Loading...
HomeMy WebLinkAboutLA160777 - 20173 Harvest Dr Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received _____ _______ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ HOME PHONE _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN. NAME OF APPLICANT (Please Print)DATE APPLICANT’S SIGNATURE: www.lakevillemn.gov 20173 Harvest Dr Lakeville MN 55044 New Single Family Dwelling n/a $355,000.00 04.24.2018 10.24.2018 6 5 Berres Ridge 3rd ■invoices@stonecottage.com Stone Cottage Construction, Inc. 636874 952.388.1301 651.261.1633 14787 Energy Way Apple Valley MN 55124 Scherer Plumbing 952.447.6734 15548 Red Oaks RD SE Prior Lake MN 55378 Lofgren Heating & Air Conditioning 952.431.5811 5708 Upper 147th St W Apple Valley MN 55124 Bohn Well Drilling 952.445.4809 4.11.2018 ✘ ✘ ✘ Troy Asleson - President - Stone Cottage Construction, Inc. RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: 20173 HARVEST DR, LAKEVILLE *ALL DOOR & W I N D O W H E A D E R S TO BE S.P. F . # 2 O R B E T T E R written consent of Planco MN, Inc. modified or used in any redesign without the prior may not be assigned or copied, and may not be may not be re-used for any additional structures,structure. Planco MN reserves all rights. These plans license is granted to use these plans to build one Copyright for these drawings is owned by Planco MN,Planco MN, Inc.c BERRES RIDGE MODEL #2 # 1 8 - 1 3 4 S M A 1 8 2018 STONE COTTAGE CONSTRUCTION, INC. LOT 6, BLOCK 5, BERRES RIDGE 3RD ADDITIION F R O N T E L E V A T I O N 1 / 4 " = 1 ' - 0 " & S O F F I T A L U M . F A S C I A T O T A L 2 n d F L R . 1 s t F L R . 1 , 2 1 9 S Q . F T . 1 , 2 8 4 S Q . F T . 2 , 5 0 3 S Q . F T . 1 6 x 8 O V H . D R . G L A S S @ T O P P A N E L GLASS @ TOP PANE L 9x8 OVH. DR. S S 8 ' - 4 " P O U R E D F O U N D A T I O N 1 ' - 3 " 128 1 2 6 V I N Y L B & B V I N Y L B & B V I N Y L S H A K E C O N C . P O R C H 4" VINYL SIDINGSI M O N T O N W D W S . ST O N E A S S H O W N FR O N T O N L Y G R I D S I N W D W S . FR O N T & S I D E S ALL SIDES S T O N E 2 4 " W R A P VINYL SHAKE, B & BFRONT ONLY S T O N E O N J O G 9 ' C E I L I N G @ F I R S T F L O O R 1 0 1 2 4 " T R I M S T O N E 1 0 1 2 1 0 / 1 2 1 0 / 1 2 1 0 / 1 2 4 " T R I M S S 4" CORNERS 4" TRIM ( 3 ) G A B L E B R A C K E T S ( 3 ) 2 / 0 x 2 / 0 F X ( 2 ) B R A C K E T S 4" VINYLSIDING S T O N E C A P 4 " V I N Y L S I D I N G STONE 24"WRAP F L O W E R B O X C o n c e p t A p p r o v a l O N L Y S u b j e c t t o F i e l d I n s p e c t i o n I n s p e c t o r D a t e 2 0 1 5 M N B l d g C o d e 0 4 / 3 0 / 2 0 1 8 d m a t h e w s V E R I F Y A L L G R A D E L I N E S Planco MN, Inc.C # 1 8 - 1 3 4 S M A 2 8 2018 LEFT ELEVATI O N 1 / 8 " = 1 ' - 0 " VINYL 1 ' - 6 " 8 1 2 1 0 / 1 2 10/126"1'-0" S I D I N G V I N Y L CORNERS VINYL SIDING S T O N E 2 4 " W R A P R I G H T E L E V A T I O N 1 / 8 " = 1 ' - 0 " S I D I N G V I N Y L 1 ' - 0 " 2 ' - 0 " S T O N E 2 4 " W R A P 1 2 6 1 0 / 1 2 C O R N E R S V I N Y L R E A R E L E V A T I O N 1 / 8 " = 1 ' - 0 " S I D I N G V I N Y L S I D I N G V I N Y L 1 0 1 2 8 / 1 2 1 ' - 3 " 1 ' - 0 " 1 ' - 3 " 8 / 1 2 C O R N E R S V I N Y L S e c u r e d o o r c l o s e d u n t i l d e c k i s c o n s t r u c t e d w i t h a s e p a r a t e p e r m i t . Planco MN, Inc.C # 1 8 - 1 3 4 S M A 3 8 2018 B A S E M E N T P L A N 1 / 4 " = 1 ' - 0 " U P 1 5 R U N E X C A V A T E D W H F U R N F . D . 9 2 % 3 6 " 2 ' - 4 " 5 ' - 0 " 2 ' - 6 " 2 ' - 8 " 2 ' - 8 " 5 / 0 x 4 / 6 S L 2 - 2 x 1 0 F U T . B D R M * N O F I N I S H M E C H / S T O R A G E * N O F I N I S H 1 1 7 / 8 " L S L 1 9 . 