HomeMy WebLinkAboutItem 06.m• • • ☐☐ 2 197186v2 1 (reserved for recording information) DEVELOPMENT CONTRACT (Developer Installed Improvements) PHEASANT RUN OF LAKEVILLE FOURTH ADDITION CONTRACT dated ____________________, 2018, by and between the CITY OF LAKEVILLE, a Minnesota municipal corporation (“City”), and KJ WALK, INC., a Florida corporation (the “Developer”). 1. REQUEST FOR PLAT APPROVAL. The Developer has asked the City to approve a plat for Pheasant Run of Lakeville Fourth Addition (referred to in this Contract as the "plat"). The land is situated in the County of Dakota, State of Minnesota, and is legally described as: Outlot D, Pheasant Run of Lakeville Third Addition, Dakota County Minnesota, according to the recorded plat thereof. 2. CONDITIONS OF PLAT APPROVAL. The City hereby approves the plat on condition that the Developer enter into this Contract, furnish the security required by it, and record the plat with the County Recorder or Registrar of Titles within 100 days after the City Council approves the final plat. 3. RIGHT TO PROCEED. Within the plat or land to be platted, the Developer may not grade or otherwise disturb the earth or remove trees, unless a grading permit has been approved by the City Engineer following approval of a preliminary plat by the City Council, construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings until all the following conditions have been satisfied: 1) this agreement has been fully executed by both parties and filed with the City Clerk, 2) t he 197186v2 2 necessary security has been received by the City, 3) the necessary insurance for the Developer and its construction contractors has been received by the City, and 4) the plat has been filed with the Dakota County Recorder or Registrar of Titles’ office. 4. PHASED DEVELOPMENT. If the plat is a phase of a multi-phased preliminary plat, the City may refuse to approve final plats of subsequent phases if the Developer has breached this Contract and the breach has not been remedied. Development of subsequent phases may not proceed until Development Contracts for such phases are approved by the City. Park dedication charges referred to in this Contract are not being imposed on outlots, if any, in the plat that are designated in an approved preliminary plat for future subdivision into lots and blocks. Such charges will be calculated and imposed when the outlots are final platted into lots and blocks. 5. PRELIMINARY PLAT STATUS. If the plat is a phase of a multi-phased preliminary plat, the preliminary plat approval for all phases not final platted shall lapse and be void unless final platted into lots and blocks, not outlots, within two (2) years after preliminary plat approval. 6. CHANGES IN OFFICIAL CONTROLS. For two (2) years from the date of this Contract, no amendments to the City’s Comprehensive Plan, except an amendment placing the plat in the current metropolitan urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications of the approved plat unless required by state or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the contrary, to the full extent permitted by state law, the City may require compliance with any amendments to the City’s Comprehensive Plan, official controls, platting or dedication requirements enacted after the date of this Contract. 7. DEVELOPMENT PLANS. The plat shall be developed in accordance with the following plans. The plans shall not be attached to this Contract. With the exception of Plans A, B, C, and F the plans may be prepared, subject to the City Engineer’s approval, after entering the Contract, but before commencement of any work in the plat. The City Engineer may approve minor amendments to Plan B without City Council approval. The erosion control plan may also be approved by the Dakota County Soil 197186v2 3 and Water Conservation District. If the plans vary from the written terms of this Contract, the written terms shall control. The plans are: Plan A - Plat Plan B - Final Grading, Drainage, and Erosion Control Plan Plan C - Tree Preservation Plan Plan D - Plans and Specifications for Public Improvements Plan E - Street Lighting Plan Plan F - Landscape Plan 8. IMPROVEMENTS. The Developer shall install and pay for the following: A. Sanitary Sewer System B. Water System C. Storm Sewer System D. Streets E. Concrete Curb and Gutter F. Street Lights G. Site Grading, Stormwater Treatment/Infiltration Basins, and Erosion Control H. Underground Utilities I. Setting of Iron Monuments J. Surveying and Staking K. Sidewalks and Trails L. Retaining Walls The improvements shall be installed in accordance with the City subdivision ordinance; City standard specifications for utility and street construction; and any other ordinances including Section 11-16-7 of the City Code concerning erosion and drainage and Section 4-1-4-2 prohibiting grading, construction activity, and the use of power equipment between the hours of 10 o’clock p.m. and 7 o’clock a.m. The Developer shall submit plans and specifications which have been prepared by a competent registered professional 197186v2 4 engineer to the City for approval by the City Engineer. The Developer shall instruct its engineer to provide adequate field inspection personnel to assure an acceptable level of quality control to the extent that the Developer’s engineer will be able to certify that the construction work meets the approved City standards as a condition of City acceptance. In addition, the City may, at the City’s discretion and at the Developer’s expense, have one or more City inspectors and a soil engineer inspect the work on a full or part-time basis. The Developer, its contractors and subcontractors, shall follow all instructions received from the City’s inspectors. The Developer’s engineer shall provide for on-site project management. The Developer’s engineer is responsible for design changes and contract administration between the