May 7, 2018 Item No. ______
ITERI ADDITION PRELIMINARY AND FINAL PLAT
Proposed Action
Staff recommends adoption of the following motion: Move to approve a resolution approving the
preliminary and final plat of Iteri Addition.
Overview
SD Companies, LLC has submitted preliminary and final plat applications and plans for the
development of four single family residential lots on 3.0 acres to be known as Iteri Addition. The
Iteri Addition preliminary and final plat is located south of 194th Street and west of Iteri Avenue.
The property is part of the metes and bounds described Appaloosa Farm subdivision created in the
1960’s.
At their April 5, 2018 meeting, the Planning Commission held a public hearing to consider the
preliminary plat. There was one public comment raised at the public hearing regarding the known
discrepancy with the legal descriptions and monumentation of lots within the original Appaloosa
Farm subdivision. The Planning Commission unanimously recommended approval of the
preliminary plat. The Parks, Recreation and Natural Resources Committee unanimously
recommended approval of the preliminary plat at their April 4, 2018 meeting.
Primary Issue to Consider
• Will the final plat remedy the Appaloosa Farm subdivision’s existing property monumentation?
The final plat will remedy the current property monumentation which has been identified by the
Dakota County Surveyor as being in error.
Supporting Information
• Preliminary and Final Plat Resolution
• Signed Development Contract
• April 5, 2018 Planning Commission draft meeting minutes
• April 4, 2018 Parks, Recreation and Natural Resources Committee draft meeting minutes
• March 30, 2018 Planning report and March 29, 2018 engineering report
Financial Impact: $ None Budgeted: Y/N ____ Source: _____________________________
Related Documents (CIP, etc.):_Zoning & Subdivision Ordinances _______________________________
Community Values: A Home for All Ages and Stages of Life_____________________________________
Report Completed by: Frank Dempsey, AICP, Associate Planner
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. 18-____
RESOLUTION APPROVING THE PRELIMINARY AND
FINAL PLAT OF ITERI ADDITION
WHEREAS, the owner of the plat described as ITERI ADDITION has requested
approval of a preliminary and final plat; and
WHEREAS, the preliminary plat was reviewed by the Planning Commission and the
Parks, Recreation and Natural Resources Committee; and
WHEREAS, the ITERI ADDITION preliminary and final plat is acceptable to the
City.
NOW THEREFORE BE IT RESOLVED by the Lakeville City Council:
1. The ITERI ADDITION preliminary and final plat is approved subject to the
developer’s execution of the development contract and security requirements.
2. The Mayor and City Clerk are hereby authorized to sign the development contract
and the final plat mylars.
3. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
ADOPTED by the Lakeville City Council this 7th day of May, 2018
CITY OF LAKEVILLE
_______
Douglas P. Anderson, Mayor
ATTEST:
______________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _________is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 7th day of May, 2018 as shown by the
minutes of said meeting in my possession.
______________________________
Charlene Friedges
City Clerk
(SEAL)
Drafted By:
City of Lakeville
20195 Holyoke Avenue
Lakeville, MN 55044
1
City of Lakeville
Planning Department
Memorandum
To : Planning Commission
From: Frank Dempsey, AICP, Associate Planner
Date: March 30, 2018
Subject: Packet Material for the April 5, 2018 Planning Commission Meeting
Agenda Item: Iteri Addition Preliminary and Final Plat
Application Action Deadline: July 6, 2018
BACKGROUND
SD Companies, LLC has applied for a preliminary and final plat for the development of four
single family residential lots on 3.0 acres to be known as Iteri Addition. The Iteri Addition
preliminary and final plat is located south of 194th Street and west of Iteri Avenue. The property
is part of the metes and bounds described Appaloosa Farm subdivision created in the 1960’s.
The property proposed for preliminary and final plat is located at 19455 Iteri Avenue.
The Iteri Addition preliminary and final plat plans have been distributed to Engineering Division
and Parks and Recreation Department staff and the Parks, Recreation and Natural Resources
Committee.