2 " O . C . 1 1 7 / 8 " L S L 1 9 . 2 " O . C . 3-11 7/8" LSL DROPPED 1 1 7 / 8 " L S L 1 9 . 2 " O . C . 1 1 7 / 8 " L S L 1 9 . 2 " O . C . 2 - 2 x 1 0 T R E A T E D 4 x 6 C U R B 2 x 6 - 1 6 " O . C . 1 6 x 8 F T G . 3 0 " x 3 0 " x 1 2 " P A D F T G . 3 0 " x 3 0 " x 1 2 " P A D F T G . 3 0 " x 3 0 " x 1 2 " P A D F T G . 3 0 ' - 0 " 1 6 ' - 9 " 2 ' - 7 " 1 0 ' - 8 " 4 ' - 9 " 5 ' - 1 1 " 8 ' - 6 " 40'-0" 31'-0" T R E A T E D 4 x 6 C U R B 2 x 6 - 1 6 " O . C . 1 6 x 8 F T G . 3'-0" 12'-4"11'-2"14'-3"1'-9" 7'-2"3'-8" 3 ' - 7 " 9 ' - 8 " 3'-9"3'-9" 5 ' - 0 " 4 ' - 6 " 1 0 " 4 ' - 8 " 8'-0" 31'-6"8'-0"16'-0"LOOKOUT 2 ' - 0 " 8 ' - 4 " P O U R E D F O U N D A T I O N 4 8 3 4 F U T . F A M I L Y / R E C R O O M * N O F I N I S H S U M P 9'-0" 9'-0" LOOKOUT 3 / 4 R . I . 6" 6 ' - 0 " P . D . 2 " L E D G E 2-11 7/8" LSL FLUSH 2'-9" U N E X C . 2 " L E D G E 3 ' - 4 " 6 x 3 C O N C . S L A B 5'-0"16'-6" 5'-9" 22'-0"2'-0"20'-0" 5 5 ' - 0 " 3 0 ' - 0 " 2 5 ' - 0 " 1 9 ' - 0 " 1 1 ' - 0 " 1 7 ' - 0 " 8 ' - 0 " 1 ' - 3 " 7'-6"53'-6" 1 7 ' - 0 " 1 2 ' - 6 " 6 ' - 0 " R A D O N V E N T TRT. 4x6 CURB 2x6 - 16" O.C. 16x8 FTG. T R E A T E D 4 x 4 C U R B 2 x 4 - 1 6 " O . C . 1 6 x 8 F T G . N O F T G . @ T O I L E T S D / C O 1 0 " 4 4 4 4 4 U F E R G r o u n d - P r o v i d e 2 0 ' R e b a r i n f o o t i n g a n d s t u b u p n e a r e l e c t r i c a l s e r v i c e p a n e l . Planco MN, Inc.C # 1 8 - 1 3 4 S M A 4 8 2018 F I R S T F L O O R P L A N 1 / 4 " = 1 ' - 0 " 1 , 2 1 9 S Q . F T . 9 ' C E I L I N G @ F I R S T F L O O R 3 ' - 0 " G A S F . P . 40'-0" 11'-6"12'-6"16'-0" 3'-9" U P 1 7 R D N 1 5 R 1 6 x 8 O V H D O O R 9x8 O V H D O O R G A R A G E * 4 " C O N C . F L O O R * W O O D F O Y E R MICRO OVEN/ REF'G 30" COOKTOP W/ HOOD 1 0 " S . B . 3 ' - 1 0 " 4 ' - 6 " 3 ' - 8 " K I T C H E N * W O O D * W O O D D I N I N G G R E A T R O O M * W O O D * C A R P E T O F F I C E ARCHED SOFFIT ARCHED SOFFIT P E D 2 ' - 4 " 9 / 0 x 5 / 0 S L 3 - 2 x 1 0 1 ' - 3 " 1 4 ' - 5 " 1 0 " 1 ' - 3 " 1 4 ' - 0 " 9'-4" 10'-10" 1 0 " 3 0 ' - 0 " 1 6 ' - 2 " 9 ' - 2 " 5 / 0 x 5 / 0 S L 2 - 2 x 1 0 T O P @ 7 ' - 6 " 2 / 0 x 4 / 0 - 3 S H 2/0x2/0-3 FX 2-9 1/2" LSL 5 5 ' - 0 " 3 0 ' - 0 " 2 5 ' - 0 " 1 7 ' - 0 " 1 9 ' - 0 " 1 1 ' - 0 " 5'- 1 1 " 5 ' - 1 " 9 ' - 6 " 9 ' - 6 " 53'-6"2'-0"20'-0"31'-6"22'-0"7'-6"16'-0" 2 ' - 0 " 10'-10"5'-2" 3'-9" 5 ' - 1 0 " 4 ' - 6 " 1 0 " 5'-1"6'-3"4'-8" 1 ' - 8 " (FRAMING) W . I . C . * V I N Y L R A I L 4 ' - 8 " 2-2x10 2/6x4/0 SH 1 2 x 1 2 B O X E D C O L . 2 - 7 1 / 4 " L S L 3 - 2 x 1 0 1 8 " F L R . T R U S S 1 9 . 2 " O . C . 3'-0" R A I L 2 4 " P A N T . 1 8 " F L R . T R U S S 1 9 . 2 " O . C . 1 8 " F L R . T R U S S 1 9 . 2 " O . C . 4 ' - 6 " A R C H E D S O F F I T A R C H E D S O F F I T 1'-3"14'-3" 10" 2 ' - 8 " F U L L V I E W G I R D E R 3/0x2/0 FX 3-2x10 3/0x2/0 FX 3-2x10 9 ' - 2 " 3 ' - 1 0 " F 8 ' - 3 " 7 ' - 1 1 " 1 0 " WALL EDGE 4 ' - 8 " 2 ' - 8 " 4 ' - 9 " 1'-11"3'-3" 5'-6" 1 ' - 0 " 2 4 " C A N T . C O N C . P O R C H 1 2 " C A N T . 6'-3"6'-3" 2'-4"2'-4"2'-9"2'-4" W A L L E D G E W A L L E D G E TRUSSES 24" O.C. 10" 2 x 6 2 x 6 T U R N S T U D S 3-11 7/8" LVL DROPPED3-11 7/8" LVL DROPPED 3 - 2 x 1 0 DBL. 2'-6" PKT. DRS. 2 - 2 x 1 0 4 ' - 0 " * W O O D * W O O D 1 ' - 3 " * S H T R K . C L G . S L S L 6" 8 ' - 0 " 4 ' - 0 " 4 ' - 0 " 2 - 1 1 7 / 8 " L S L 2 - 9 1 / 2 " L S L D E C O R A T I V E B E A M S 8'-0" 8 ' - 0 " 2 ' - 8 " P K T . F L U S H L S L GIRDER 6 6 " B E N C H 2 ' - 8 " F I R E D R . 