single Limit – Bodily Injury & Property Damage
Including Owned, Hired & Non-Owned Automobiles
Workers Compensation
Workers’ Compensation insurance in accordance with the statutory requirements of the
State of Minnesota, including Employer’s Liability with minimum limits are as follows:
• $500,000 – Bodily Injury by Disease per employee
• $500,000 – Bodily Injury by Disease aggregate
• $500,000 – Bodily Injury by Accident
The Developer’s and general contractor’s insurance must be “Primary and Non-Contributory”.
All insurance policies (or riders) required by this Contract shall be (i) taken out by and
maintained with responsible insurance companies organized under the laws of one of the
states of the United States and qualified to do business in the State of Minnesota, (ii) shall
name the City, its employees and agents as additional insureds (CGL and umbrella only) by
endorsement which shall be filed with the City. A copy of the endorsement must be submitted
with the certificate of insurance.
Developer’s and general contractor’s policies and Certificate of Insurance shall contain a
provision that coverage afforded under the policies shall not be cancelled without at least thirty
197186v2 20
(30) days’ advanced written notice to the City, or ten (10) days’ notice for non-payment of
premium.
An Umbrella or Excess Liability insurance policy may be used to supplement Developer’s
or general contractor’s policy limits on a follow-form basis to satisfy the full policy limits
required by this Contract.
J. Indemnification. To the fullest extent permitted by law, Developer agrees to defend, indemnify
and hold harmless the City, and its employees, officials, and agents from and against all
claims, actions, damages, losses and expenses, including reasonable attorney fees, arising
out of Developer’s negligence or its performance or failure to perform its obligations under this
Contract. Developer’s indemnification obligation shall apply to Developer’s general contractor,
subcontractor(s), or anyone directly or indirectly employed or hired by Developer, or anyone for
whose acts Developer may be liable. Developer agrees this indemnity obligation shall survive
the completion or termination of this Contract.
K. Each right, power or remedy herein conferred upon the City is cumulative and in addition to
every other right, power or remedy, express or implied, now or hereafter arising, available to City,
at law or in equity, or under any other agreement, and each and every right, power and remedy
herein set forth or otherwise so existing may be exercised from time to time as often and in such
order as may be deemed expedient by the City and shall not be a waiver of the right to exercise
at any time thereafter any other right, power or remedy.
L. The Developer may not assign this Contract without the written permission of the City Council.
The Developer's obligation hereunder shall continue in full force and effect even if the Developer
sells one or more lots, the entire plat, or any part of it, until the City’s issuance of a Certificate of
Completion and Release.
M. Retaining walls that require a building permit shall be constructed in accordance with plans and
specifications prepared by a structural or geotechnical engineer licensed by the State of
Minnesota. Following construction, a certification signed by the design engineer shall be filed
197186v2 21
with the Building Official evidencing that the retaining wall was constructed in accordance with
the approved plans and specifications. All retaining walls identified on the development plans
and by special conditions referred to in this Contract shall be constructed before any other
building permit is issued for a lot on which a retaining wall is required to be built.
N. Should the Developer convey any lot or lots in the Development to a third party, the City and the
owner of that lot or those lots may amend this Development Contract or other city approvals or
agreements for development or use of those lots without the approval or consent of the
Developer or other lot owners in the Development. Private agreements between the owners of
lots within the Development for shared service or access and related matters necessary for the
efficient use of the Development shall be the responsibility of the lot owners and shall not bind or
restrict City authority to approve applications from any lot owner in the Development.
35. NOTICES. Required notices to the Developer shall be in writing, and shall be either hand
delivered to the Developer, its employees or agents, or mailed to the Developer by certified mail at the
following address: KJ Walk, Inc., 6001 Egan Drive Suite 100, Savage, Minnesota 55378. Notices to the
City shall be in writing and shall be either hand delivered to the City Administrator, or mailed to the City
by certified mail in care of the City Administrator at the following address: Lakeville City Hall, 20195
Holyoke Avenue, Lakeville, Minnesota 55044.
CITY OF LAKEVILLE
BY: ___________________________________________
Douglas P. Anderson, Mayor
(SEAL)
AND __________________________________________
Charlene Friedges, City Clerk
197186v2 22
STATE OF MINNESOTA )
)ss.
COUNTY OF DAKOTA )
The foregoing instrument was acknowledged before me this ________ day of ______________,
2_____, by Douglas P. Anderson and by Charlene Friedges, the Mayor and City Clerk of the City of
Lakeville, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority
granted by its City Council.
______________________________________________
NOTARY PUBLIC
1
2
3
4
Dakota County GIS±
Pheasant Run of Lakeville
Fourth Addition Final Plat area
PILOTKNOBROAD(CSAH31)CITY OF FARMINGTON
180th St W EMBERSAVECity of LakevilleLocation Map
Pheasant Run of
Lakeville Fourth Addition
Final Plat
EXHIBIT A
179TH ST
For Review
May 5, 2015
I hereby certify that this plan was prepared by me,
or under my direct supervision, and that I am a
duly registered engineer under the laws of the
State of Minnesota.