EXHIBITS
Exhibit A – Location/Zoning Map
Exhibit B – Aerial Photo
Exhibit C – Plan Cover Sheet
Exhibit D – Existing Conditions and Demolition Plan
Exhibit E – Encroachment and Lot Line Adjustment Sketch
Exhibit F – Preliminary Plat
2
Exhibit G – Final Plat
Exhibit H – Site Plan
Exhibit I – Grading and Erosion Control Plan and Grading Exhibit (2 Pages)
Exhibit J – Utility Plan
Exhibit K – Landscape Plan
Exhibit L – Tree Preservation Plan
PLANNING ANALYSIS
PRELIMINARY PLAT AND FINAL PLAT
Existing Conditions. The subject property includes one metes and bounds parcel currently
occupied by a single family home constructed in 1978. The home is planned to be removed to
allow the construction of four new single family homes on the proposed four lots. Two water
wells are located on the property as shown on the survey. These wells must be abandoned in
accordance with Dakota County regulations. Any existing private septic system shall be removed
from the property.
The properties in the area are served with overhead private utility lines and poles. Any private
overhead utility services that serve the future lots in Iteri Addition shall be placed underground
as shown on the proposed plans. The Iteri Addition property is served with sanitary sewer and
water services. Sewer was extended to the Appaloosa Farms area as part of a public improvement
project in 2006. Utilities were installed and assessed for four sewer and water service units in
anticipation of the possibility for future subdivision and development of four lots. Similar
preliminary and final plats have been approved in Appaloosa Farm in 2007 (Curren Addition)
and 2014 (Appaloosa Farms Addition).
Encroachments and Lot Line Adjustments. The property survey shows a property line
encroachment of the house located at 9894 – 194th Street. Dakota County has determined that
the property legal descriptions in the Appaloosa Farm subdivision do not match the in-ground
property monumentation, possibly from an incorrect survey or incorrect monumentation
originating in the 1960’s. The result of this possible incorrect monumentation is that a 10 foot
wide gap will be created at the time the plat is recorded. This 10 foot wide gap became evident
with the plats of Paradise Hills to the east, Curren Addition to the south and the Appaloosa
Farms plat north of 194th Street in 2014.
To eliminate the gap with the Iteri Addition plat, the developer proposes to convey ownership of
the west 18 feet of the subject property to the two adjacent property owners. This shift in the
existing lot line will eliminate the encroachment of the house at 9894 – 194th Street but also
3
increase the setback of the house to the south at 9900 – 194th Street, thereby eliminating that non-
conforming condition. Planning Department staff concurs with the lot line adjustment to allow
Dakota County to record the adjustment consistent with the approved description sketch. The
final plat of Iteri Addition would then be recorded sequentially with the lot line adjustment,
thereby removing the existing non-conforming condition and eliminating the gap in the legal
descriptions.
Consistency with the Comprehensive Plan. The Iteri Addition property is located in Planning
District 5, Central Area/Heritage Commons area of the 2008 Comprehensive Plan. Planning District
5 guides the area for low density residential development. The proposed Iteri Addition preliminary
and final plat is consistent with the 2008 Comprehensive Plan.
Zoning and Adjacent Land Uses. The Iteri Addition preliminary and final plat is zoned RS-2,
Single Family Residential District. Adjacent land uses and zoning are as follows:
North –194th Street and single family homes (RS-2 District)
East – Iteri Avenue (RS-2 District)
South – Single family home (RS-2 District)
West – Single family homes (RS-2 District)
Consistency with the Capital Improvement Plan (CIP). City streets, sanitary sewer and water
improvements associated with the Iteri Addition preliminary and final plat were installed in 2004 and
have been partially paid with the remaining utilities deferred until the property is subdivided. The costs
associated with the development, including payment of deferred utility assessments, will be financed
entirely by the developer.
Premature Subdivision Criteria. A preliminary plat may be deemed premature if any of the
criteria listed in Chapter 10-2-4-1 of the Subdivision Ordinance exist. Eligible criteria pertain to a
lack of adequate: drainage, water, streets, sanitary sewer, and public service capacity (police and fire
protection). The other pertinent criteria pertain to inconsistencies with the City Comprehensive
Land Use and Capital Improvement Plans (discussed above). Staff review of the Iteri Addition
preliminary and final plat against these criteria finds that it is not a premature subdivision.