Developer and the Developer’s contractor. The Developer or its engineer shall schedule a pre-construction meeting at a mutually agreeable time at the City with all parties concerned, including the City staff, to review the program for the construction work. Within thirty (30) days after the completion of the improvements and before the security is released, the Developer shall supply the City with a complete set of reproducible “as constructed” plans and an electronic file of the “as constructed” plans in an AutoCAD .DWG file or a .DXF file, all prepared in accordance with City standards. In accordance with Minnesota Statutes 505.021, the final placement of iron monuments for all lot corners must be completed before the applicable security is released. The Developer’s surveyor shall also submit a written notice to the City certifying that the monuments have been installed following site grading, utility and street construction. 9. CONTRACTORS/SUBCONTRACTORS. City Council members, City employees, and City Planning Commission members, and corporations, partnerships, and other entities in which such individuals have greater than a 25% ownership interest or in which they are an officer or director may not act as contractors or subcontractors for the public improvements identified in Paragraph 8 above. 10. PERMITS. The Developer shall obtain or require its contractors and subcontractors to obtain all necessary permits, which may include: A. Dakota County for County Road Access and Work in County Rights-of-Way B. MnDot for State Highway Access C. MnDot for Work in Right-of -Way 197186v2 5 D. Minnesota Department of Health for Watermains E. MPCA NPDES Permit for Construction Activity F. MPCA for Sanitary Sewer and Hazardous Material Removal and Disposal G. DNR for Dewatering H. City of Lakeville for Building Permits I. MCES for Sanitary Sewer Connections J. City of Lakeville for Retaining Walls 11. DEWATERING. Due to the variable nature of groundwater levels and stormwater flows, it will be the Developer’s and the Developer’s contractors and subcontractors responsibility to satisfy themselves with regard to the elevation of groundwater in the area and the level of effort needed to perform dewatering and storm flow routing operations. All dewatering shall be in accordance with all applicable county, state, and federal rules and regulations. DNR regulations regarding appropriations permits shall also be strictly followed. 12. TIME OF PERFORMANCE. The Developer shall install all required public improvements by November 30, 2018, with the exception of the final wear course of asphalt on streets. The final wear course on streets shall be installed between August 15th and October 15th the first summer after the base layer of asphalt has been in place one freeze thaw cycle. The Developer may, however, request an extension of time from the City. If an extension is granted, it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and the extended completion date. Final wear course placement outside of this time frame must have the written approval of the City Engineer. 13. LICENSE. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the plat to perform all work and inspections deemed appropriate by the City in conjunction with plat development. 14. EROSION CONTROL. Prior to initiating site grading, the erosion control plan, Plan B, shall be implemented by the Developer and inspected and approved by the City or Dakota County Soil and Water Conservation District. The City or Dakota County Soil and Water Conservation District may impose additional erosion control requirements if they would be beneficial. All areas disturbed by the grading 197186v2 6 operations shall be stabilized per the MPCA Stormwater Permit for Construction Activity. Seed shall be in accordance with the City’s current seeding specification which may include temporary seed to provide ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion. If the Developer does not comply with the MPCA Stormwater Permit for Construction Activity or with the erosion control plan and schedule or supplementary instructions received from the City or the Dakota County Soil and Water Conservation District, the City may take such action as it deems appropriate to control erosion. The City will endeavor to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect the Developer’s and City’s rights or obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred for such work within ten (10) days, the City may draw down the letter of credit to pay any costs. No development, utility or street construction will be allowed and no building permits will be issued unless the plat is in full compliance with the approved erosion control plan. 15. GRADING. The plat shall be graded in accordance with the approved grading development and erosion control plan, Plan “B”. The plan shall conform to City of Lakeville specifications. Within thirty (30) days after completion of the grading and before the City approves individual building permits (except two (2) model home permits on lots acceptable to the Building Official), the Developer shall provide the City with an “as constructed” grading plan certified by a registered land surveyor or engineer that all storm water treatment/infiltration basins and swales, have been constructed on public easements or land owned by the City. The “as constructed” plan shall include field verified elevations of the following: a) cross sections of storm water treatment/infiltration basins; b) location and elevations along all swales, wetlands, wetland mitigation areas if any, locations and dimensions of borrow areas/stockpiles, and installed “conservation area” posts; and c) lot corner elevations and house pads, and all other items listed in City Code Section 10- 3-5.NN. The City will withhold issuance of building permits until the approved certified grading plan is on file with the City and all