HomeMy WebLinkAboutItem 06.k
Date: Item No.
SPIRIT OF BRANDTJEN FARM 19TH ADDITION FINAL PLAT
Proposed Action
Staff recommends adoption of the following motion: Move to approve resolutions approving the Spirit
of Brandtjen Farm 19th Addition final plat and designating no parking areas.
Overview
Tradition Development (a/k/a SBF Development Corp.) representatives are requesting approval of the
Spirit of Brandtjen Farm (SBF) 19th Addition final plat of 44 single family lots located south of 162nd
Street and east of Eagleview Drive. This is the second phase of the SBF 18th Addition preliminary plat
of 190 single family lots and 63 detached townhome lots approved by the City Council on May 15,
2017. The first phase final plat of 55 single family lots and 63 detached townhome units was approved
by the City Council on July 24, 2017. The layout of the SBF 19th Addition final plat is consistent with
the approved SBF 18th Addition preliminary plat. In conjunction with the SBF 19th Addition final plat,
a no parking resolution is required consistent with the street designs approved with the SBF PUD.
Primary Issue to Consider
None
Supporting Information
• Final plat and no parking resolutions
• Signed development contract agreement
• March 27, 2018 planning report and April 3, 2018 engineering report
Financial Impact: $ Budgeted: Y☐ N☐ Source:
Related Documents: (CIP, ERP, etc.):
Envision Lakeville Community Values: A Home for All Ages and Stages of Life
Report Completed by: Daryl Morey, Planning Director
May 7, 2018
Subdivision Ordinance, SBF PUD Booklet
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. __________
RESOLUTION APPROVING THE FINAL PLAT OF
SPIRIT OF BRANDTJEN FARM 19TH ADDITION
WHEREAS, the owner of the plat described as Spirit of Brandtjen Farm 19th
Addition has requested final plat approval; and
WHEREAS, the preliminary plat was reviewed by the Planning Commission and
the Parks, Recreation and Natural Resources Committee and approved by the City
Council; and
WHEREAS, the final plat is consistent with the approved preliminary plat; and
WHEREAS, the final plat is acceptable to the City.
NOW, THEREFORE, BE IT RESOLVED by the Lakeville City Council:
1. The final plat of Spirit of Brandtjen Farm 19th Addition is hereby approved
subject to the development contract and planned unit development
agreement, the security requirements, and the terms and conditions of the
Spirit of Brandtjen Farm Master Planned Unit Development Stage Plan
Agreement dated October 17, 2005.
2. The Mayor and City Clerk are hereby directed to sign the final plat mylars and
the development contract.
3. The City Clerk is directed to file a certified copy of this resolution with the
Dakota County Recorder.
ADOPTED by the Lakeville City Council this 7th day of May 2018.
CITY OF LAKEVILLE
BY: _______________________
Douglas P. Anderson, Mayor
ATTEST:
________________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
(
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _______ is a true and correct copy of
the resolution presented to and adopted by the City Council of the City of Lakeville at a
duly authorized meeting thereof held on the 7th day of May 2018 as shown by the
minutes of said meeting in my possession.
________________________
Charlene Friedges, City Clerk
(SEAL)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO:
RESOLUTION DESIGNATING “NO PARKING” AREAS ON
162ND STREET, DUSKWOOD TRAIL, DUTCH BARN DRIVE, AND DURANGO TRAIL
WHEREAS, the City Council for the City of Lakeville is authorized in accordance
with City Code to designate parking zones within the city, and
WHEREAS, the section of 162nd Street will be constructed to allow a single traffic
lane in each direction with no parking on both sides, and the sections of Duskwood
Trail, Dutch Barn Drive, and Durango Trail will be constructed to allow a single traffic
lane in each direction with parking on one side only, all in Spirit of Brandtjen Farm 19th
Addition, consistent with the approved street sections in the Spirit of Brandtjen Farm
planned unit development, and
WHEREAS, establishing “No Parking” areas on 162nd Street, Duskwood Trail,
Dutch Barn Drive, and Durango Trail will discourage potential on-street parking,
maintain sufficient access to the traffic lanes, provide increased sight lines for drivers,
and reduce the interaction between vehicles and pedestrians.
NOW, THEREFORE, BE IT RESOLVED, that both sides of 162nd Street, the
north side of Duskwood Trail, and the southeast sides of Dutch Barn Drive and Durango
Trail shall be designated “No Parking” anytime.