Phasing. The Iteri Addition will be developed in one phase.
Density/Average Lot Size. The Iteri Addition preliminary and final plat consists of four single
family lots on 3.0 acres. The gross density is 1.33 units per acre. Net density, excluding street
dedicated right-of-way is 1.58 units per acre. Lot sizes range between 23,840 and 33,948 square
feet with an average lot size of 27,543 square feet.
4
Lots/Blocks. The RS-2 District allows single family homes subject the following minimum
requirements:
Lot Area
Interior: 15,000 square feet
Corner: 18,000 square feet
Lot Width
Interior: 100 feet
Corner: 120 feet
The Iteri Addition preliminary and final plat meets the requirements for lot area and lot width.
Setbacks. The minimum RS-2 District building setback requirements are as follows:
Yard Front Rear Side Interior/Corner
Setbacks 30 feet 30 feet 15 feet/30 feet
The proposed custom graded house pads shown on the grading plan indicate that all four lots
have adequate building pad areas that meet setback requirements.
Outlots. There are no outlots proposed with the Iteri Addition preliminary and final plat.
Streets. The Iteri Adition preliminary and final plat abuts 194th Street and Iteri Avenue. Both are
local streets requiring and include the minimum required 60 feet of right-of-way. No other street
construction is proposed.
Grading, Drainage, Erosion Control, and Utilities. Proposed grading, drainage and erosion
control and utilities for the Iteri Addition preliminary and final plat have been reviewed by
Engineering Division staff.
Utilities serving the Appaloosa Farm neighborhood were installed and assessed in 2006 as part of
the project to bring sewer and water utilities to the neighborhood and to pave the neighborhood
street. Two existing wells are shown on the property survey. These wells must be sealed in
accordance with Lakeville and Dakota County regulations.
Existing overhead utilities serving the properties will be placed underground as identified on the
preliminary plat plans.
Engineering Division staff recommends approval of the preliminary and final plat.
5
Tree Preservation. The tree preservation plan identifies 92 significant trees within the preliminary
plat area. Since the grading plan proposes custom grading, instead of mass grading, for each lot,
each lot will require an individual tree preservation plan with each building permit. Staff will review
each plan to maximize the number of save trees for each lot.
Wetlands. A wetland delineation was completed for the preliminary plat. No wetlands were
identified within the preliminary plat area.
Landscape Plan. The proposed landscape plan identifies the type of landscaping to be
incorporated into the proposed rain garden (stormwater retention area) located at the southeast
corner of Lot 4. The proposed rain garden is designed to allow on-site drainage to filter
stormwater and infiltrate into the soil prior to overflowing into the public stormwater system. The
proposed landscaping is intended to benefit this effort.
Park Dedication. The City’s Park, Trails and Open Space Plan does not identify a need for public
park land within the Iteri Addition preliminary and final plat area. Staff recommends a payment of
cash in lieu of land dedication to satisfy the park dedication requirement for this plat. The
proposed four lots will require a cash contribution of $16,360 at $4,090 per single family residential
lot. The Parks, Recreation and Natural Resources Committee will make a recommendation related
to the park dedication requirement for the Iteri Addition preliminary and final plat at their April 4,
2018 meeting. Their recommendation will be forwarded to the Planning Commission at the public
hearing.
Trails/Sidewalks. No trails or sidewalks are required adjacent to existing streets.
MUSA. The Iteri Addition preliminary and final plat is located within the current MUSA and
sewer and water utilities are available to serve the project.
Final Plat. The Iteri Addition final plat is consistent with the proposed preliminary plat.
RECOMMENDATION
Planning Department staff recommends approval of the Iteri Addition preliminary and final plat
subject to the following stipulations:
1. Implementation of the recommendations listed in the March 29, 2018 engineering report.
2. Written authorization is required from the owners of 9894 – 194th Street and 9900 – 194th
Street to adjust the east boundaries of each parcel as described in in the planning report
6
and description sketch. The lot line adjustments shall be completed and recorded with
Dakota County in advance of recording of the Iteri Addition final plat.