2 ' - 4 " C H A S E 6 ' - 0 " 1 7 ' - 0 " 1 2 ' - 6 " 5 ' - 6 " 7 ' - 0 " * V I N Y L 5'-0"16'-6" * 2 x 6 W A L L S 2 x 6 R A D O N V E N T T R A N S O M 3'-6"4'-0" CAB. 3 ' - 0 " C A B . G I R D E R F . T . G I R D E R F . T . S D / C O 2-2x10 FLUSH 4 4 4 4 C S - W S P C S - W S P 4 4 4 4 4 4 4 4 CS-PF C S - P F C S - P F C S - P F 4 4 2 - 2 x 8 3 - 2 x 1 2 2 - 9 1 / 2 L S L 2 - 9 1 / 2 L S L Planco MN, Inc.C # 1 8 - 1 3 4 S M A 5 8 2018 S E C O N D F L O O R P L A N 1 / 4 " = 1 ' - 0 " 1 , 2 8 4 S Q . F T . 41'-0" 7'-0"11'-0"11'-0" D N 1 7 R RAIL 7 8 " 2 ' - 4 " 2 ' - 4 " 2 ' - 6 " 2 ' - 6 " 2 ' - 6 " 2 ' - 0 " 2 ' - 8 " 5 ' - 0 " 5 ' - 0 " 5 ' - 0 " M A S T E R B E D R O O M * C A R P E T * C A R P E T W . I . C . 5'-5" 2 - 2 x 1 0 7 / 6 x 5 / 0 S L B E D R O O M # 2 * C A R P E T * C A R P E T B E D R O O M # 3 B E D R O O M # 4 * C A R P E T 3 0 ' - 0 " 1 5 ' - 8 " 1 4 ' - 4 " 3 0 ' - 0 " 8 ' - 0 " 3 8 ' - 0 " 1 7 ' - 0 " 1 3 ' - 0 " 8 ' - 6 " 8 ' - 6 " 5 ' - 9 " 7 ' - 3 " 2'-0" 39'-0" 7'-0"8'-0"8'-0"16'-0" 6 ' - 2 " 6 ' - 1 0 " 1 3 ' - 0 " 2 ' - 6 " 2 ' - 6 " 1 2 ' - 0 " 11'-0"4'-0"3'-9"3'-9" 2 ' - 6 " 2 ' - 0 " 4 ' - 6 " 6 ' - 8 " 1 0 " 5 ' - 2 " 2-2x10 2/6x4/0 SH 6/0x3/0 FX TEMP 2-2x10 6/0x4/6 SL 3-2x10 3 - 2 x 1 0 2 / 0 x 5 / 2 S H - 3 / 0 x 5 / 2 S H - 2 / 0 x 5 / 2 S H 3 / 0 x 5 / 2 - 2 S H 2 - 2 x 1 0 72" LIN. 2 ' - 0 " 2 ' - 4 " 2 ' - 4 " 2 ' - 4 " 6'-7" 1 / 2 W A L L W / G L A S S P A N E L F I B . B A S E C . T . W A L L S 5 / 0 x 2 / 0 F I X E D T E M P 2 - 2 x 1 0 2-2x10 2/6x4/0 SH 5'-1"1'-11" 1 ' - 8 " 3 ' - 0 " 1 3 ' - 2 " 6 0 3 4 4'-5"3'-8" P K T . 7 ' - 3 " 7 ' - 1 " 3 ' - 4 " 3 ' - 8 " 5'-51 2"5'-61 2" 4'-3" 2 ' - 8 " 7'-2" F F F 2 x 6 2 x 6 T R U S S E S 2 4 " O . C . GIRDER TRUSSES 24" O.C. * C . T . * C . T . * V I N Y L * V I N Y L * V I N Y L TOP @ 9'-6" OFF LANDING 5'-0" TUB & SHOWER 1 PIECE FIB. 2'-7" 1'-10" 1 ' - 1 0 " 1'-10" 1 ' - 1 0 " 2 ' - 6 " 6'-11" BENCH 1 0 ' - 1 0 " 2-9 1/2" LSL SLOPED CLG. 6 ' - 4 " 1 / 2 W A L L W / W D . C A P W D W A L L H U N G L T 2'-0" 2 ' - 0 " * B O X V A U L T 2 x 6 R A D O N V E N T 1'-10" L I N . 1 6 6 8 2'-3" 2 ' - 0 " S D S D S D S D S D / C O ACCESS ATTIC - M i n . 1 5 " c l e a r a n c e t o a n y o b s t r u c t i o n f r o m c e n t e r o f W . C . , 2 4 " i n f r o n t ( t y p ) . 4 4 CS-WSP 4 4 4 C S - W S P C S - W S P 4 4 4 CS-WSP 2 - 2 x 1 0 Planco MN, Inc.C # 1 8 - 1 3 4 S M A 6 8 2018 1 6 x 8 G R A D E W A T E R P R O O F I N G P O U R E D W A L L 2 x 6 - 1 6 " O . C . V B R - 2 1 I N S U L . SHEATHINGSIDING R - 2 1 I N S U L . 9'-11 8" V B  “ 2 x 6 - 1 6 " O . C . 3 0 ' - 0 " 2 x 6 - 1 6 " O . C . V B 1 / 2 " G Y P . B D . R - 2 1 I N S U L . 8'-11 8" ( D E S I G N E D B Y M F R ) T R U S S E S @ 2 4 " O . C . R - 4 9 I N S U L . S H E A T H I N G S I D I N G R - 2 1 I N S U L . 1 / 2 " G Y P . B D . V B 2 x 6 - 1 6 " O . C . 2 x 6 - 1 6 " O . C . V B 1 / 2 " G Y P . B D . R - 2 1 I N S U L . R - 2 0 S P R A Y F O A M R - 2 0 S P R A Y F O A M 1 1 7 / 8 " L S L @ 1 9 . 2 " O . C . 1 8 " F L O O R T R U S S E S @ 1 9 . 2 " O . C . 3 / 4 " T & G F L O O R 3 / 4 " T & G F L O O R 1 - 2 x 6 T R E A T E D 8 ' - 4 " P O U R E D W A L L W / R E B A R P E R C O D E S I L L P L A T E 1 6 x 8 WATERPROOFING 9 1 / 2 " I J T S . 9 1 / 2 " I J T S . 17 RISERS 15 RISERS 1 0 " 3 - 1 1 7 / 8 " L V L 3 - 1 1 7 / 8 " L S L GRADE 2 - 9 1 / 2 " L S L 6 ' - 8 " M I N . H D R M 1 x 8 R I S E R S 5 / 4 x 1 1 T R E A D S 3 - 2 x 1 2 S T R I N G E R S T A I R N O T E S : 1 0 " R U F F C U T T R E A D S R - 2 0 S P R A Y F O A M 2 ' - 0 " C R O S S S E C T I O N 3 / 8 " = 1 ' - 0 " E N E R G Y H E E L A L U M . A L U M . F A S C I A S O F F I T V E N T E D 1 ' - 3 " VENTEDSOFFIT ALUM.ALUM. FASCIA 1 / 2 " S H T G . S H I N G L E S 1 5 # F E L T 1'-3" E N E R G Y H E E L 1 0 1 2 5 0 % R O O F 5 0 % S O F F I T R O O F V E N T S @ 1 / 3 0 0 A T T I C 1 0 1 2 2 - 1 1 7 / 8 " L S L 9'-6" TOP OF WDW. 2 " F U R R I N G W A L L 1 / 2 " G Y P . B D . 