ADOPTED by the Lakeville City Council this 7th day of May 2018.
CITY OF LAKEVILLE
By: ________________________
Douglas P. Anderson, Mayor
ATTEST:
__________________________________
Charlene Friedges, City Clerk
3601 Thurston Avenue
Anoka, MN 55303
763.231.5840
TPC@PlanningCo.com
1
MEMORANDUM
TO: Daryl Morey
FROM: D. Daniel Licht, AICP
DATE: 27 March 2018
RE: Lakeville – SBF; SBF 19th Addition Final Plat
TPC FILE: 135.01
BACKGROUND
SBF Development Corporation has submitted application for final plat approval of Spirit of
Brandtjen Farm 19th Addition. The proposed final plat consists of 44 single family lots located
south of 162nd Street (and incudes right-of-way for 162nd Street) and east of Eagleview Drive.
The subject site is zoned PUD, Planned Unit Development District as approved by the City
Council on 20 June 2005. The SBF 18th Addition PUD Development Stage Plan and preliminary
plat of 190 single family lots and 63 detached townhome units was approved by the City
Council on 15 May 2017. The first phase final plat of 55 single family lots and 63 detached
townhome units was approved by the City Council on 24 July 2017.
Exhibits:
A. Site Location Map
B. SBF PUD Master Site Plan
C. SBF 18th Addition Lot Designation Plan
D. SBF 18th Addition Approved PUD Development Stage Plan/Preliminary Plat
E. SBF 19th Addition Final Plat
F. SBF 19th Addition Grading and Drainage Plan
ANALYSIS
Land Use. The SBF Land Use Plan (Page 3.4 of the SBF PUD Booklet) guides the area of SBF 19th
Addition for a range of Medium Density Residential (6-8du./ac.), High Density
2
Residential(12+du/ac.), and trailway land uses and illustrates development of multiple family
residential dwellings. The approved PUD Development Stage Plan for the subject site is lower
in density than that guided by the SBF Master Site Plan, but maintains the minimum of 3.0
dwelling units per acre of density required by the Metropolitan Council for the City’s overall
2030 Land Use Plan. The 44 single family cottage lots within the proposed SBF 19th Addition are
consistent with the approved PUD Development Stage Plan in terms of number and subdivision
design.
Lot Requirements. The proposed 44 single family lots are required to have a minimum 60 foot
width consistent with the minimum standards for cottage lots as set forth in Section 7 of the
SBF PUD Booklet, shown in the table below. Each lot has adequate area within required
minimum setbacks, also shown in the table below, to allow for construction of a single family
dwelling.
Min.
Lot
Width
Setbacks
Front Side Rear
House Garage
Door Garage Interior
Corner
House Garage
Door Garage House Garage
60ft. 20ft. 25ft. 15ft. 7ft. 15ft 25ft 15ft 20ft. 10ft.
Streets. The final plat includes right-of-way for 162nd Street as well as internal streets. The
right-of-way for 162nd Street is 80 feet wide consistent with the approved preliminary plat and
requirements for a minor collector roadway. Internal streets have 52 foot wide right-of-way
consistent with the preliminary plat and Street SC.3 in the SBF PUD Booklet. The street plans
include construction of five foot wide concrete sidewalks along both sides of all streets within
the public right-of-way also consistent with the street section designs within the SBF PUD
Booklet. All street construction plans are subject to review and approval of the City Engineer.
Street names shown on the final plat comply with the Dakota County Grid System.
Landscaping. A landscape plan has been submitted and includes buffer yard plantings in rear
yards abutting 162nd Street, as well as planting shade trees along interior street boulevards.
The landscape plan has been reviewed by the City Forester and recommended changes have
been forwarded to the developer. The developer will be required to provide a security for
installation of the landscaping within the proposed final plat as part of the development
agreement.
Park Dedication. No public park land will be dedicated to the City with the SBF 19th Addition
final plat. Park dedication requirements for the proposed final plat will be satisfied as a cash
fee in lieu of land to be paid with execution of the development agreement. The calculation of
the cash fee in lieu of land for SBF 19th Addition is to be in accordance with the formula
established by the SBF Master PUD Development Agreement:
44 lots x $2,250.00/lot = $99,000.00
3
Outlots. There are no outlots within the area of the proposed final plat.
Easements. The final plat illustrates drainage and utility easements at the perimeter of all of
the lots as required by Section 10-4-4 of the Subdivision Ordinance. All drainage and utility
easements are subject to review and approval of the City Engineer.