3. All existing overhead utilities shall be placed underground. Any new utilities shall be
placed underground.
4. If the existing house is to be demolished, a demolition permit shall be required. If the
house is to be moved from the property, moving shall be in compliance with all state and
local requirements.
5. The water well shall be properly abandoned and sealed in compliance with state and local
requirements. Any septic structure located on the property shall be removed prior to
issuance of building permits for the four new single family lots.
6. Custom grading and tree preservation plans are required with building permits prior to
construction on each lot.
RS-2
RS-2
P/OS
RS-2
RS-3
RS-3
RS-3
RS-3
RS-3
RS-2
RS-2
JAGUARAVE192ND ST W
ITERILNITERI AVEISMAY P A T H
IRELAND WAYITERI CT W
JADE
LNJASPERTER KENWOODTRL194TH ST W
ITTABENA WAYÜ
ITERI ADDITION
EXHIBIT A
ITERI ADDITION
Property Information
February 6, 2018
0 225 450112.5 ft
0 60 12030 m
1:2,400
Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification.
EXHIBIT B
City of Lakeville
Public Works – Engineering Division
Memorandum
To: Frank Dempsey, Associate Planner
From: Joe Powers, Project Engineer
McKenzie L. Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Jerilyn Erikson, Finance Director
Gene Abbott, Building Official
Date: March 29, 2018
Subject: Iteri Addition
• Preliminary Plat Review
• Final Plat Review
• Preliminary and Final Grading and Erosion Control Plan Review
• Preliminary and Final Utility Plan Review
• Preliminary and Final Tree Preservation Plan Review
BBAACCKKGGRROOUUNNDD
SD Companies, LLC has applied for a preliminary and final plat for the development to be
known as Iteri Addition. The Iteri Addition preliminary and final plat is located south of 194th
Street and west of Iteri Avenue in the metes and bounds described Appaloosa Farm
subdivision created in the 1960’s. The property is located at 19455 Iteri Avenue.
The preliminary and final plat consists of four (4) single family residential lots within one block
on 3.0 acres.
The proposed subdivision will be completed by:
Developer: SD Companies, LLC
Engineer: Pioneer Engineering
IITTEERRII AADDDDIITTIIOONN
MMAARRCCHH 1199,, 22001188
PPAAGGEE 22 OOFF 88
SSIITTEE CCOONNDDIITTIIOONNSS
The Iteri Addition site includes one existing homestead that will be removed with the
development. The developer shall submit a security for the removal of the existing
homestead and well. Existing overhead utility lines are located alongside Iteri Avenue and
194th St. Overhead utilities along the west side of the property provide service to the existing
homestead and adjacent properties to the west. The remainder of the site is undeveloped.
The land generally slopes from the northeast to the west and south.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
Iteri Avenue and 194th Street
Iteri Addition is located west of and adjacent to Iteri Avenue and south of and adjacent to
194th Street, both local residential roadways as identified in the City’s Transportation Plan. The
½ right-of-way requirement for a local roadway is 30 feet. The Developer is dedicating the
necessary right-of-way to satisfy the right-of-way requirement.
Iteri Avenue and 194th Street are currently constructed as 22-foot wide paved rural roadways
with 1-foot wide gravel shoulders within a prescriptive rights easement. These roads could be
reconstructed in the future to a 32-foot wide urban section with concrete curb and gutter.
The City’s current Capital Improvement Plan does not include improvements to these roads.
Because it is unlikely that these roads will be upgraded to an urban section before the
existing pavement deteriorates to a point where complete reconstruction is required, the
Developer will grade the right-of-way along the roads to collect and convey runoff through
side yard drainage and utility easements to a proposed rain garden/filtration basin at the
southeast corner of the development.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for site grading and building construction shall be
through a single rock construction entrance on the east side of the site. Off-site access to this
site shall be from Iteri Avenue via 192nd Street.