2 0 ' - 1 0 " R-10 W/ <2.6 ACHINSUL. 1 0 " 73 8" 1 0 " 71 2" D R A I N T I L E DRAIN TILE 2 " F O A M W / V . B . 5 / 8 " G Y P . B D . 5 / 8 " G Y P . B D . 5 / 8 " G Y P . B D . 2 - 2 x 1 0 Planco MN, Inc.C # 1 8 - 1 3 4 S M A 7 8 2018 5 ' - 9 " C O N C . P O R C H G R A D E M I N I M A L H E E L V E N T E D S O F F I T F A S C I A A L U M . A L U M . 2 - 7 1 / 4 " L S L 1 2 6 6 x 6 P O S T 9'-11 8" C R O S S S E C T I O N 3 / 8 " = 1 ' - 0 " R-20 S P R A Y F O A M  “ 1 1 7 / 8 " L S L @ 1 9 . 2 " O . C . P E R C O D E W A L L W / R E B A R 8 ' - 4 " P O U R E D R - 2 0 S P R A Y F O A M S I L L P L A T E 1 - 2 x 6 T R E A T E D 3 1 / 2 " C O N C . F L O O R 1 6 x 8 P R O O F I N G W A T E R T R U S S E S @ 2 4 " O . C . ( D E S I G N E D B Y M F R ) R-20 S P R A Y F O A M SHEATHINGSIDING 8'-11 8" 1 8 " F L O O R T R U S S E S @ 1 9 . 2 " O . C . R- 2 1 I N S U L . 1/2 " G Y P . B D . V B 2x 6 - 1 6 " O . C . R- 2 1 I N S U L . 1/2 " G Y P . B D . V B 2x 6 - 1 6 " O . C . R - 4 9 I N S U L . 2 x 6 - 1 6 " O . C . 1 / 2 " G Y P . B D . R - 2 1 I N S U L . 1 / 2 " G Y P . B D . 2 x 6 - 1 6 " O . C . 3 / 4 " T & G F L O O R V B R - 2 1 I N S U L . W / V . B . 5 / 8 " G Y P . B D . V B R - 2 0 S P R A Y F O A M S I D I N G S H E A T H I N G 2 ' - 0 " 5 / 8 " G Y P . B D . 3 / 4 " T & G F L O O R 1 ' - 6 " 5 ' - 6 " 3 9 ' - 0 " 17 RISERS15 RISERS B O X V A U L T @ M A S T E R R- 2 1 I N S U L . V B 2x 6 - 1 6 " O . C . 6 ' - 8 " M I N . H D R M 1 x 8 R I S E R S 5 / 4 x 1 1 T R E A D S 3 - 2 x 1 2 S T R I N G E R S T A I R N O T E S : 1 0 " R U F F C U T T R E A D S 8 " 1 2 x 1 2 B O X E D C O L U M N E N E R G Y H E E L A L U M . A L U M . F A S C I A S O F F I T V E N T E D 1 ' - 3 " S H E A T H I N G M I N . R - 3 8 @ C A N T . P O U R E D W A L L GRADE16x82" F O A M 758"2" FOAM W/“%(9(/512"4'-0" 73 8"71 2" D R A I N T I L E R - 1 0 W / < 2 . 6 A C H I N S U L . 1 6 x 8 1 6 x 8 1 6 x 8 T R T . 4 x 4 C U R B T R T . 4 x 6 C U R B 2 x 6 - 1 6 " O . C . 2 x 4 - 1 6 " O . C . 8" 2'-0" 2 ' - 0 " 1 6 ' - 0 " Planco MN, Inc.C # 1 8 - 1 3 4 S M A 8 8 2018 G Y P . B D . G A R A G E 9'-11 8" 3 / 4 " T & G F L O O R C R O S S S E C T I O N 3 / 8 " = 1 ' - 0 "  “ 1 1 7 / 8 " L S L @ 1 9 . 2 " O . C . 3 1 / 2 " C O N C . F L O O R 1 6 x 8 D R A I N T I L E A S R E Q U I R E D 5 / 8 " G Y P . B D . R - 2 0 S P R A Y F O A M R - 2 1 I N S U L . 1 / 2 " G Y P . B D . V B 2 x 6 - 1 6 " O . C . P E R C O D E W A L L W / R E B A R 8 ' - 4 " P O U R E D S I L L P L A T E 1 - 2 x 6 T R E A T E D 5 / 8 " T Y P E " X " 1 8 " F L O O R T R U S S E S @ 1 9 . 2 " O . C . P R O O F I N G W A T E R R - 2 0 S P R A Y F O A M 3 / 4 " T & G F L O O R 4 " C O N C . F L O O R G A R A G E 1 6 x 8 G R A D E P O U R E D W A L L 2 X 6 - 1 6 " O . C . S L O P E T O D O O R S 16x8 GRADEPOURED WALL 2X6- 16" O.C.R-20 SPRAY FOAM R-21 INSUL.1/2" GYP. BD.VB 2x6- 16" O.C.8'-0"8'-118"18" FLOOR TRUSSES @ 19.2" O.C.GYP. BD.5/8" TYPE " X " ENERGY HEEL ( D E S I G N E D B Y M F R ) T R U S S E S @ 2 4 " O . C . R-49 INSUL. G I R D E R 1 2 ' - 0 " 2 ' - 0 " 2 2 ' - 0 " C R O S S S E C T I O N 3 / 8 " = 1 ' - 0 " W/ V.B.5/8" GYP. BD.3/4" T & G FLOOR VENTEDSOFFIT ALUM.ALUM. FASCIA 1/2" SHTG.SHINGLES15# FELT1'-3"10 12 50% ROOF 50% SOFFIT ROOF VENTS @ 1/300 ATTIC 10'-31 4" R - 1 0 W / < 2 . 6 A C H I N S U L . 1'-0316"4'-212" 1'-0" 1 0 " 1 4 ' - 5 " 1 ' - 3 " R = 2 4 ' - 3 5 / 8 " 7'-0" 9'-11 8" D I N I N G / G R E A T R O O M A R C H D E T A I L 3 / 8 " = 1 ' - 0 " Min. R-30 Insulation Stone Cottage HVAC Load Calculations for Stone Cottage 20173 Harvest Dr Lakeville,mn Prepared By: Randy Andrews Lofgren Heating 5708 Upper 147th Street West Apple Vallley, MN 55124 Thursday, April 12, 2018 Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 2 Project Report General Project Information Project Title:Stone Cottage Project Date:Thursday, April 12, 2018 Client Name:Stone Cottage Client Address:20173 Harvest Dr Client City:Lakeville,mn Company Name:Lofgren Heating Company Representative:Randy Andrews Company Address:5708 Upper 147th Street West Company City:Apple Vallley, MN 55124 Company E-Mail Address:rrandrews@lofgrenheating-ac.com Design Data Reference City:Minneapolis, Minnesota Building Orientation:Front door faces North Daily Temperature Range:Medium Latitude:44 Degrees Elevation:834 ft. Altitude Factor:0.970 Elevation Sensible Adj. Factor:1.000 Elevation Total Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29 Check Figures Total Building Supply CFM:1,153 CFM Per Square ft.:0.310 Square ft. of Room Area:3,722 Square ft. Per Ton:1,343 Volume (ft³) of Cond. Space:30,995 Building Loads Total Heating Required Including Ventilation Air:54,482 Btuh 54.482 MBH Total Sensible Gain:24,949 Btuh 79 % Total Latent Gain:6,449 Btuh 21 % Total Cooling Required Including Ventilation Air:31,397 Btuh 2.62 Tons (Based On Sensible + Latent) 2.77 Tons (Based On 75% Sensible Capacity) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\20173 HARVEST 04122018.rhv Thursday, April 12, 2018, 10:40 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 3 Load Preview Report Scope Has AED Net Ton ft.² /Ton Area Sen Gain Lat Gain Net Gain Sen Loss Sys Htg CFM Sys Clg CFM Sys Act CFM Duct Size Building 2.62 1,423 3,722 24,949 6,449 31,397 54,482 1,040 1,153 1,153 System 1 No 2.62 1,423 3,722 24,949 6,449 31,397 54,482 1,040 1,153 1,153 21x10 Ventilation 340 1,352 1,692 4,550 Zone 1 3,722 24,609 5,097 29,706 49,932 1,040 1,153 1,153 21x10 1-Main Level 1,219 10,097 1,834 11,931 17,467 364 473 473 6--6 2-Upper Level 1,284 10,836 2,434 13,270 18,341 382 508 508 6--6 3-Lower Level 1,219 3,676 829 4,505 14,124 294 172 172 2--6 C:\ ...\20173 HARVEST 04122018.rhv Thursday, April 12, 2018, 10:40 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 4 Total Building Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 446 12,417 0 9,216 9,216 11N: Door-Metal - Polystyrene Core 63 1,918 0 529 529 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 3361 19,008 0 2,905 2,905 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 342 1,458 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1284 2,234 0 1,233 1,233 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 839 1,825 0 0 0 Subtotals for structure:38,860 0 13,883 13,883 People:7 1,400 1,610 3,010 Equipment:2,500 8,000 10,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 119, Summer CFM: 62 11,072 1,197 860 2,057 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 AED Excursion:0 0 256 256 Total Building Load Totals:54,482 6,449 24,949 31,397 Check Figures Total Building Supply CFM:1,153 CFM Per Square ft.:0.310 Square ft. of Room Area:3,722 Square ft. Per Ton:1,343 Volume (ft³) of Cond. Space:30,995 Building Loads Total Heating Required Including Ventilation Air:54,482 Btuh 54.482 MBH Total Sensible Gain:24,949 Btuh 79 % Total Latent Gain:6,449 