Loading...
HomeMy WebLinkAboutLA160905 - 18935 Iden Way Approved Plans7 : 127 : 127 : 127 : 127 : 127 : 12 3 '-6 " 7 : 127 : 127 : 127 : 127 : 127 : 12 7 : 127 : 127 : 127 : 127 : 127 : 12 DASHED LINES REPRESENT PATIO WALKOUT OPTION 8 '-1 1 /8 " 1 '-6 3 /4 " 9 ' 1 5 '-7 1 /4 " DASHED LINES REPRESENT LO/WO OPTION NO WINDOW FOR FULL BASEMENT OPTION 7 : 127 : 127 : 127 : 127 : 127 : 12 8 : 12 8 : 12 8 : 12 8 : 12 8 : 12 7 12 7 12 DASHED LINES REPRESENT LO/WO OPTION WINDOW FOR FB ONLY STEP GRADE PER SITE CONDITIONS 8 : 12 8 : 12 8 : 12 8 : 12 8 : 12 8 : 12 8 : 12 8 : 12 8 : 12 8 : 128 : 12 DASHED LINES REPRESENT LO/WO OPTION STEP GRADE PER SITE CONDITIONS 8 : 12 8 : 12 8 : 12 8 : 12 8 : 128 : 12 T h e s e p l a n s a r e p r o p e r t y o f L o o m i s H o m e s L L C a n d m a y n o t b e r e p r o d u c e d o r u s e d w i t h o u t w r i t t e n c o n s e n t . SHEET: DATE: A-1 THE Waterford Overview: -Rambler Single-Family Home -1830 Finished Square Feet -1539 Unfinished Square Feet -3 Bedrooms 2 Full Bath -Three Stall Garage 1 8 9 3 5 I d e n W a y L a k e v i l l e ,M N L o t 6 B l o c k 7 C h o k e c h e r r y H i l l 2 n d 4/27/2018 ELEVATION A 9' 1 1/8" PLATE HEIGHT 9' 1 1/8" PLATE HEIGHT 9' 1 1/8" 9' 1 1/8" PLATE HEIGHT Secure door closed until deck is constructed with a separate permit. Concept Approval ONLY Subject to Field Inspection Inspector Date 2015 MN Bldg Code 05/07/2018dmathews CONCRETE EGRESS PITS FOR FULL BASEMENT OPTION SELECTED S S S S 6 0 "x 2 1 " 6 0 "x 2 1 " 5036RS 5036RS 5 0 3 6 R S 5 0 3 6 R S 2 6 6 8 2 8 6 8 2668 2468 2668 2 6 6 8 2 8 6 8 UP FD SUMP 16'1 1/2" M.O 8'1 1/2" M.O S1 S-1 S1 S-1 S e c t i o n 1 S2 S-1 S2 S-1Section 2 50'-11" 2 3 '-5 " 6 '-1 1 " 5 " 2 0 '-1 0 " 2 ' 5 3 '-7 " 6 '-5 " 40'-5"7'-5" 47'-10" 3'-1" 4 3 '-1 " 8 '-5 " 5 1 '-6 " 5 3 '-7 " 8 '-6 " 3'-6" 23'-5 3/4"17'-6 1/4"7' 1 9 '-1 " 8'19'-4"13'-8" 7 '-1 0 " 4'-4" 7 '-6 " 2 2 '-1 1 1 /2 " 17'-7" 26'-1" X 6'-8" 12'-11" X 4'-0" 46'-6" X 18'-3" 5'-9" X 11'-6" 14'-6" X 13'-11" WINDOW LOCATION FOR FB ONLY FUTURE BEDROOM #4 BATH CLOSET FUTURE FAMILY UTILITY 3'x3' PAD EGRESS PIT 5036RS 5036RS 5036RS FD SUMP 5'-10 1/2"17'-0 1/2"17'-7"7'-6" 48' STEP FOUNDATION PER GRADE 6068 5036RS 5036RS FD SUMP 6'-5"16'-6"17'-7"7'-6" 48' T h e s e p l a n s a r e p r o p e r t y o f L o o m i s H o m e s L L C a n d m a y n o t b e r e p r o d u c e d o r u s e d w i t h o u t w r i t t e n c o n s e n t . FOUNDATION PLAN FOUNDATION LOOKOUT OPTION SHEET: 1/4"=1'-0" FOUNDATION WALKOUT OPTION DATE: FOUNDATION PLAN A-2 FOOTING NOTES: 1: ALL FOOTINGS TO REST ON CLEAN, FIRM UNDISTURBED SOIL. 2: CONCRETE STRENGTH 5,000 PSI. 3: PERIMETER FOOTING (20"x8") 4: LOAD BEARING FOOTING (16"x8") 5: DRAIN TILE PLACED ON INSIDE & OUTSIDE OF FOOTING. 1 8 9 3 5 I d e n W a y L a k e v i l l e ,M N L o t 6 B l o c k 7 C h o k e c h e r r y H i l l 2 n d FULL BASEMENT 4/27/2018 (3) 20" LVL #15 (3) 2x8 #14 (2) 2x10 #12 (2) 2x10 #11 Headers (2) 2x6 Unless Noted Otherwise UFER Ground -Provide 20' Rebar in footing and stub up near electrical service panel. 