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS
There are no required or proposed sidewalks or trails associated with the Iteri Addition
subdivision.
The Park Dedication Fee has not been collected on the parent parcel and shall be paid at the
time of final plat approval. The Park Dedication Fee is based on the rate in effect at the time of
final plat approval and is calculated as follows:
4 units x $4,090.00/dwelling unit = $16,360.00
Single-Family Dwelling Units Park Dedication Fee Rate Total
IITTEERRII AADDDDIITTIIOONN
MMAARRCCHH 1199,, 22001188
PPAAGGEE 33 OOFF 88
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR AANNDD WWAATTEERRMMAAIINN
Iteri Addition is located within subdistrict ML-71040 of the Marion Lake sanitary sewer district
as identified in the City’s Comprehensive Sanitary Sewer Plan. Wastewater will be conveyed
via existing trunk sanitary sewer to the MCES Farmington Interceptor and continue to the
Empire Wastewater Treatment Facility. The downstream facilities have sufficient capacity to
serve the proposed residential subdivision.
8-inch lateral sanitary sewer and 8-inch lateral watermain were installed as part of City Project
04-01 improvements to serve the adjacent existing properties and potential subdivided
properties within the parent parcel. In addition to the lateral improvements, sanitary sewer
and water service stubs were extended to both existing property lines and future property
lines consistent with potential lot subdivisions identified in the Feasibility Study prepared by
WSB & Associates, Inc. dated March 7, 2005. The Feasibility Study identified the existing
properties within the parent parcel that could potentially be subdivided in the future and
included exhibits depicting potential lot splits. Sanitary sewer and water services were
installed for all of the proposed lots within Iteri Addition. The existing homestead connected
to sanitary sewer and water in 2006 and was previously assessed for sanitary sewer and water
main connections. Sanitary sewer and watermain connection charges for Lots 2, 3, and 4 shall
be paid with the individual building permits.
The developer of Iteri Addition is proposing to abandon one of the existing water and
sanitary sewer services on the north side of the proposed subdivision and install a new water
and sanitary sewer service on the east side of the proposed subdivision to accommodate a
different lot layout from that identified in the March, 2005 Feasibility Study. The new services
will be installed by the developer at no cost to the City and the existing services will be
abandoned by the developer at the right of way. A security shall be collected for the
abandonment of the services to the right of way. An additional cash escrow of $6,500 will be
collected at the time of Final Plat, to be used by the City to abandon the services at the water
main and sanitary sewer main when 194th Street is next resurfaced or reconstructed, or if
required due to deteriorating condition of the services.
The City Council adopted levied special assessments for the construction of sanitary sewer,
watermain and rural paved roadways within the parent parcel on July 18, 2005. The following
special assessments were in association with City Project 04-10 improvements and include
interest from July, 2005 to December, 2018:
19455 Iteri Avenue – PID 22-01900-16-010 (existing homestead):
#1158 Roadway Improvement 04-10 $2,413.60
#1195 Sanitary Sewer Unit $280.80
#1196 Water Unit Charge $1,356.80
#1223 Sanitary Sewer 04-10 $2,188.07
#1224 Watermain 04-10 $2,352.90
IITTEERRII AADDDDIITTIIOONN
MMAARRCCHH 1199,, 22001188
PPAAGGEE 44 OOFF 88
19455 Iteri Avenue – PID 22-01900-16-010 (3 future parcels):
#1161 Deferred Rural Roadway $32,790.48
#1162 Deferred Sanitary Sewer $21,212.12
#1163 Deferred Watermain $22,809.80
The future parcels shall have the special assessment numbers 1161, 1162, 1163 apportioned
to it. The final plat shall trigger the end of the deferment for the future parcels and special
assessment numbers 1161, 1162, and 1163. The deferment will end upon approval of the final
plat, and the assessments numbered 1161, 1162, and 1163 will be re-assessed over a 20 year
period at 4.5% interest rate with the first year becoming payable in 2019.
The parent parcel was previously assessed the Sanitary Sewer Trunk Area Charge. The
assessment has been paid.