erosion control measures are in place as determined by the City Engineer. The Developer certifies to the City that all lots with house footings placed on fill have been monitored and constructed to meet or exceed FHA/HUD 79G specifications. The soils observation and testing report, 197186v2 7 including referenced development phases and lot descriptions, shall be submitted to the Building Official for review prior to the issuance of building permits. Before a building permit is issued, a cash escrow of $1,000.00 per lot shall be furnished to the City to guarantee compliance with the erosion control and grading requirements and the submittal of an as - built certificate of survey. Prior to the release of the required individual lot grading and erosion control security that is submitted with the building permit, an as-built certificate of survey for single family lots must be submitted to verify that the final as-built grades and elevations of the specific lot and all building setbacks are consistent with the approved grading plan for the development, and amendments thereto as approved by the City Engineer, and that all required property monuments are in place. If the final grading, erosion control and as-built survey is not timely completed, the City may enter the lot, perform the work, and apply the cash escrow toward the cost. Upon satisfactory completion of the grading, erosion control and as-built survey, the escrow funds, without interest, less any draw made by the City, shall be returned to the person who deposited the funds with the City. 16. CLEAN UP. The Developer shall clean dirt and debris from streets that has resulted from construction work by the Developer, home builders, subcontractors, their agents or assigns. Prior to any construction in the plat, the Developer shall identify in writing a responsible party and schedule for erosion control, street cleaning, and street sweeping. 17. OWNERSHIP OF IMPROVEMENTS. Upon completion of the work and construction required by this Contract and final acceptance by the City, the improvements lying within public easements shall become City property without further notice or action. 18. CITY ENGINEERING ADMINISTRATION AND CONSTRUCTION OBSERVATION. The Developer shall pay a fee for in-house engineering administration. City engineering administration will include monitoring of construction observation, consultation with Developer and its engineer on status or problems regarding the project, coordination for final inspection and acceptance, project monitoring during the warranty period, and processing of requests for reduction in security. Fees for this service shall be three percent (3%) of construction costs identified in the Summary of Security Requirements if using a letter of 197186v2 8 credit, assuming normal construction and project scheduling. The Developer shall pay for construction observation performed by the City’s in-house engineering staff or consulting engineer. Construction observation shall include part or full time inspection of proposed public utilities and street construction and will be billed on hourly rates estimated to be five percent (5%) of the estimated construction cost. 19. STORM SEWER AREA CHARGE. Development of Pheasant Run of Lakeville Fourth Addition includes the construction of a public storm sewer system. Storm sewer will be installed within the subdivision to collect and convey stormwater runoff generated from within the public right-of-way and lots to the public stormwater management basins located within Outlots A and B. Draintile construction is required in areas of non-granular soils within Pheasant Run of Lakeville Fourth Addition for the street sub-cuts and lots. Any additional draintile construction, including perimeter draintile required for building footings, which is deemed necessary during construction shall be the Developer’s responsibility to install and finance. The Trunk Storm Sewer Area Charge has not been collected on the parent parcel, and must be paid upon final plat approval and is calculated as follows: Gross Area of Pheasant Run of Lakeville Fourth 498,827.00 s.f. Less Area of Outlot A (Stormwater Management Basin) (-) 57,034.00 s.f. Less Area of Outlot B (Stormwater Management Basin) (-) 20,500.00 s.f. Less Area of Outlot C (Future Development) (-) 15,357.00 s.f. Total = 405,936.00 s.f. 405,936.00 s.f. x $0.178/s.f. = $72,256.61 Net Area of Pheasant Run of Lakeville Fourth Addition Single Family Area Charge Total Trunk Storm Sewer Area Charge The Trunk Storm Area Charge will be collected at the time Outlot C is final platted into lots and blocks, at the rate in effect at the time of final plat approval The Developer will receive a credit to the Trunk Storm Sewer Area Charge for deeding Outlots A and B to the City, consistent with City policy. The credit is based on the area of the outlots and is 197186v2 9 calculated at the rate of $5,500 per acre, and will be applied to the final plat cash fees, calculated as follows: 1.78 acres x $5,500/acre = $9,790.00 Total Area of Outlots A and B Per Acre Credit Total 20. SANITARY SEWER AVAILABILITY CHARGE. The Sanitary Sewer Availability Charge has not been collected on the parent parcel and shall be paid upon final plat approval. The fee will be based on the rate in effect at the time of final plat approval and is calculated as follows: 29 units x $327.00 = $9,483.00 Total Units In Pheasant Run of Lakeville Fourth Addition Sanitary Sewer Availability Charge Per Unit Sanitary Sewer Availability Charge required 21. WATERMAIN. Development of Pheasant Run of Lakeville Fourth Addition includes the extension of public watermain. Watermain shall be extended within the development from watermain constructed with the first phase of the development to provide water service to the subdivision. Consistent with the City’s Water Plan, the Developer shall extend 12-inch watermain through the development from existing watermain within Pilot Knob Road to connect to the existing distribution system. The Developer will receive a $98,975.00 credit to their cash fees with the final plat for the oversizing of the trunk watermain, calculated as the cost difference between 8-inch watermain and the 12- inch watermain that will be installed. The 12-inch watermain will be installed along Essex Lane to Embers Avenue. The Lateral Watermain Access Charge is due for the portion of 12-inch watermain within Pilot Knob Road right-of-way adjacent the parent parcel. The Lateral Watermain Access Charge is based on the rate in effect at the time of final plat approval and is calculated as follows: 389.97 x $41.00/Front Foot = $15,988.77 Front Footage along Pilot Knob Road Lateral Watermain Access Charge Total 197186v2 10 22. CONSTRUCTION ACCESS. Construction traffic access and egress for grading, utility and street construction shall be from Embers Avenue, by way of 179th Street. 23. PARK, TRAILS AND SIDEWALKS. Development of Pheasant Run of Lakeville Fourth Addition includes the construction of public trails and sidewalks. The Developer shall install a 5-foot wide concrete sidewalk, with pedestrian curb ramps, along one side of the local roadways. The Developer shall install a bituminous trail along the north side of 179th Street and west side of Pilot Knob Road adjacent to the plat. The Developer is responsible for 100% of the grading and restoration of the bituminous trail. The Developer shall receive a credit to the Park Dedication Fee for the City’s 45% of 3/8th share of the trail construction costs along 179th Street and Pilot Knob Road, calculated as follows: $34,625.00 X 3/8 X 45% = $5,842.97 179th Street and Pilot Knob Road Estimated Trail Construction Cost City’s Share Total Credit to Cash Fees 56.83% (109.68/193 lots) of the Park Dedication requirement was satisfied with previous phases of the Pheasant Run of Lakeville preliminary plat, through a combination of land dedication for a future greenway corridor and a cash contribution. The remainder of the Park Dedication requirement will be satisfied through a cash contribution. The Park Dedication requirement for Pheasant Run of Lakeville Fourth Addition is calculated as follows: 29 lots x $4,090.00 = $118,610.00 Lots in Pheasant Run of Lakeville Fourth Addition Park Dedication Rate Park Dedication Requirement 24. TRAFFIC CONTROL SIGNS. The Developer shall pay a cash fee for traffic control signs due upon final plat approval. Street signing consists of: three stop and street blade combinations at $450 each, two stop signs at $350 each, one one-way arrow sign at $125, six nine button delineators at $125 each, two future thru street signs at $75 each and a mobilization fee of $150 for a total of $3,225. If the street signs are installed during frost conditions, the developer shall pay an additional $150 for each street sign location. A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat approval and is calculated as follows: 197186v2 11 29 units x $35.40/unit = $1,026.60 Dwelling Units Streetlight Operating Fee Total 25. ENVIRONMENTAL RESOURCES EXPENSES. The Developer shall pay to the City $1,333.76 in payment of the first year environmental resources expenses for the subdivision due upon final plat approval. The fee is calculated as follows: 29 units x $10.42/unit/qtr. x 4 qtrs. = $1,208.72 Dwelling Units Environmental Resources Fee Total 26. LANDSCAPING. Unless the lot already has two (2) trees on it, the Developer or lot purchaser shall plant sufficient trees so that there are at least two (2) trees on every lot in the plat, one of which must be planted in the front yard. Trees that are chosen by the Developer or property owner cannot cause a public nuisance, such as cotton producing trees, or trees that may become a public hazard due to insect infestation or weak bark. The minimum deciduous tree size shall be two and one-half (2½) inches caliper, balled and burlapped. Evergreen trees must be at least eight feet (8’) tall. The trees may not be planted in the right-of-way. The Developer or lot purchaser shall sod the front yard, boulevard, and side yards to the rear of the structure on every lot. Weather permitting, the trees, sod, and seed shall be planted within sixty (60) days after a home has received a certificate of occupancy. Before a building permit is issued, a cash escrow of $1,000.00 per lot shall be furnished the City to guarantee compliance with the landscaping requirements. If the landscaping is not completed in a timely manner, the City may enter the lot, perform the work, and apply the cash escrow toward the cost. Upon satisfactory completion of the landscaping the escrow funds, without interest, less any draw made by the City, shall be returned to the person who deposited the funds with the City. All trees shall be warranted to be alive, of good quality, and disease free for twelve (12) months after planting. Any replacements shall be warranted for twelve (12) months from the time of planting. The Developer or property owner is responsible for contacting the City when all the landscaping has been installed to set up an inspection. Fifty percent (50%) of the security will be released when all the landscaping has been installed and inspected by City staff and the 197186v2 12 remaining fifty percent (50%) will be released one year after the landscaping inspection and any warranty work has been completed. 27. BUFFER YARD BERM/LANDSCAPE SCREEN. A buffer yard containing earth berms and/or plantings of a sufficient density to provide a visual screen and a reasonable buffer a minimum of ten feet in height shall be provided adjacent to 179th Street and Pilot Knob Road. A certified as-built grading plan of the buffer yard berm must be submitted and approved by City staff prior to the installation of any buffer yard plantings. The Developer shall provide a security in the amount of $15,600.00 for installation of the landscaping at the time of final plat approval. 28. SPECIAL PROVISIONS. The following special provisions shall apply to plat development: A. Implementation of the recommendations listed in the April 9,2018 Engineering Report. B. Before the City signs the final plat, the Developer shall convey Outlots A and B to the City by Warranty Deed free and clear of any and all encumbrances other than public utility and right of way easements. C. The Developer shall pay a cash fee for City Engineering Administration. The fee for City Engineering Administration will be based on three percent (3.00%) of the estimated construction cost, or $17,708.52. The Developer will receive a credit to the cash fees for City Engineering Administration of oversized public improvements. D. The Developer shall place a “Future Street Extension” sign and barricade at the north termini of Embers Avenue and English Avenue until extended in the future. E. A $1,000 cash escrow must be submitted with the building permit applications for Lots 2-9, Block 3, and Lot 2, Block 4 to guarantee installation of the buffer side/rear yard sod to the edge of the trail to be constructed on the north side of 179th Street. This escrow will be in addition to the 2 (two) trees/lot and front yard sod escrow required at the time of building permit. F. Prior to City Council approval of the final plat, the Developer shall furnish a boundary survey of the proposed property to be platted with all property corner monumentation in place and marked with lath and a flag. Any encroachments on or adjacent to the property shall be noted on the 197186v2 13 survey. The Developer shall post a security to ensure the final placement of interior subdivision iron monuments at property corners. The security was calculated as follows: 32 lots/outlots at $100.00 per lot/outlots. The security will be held by the City until the Developer's land surveyor certifies that all irons have been set following site grading and utility and street construction. In addition, the certificate of survey must also include a certification that all irons for a specific lot have either been found or set prior to the issuance of a building permit for that lot. G. The Developer shall pay a cash fee for the preparation of record construction drawings and City base map updating. This fee is $90.00 per lot/outlot for a total charge of $2,880.00. H. The Developer shall be responsible for the cost of street light installation consistent with a street lighting plan approved by the City. Before the City signs the final plat, the Developer shall post a security for street light installation consistent with the approved plan. The estimated amount of this security is $10,800.00 and consists of nine (9) post top lights at $1,200.00 each. I. The Developer is required to submit the final plat in electronic format. The electronic format shall be either AutoCAD.DWG file or a .DXF file. All construction record drawings (e.g., grading, utilities, streets) shall be in electronic format in accordance with standard City specifications. 29. SUMMARY OF SECURITY REQUIREMENTS. To guarantee compliance with the terms of this Contract, payment of real estate taxes including interest and penalties, payment of special assessments, payment of the costs of all public improvements, and construction of all public improvements, the Developer shall furnish the City with a cash escrow, letter of credit or alternate security, in the form attached hereto, from a bank ("security") for $687,766.66. If an alternate security is furnished, the Developer shall also furnish a letter of credit for twenty-five percent (25%) of the alternate security amount to cover any contract increases. The amount of the security was calculated as follows: CONSTRUCTION COSTS: A. Sanitary Sewer $61,592.00 B. Watermain 194,810.00 C. Storm Sewer/Draintile 64,076.00 D. Streets 229,806.00 197186v2 14 E. Erosion Control/Stormwater Basins, Restoration, Grading Certification 40,000.00 CONSTRUCTION SUB-TOTAL $590,284.00 OTHER COSTS: A. Developer’s Design (3.0%) $17,708.52 B. Developer’s Construction Survey (2.5%) 14,757.10 C. City Legal Expenses (Est. 0.5%) 2,951.42 D. City Construction Observation (Est. 5.0%) 29,514.20 E. Developer’s Record Drawings (0.5%) 2,951.42 F. Landscaping 15,600.00 G. Street Lights 10,800.00 H. Lot Corners/Iron Monuments 3,200.00 OTHER COSTS SUB-TOTAL $ 97,482.66 TOTAL SECURITIES: $687,766.66 This breakdown is for historical reference; it is not a restriction on the use of the security. The bank shall be subject to the approval of the City Administrator. The City may draw down the security, on five (5) business days written notice to the Developer, for any violation of the terms of this Contract or without notice if the security is allowed to lapse prior to the end of the required term. If the required public improvements are not completed at least thirty (30) days prior to the expiration of the security, the City may also draw it down without notice. If the security is drawn down, the proceeds shall be used to cure the default. Upon receipt of proof satisfactory to the City that work has been completed and financial obligations to the City have been satisfied, with City approval the security may be reduced from time to time by ninety percent (90%) of the financial obligations that have been satisfied. Ten percent (10%) of the amounts certified by the Developer's engineer shall be retained as security until all improvements have been completed, all financial obligations to the City satisfied, the required "as constructed" plans have been received by the City, a warranty security is provided, and the public improvements are accepted by the City Council. The City’s standard specifications for utility and street construction outline procedures for security reductions. 197186v2 15 30. SUMMARY OF CASH REQUIREMENTS. The following is a summary of the cash requirements under this Contract which must be furnished to the City prior to the City Council signing the final plat: A. Park Dedication 118,610.00 B. Sanitary Sewer Availability Charge 9,483.00 C. Trunk Storm Sewer Area Charge 72,256.61 D. Lateral Watermain Access Charge 15,988.77 E. Traffic Control Signs 3,225.00 F. Streetlight Operating Fee 1,026.60 G. Environmental Resource Expenses 1,208.72 H. City Base Map Updating Fee 2,880.00 I. City Engineering Administration (3% for letters of credit or 3.25% for alternate disbursement 17,708.52 SUBTOTAL CASH REQUIREMENTS $242,387.22 CREDITS TO THE CASH REQUIREMENTS Watermain Oversizing (Water Fund) Deeding Outlot A and B (Trunk Storm) Trail Construction along 179th Street (Park Dedication $ 98,975.00 9,790.00 5,842.97 SUBTOTAL - CREDITS TO THE CASH REQUIREMENTS $ 114,607.97 TOTAL CASH REQUIREMENTS WITH THE FINAL PLAT $127,779.25 31. WARRANTY. The Developer warrants all improvements required to be constructed by it pursuant to this Contract against poor material and faulty workmanship. The warranty period for streets is one year. The warranty period for underground utilities is two years and shall commence following completion and acceptance by City Council. The one year warranty period on streets shall commence after the final wear course has been installed and accepted by the City Council. The Developer shall post maintenance bonds in the amount of twenty-five percent (25%) of final certified construction costs to secure the warranties. The City shall retain ten percent (10%) of the security posted by the Developer until the maintenance bonds are furnished to the City or until the warranty period expires, whichever first occurs. The 197186v2 16 retainage may be used to pay for warranty work. The City’s standard specifications for utility and street construction identify the procedures for final acceptance of streets and utilities. 32. RESPONSIBILITY FOR COSTS. A. Except as otherwise specified herein, the Developer shall pay all costs incurred by it or the City in conjunction with the development of the plat, including but not limited to Soil and Water Conservation District charges, legal, planning, engineering and construction observation inspection expenses incurred in connection with approval and acceptance of the plat, the preparation of this Contract, review of construction plans and documents, and all costs and expenses incurred by the City in monitoring and inspecting development of the plat. B. The Developer shall hold the City and its officers, employees, and agents harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from plat approval and development. The Developer shall indemnify the City and its officers, employees, and agents for all costs, damages, or expenses which the City may pay or incur in consequence of such claims, including attorneys' fees. C. The Developer shall reimburse the City for costs incurred in the enforcement of this Contract, including engineering and attorneys' fees. D. The Developer shall pay, or cause to be paid when due, and in any event before any penalty is attached, all special assessments referred to in this Contract. This is a personal obligation of the Developer and shall continue in full force and effect even if the Developer sells one or more lots, the entire plat, or any part of it. E. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Contract within thirty (30) days after receipt. If the bills are not paid on time, the City may halt plat development and construction until the bills are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of eighteen percent (18%) per year. Additionally, the Developer shall pay in full all bills submitted to it by the City prior to any reductions in the security for the development. 197186v2 17 F. In addition to the charges and special assessments referred to herein, other charges and special assessments may be imposed such as but not limited to sewer availability charges ("SAC"), City water connection charges, City sewer connection charges, and building permit fees. 33. DEVELOPER’S DEFAULT. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall prompt ly reimburse the City for any expense incurred by the City, provided the Developer, except in an emergency as determined by the City, is first given notice of the work in default, not less than forty-eight (48) hours in advance. This Contract is a license for the City to act, and it shall not be necessary for the City to seek a Court order for permission to enter the land. When the City does any such work, the City may, in addition to its other remedies, assess the cost in whole or in part. 34. MISCELLANEOUS. A. The Developer represents to the City that the plat complies with all city, county, metropolitan, state, and federal laws and regulations, including but not limited to: subdivision ordinances, zoning ordinances, and environmental regulations. If the City determines that the plat does not comply, the City may, at its option, refuse to allow construction or development work in the plat until the Developer does comply. Upon the City's demand, the Developer shall cease work until there is compliance. B. Third parties shall have no recourse against the City under this Contract. C. Breach of the terms of this Contract by the Developer shall be grounds for denial of building permits, including lots sold to third parties. D. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Contract. E. Grading, curbing, and one lift of asphalt shall be installed on all public and private streets prior to issuance of any building permits, except two (2) model homes on lots acceptable to the Building 197186v2 18 Official. Approval of an administrative permit in compliance with Chapter 27 of the City’s zoning ordinance is required prior to the construction of any model homes. F. If building permits are issued prior to the acceptance of public improvements, the Developer assumes all liability and costs resulting in delays in completion of public improvements and damage to public improvements caused by the City, Developer, its contractors, subcontractors, material men, employees, agents, or third parties. No sewer and water connections or inspections may be conducted and no one may occupy a building for which a building permit is issued on either a temporary or permanent basis until the streets needed for access have been paved with a bituminous surface and the utilities are accepted by the City Engineer. G. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or release. H. This Contract shall run with the land and may be recorded against the title to the property. In the event this Contract is recorded, the City covenants to provide a recordable Certificate of Completion promptly upon the completion of the work and responsibilities required herein, payment of all costs and fees required and compliance with all terms of the Contract. The Developer covenants with the City, its successors and assigns, that the Developer is well seized in fee title of the property being final platted and/or has obtained consents to this Contract, in the form attached hereto, from all parties who have an interest in the property; that there are no unrecorded interests in the property being final platted; and that the Developer will indemnify and hold the City harmless for any breach of the foregoing covenants. I. Insurance. Prior to execution of the final plat, Developer and its general contractor shall furnish to the City a certificate of insurance showing proof of the required insurance required under this Paragraph. Developer and its general contractor shall take out and maintain or cause to be taken out and maintained until six (6) months after the City has accepted the public 197186v2 19 improvements, such insurance as shall protect Developer and its general contractor and the City for work covered by the Contract including workers’ compensation claims and property damage, bodily and personal injury which may arise from operations under this Contract, whether such operations are by Developer and its general contractor or anyone directly or indirectly employed by either of them. The minimum amounts of insurance shall be as follows: Commercial General Liability (or in combination with an umbrella policy) $2,000,000 Each Occurrence $2,000,000 Products/Completed Operations Aggregate $2,000,000 Annual Aggregate The following coverages shall be included: Premises and Operations Bodily Injury and Property Damage Personal and Advertising Injury Blanket Contractual Liability Products and Completed Operations Liability Automobile Liability $2,000,000 Combined Single Limit – Bodily Injury & Property Damage Including Owned, Hired & Non-Owned Automobiles Workers Compensation Workers’ Compensation insurance in accordance with the statutory requirements of the State of Minnesota, including Employer’s Liability with minimum limits are as follows: • $500,000 – Bodily Injury by Disease per employee • $500,000 – Bodily Injury by Disease aggregate • $500,000 – Bodily Injury by Accident The Developer’s and general contractor’s insurance must be “Primary and Non-Contributory”. All insurance policies (or riders) required by this Contract shall be (i) taken out by and maintained with responsible insurance companies organized under the laws of one of the states of the United States and qualified to do business in the State of Minnesota, (ii) shall name the City, its employees and agents as additional insureds (CGL and umbrella only) by endorsement which shall be filed with the City. A copy of the endorsement must be submitted with the certificate of insurance. Developer’s and general contractor’s policies and Certificate of Insurance shall contain a provision that coverage afforded under the policies shall not be cancelled without at least thirty 197186v2 20 (30) days’ advanced written notice to the City, or ten (10) days’ notice for non-payment of premium. An Umbrella or Excess Liability insurance policy may be used to supplement Developer’s or general contractor’s policy limits on a follow-form basis to satisfy the full policy limits required by this Contract. J. Indemnification. To the fullest extent permitted by law, Developer agrees to defend, indemnify and hold harmless the City, and its employees, officials, and agents from and against all claims, actions, damages, losses and expenses, including reasonable attorney fees, arising out of Developer’s negligence or its performance or failure to perform its obligations under this Contract. Developer’s indemnification obligation shall apply to Developer’s general contractor, subcontractor(s), or anyone directly or indirectly employed or hired by Developer, or anyone for whose acts Developer may be liable. Developer agrees this indemnity obligation shall survive the completion or termination of this Contract. K. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, express or implied, now or hereafter arising, available to City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. L. The Developer may not assign this Contract without the written permission of the City Council. The Developer's obligation hereunder shall continue in full force and effect even if the Developer sells one or more lots, the entire plat, or any part of it, until the City’s issuance of a Certificate of Completion and Release. M. Retaining walls that require a building permit shall be constructed in accordance with plans and specifications prepared by a structural or geotechnical engineer licensed by the State of Minnesota. Following construction, a certification signed by the design engineer shall be filed 197186v2 21 with the Building Official evidencing that the retaining wall was constructed in accordance with the approved plans and specifications. All retaining walls identified on the development plans and by special conditions referred to in this Contract shall be constructed before any other building permit is issued for a lot on which a retaining wall is required to be built. N. Should the Developer convey any lot or lots in the Development to a third party, the City and the owner of that lot or those lots may amend this Development Contract or other city approvals or agreements for development or use of those lots without the approval or consent of the Developer or other lot owners in the Development. Private agreements between the owners of lots within the Development for shared service or access and related matters necessary for the efficient use of the Development shall be the responsibility of the lot owners and shall not bind or restrict City authority to approve applications from any lot owner in the Development. 