466 Wall bracing required on lookout wall, 1.15 times the required bracing for wall above. TRUSS DETAILS 1.ALL TRUSSES SHALL CARRY MANUFACTURES STAMP. 2.ALL TRUSSES SHALL BE INSTALLED AND BRACED TO MANUFACTURES SPECIFICATIONS. 3.ALL TRUSSES WILL NOT BE FIELD ALTERED WITHOUT PRIOR BUILDING DEPT. APPROVAL IF ENGINEERING CALCULATIONS. 4.ALL TRUSSES SHALL HAVE DESIGN AND DRAWINGS ON SITE FOR FRAMING INSPECTION. 5.ALL ROOF FRAMING 24" O.C 6: OVERHANGS 18" STAIRWAY NOTES Every Stairway Shall have Headroom Clearance of Not Less Than 6' 8". Stair MAX Rise 7 3/4" & MIN Run of 10". Handgrip On Handrails SHALL Not be less than 1 1/4" or More Than 2". Guard Rail Height of 36" MIN & Less Than 4" Opening on Spindles and Stair Risers. Handrails Shall be at 34"-38" Above the nose of the tread and shall be continuous the full length of the stairs with each end returned to the wall. Interior stairways shall be provided with a light source at each landing. DN S B 6 0 2 1 SB48 B33 SB36DW B33 B 1 8 L B24LB3D30R S B 6 0 2 1 SB48 B33 SB36 B33 B 1 8 L B24LB3D30R E l o n g a t e d T o i l e t S h o w e r p a n R e c t (m e d i u m ) [4 8 ] R E F . T o p -M o u n t R e f r i g e r a t o r Electric Range Dryer Washer 3 6 " O p e n F r o n t [ 3 6 W ] Single Basin Laundry SinkW3012 W 3 7 1 2 2 4 W 1 8 3 0 R W 3 0 3 0 W3330W3330 2668 4468MU 5040RS 5 0 4 0 R S 2868 8070 16070 2020FX 6068 6044TC 5040RS 5 0 6 8 2 4 6 8 2 6 6 8 4 0 6 8 2668 3 0 6 8 S R O 2868 2668 2 8 6 8 1668 2468 2 4 6 8 2 468 42" Half Wall Wood Cap CARPET CARPET CARPET CARPET CARPET Vinyl Vinyl Vinyl 4'-7 1/2"7'-2" 2'-4 1/2" 7'-0 1/8" 11'-0 1/4" 1 0 '-1 " 3 '-8 "4 ' 7 ' 3' 3 '-2 1 /2 " 3'-9 3/4" 3 '-1 1 /4 " 5'5'10'10' 10'20'7'-7 1/2"1'-7"11'-9 1/2" 51' 6'-5"16'-6"10'-6"7'-1"7'-6" 33'-5"14'-7" 48' 3' 1 4 '-9 3 /4 " 8 '-8 1 /4 " 6 '-1 1 " 2 1 '-3 " 2 ' 5 3 '-8 " 5 '-4 " 5 '-0 1 /2 " 2 ' 1 0 '-6 " 5 '-4 1 /2 " 1 0 '-4 1 /2 " 4 '-3 1 /2 " 2 1 '-1 1 /2 " 5 3 '-8 " 6 '-6 " 6'-8" 6'-2 1/2" 12'-4" 1 0 '-6 1 /2 " 9'8'-0 1/2"9'-3 7/8" 26'-4 3/8" 7' 1 9 '-1 " 8'-1 1/2" 4 '-0 1 /2 " 195 sq ft 663 SQ FT 62 sq ft 175 SQ FT 121 sq ft 429 sq ft 59 SQ FT 218 sq ft 144 sq ft 55 sq ft 135 sq ft 79 sq ft 73 sq ft70 sq ft GARAGE Bedroom #3 Bath PORCH Master Bdrm Master Closet Master Bath Laundry Mud Room Bedroom #2 Dining Great Room Kitchen Optional Lockers Optional Fireplace ENTRY 42" 1/2 wall END PANEL (3)CORBEL FOR GRANITE OPTION (2) 2X10 HDR UNDER WALL TIE 1/2 WALL INTO FLOOR TRUSSES T h e s e p l a n s a r e p r o p e r t y o f L o o m i s H o m e s L L C a n d m a y n o t b e r e p r o d u c e d o r u s e d w i t h o u t w r i t t e n c o n s e n t . CONSTRUCTION NOTES: 2x6 EXTERIOR FRAMING SPACED AT 16" O.C. 2x6 GARAGE FRAMING SPACED AT 16" O.C. 2x4 INTERIOR FRAMING SPACED AT 16" O.C. EXTERIOR WALL SHEATHING 1/2" OSB SHEATHING SUBFLOOR: 3/4" OSB EXTERIOR GRADE. ROOF SHEATHING: 