The Developer shall provide a security for payment of one year of real estate taxes, a total of
$4,840.22 with the final plat.
The septic system for the property was abandoned and possibly removed when the existing
homestead connected to City sewer in 2006. The developer shall determine if the septic
system was completely removed and, if necessary, shall remove any remaining portion of the
septic system. The existing well will be removed with the Iteri Addition development.
OOVVEERRHHEEAADD LLIINNEESS
Consistent with the City’s Public Ways and Property Ordinance, the Developer shall remove
the existing overhead utility lines and poles along the west side of Iteri Avenue and the south
side of 194th Street, including those that served the existing homestead. A $16,236.00 security
shall be submitted with the final plat to ensure that the overhead utility lines and poles are
removed. The poles along the west side of the plat, which serve the existing houses to the
west, will remain.
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
Iteri Addition is located within subdistrict ML-50 of the Marion Lake drainage district as
identified in the City’s Water Resources Management Plan.
Development of Iteri Addition includes the construction of a raingarden/treatment basin
within a proposed drainage and utility easement on the south side of Lot 4. The Developer
shall construct the basin with a sand compost mixture per LV-STM-30. The proposed basin
and upstream swale will provide pre-treatment, volume reduction, and rate control for the
development. The home builders must grade the right-of-way along Iteri Avenue to direct the
roadway runoff to the treatment basin through side yard drainage and utility easements. A
temporary diversion swale shall be constructed to divert runoff away from the basin until the
basin has been fully established. The City is not liable for any erosion or sediment deposit
from the public runoff to the undeveloped lots.
IITTEERRII AADDDDIITTIIOONN
MMAARRCCHH 1199,, 22001188
PPAAGGEE 55 OOFF 88
Culverts are required under the driveways of Lots 1-4, Block 1 to convey runoff via the
roadside ditch along Iteri Avenue into the treatment basin. The driveway culverts shall be
installed during grading operations and construction of the treatment basin.
The grading plan indicates that the lots within Iteri Addition will be custom graded by
prospective homeowners. Consistent with Subdivision Ordinance requirements, all custom
graded lots shall submit a custom grading plan, erosion control plan, tree preservation plan,
soil survey and pre-approved site/building plan prior to the issuance of a building permit. The
Developer shall provide a $20,000 security to ensure that the lots are graded with positive
drainage away from the building, including side-yard swales that direct runoff toward the
treatment basin, and that the driveways are constructed consistent with the driveway
culverts. The grading specifications shall also indicate that all embankments meet FHA/HUD
79G specifications.
SSTTOORRMM SSEEWWEERR
Proposed improvements associated with Iteri Addition include the construction of driveway
culverts on Lots 1-4, Block 1 along Iteri Avenue.
Any draintile construction, including perimeter draintile required for building footings, which
is deemed necessary during construction shall be the Developer’s responsibility to install and
finance.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcel and shall be
paid at the time of final plat approval. The Trunk Storm Sewer Area Charge is calculated as
follows:
110,175 s.f. x $0.178/s.f. = $19,611.15
Net Area of Iteri Addition Area Charge Total
FEMA FLOODPLAIN ANALYSIS
Iteri Addition is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the Federal
Emergency Management Agency (FEMA). Based on this designation, there are no areas in the
plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA.
WWEETTLLAANNDDSS
A wetland delineation was completed for the site. The wetland delineation did not identify
any wetlands on the site and no wetland impacts are proposed with the plat.
IITTEERRII AADDDDIITTIIOONN
MMAARRCCHH 1199,, 22001188
PPAAGGEE 66 OOFF 88
TTRREEEE PPRREESSEERRVVAATTIIOONN
A tree preservation plan was completed for Iteri Addition. The plan identifies a total of 92
significant trees within the site. The plan proposes to save 86 (93%) trees on the site. An
individual tree preservation plan will be required with each building permit.
The tree preservation plan satisfies City requirements. All “save” trees that are damaged or
removed will require replacement at a ratio of 2:1 as per the Lakeville Subdivision Ordinance.