Btuh 21 % Total Cooling Required Including Ventilation Air:31,397 Btuh 2.62 Tons (Based On Sensible + Latent) 2.77 Tons (Based On 75% Sensible Capacity) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\20173 HARVEST 04122018.rhv Thursday, April 12, 2018, 10:40 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 5 Building Pie Chart Building Loss 54,482 Btuh Floor 3%Roof 4% Wall 38% Glass 23% Door 4% Infiltration 20% Ventilation 8% Building Gain 31,397 Btuh Roof 4% Wall 9% Glass 29% Door 2%People 10% Equipment 33% Infiltration 7% Ventilation 5%AED Excursion 1% C:\ ...\20173 HARVEST 04122018.rhv Thursday, April 12, 2018, 10:40 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 6 System 1 Whole House Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 446 12,417 0 9,216 9,216 11N: Door-Metal - Polystyrene Core 63 1,918 0 529 529 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 3361 19,008 0 2,905 2,905 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 342 1,458 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1284 2,234 0 1,233 1,233 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 839 1,825 0 0 0 Subtotals for structure:38,860 0 13,883 13,883 People:7 1,400 1,610 3,010 Equipment:2,500 8,000 10,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 119, Summer CFM: 62 11,072 1,197 860 2,057 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 AED Excursion:0 0 256 256 System 1 Whole House Load Totals:54,482 6,449 24,949 31,397 Check Figures Supply CFM:1,153 CFM Per Square ft.:0.310 Square ft. of Room Area:3,722 Square ft. Per Ton:1,343 Volume (ft³) of Cond. Space:30,995 System Loads Total Heating Required Including Ventilation Air:54,482 Btuh 54.482 MBH Total Sensible Gain:24,949 Btuh 79 % Total Latent Gain:6,449 Btuh 21 % Total Cooling Required Including Ventilation Air:31,397 Btuh 2.62 Tons (Based On Sensible + Latent) 2.77 Tons (Based On 75% Sensible Capacity) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\20173 HARVEST 04122018.rhv Thursday, April 12, 2018, 10:40 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 7 Detailed Room Loads - Room 1 - Main Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,219.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,219.0 sq.ft.Supply Air:473 CFM Ceiling Height:9.0 ft.Supply Air Changes:2.6 AC/hr Volume:10,971.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:6 Actual Winter Vent.:49 CFM Runout Air:79 CFM Percent of Supply.:10 % Runout Duct Size:6 in.Actual Summer Vent.:29 CFM Runout Air Velocity:402 ft./min.Percent of Supply:6 % Runout Air Velocity:402 ft./min.Actual Winter Infil.:43 CFM Actual Loss:0.101 in.wg./100 ft.Actual Summer Infil.:22 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain W -Wall-12F-0sw 40 X 9 330 0.065 5.7 1,866 0.9 0 285 E -Wall-12F-0sw 40 X 9 349 0.065 5.7 1,974 0.9 0 302 N -Wall-12F-0sw 38 X 9 236 0.065 5.7 1,335 0.9 0 204 S -Wall-12F-0sw 38 X 9 248 0.065 5.7 1,402 0.9 0 214 N -Door-11N 6 X 7 42 0.350 30.5 1,279 8.4 0 353 N -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 W -Gls-4A-1a-o shgc-0.33 0%S 30 0.320 27.8 835 35.0 0 1,050 E -Gls-4A-1a-o shgc-0.33 0%S 11 0.320 27.8 306 35.0 0 385 N -Gls-4A-1a-o shgc-0.33 100%S 43 0.320 27.8 1,197 10.4 0 448 S -Gls-4A-1a-o shgc-0.33 0%S 94 0.320 27.8 2,617 19.2 0 1,803 Subtotals for Structure:13,450 0 5,220 Infil.: Win.: 43.3, Sum.: 22.5 1,404 2.861 4,017 0.222 434 312 AED Excursion:105 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:1,000 4,000 Room Totals:17,467 1,834 10,097 C:\ ...