Loading...
HomeMy WebLinkAbout17934 Equinox Ave SurveyENGINEERING REVIEWED Date:_5/14/18 lritchie____ *Maintain 6" between siding & sod *No structures in easements The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and accepted before As-built escrow monies will be released. All structures must be flush with the sod. This will be scheduled with the landscape inspection. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION