Loading...
HomeMy WebLinkAboutLA161120 - 17934 Equinox Ave Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received _______ ________ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ HOME PHONE _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN. NAME OF APPLICANT (Please Print)DATE APPLICANT’S SIGNATURE: www.lakevillemn.gov 17934 Equinox Ave Lakeville MN 55044 New Single Family Dwelling n/a $264,000.00 5.22.2018 12.22.2018 2 3 Pheasant Run ■invoices@stonecottage.com Stone Cottage Construction, Inc. 636874 952.388.1301 651.261.1633 14787 Energy Way Apple Valley MN 55124 Scherer Plumbing 952.447.6734 15548 Red Oaks Road SE Prior lake MN 55124 Lofgren Heating & Air Conditioning 952.431.5811 5708 Upper 147th St W #102 Apple Valley MN 55124 Bohn Well Drilling 952.445.4809 Troy Asleson - President - Stone Cottage Construction, Inc.5.2.2018 ✘ ✘ ✘ RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: C o n c e p t A p p r o v a l O N L Y S u b j e c t t o F i e l d I n s p e c t i o n I n s p e c t o r D a t e 2 0 1 5 M N B l d g C o d e 0 5 / 1 5 / 2 0 1 8 d m a t h e w s S e c u r e d o o r c l o s e d u n t i l d e c k i s c o n s t r u c t e d w i t h a s e p a r a t e p e r m i t . P F H 4 - 1 1 3 - 1 4 - 3 S t r a p U F E R G r o u n d - P r o v i d e 2 0 ' R e b a r i n f o o t i n g a n d s t u b u p n e a r e l e c t r i c a l s e r v i c e p a n e l . 4 4 5 - 9 4 4 4 4 4 - 3 4 3 3 P F H P F H P F H 1 5 4 - 3 3 4 4 Str a p - M i n . 1 5 " c l e a r a n c e t o a n y o b s t r u c t i o n f r o m c e n t e r o f W . C . , 2 4 " i n f r o n t ( t y p ) . 2 . 2 5 2 2 2 2 2 2 2 . 2 5 2 2 2 2 2 Stone Cottage HVAC Load Calculations for Stone Cottage 17934 Equinox Ave Lakeville,mn Prepared By: Randy Andrews Lofgren Heating 5708 Upper 147th Street West Apple Vallley, MN 55124 Monday, April 16, 2018 Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 2 Project Report General Project Information Project Title:Stone Cottage Project Date:Monday, April 16, 2018 Client Name:Stone Cottage Client Address:17934 Equinox Ave Client City:Lakeville,mn Company Name:Lofgren Heating Company Representative:Randy Andrews Company Address:5708 Upper 147th Street West Company City:Apple Vallley, MN 55124 Company E-Mail Address:rrandrews@lofgrenheating-ac.com Design Data Reference City:Minneapolis, Minnesota Building Orientation:Front door faces West Daily Temperature Range:Medium Latitude:44 Degrees Elevation:834 ft. Altitude Factor:0.970 Elevation Sensible Adj. Factor:1.000 Elevation Total Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29 Check Figures Total Building Supply CFM:1,324 CFM Per Square ft.:0.379 Square ft. of Room Area:3,492 Square ft. Per Ton:1,099 Volume (ft³) of Cond. Space:31,428 Building Loads Total Heating Required Including Ventilation Air:51,464 Btuh 51.464 MBH Total Sensible Gain:28,606 Btuh 82 % Total Latent Gain:6,445 Btuh 18 % Total Cooling Required Including Ventilation Air:35,051 Btuh 2.92 Tons (Based On Sensible + Latent) 3.18 Tons (Based On 75% Sensible Capacity) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\17934 EQUINOX 04162018.rhv Monday, April 16, 2018, 12:05 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 3 Load Preview Report Scope Has AED Net Ton ft.² /Ton Area Sen Gain Lat Gain Net Gain Sen Loss Sys Htg CFM Sys Clg CFM Sys Act CFM Duct Size Building 2.92 1,196 3,492 28,606 6,445 35,051 51,464 977 1,324 1,324 System 1 Yes 2.92 1,196 3,492 28,606 6,445 35,051 51,464 977 1,324 1,324 22x10 Ventilation 340 1,352 1,692 4,550 Zone 1 3,492 28,266 5,093 33,359 46,914 977 1,324 1,324 22x10 1-Main Level 1,134 11,665 1,835 13,500 16,303 339 546 546 6--6 2-Upper Level 1,224 11,836 2,447 14,283 17,502 364 555 555 7--6 3-Lower Level 1,134 4,765 811 5,576 13,109 273 223 223 3--6 C:\ ...