The Developer is required to post a security for tree preservation on an individual lot basis for
each lot containing a “save” significant tree. The security is $1,500 for each lot with a “save”
significant tree and $1,000 for each outlot with a “save” significant tree and is calculated as
follows:
Block 1, Lots 1, 2, 3, and 4 4 Lots @ $1,500.00 each = $6,000.00
Total = $6,000.00
EERROOSSIIOONN CCOONNTTRROOLL
The grading plan indicates that all lots within Iteri Addition will be custom graded by
prospective builders/homeowners. All custom graded lots shall submit a custom grading
plan, erosion control plan, tree preservation plan, soil survey and pre-approved site/building
plan prior to the issuance of a building permit.
SSEECCUURRIITTIIEESS
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to Iteri Addition. The construction costs are based upon estimates
submitted by the Developer’s engineer on March 8, 2018.
CONSTRUCTION COSTS
Removals and Demolition
Site Grading, Erosion Control, and Restoration
Storm Sewer and Basin Installation
Utility Installation
$8,560.00
11,565.00
15,179.50
23,057.50
SUBTOTAL - CONSTRUCTION COSTS $ 58,362.00
OTHER COSTS
Developer’s Design (3.0%) $1750.86
Developer’s Construction Survey (2.5%) 1,459.05
City’s Legal Expense (0.5%) 291.81
City Construction Observation (5.0%) 2,918.10
Developer’s Record Drawing (0.5%) 291.81
Existing Homestead Special Assessments
1158, 1195, 1196, 1223, 1224
8,592.17
Deferred Special Assessments 1161-1163 76,812.40
IITTEERRII AADDDDIITTIIOONN
MMAARRCCHH 1199,, 22001188
PPAAGGEE 77 OOFF 88
One year of Real Estate Taxes 4,840.22
Bury Overhead Utility Lines 16,236.00
Custom Graded Lots 20,000.00
Tree Preservation 6,000.00
Lot Corners
Streetlights
Landscaping and Raingarden Construction
400.00
2,400.00
30,000.00
SUBTOTAL - OTHER COSTS $ 171,992.42
TOTAL PROJECT SECURITIES $230,354.42
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
$400.00. The City shall hold this security until the Developer’s land surveyor certifies that all
irons have been placed following site grading.
The streetlight security totals $2,400.00, which consists of two decorative streetlights at
$1200.00 each.
CCAASSHH FFEEEESS
The Park Dedication Fee for Iteri Addition is $16,360.00.
A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat
approval and is calculated as follows:
4 units x $8.85/unit/qtr. x 4 qtrs. = $141.60
Dwelling Units Streetlight Operating Fee Total
A cash fee for one-year of surface water management expenses shall be paid at the time of
final plat approval and is calculated as follows:
4 units x $10.42/unit/qtr. x 4 qtrs. = $166.72
Dwelling Units Surface Water Management Fee Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
4 lots
x $90.00/lot
= $360.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be either a .dwg file (AutoCAD) or a .dxf format.
IITTEERRII AADDDDIITTIIOONN
MMAARRCCHH 1199,, 22001188
PPAAGGEE 88 OOFF 88
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction costs, or $1,750.86.
CASH REQUIREMENTS
Park Dedication Fee $16,360.00
Trunk Storm Sewer Area Charge 19,611.15
Streetlight Operating Fee 141.60
Surface Water Management Fee 166.72
City Base Map Updating Fee 360.00
City Engineering Administration (3.00%)
Cash Escrow for Future Abandonment of Utility Services
1,750.86
6,500.00
TOTAL - CASH REQUIREMENTS $44, 890.23
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the preliminary plat, final plat, grading and erosion
control plan, utility plan, and tree preservation plan for Iteri Addition, subject to the
requirements and stipulations within this report.
• The developer shall determine if the septic system for the existing homestead has
been completely removed and shall remove any remaining portion of the septic
system.
• The stormwater management plan and associated portions of the construction plans
are subject to final review by the City and the City’s consultant. The developer shall
respond to and comply with any additional requests or comments related to the
stormwater management plan prior to City Council approval of the final plat.