Grading Plan. The developer has submitted grading, drainage and erosion control plans, which
are subject to review and approval by the City Engineer.
Utilities. The subject site is located within the current MUSA. A utility plan has been submitted
for extension of sanitary sewer and water services to the proposed SBF 19th Addition final plat.
All utility plans are subject to review and approval of the City Engineer.
Homeowners Association. Documents incorporating the SBF 19th Addition final plat as part of
the SBF Master Homeowners Association are required to be submitted and are subject to
review and approval by the City Attorney.
Development Agreement. The Subdivision Ordinance requires the developer to provide
construction and warranty securities for the public improvements within the SBF 19th Addition
final plat that are to be outlined within a development agreement. The development
agreement will be drafted by the City Attorney and is to be executed by the applicant prior to
City Council consideration of the final plat.
CONCLUSION
The SBF 19th Addition final plat is consistent with the requirements of the SBF PUD District,
Zoning Ordinance, Subdivision Ordinance, and PUD Development Stage Plan and preliminary
plat. Our office and City staff recommends approval of the proposed development subject to
the conditions outlined below:
1. SBF 19th Addition shall be developed consistent with the approved SBF Master Plan, the
PUD booklet dated 20 June 2005 and the SBF 18th Addition PUD Development Stage
Plan/Preliminary Plat approved 15 May 2017.
2. The single family lots within SBF 19th Addition shall be subject to the requirements
established for cottage lots within the PUD Booklet and approved with the PUD
Development Stage Plan as follows:
Min.
Lot
Width
Setbacks
Front Side Rear
House Garage
Door Garage Interior
Corner
House Garage
Door Garage House Garage
60ft. 20ft. 25ft. 15ft. 7ft. 15ft 25ft 15ft 20ft. 10ft.
4
3. All street construction plans shall be subject to review and approval of the City Engineer.
4. Park dedication requirements shall be satisfied at the time of final plat approval by
payment of a cash fee in lieu of land of $99,000.00 based on the formula established by
the SBF Master PUD Development Agreement.
5. All easements are subject to review and approval of the City Engineer.
6. All grading, drainage, and erosion control plans shall be subject to review and approval
of the City Engineer.
7. All utility plans shall be subject to review and approval of the City Engineer.
8. The landscape plan shall be revised to address the recommendations of the City
Forester. The developer shall provide a security for installation of the landscaping
consistent with the approved landscape plan.
9. Homeowners Association documents for SBF 19th Addition are subject to review and
approval by the City Attorney.
10. The applicant shall execute a development agreement with the City as drafted by City
Attorney and subject to approval of the City Council.
c. Justin Miller, City Administrator
Alex Jordon, Senior Project Engineer
John Hennen, Parks and Recreation Director
Andrea McDowell Poehler, City Attorney
City of Lakeville
Public Works– Engineering Division
Memorandum
To: Daryl Morey, Planning Director
From: Alex Jordan, Senior Project Engineer
McKenzie Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
Date: April 3, 2018
Subject: Spirit of Brandtjen 19th Addition
• Final Plat Review
• Final Grading Plan Review
• Utility Plan Review
• Erosion Control Plan Review
BBAACCKKGGRROOUUNNDD
SBF Development Corporation has submitted a final plat named Spirit of Brandtjen Farm (SBF)
19th Addition. This is the second phase of the SBF 18th Addition Preliminary Plat approved by
the City Council on May 15, 2017. The proposed development is located south of and
adjacent to 162nd Street, west of Diamond Path (future CSAH 33) and east of Eagleview Drive.
The parent parcels consist of Outlots J and K, Spirit of Brandtjen Farm 18th Addition. The
development is zoned PUD, Planned Unit Development.
The final plat consists of 44 single family lots within four (4) blocks.
The proposed development will be completed by:
Developer: SBF Development Corporation
Engineer/Surveyor: James R. Hill, Inc.
SSIITTEE CCOONNDDIITTIIOONNSS
The site was previously a gravel processing operation. The gravel processing on the parent
parcels has been completed and the site encroachments have been removed.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1199TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
AAPPRRIILL 33,, 22001188
PPAAGGEE 22
The site was mass graded with the Spirit of Brandtjen Farm 18th Addition improvements.
EEAASSEEMMEENNTTSS
The following easements will expire upon final platting of the underlying outlots into lots and
blocks:
• Temporary turnaround easement per Doc. No. 3211367 on Outlot J, Spirit of Brandtjen
Farm 18th Addition.
• Temporary turnaround easement per Doc. No. 3211368 on Outlot J, Spirit of Brandtjen
Farm 18th Addition.
• Temporary turnaround easement per Doc. No. 3211365 on Outlot K, Spirit of Brandtjen
Farm 18th Addition.
• Temporary turnaround easement per Doc. No. 3211366 on Outlot K, Spirit of Brandtjen
Farm 18th Addition.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
162nd Street
Development of SBF 19th Addition includes the construction of 162nd Street, a minor collector
roadway as identified in the City’s Transportation Plan. 162nd Street is designed as a 36-foot
wide two-lane urban roadway, within 80-feet of right-of-way. 5-foot wide concrete sidewalks
will be installed along the north and south sides of the street. Construction of 162nd Street
will provide a connection between Pilot Knob Road (CSAH 31) and Diamond Path (Future
CSAH 33).
Durango Trail
Development of Spirit of Brandtjen Farm 19th Addition includes the construction of Durango
Trail, a local roadway. Durango Trail is designed as a 28-foot wide urban roadway with a 5-
foot wide concrete sidewalk along both sides of the street. The Developer is dedicating 52-
feet of right-of-way. Durango Trail will provide access to 162nd Street. The street and
landscaped boulevard design is consistent with the Spirit of Brandtjen Farm Planned Unit
Development Plan.
Duskwood Trail and Dutch Barn Drive
Development of Spirit of Brandtjen Farm 19th Addition includes the construction of
Duskwood Trail and Dutch Barn Drive, both local roadways. The local roadways are designed
as 28-foot wide urban roadways with a 5-foot wide concrete sidewalk along both sides of the
streets. The Developer is dedicating 52-feet of right-of-way for the local roadways. The street
and landscaped boulevard design is consistent with the Spirit of Brandtjen Farm Planned Unit
Development Plan.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1199TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
AAPPRRIILL 33,, 22001188
PPAAGGEE 33
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility and street construction for SBF 19th
Addition shall be restricted to a single entrance at 162nd Street, via Eagleview Drive.
PARKS, TRAILS AND SIDEWALKS
Development of SBF 19th Addition includes the construction of public sidewalks. 5-foot wide
concrete sidewalks will be constructed along both sides of all streets.
The Parks, Trails and Open Space Plan and SBF Land Use Plan identify the area of the parent
parcels as a location for a future greenway corridor and trail system. The greenway corridor
will follow the alignment of the existing Metropolitan Council Sanitary Sewer easement,
extending from the at-grade street crossing at 162nd Street to the pedestrian underpass at
Eagleview Drive. The Developer constructed the greenway corridor improvements with the
development of SBF 18th Addition. The City provided a credit to the Developer’s Park
Dedication with SBF 18th Addition for the cost of the greenway corridor improvements. The
credit amount for SBF 18th Addition exceeded the required Park Dedication Fee for SBF 18th
Addition, and it was agreed that the remaining credit would be applied to the Developer’s
cash fees with future phases of the SBF Development. The remaining credit was calculated as
follows:
Outlot D (excluding easements): 2.34 acres x $45,343/acre = $106,102.62
Landscaping + $89,244.00
Bituminous Trail Construction + $39,900.00
Trail Lighting + $32,843.00
Total Credit $268,089.62
Less Park Dedication Required with SBF 18th
Addition Final Plat
- ($267,750.00)
Remaining Credit for SBF 19th Addition $339.62
The Park Dedication Fee has not been collected on the parent parcels and will be required to
be collected with the final plat, calculated as follows:
44 units x $2,250 = $99,000.00 -$339.62 = $98,660.38
Lots in SBF 19th
Addition
Detached Unit Park
Dedication Rate
SBF 19th Addition
Park Dedication Fee
Less Remaining Credit
with SBF 18th Addition
Total Required
with Final Plat
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR::
SBF 19th Addition is located within sub-district NC-20060 of the North Creek sanitary sewer
district as identified in the City’s Comprehensive Sewer Plan. Wastewater will be conveyed via
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1199TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
AAPPRRIILL 33,, 22001188
PPAAGGEE 44
existing trunk sanitary sewer to the MCES Farmington Interceptor and continue to the Empire
Wastewater Facility. The downstream facilities have sufficient capacity to serve the proposed
subdivision.
The Sanitary Sewer Availability Charge has not been collected on the parent parcels and must
be paid with the final plat. The fee will be based on the rate in effect at the time of final plat
approval, calculated as follows:
44 units x $327.00/unit = $14,388.00
Units in SBF 19th Addition Sanitary Sewer
Availability Charge
Total Required with
the final plat
WWAATTEERRMMAAIINN::
Development of SBF 19th Addition includes the construction of 8-inch watermain to provide
water service to the development. The 8-inch watermain will connect to and extend from an
existing 12-inch watermain within 162nd Street.
Final locations and sizes of all public sanitary sewer and watermain facilities will be reviewed
by City staff with the final construction plans.
OOVVEERRHHEEAADD LLIINNEESS
There are no existing overhead utility lines and/or poles within the parent parcels.
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
BBAACCKKGGRROOUUNNDD
Spirit of Brandtjen Farm (SBF) is a planned unit development of which development began in
2005. The proposed development encompasses nearly all of the north half of Section 1,
Township 114, Range 20 and a substantial portion of the south half of said section. The initial
stormwater modeling and drainage plan for SBF, located on the south half of Section 1, was
prepared by Westwood Professional Services. The original design consisted of a main basin,
Spirit, surrounded by six National Urban Runoff Program (NURP) basins.
The Spirit basin design did not include a gravity outlet other than infiltration. A system of
pumps was incorporated into the design to serve three functions: 1) Irrigation supply, 2)
Recirculation for water features, and 3) Drawdown, if needed. During 2008, a decision was
made to not construct the recirculation features. As a result, the proposed pumping station
was not constructed, however, the pump station draw intake line was.
As development has continued, Spirit basin appears to have adequately infiltrated all runoff
from the development without the presence of the pumping system.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1199TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
AAPPRRIILL 33,, 22001188
PPAAGGEE 55
A gravel processing area has been in operation on the north half of Section 1 in excess of forty
years. As part of gravel operations years ago, a series of basins was constructed as wash basins
for sand processing. The operational need for these basins ended approximately in 2013 and
a reclamation plan was prepared for the gravel processing area. As part of the reclamation
plan, the largest basin was measured and quantified, and incorporated into the reclamation
plan with intended use as a stormwater management basin. The basin is referred to as
Nordeast Basin.
PPRROOPPOOSSEEDD SSTTOORRMMWWAATTEERR MMAANNAAGGEEMMEENNTT PPLLAANN
SBF 19th Addition is located within the North Creek drainage district as identified in the City’s
Water Resources Management Plan. The plat is located within sub-districts NC-13, NC-14A,
and NC 14-B.
The proposed stormwater management plan is a regional plan that connects the 96 acres
within the Nordeast Basin drainage area. The proposed system utilizes the existing Nordeast
Basin for flood storage and infiltration, having peripheral National Urban Runoff Protection
(NURP) and stormwater collection systems. The pretreatment NURP basins are proposed to be
multi-celled. The stormwater management system to serve SBF 19th Addition was constructed
with development of SBF 18th Addition.
A National Pollution Discharge Elimination System General Stormwater Permit for
construction activity is required by the Minnesota Pollution Control Agency for areas
exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit
Coverage must be submitted to the City upon receipt from the MPCA.
SSTTOORRMM SSEEWWEERR
Development of SBF 19th Addition includes the construction of a public storm sewer system.
Storm sewer will be installed to collect and convey stormwater runoff generated from the
streets and open space within the development. The storm sewer will convey the runoff to
the stormwater management basins within SBF. The constructed public storm sewer shall be
located within public right-of-way and/or public drainage and utility easements.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcels and must
be paid at the time of final plat approval. The Developer is eligible for an $86,841.22 credit for
constructing Regional Stormwater Management Basin (Nordeast) to retain stormwater runoff
on-site up to and beyond the 1% rainfall event.
The Trunk Storm Sewer Area Charge will not be collected for the portions of SBF 19th Addition
and future phases of the SBF 18th Addition preliminary plat that drain directly to Nordeast
(partially applicable to Outlots G, H, I and L, SBF 18th Addition). An estimated 45 acres of
unplatted property is eligible for future credit.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1199TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
AAPPRRIILL 33,, 22001188
PPAAGGEE 66
The Trunk Storm Sewer Area Charge for the portion of SBF 19th Addition that does not drain to
Nordeast shall be paid with the final plat, calculated as follows:
309,672.60 s.f. x $0.178/s.f. = $55,121.73
Net Area of SBF 19th Addition Trunk Storm Sewer
Area Charge
Total Required
with the final plat
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
FFEEMMAA FFLLOOOODDPPLLAAIINN AANNAALLYYSSIISS
The area of SBF 19th Addition is shown on the Flood Insurance Rate Map (FIRM) as Zone X by
the Federal Emergency Management Agency (FEMA). Based on this designation, the
development is not located within a Special Flood Hazard Area (SFHA), as determined by
FEMA.
WWEETTLLAANNDDSS
There are no wetlands within the project area.
TTRREEEE PPRREESSEERRVVAATTIIOONN
There are no significant trees within the project area.
EERROOSSIIOONN CCOONNTTRROOLL
The Developer is responsible for obtaining a MPCA Construction Permit for the site as well as
developing and maintaining the SWPPP throughout construction phase. The permit requires
that all erosion and sediment BMPS be clearly outlined in a site’s SWPPP. Changes made
throughout construction should be documented in the SWPPP.
Additional erosion control measures may be required during construction as deemed
necessary by City staff or the Dakota County Soil and Water District. Any additional measures
required shall be installed and maintained by the developer.
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to Spirit of Brandtjen Farm 19th Addition. Construction costs are based
upon estimates submitted by the Developer’s engineer on March 5, 2018.
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1199TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
AAPPRRIILL 33,, 22001188
PPAAGGEE 77
CONSTRUCTION COSTS
Sanitary Sewer $ 146,349.05
Watermain 143,374.53
Storm Sewer 238,303.02
Street Construction 564,222.80
Erosion Control, Grading Certification and Restoration 45,000.00
SUBTOTAL - CONSTRUCTION COSTS $ 1,137,249.40
OTHER COSTS
Developer’s Design (3.0%) $ 34,117.48
Developer’s Construction Survey (2.5%) 28,431.24
City’s Legal Expense (0.5%) 5,686.25
City Construction Observation (5.0%) 56,862.47
Developer’s Record Drawing (0.5%) 5,686.25
Landscaping 25,000.00
Street Lights 13,200.00
Lot Corners/Iron Monuments 4,400.00
SUBTOTAL - OTHER COSTS $173,383.69
TOTAL PROJECT SECURITY $ 1,310,633.09
The street light security totals $13,200 which consists of eleven (11) post-top street lights at
$1,200 each.
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
$4,400.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all
irons have been placed following site grading, street and utility construction.
CASH FEES
A cash fee for traffic control signs is due with Spirit of Brandtjen Farm 19th Addition. Street
signing consists of three stop signs with street blade combinations at $450.00 each plus a
mobilization fee of $150.00, for a total of $1,500.00. If the street signs are installed during frost
conditions, the developer shall pay an additional $150.00 for each street sign location.
A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat
approval and is calculated as follows:
44 units x $8.85/unit/qtr. x 4 qtrs. = $1,557.60
Dwelling Units Streetlight Operating Fee Total
SSPPIIRRIITT OOFF BBRRAANNDDTTJJEENN FFAARRMM 1199TTHH AADDDDIITTIIOONN –– FFIINNAALL PPLLAATT
AAPPRRIILL 33,, 22001188
PPAAGGEE 88
A cash fee for one-year of environmental resources expenses shall be paid at the time of final
plat approval and is calculated as follows:
44 units x $10.42/unit/qtr. x 4 qtrs. = $1,833.92
Dwelling Units Environmental Resources Fee Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
44 units x $90.00/unit = $3,960.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be in either .dwg (AutoCAD) or .dxf format.
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction cost, or $34,117.48.
CASH REQUIREMENTS
Park Dedication Fee $ 98,660.38
Sanitary Sewer Availability Charge 14,388.00
Trunk Storm Sewer Area Charge 55,121.73
Traffic Control Signs 1,500.00
Streetlight Operating Fee 1,557.60
Environmental Resources Fee 1,833.92
City Base Map Updating Fee 3,960.00
City Engineering Administration (3.00%) 34,117.48
SUBTOTAL - CASH REQUIREMENTS $211,139.11
CREDITS TO CASH REQUIREMENTS
Nordeast Basin Credit (Trunk Storm Sewer) $ 86,841.22
SUBTOTAL – CREDITS TO CASH REQUIREMENTS
$ 86,841.22
TOTAL CASH REQUIREMENTS WITH THE FINAL PLAT $124,297.89
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the SBF 19th Addition final plat, grading plan, utility
plan, and erosion control plan subject to the requirements and stipulations of this report.