\17934 EQUINOX 04162018.rhv Monday, April 16, 2018, 12:05 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 4 Total Building Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 419 11,666 0 13,526 13,526 11N: Door-Metal - Polystyrene Core 63 1,918 0 529 529 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2974 16,819 0 2,570 2,570 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 360 1,535 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1224 2,130 0 1,175 1,175 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 834 1,814 0 0 0 Subtotals for structure:35,882 0 17,800 17,800 People:7 1,400 1,610 3,010 Equipment:2,500 8,000 10,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 119, Summer CFM: 62 11,032 1,193 856 2,049 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 Total Building Load Totals:51,464 6,445 28,606 35,051 Check Figures Total Building Supply CFM:1,324 CFM Per Square ft.:0.379 Square ft. of Room Area:3,492 Square ft. Per Ton:1,099 Volume (ft³) of Cond. Space:31,428 Building Loads Total Heating Required Including Ventilation Air:51,464 Btuh 51.464 MBH Total Sensible Gain:28,606 Btuh 82 % Total Latent Gain:6,445 Btuh 18 % Total Cooling Required Including Ventilation Air:35,051 Btuh 2.92 Tons (Based On Sensible + Latent) 3.18 Tons (Based On 75% Sensible Capacity) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\17934 EQUINOX 04162018.rhv Monday, April 16, 2018, 12:05 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 5 Building Pie Chart Building Loss 51,464 Btuh Floor 4%Roof 4% Wall 36% Glass 23% Door 4% Infiltration 21% Ventilation 9% Building Gain 35,051 Btuh Roof 3%Wall 7% Glass 39% Door 2%People 9% Equipment 30% Infiltration 6% Ventilation 5% C:\ ...\17934 EQUINOX 04162018.rhv Monday, April 16, 2018, 12:05 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 6 System 1 Whole House Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 419 11,666 0 13,526 13,526 11N: Door-Metal - Polystyrene Core 63 1,918 0 529 529 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2974 16,819 0 2,570 2,570 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 360 1,535 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1224 2,130 0 1,175 1,175 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 834 1,814 0 0 0 Subtotals for structure:35,882 0 17,800 17,800 People:7 1,400 1,610 3,010 Equipment:2,500 8,000 10,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 119, Summer CFM: 62 11,032 1,193 856 2,049 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 System 1 Whole House Load Totals:51,464 6,445 28,606 35,051 Check Figures Supply CFM:1,324 CFM Per Square ft.:0.379 Square ft. of Room Area:3,492 Square ft. Per Ton:1,099 Volume (ft³) of Cond. Space:31,428 System Loads Total Heating Required Including Ventilation Air:51,464 Btuh 51.464 MBH Total Sensible Gain:28,606 Btuh 82 % Total Latent Gain:6,445 Btuh 18 % Total Cooling Required Including Ventilation Air:35,051 Btuh 2.92 Tons (Based On Sensible + Latent) 3.18 Tons (Based On 75% Sensible Capacity) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\17934 EQUINOX 04162018.rhv Monday, April 16, 2018, 12:05 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 7 Detailed Room Loads - Room 1 - Main Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,134.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,134.0 sq.ft.Supply Air:546 CFM Ceiling Height:9.0 ft.Supply Air Changes:3.2 AC/hr Volume:10,206.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:6 Actual Winter Vent.:49 CFM Runout Air:91 CFM Percent of Supply.:9 % Runout Duct Size:6 in.Actual Summer Vent.:29 CFM Runout Air Velocity:464 ft./min.Percent of Supply:5 % Runout Air Velocity:464 ft./min.Actual Winter Infil.:43 CFM Actual Loss:0.134 in.wg./100 ft.Actual Summer Infil.:23 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain W -Wall-12F-0sw 30 X 9 158 0.065 5.7 893 0.9 0 137 E -Wall-12F-0sw 30 X 9 167 0.065 5.7 944 0.9 0 144 N -Wall-12F-0sw 40 X 9 355 0.065 5.7 2,008 0.9 0 307 S -Wall-12F-0sw 40 X 9 355 0.065 5.7 2,008 0.9 0 307 W -Door-11N 6 X 7 42 0.350 30.5 1,279 8.4 0 353 W -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 W -Gls-4A-1a-o shgc-0.33 0%S 49 0.320 27.8 1,364 35.0 0 1,715 E -Gls-4A-1a-o shgc-0.33 0%S 103 0.320 27.8 2,868 35.0 0 3,606 N -Gls-4A-1a-o shgc-0.33 100%S 5 0.320 27.8 139 10.4 0 52 S -Gls-4A-1a-o shgc-0.33 0%S 5 0.320 27.8 139 19.2 0 96 Subtotals for Structure:12,281 0 6,893 Infil.: Win.: 43.3, Sum.: 22.5 1,260 3.192 4,022 0.248 435 312 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:1,000 4,000 Room Totals:16,303 1,835 11,665 C:\ ...