Luke Warren Israelson
6001 Egan Drive, Ste 100, Savage, MN 55378
Phone: 952.226.3200 Web: www.kjwalk.com
Date:
03/27/14
Revision:
Original
Preliminary Plat Set
Preliminary Plat (West)
Registration #: 51362
OF LAKEVILLELAKEVILLE, MN
SHEET 2 of 13
Date: 5/5/2015
FILE PATH: C:\Users\Skills\Documents\Projects\Lakeville\Pheasant Run\Engineering\CAD\DWGs\PR1-FINAL PLAT-PF.dwg
0 60 120 180
06/17/14 Revised : City Comments
5'
7'
10'
30'
25'
10'ROW
TYPICAL LOT
SETBACKS AND EASEMENTS
ROW
20'HOUSE SETBACKGARAGE SETBACK20'
10'
10'
30'
25'
10'20'HOUSE SETBACKGARAGE SETBACKROW
08/14/14 Revised
09/05/14 Revised
SITE DATA
TOTAL SITE AREA 80.208 AC.
NUMBER OF SINGLE FAMILY LOTS 193 LOTS
LOT AREA 58.901 AC.
RIGHT OF WAY AREA (179TH ST W.)5.198 AC.
RIGHT OF WAY AREA (LOCAL STREET)13.080 AC.
RIGHT OF WAY AREA (PILOT KNOB)3.029 AC.
OUTLOT AREA (OUTLOT A-J)16.639 AC.
TOTAL DELINEATED WETLAND 0.939 AC.
WETLAND TO BE PROTECTED 0.531 AC.
WETLAND TO BE REPLACED 0.408 AC.
SINGLE FAMILY LOT REQUIREMENTS (RS-4)
MIN. LOT AREA - INTERIOR LOTS 8,400 S.F.
MIN. LOT WIDTH AT SETBACK - INTERIOR LOTS 70 FEET
MIN. LOT AREA - CORNER LOTS 10,200 S.F.
MIN. LOT WIDTH AT SETBACK - CORNER LOTS 85 FEET
MIN. LOT WIDTH AT SETBACK - CORNER
LOTS ABUTTING 179TH ST W. 110 FEET
MIN. LOT DEPTH - LOTS
ABUTTING 179TH ST W. 150 FEET
MINIMUM STEBACKS (RS-4)
FRONT 25 FEET
SIDE (HOUSE/GARAGE) 7 FEET
SIDE (STREET)20 FEET
REAR 30 FEET
SIDE (179TH ST W.)30 FEET
REAR (179TH ST W.)50 FEET
11/14/14 Revised
100
PROPERTY IS ZONED RM-1 BUT IS
BEING DEVELOPED UNDER RS-4
STANDARDS.
12/17/14 Revised : City Comments
01/19/15 Revised
03/17/15 Revised
03/31/15 Revised
05/05/15 Revised
For Review
May 5, 2015
6001 Egan Drive, Ste 100, Savage, MN 55378
Phone: 952.226.3200 Web: www.kjwalk.com
Date:
03/27/14
Revision:
Original
Preliminary Plat Set
Preliminary Plat (East)
OF LAKEVILLELAKEVILLE, MN
SHEET 3 of 13
FILE PATH: C:\Users\Skills\Documents\Projects\Lakeville\Pheasant Run\Engineering\CAD\DWGs\PR1-FINAL PLAT-PF.dwg
0 60 120 180
I hereby certify that this plan was prepared by me,
or under my direct supervision, and that I am a
duly registered engineer under the laws of the
State of Minnesota.
Luke Warren Israelson
Registration #: 51362 Date: 5/5/2015
11/14/14 Revised
5'
7'
10'
30'
25'
10'
TYPICAL LOT
SETBACKS AND EASEMENTS
ROW
20'HOUSE SETBACKGARAGE SETBACK20'
10'
10'
30'
25'
10'20'HOUSE SETBACKGARAGE SETBACKROW
12/17/14 Revised : City Comments
01/19/15 Revised
03/17/15 Revised
03/31/15 Revised
05/05/15 Revised
•
•
•
PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE FFOOUURRTTHH AADDDDIITTIIOONN–– FFIINNAALL PPLLAATT
AAPPRRIILL 99,, 22001188
PPAAGGEE 22 OOFF 99
•
•
PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE FFOOUURRTTHH AADDDDIITTIIOONN–– FFIINNAALL PPLLAATT
AAPPRRIILL 99,, 22001188
PPAAGGEE 33 OOFF 99
PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE FFOOUURRTTHH AADDDDIITTIIOONN–– FFIINNAALL PPLLAATT
AAPPRRIILL 99,, 22001188
PPAAGGEE 44 OOFF 99
PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE FFOOUURRTTHH AADDDDIITTIIOONN–– FFIINNAALL PPLLAATT
AAPPRRIILL 99,, 22001188
PPAAGGEE 55 OOFF 99
PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE FFOOUURRTTHH AADDDDIITTIIOONN–– FFIINNAALL PPLLAATT
AAPPRRIILL 99,, 22001188
PPAAGGEE 66 OOFF 99
PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE FFOOUURRTTHH AADDDDIITTIIOONN–– FFIINNAALL PPLLAATT
AAPPRRIILL 99,, 22001188
PPAAGGEE 77 OOFF 99
PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE FFOOUURRTTHH AADDDDIITTIIOONN–– FFIINNAALL PPLLAATT
AAPPRRIILL 99,, 22001188
PPAAGGEE 88 OOFF 99
PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE FFOOUURRTTHH AADDDDIITTIIOONN–– FFIINNAALL PPLLAATT
AAPPRRIILL 99,, 22001188
PPAAGGEE 99 OOFF 99