35. NOTICES. Required notices to the Developer shall be in writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by certified mail at the following address: KJ Walk, Inc., 6001 Egan Drive Suite 100, Savage, Minnesota 55378. Notices to the City shall be in writing and shall be either hand delivered to the City Administrator, or mailed to the City by certified mail in care of the City Administrator at the following address: Lakeville City Hall, 20195 Holyoke Avenue, Lakeville, Minnesota 55044. CITY OF LAKEVILLE BY: ___________________________________________ Douglas P. Anderson, Mayor (SEAL) AND __________________________________________ Charlene Friedges, City Clerk 197186v2 22 STATE OF MINNESOTA ) )ss. COUNTY OF DAKOTA ) The foregoing instrument was acknowledged before me this ________ day of ______________, 2_____, by Douglas P. Anderson and by Charlene Friedges, the Mayor and City Clerk of the City of Lakeville, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. ______________________________________________ NOTARY PUBLIC 1 2 3 4 Dakota County GIS± Pheasant Run of Lakeville Fourth Addition Final Plat area PILOTKNOBROAD(CSAH31)CITY OF FARMINGTON 180th St W EMBERSAVECity of LakevilleLocation Map Pheasant Run of Lakeville Fourth Addition Final Plat EXHIBIT A 179TH ST For Review May 5, 2015 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly registered engineer under the laws of the State of Minnesota. Luke Warren Israelson 6001 Egan Drive, Ste 100, Savage, MN 55378 Phone: 952.226.3200 Web: www.kjwalk.com Date: 03/27/14 Revision: Original Preliminary Plat Set Preliminary Plat (West) Registration #: 51362 OF LAKEVILLELAKEVILLE, MN SHEET 2 of 13 Date: 5/5/2015 FILE PATH: C:\Users\Skills\Documents\Projects\Lakeville\Pheasant Run\Engineering\CAD\DWGs\PR1-FINAL PLAT-PF.dwg 0 60 120 180 06/17/14 Revised : City Comments 5' 7' 10' 30' 25' 10'ROW TYPICAL LOT SETBACKS AND EASEMENTS ROW 20'HOUSE SETBACKGARAGE SETBACK20' 10' 10' 30' 25' 10'20'HOUSE SETBACKGARAGE SETBACKROW 08/14/14 Revised 09/05/14 Revised SITE DATA TOTAL SITE AREA 80.208 AC. NUMBER OF SINGLE FAMILY LOTS 193 LOTS LOT AREA 58.901 AC. RIGHT OF WAY AREA (179TH ST W.)5.198 AC. RIGHT OF WAY AREA (LOCAL STREET)13.080 AC. RIGHT OF WAY AREA (PILOT KNOB)3.029 AC. OUTLOT AREA (OUTLOT A-J)16.639 AC. TOTAL DELINEATED WETLAND 0.939 AC. WETLAND TO BE PROTECTED 0.531 AC. WETLAND TO BE REPLACED 0.408 AC. SINGLE FAMILY LOT REQUIREMENTS (RS-4) MIN. LOT AREA - INTERIOR LOTS 8,400 S.F. MIN. LOT WIDTH AT SETBACK - INTERIOR LOTS 70 FEET MIN. LOT AREA - CORNER LOTS 10,200 S.F. MIN. LOT WIDTH AT SETBACK - CORNER LOTS 85 FEET MIN. LOT WIDTH AT SETBACK - CORNER LOTS ABUTTING 179TH ST W. 110 FEET MIN. LOT DEPTH - LOTS ABUTTING 179TH ST W. 150 FEET MINIMUM STEBACKS (RS-4) FRONT 25 FEET SIDE (HOUSE/GARAGE) 7 FEET SIDE (STREET)20 FEET REAR 30 FEET SIDE (179TH ST W.)30 FEET REAR (179TH ST W.)50 FEET 11/14/14 Revised 100 PROPERTY IS ZONED RM-1 BUT IS BEING DEVELOPED UNDER RS-4 STANDARDS. 12/17/14 Revised : City Comments 01/19/15 Revised 03/17/15 Revised 03/31/15 Revised 05/05/15 Revised For Review May 5, 2015 6001 Egan Drive, Ste 100, Savage, MN 55378 Phone: 952.226.3200 Web: www.kjwalk.com Date: 03/27/14 Revision: Original Preliminary Plat Set Preliminary Plat (East) OF LAKEVILLELAKEVILLE, MN SHEET 3 of 13 FILE PATH: C:\Users\Skills\Documents\Projects\Lakeville\Pheasant Run\Engineering\CAD\DWGs\PR1-FINAL PLAT-PF.dwg 0 60 120 180 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly registered engineer under the laws of the State of Minnesota. Luke Warren Israelson Registration #: 51362 Date: 5/5/2015 11/14/14 Revised 5' 7' 10' 30' 25' 10' TYPICAL LOT SETBACKS AND EASEMENTS ROW 20'HOUSE SETBACKGARAGE SETBACK20' 10' 10' 30' 25' 10'20'HOUSE SETBACKGARAGE SETBACKROW 12/17/14 Revised : City Comments 01/19/15 Revised 03/17/15 Revised 03/31/15 Revised 05/05/15 Revised • • • PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE FFOOUURRTTHH AADDDDIITTIIOONN–– FFIINNAALL PPLLAATT AAPPRRIILL 99,, 22001188 PPAAGGEE 22 OOFF 99 • • PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE FFOOUURRTTHH AADDDDIITTIIOONN–– FFIINNAALL PPLLAATT AAPPRRIILL 99,, 22001188 PPAAGGEE 33 OOFF 99 PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE FFOOUURRTTHH AADDDDIITTIIOONN–– FFIINNAALL PPLLAATT AAPPRRIILL 99,, 22001188 PPAAGGEE 44 OOFF 99 PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE FFOOUURRTTHH AADDDDIITTIIOONN–– FFIINNAALL PPLLAATT AAPPRRIILL 99,, 22001188 PPAAGGEE 55 OOFF 99 PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE FFOOUURRTTHH AADDDDIITTIIOONN–– FFIINNAALL PPLLAATT AAPPRRIILL 99,, 22001188 PPAAGGEE 66 OOFF 99 PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE FFOOUURRTTHH AADDDDIITTIIOONN–– FFIINNAALL PPLLAATT AAPPRRIILL 99,, 22001188 PPAAGGEE 77 OOFF 99 PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE FFOOUURRTTHH AADDDDIITTIIOONN–– FFIINNAALL PPLLAATT AAPPRRIILL 99,, 22001188 PPAAGGEE 88 OOFF 99 PPHHEEAASSAANNTT RRUUNN OOFF LLAAKKEEVVIILLLLEE FFOOUURRTTHH AADDDDIITTIIOONN–– FFIINNAALL PPLLAATT AAPPRRIILL 99,, 22001188 PPAAGGEE 99 OOFF 99