\17934 EQUINOX 04162018.rhv Monday, April 16, 2018, 12:05 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 8 Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,224.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,224.0 sq.ft.Supply Air:555 CFM Ceiling Height:9.0 ft.Supply Air Changes:3.0 AC/hr Volume:11,016.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:7 Actual Winter Vent.:52 CFM Runout Air:79 CFM Percent of Supply.:9 % Runout Duct Size:6 in.Actual Summer Vent.:29 CFM Runout Air Velocity:403 ft./min.Percent of Supply:5 % Runout Air Velocity:403 ft./min.Actual Winter Infil.:45 CFM Actual Loss:0.102 in.wg./100 ft.Actual Summer Infil.:23 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain W -Wall-12F-0sw 30 X 9 213 0.065 5.7 1,205 0.9 0 184 E -Wall-12F-0sw 30 X 9 192 0.065 5.7 1,086 0.9 0 166 N -Wall-12F-0sw 42 X 9 345 0.065 5.7 1,951 0.9 0 298 S -Wall-12F-0sw 42 X 9 370 0.065 5.7 2,092 0.9 0 320 W -Gls-4A-1a-o shgc-0.33 0%S 57 0.320 27.8 1,587 35.0 0 1,995 E -Gls-4A-1a-o shgc-0.33 0%S 78 0.320 27.8 2,172 35.0 0 2,730 N -Gls-4A-1a-o shgc-0.33 100%S 33 0.320 27.8 919 10.4 0 344 S -Gls-4A-1a-o shgc-0.33 0%S 8 0.320 27.8 223 19.1 0 153 UP-Ceil-16B-50 1224 X 1 1224 0.020 1.7 2,130 1.0 0 1,175 Subtotals for Structure:13,365 0 7,365 Infil.: Win.: 44.6, Sum.: 23.2 1,296 3.192 4,137 0.248 447 321 People: 200 lat/per, 230 sen/per:5 1,000 1,150 Equipment:1,000 3,000 Room Totals:17,502 2,447 11,836 C:\ ...\17934 EQUINOX 04162018.rhv Monday, April 16, 2018, 12:05 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 9 Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,134.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,134.0 sq.ft.Supply Air:223 CFM Ceiling Height:9.0 ft.Supply Air Changes:1.3 AC/hr Volume:10,206.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:3 Actual Winter Vent.:39 CFM Runout Air:74 CFM Percent of Supply.:18 % Runout Duct Size:6 in.Actual Summer Vent.:12 CFM Runout Air Velocity:379 ft./min.Percent of Supply:5 % Runout Air Velocity:379 ft./min.Actual Winter Infil.:31 CFM Actual Loss:0.090 in.wg./100 ft.Actual Summer Infil.:16 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain W -Wall-12F-0sw 30 X 9 270 0.065 5.7 1,527 0.9 0 233 E -Wall-12F-0sw 30 X 9 189 0.065 5.7 1,069 0.9 0 163 S -Wall-12F-0sw 40 X 9 360 0.065 5.7 2,036 0.9 0 311 N -Wall-15B0-10sf-10 40 X 9 360 0.049 4.3 1,535 0.0 0 0 E -Gls-4A-1a-o shgc-0.33 0%S 81 0.320 27.8 2,255 35.0 0 2,835 Floor-21A-24 1 X 834 834 0.025 2.2 1,814 0.0 0 0 Subtotals for Structure:10,236 0 3,542 Infil.: Win.: 30.9, Sum.: 16.1 900 3.192 2,873 0.248 311 223 Equipment:500 1,000 Room Totals:13,109 811 4,765 C:\ ...\17934 EQUINOX 04162018.rhv Monday, April 16, 2018, 12:05 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 10 System 1 Room Load Summary No Room Name Area SF Htg Sens Btuh Min Htg CFM Run Duct Size Run Duct Vel Clg Sens Btuh Clg Lat Btuh Min Clg CFM Act Sys CFM ---Zone 1--- 1 Main Level 1,134 16,303 339 6-6 464 11,665 1,835 546 546 2 Upper Level 1,224 17,502 364 7-6 403 11,836 2,447 555 555 3 Lower Level 1,134 13,109 273 3-6 379 4,765 811 223 223 Ventilation 4,550 340 1,352 System 1 total 3,492 51,464 977 28,606 6,445 1,324 1,324 System 1 Main Trunk Size:22x10 in. Velocity:867 ft./min Loss per 100 ft.:0.108 in.wg Cooling System Summary Cooling Tons Sensible/Latent Split Sensible Btuh Latent Btuh Total Btuh Net Required:2.92 82% / 18%28,606 6,445 35,051 Recommended:3.18 75% / 25%28,606 9,535 38,141 Actual:1.00 77% / 23%9,240 2,760 12,000 Equipment Data Heating System Cooling System Type:Natural Gas Furnace Standard Air Conditioner Model:QC-F38-E78-G QC-C12 Indoor Model:S12 Brand:Quikcool FE Series Quikcool AS Series Description:Hi Efficiency Furnace Standard Efficiency Air Condit Efficiency:78.3 AFUE 12.4 SEER Sound:8.1 bels Capacity:38,000 Btuh 12,000 Btuh Sensible Capacity:n/a 9,240 Btuh Latent Capacity:n/a 2,760 Btuh C:\ ...