\20173 HARVEST 04122018.rhv Thursday, April 12, 2018, 10:40 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 8 Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,284.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,284.0 sq.ft.Supply Air:508 CFM Ceiling Height:8.0 ft.Supply Air Changes:3.0 AC/hr Volume:10,272.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:6 Actual Winter Vent.:51 CFM Runout Air:85 CFM Percent of Supply.:10 % Runout Duct Size:6 in.Actual Summer Vent.:31 CFM Runout Air Velocity:431 ft./min.Percent of Supply:6 % Runout Air Velocity:431 ft./min.Actual Winter Infil.:43 CFM Actual Loss:0.116 in.wg./100 ft.Actual Summer Infil.:22 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain W -Wall-12F-0sw 40 X 9 317 0.065 5.7 1,793 0.9 0 274 E -Wall-12F-0sw 40 X 9 339 0.065 5.7 1,917 0.9 0 293 N -Wall-12F-0sw 38 X 9 271 0.065 5.7 1,533 0.9 0 234 S -Wall-12F-0sw 38 X 9 290 0.065 5.7 1,640 0.9 0 251 W -Gls-4A-1a-o shgc-0.33 0%S 43 0.320 27.8 1,197 35.0 0 1,505 E -Gls-4A-1a-o shgc-0.33 0%S 21 0.320 27.8 585 35.0 0 735 N -Gls-4A-1a-o shgc-0.33 100%S 71 0.320 27.8 1,977 10.4 0 739 S -Gls-4A-1a-o shgc-0.33 0%S 52 0.320 27.8 1,448 19.2 0 997 UP-Ceil-16B-50 1284 X 1 1284 0.020 1.7 2,234 1.0 0 1,233 Subtotals for Structure:14,324 0 6,261 Infil.: Win.: 43.3, Sum.: 22.5 1,404 2.861 4,017 0.222 434 312 AED Excursion:113 People: 200 lat/per, 230 sen/per:5 1,000 1,150 Equipment:1,000 3,000 Room Totals:18,341 2,434 10,836 C:\ ...\20173 HARVEST 04122018.rhv Thursday, April 12, 2018, 10:40 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 9 Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,219.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,219.0 sq.ft.Supply Air:172 CFM Ceiling Height:8.0 ft.Supply Air Changes:1.1 AC/hr Volume:9,752.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:2 Actual Winter Vent.:40 CFM Runout Air:86 CFM Percent of Supply.:23 % Runout Duct Size:6 in.Actual Summer Vent.:10 CFM Runout Air Velocity:439 ft./min.Percent of Supply:6 % Runout Air Velocity:439 ft./min.Actual Winter Infil.:33 CFM Actual Loss:0.120 in.wg./100 ft.Actual Summer Infil.:17 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain W -Wall-12F-0sw 40 X 9 360 0.065 5.7 2,036 0.9 0 311 E -Wall-12F-0sw 40 X 9 360 0.065 5.7 2,036 0.9 0 311 S -Wall-12F-0sw 38 X 9 261 0.065 5.7 1,476 0.9 0 226 N -Wall-15B0-10sf-10 38 X 9 342 0.049 4.3 1,458 0.0 0 0 S -Gls-4A-1a-o shgc-0.33 0%S 81 0.320 27.8 2,255 19.2 0 1,554 Floor-21A-24 1 X 839 839 0.025 2.2 1,825 0.0 0 0 Subtotals for Structure:11,086 0 2,402 Infil.: Win.: 32.7, Sum.: 17.0 1,062 2.861 3,038 0.222 329 236 AED Excursion:38 Equipment:500 1,000 Room Totals:14,124 829 3,676 C:\ ...\20173 HARVEST 04122018.rhv Thursday, April 12, 2018, 10:40 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 10 System 1 Room Load Summary No Room Name Area SF Htg Sens Btuh Min Htg CFM Run Duct Size Run Duct Vel Clg Sens Btuh Clg Lat Btuh Min Clg CFM Act Sys CFM ---Zone 1--- 1 Main Level 1,219 17,467 364 6-6 402 10,097 1,834 473 473 2 Upper Level 1,284 18,341 382 6-6 431 10,836 2,434 508 508 3 Lower Level 1,219 14,124 294 2-6 439 3,676 829 172 172 Ventilation 4,550 340 1,352 System 1 total 3,722 54,482 1,040 24,949 6,449 1,153 1,153 System 1 Main Trunk Size:21x10 in. Velocity:791 ft./min Loss per 100 ft.:0.092 in.wg Cooling System Summary Cooling Tons Sensible/Latent Split Sensible Btuh Latent Btuh Total Btuh Net Required:2.62 79% / 21%24,949 6,449 31,397 Recommended:2.77 75% / 25%24,949 8,316 33,265 Actual:1.00 77% / 23%9,240 2,760 12,000 Equipment Data Heating System Cooling System Type:Natural Gas Furnace Standard Air Conditioner Model:QC-F38-E78-G QC-C12 Indoor Model:S12 Brand:Quikcool FE Series Quikcool AS Series Description:Hi Efficiency Furnace Standard Efficiency Air Condit Efficiency:78.3 AFUE 12.4 SEER Sound:8.1 bels Capacity:38,000 Btuh 12,000 Btuh Sensible Capacity:n/a 9,240 Btuh Latent Capacity:n/a 2,760 Btuh C:\ ...\20173 HARVEST 04122018.rhv Thursday, April 12, 2018, 10:40 AM Builders Associaton of Minnesota version 101014 Date Certificate Posted x Passive (No Fan) Active (With fan and monometer or other system monitoring device) Location (or future location) of Fan: Other Please Describe Here x 10/15 x x x 20 x 20 x 21 x 49 x x x x x Not applicable, all ducts located in conditioned space x Not required per mech. code Passive Powered Interlocked with exhaust device. Describe: Input in BTUS: 70,000 Capacity in Gallons: Other, describe: AFUE or HSPF% 93% Cfm's " round duct OR " metal duct Not required per mech. code Passive Low: Other, describe: x Low: Location of fan(s), describe: Cfm's 4" " round duct OR FLEX " metal duct City Mailing Address of the Dwelling or Dwelling Unit Combustion Air Select a Type Location of duct or system: 31,397 Below Entire Slab Rig i d , E x t r u d e d P o l y s t y r e n e Ceiling, flat Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. Place your logo here New Construction Energy Code Compliance Certificate Name of Residential Contractor Stone Cottage Construction Inc. MN License Number Lakeville20173 Harvest Dr BC636874 Mech Room Heat Recover Ventilator (HRV) Capacity in cfms: Energy Recover Ventilator (ERV) Capacity in cfms: 54,482 Heating Gain Cooling Load Attic Fuel Type Solar Heat Gain Coefficient (SHGC): Windows & Doors Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area Rim Joist (2nd Floor+) 0.30 Appliances THERMAL ENVELOPE Fo a m O p e n C e l l Wall Rig i d , I s o c y n u r a t e Perimeter of Slab on Grade RADON CONTROL SYSTEM No n o r N o t A p p l i c a b l e Cooling System To t a l R - V a l u e o f a l l T y p e s o f In s u l a t i o n Type: Check All That Apply Min e r a l F i b e r b o a r d Insulation Location Fo a m , C l o s e d C e l l 0.22 Describe other insulated areas Fi b e r g l a s s , B l o w n Fi b e r g l a s s , B a t t s Foundation Wall R-value Average U-Factor (excludes skylights and one door) U: Duct system air tightness: Building envelope air tightness: Rim Joist (1st Floor) GPVL-50 13ACXN042-230 Model Heating System Natrual Gas Lennox Location of duct or system: Heating or Cooling Ducts Outside Conditioned Spaces Electric Make-up Air Select a Type AO Smith Domestic Water Heater MECHANICAL SYSTEMS Rating or Size Efficiency 13 Seer 200CFM Select Type Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): 24,949Residential Load Calculation SEER /EER Total ventilation (intermittent + continuous) rate in cfms: Balanced Ventilation capacity in cfms: High: High: MECHANICAL VENTILATION SYSTEM Capacity continuous ventilation rate in cfms: ML193UH070 Heating Loss Manufacturer Lennox Natural Gas Output in Tons: 3 Ton50 NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. “The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit.” (NPDES Construction Stormwater Permit, MPCA) “The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.” (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500 20173 Harvest Dr Stone Cottage Construction, Inc. Brian Christopherson 651.755.7199 brian@stonecottage.com New Single Family Dwelling 4 5 7 8 9 Brian Christopherson Stone Cottage Construction, Inc. 651.755.7199 brian@stonecottage.com University of Minnesota 05.31.2021 04.11.2018 04/12/18 X KH