\17934 EQUINOX 04162018.rhv Monday, April 16, 2018, 12:05 PM Builders Associaton of Minnesota version 101014 Date Certificate Posted x Passive (No Fan) Active (With fan and monometer or other system monitoring device) Location (or future location) of Fan: Other Please Describe Here x 10/15 x x x 20 x 20 x 21 x 49 x x x x x Not applicable, all ducts located in conditioned space x Not required per mech. code Passive Powered Interlocked with exhaust device. Describe: Input in BTUS: 70,000 Capacity in Gallons: Other, describe: AFUE or HSPF% 93% Cfm's " round duct OR " metal duct Not required per mech. code x Passive Low: Other, describe: x Low: Location of fan(s), describe: Cfm's 4" " round duct OR Flex " metal duct City Mailing Address of the Dwelling or Dwelling Unit Combustion Air Select a Type Location of duct or system: 35,051 Below Entire Slab Rig i d , E x t r u d e d P o l y s t y r e n e Ceiling, flat Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. Place your logo here New Construction Energy Code Compliance Certificate Name of Residential Contractor Stone Cottage Construction Inc. MN License Number Lakeville17934 Equinox Ave BC636874 Mech Room Heat Recover Ventilator (HRV) Capacity in cfms: Energy Recover Ventilator (ERV) Capacity in cfms: 51,464 Heating Gain Cooling Load Attic Fuel Type Solar Heat Gain Coefficient (SHGC): Windows & Doors Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area Rim Joist (2nd Floor+) 0.30 Appliances THERMAL ENVELOPE Fo a m O p e n C e l l Wall Rig i d , I s o c y n u r a t e Perimeter of Slab on Grade RADON CONTROL SYSTEM No n o r N o t A p p l i c a b l e Cooling System To t a l R - V a l u e o f a l l T y p e s o f In s u l a t i o n Type: Check All That Apply Min e r a l F i b e r b o a r d Insulation Location Fo a m , C l o s e d C e l l 0.22 Describe other insulated areas Fi b e r g l a s s , B l o w n Fi b e r g l a s s , B a t t s Foundation Wall R-value Average U-Factor (excludes skylights and one door) U: Duct system air tightness: Building envelope air tightness: Rim Joist (1st Floor) GPVL-50 13ACXN042-230 Model Heating System Natrual Gas Lennox Location of duct or system: Heating or Cooling Ducts Outside Conditioned Spaces Electric Make-up Air Select a Type AO Smith Domestic Water Heater MECHANICAL SYSTEMS Rating or Size Efficiency 13 Seer 200CFM Select Type Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): 28,606Residential Load Calculation SEER /EER Total ventilation (intermittent + continuous) rate in cfms: Balanced Ventilation capacity in cfms: High: High: MECHANICAL VENTILATION SYSTEM Capacity continuous ventilation rate in cfms: ML193UH070 Heating Loss Manufacturer Lennox Natural Gas Output in Tons: 3 Ton50 NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. “The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit.” (NPDES Construction Stormwater Permit, MPCA) “The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.” (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500 17934 Equinox Ave Stone Cottage Cosntruction, Inc. Brian Christopherson 651.755.7199 brian@stonecottage.com New Single Family Dwelling 4 7 9 9 5 Brian Christopherson Stone Cottage Construction, Inc. 651.755.7199 brian@stonecottage.com University of Minnesota 05.31.2018 Troy Asleson - President - Stone Cottage Construction, Inc.5/2/2018 05/04/18 X KH