15/32" OSB EXTERIOR GRADE. EXTERIOR MOISTURE PROTECTIVE BARRIER: STANDARD BUILDING WRAP MAINTENANCE FREE VINYL SIDING .044 THICKNESS. INSULATION NOTES: INSULATE ALL ACCESS DOORS/HATCHES TO ATTIC INSULATION SPECIFICATION: ATTIC R-49 FIBERGLASS BLOW-IN WALLS R-21 FIBERGLASS BATT'S FOUNDATION INSULATE ON EXTERIOR 2 3/8" ENERGY BOARD VENTILATION NOTES: ATTIC VENTILATION: AREA 1217 SQ FT. ATTIC VENTILATION EQUAL TO 1 SQ. FOOT PER 150 SQ. FEET OF ATTIC SPACE. VENTILATION SHALL BE PROTECTED FROM SNOW AND RAIN. PROVIDE 1" MIN. AIR GAP AT EAVES WITH INSULATION BAFFLES TYPE AT ALL TRUSS BAYS. PROVIDE ROOF VENTS ON BACKSIDE OF ROOFLINE ABOVE CONDITIONED AREA BLOW IN INSULATION R-49 INSULATE ALL ACCESS DOORS/HATCHES TO ATTIC ASPHALT ROOF WITH #15 TAR PAPER UNDERLAYMENT SHEET: DATE: A-3 1/4"=1' 1ST Floor 1 8 9 3 5 I d e n W a y L a k e v i l l e ,M N L o t 6 B l o c k 7 C h o k e c h e r r y H i l l 2 n d 4/27/2018 60"X96" PATIO 60X60 MU 72X60 MU 2-8 CS-WSP BRACED WALL METHOD 13'11" REQUIRED 6' CS-WSP 4' CS-WSP 6' CS-WSP CS-WSP BRACED WALL METHOD 12.8' REQUIRED CS-WSP BRACED WALL METHOD 12.8' REQUIRED 6' CS-WSP 6' CS-WSP 4' CS-WSP 5' CS-WSP 5' CS-WSP 5' CS-WSP PFH PFH -Min. 15" clearance to anyobstruction from center of W.C., 24" in front(typ). 20 ' - 0 " Max space between braced wall panels 4 4 Entire front elevation needs wall bracing. Adding two 4' panels to front of bedroom #2 plus the 2 portal frames with hold-downs at the garage door equals 16' of panels. (2) 9-1/2" LSL #3 (3) 2x10 #2 (2) 2x10 #1 (2) 2x10 #6 (3) 2x10 #5 (2) 2x8 #7 (2) 11-7/8" LVL #8 (2) 2x10 #9 7 1/4" RISE 10" TREAD SOLID WOOD CAP RAILING WALL 42" HEIGHT MIN. 6'-8" HEADROOM 18" Floor Truss 19.2" OC.18" Floor Truss 19.2" OC. 4 MIL POLY VAPOR BARRIER APPLIED ON WARM IN WINTER SIDE OF THERMAL INSULATION AT ABOVE GRADE FRAMED WALLS FLOORS AND CEILINGS. 18" Floor Truss 19.2" OC. SEAL BEHIND POLY 1/2" GYPSUM SAG RESISTANT W/ VAPOR BARRIER 1/2" SHEATHING 1/2" GYPSUM 2x6 STUDS AT 16" OC #15 TAR PAPER ASPHALT SHINGLES SOFFIT FASCIA INSULATION CHUTE FINISH SIDING 15/32" SHEATHING R21 INSULATION MANUFACTURED TRUSSES 24" OC. INSTALLED PER MFG SPEC'S R49 INSULATION VENT 1/300TH OF ROOF AREA 50% TO 80% NEAR RIDGE REMAINDER IN SOFFIT PER IRC R806 POLYSTYRENE VENTILATION CHUTES NOTE: PROVIDE RECEPTACLE FOR FUTURE RADON FAN, VENT PIPE SHALL BE INSTALLED WITH A MINIMUM 24" CLEARANCE AND 36" VERTICAL CLEARANCE TO ALLOW FOR FUTURE INSTALLATION OF RADON FAN (ACTIVE SYSTEM) RIGID WINDWASH BARRIER MUST BE INSTALLED EXTENDING TO WITHIN 1" FROM BOTTOM OF ROOF SHEATHING BETWEEN ALL TRUSS SPACES MIN 6" ENERGY HEEL ROOF ASSEMBLY MAY REQUIRE RAFTER/TRUSS TIE DOWNS ICE AND WATER REQ. FROM THE EAVES TO A LINE 24" INSIDE THE EXTERIOR WALL LINE INTERIOR INSULATION UNLESS BLOWER DOOR TEST @ 2.6 AIR CHANGES SEALANT BY CARPENTER PRIOR TO SHEATHING WATCH DOG H3 WATER PROOF 3/4" SUBFLOOR 3" MIN POLYURETHANE FOAM AT RIM JOIST 2 3/8" ENERGY BOARD 3 1/2" CONC. SEAL ALL JOINTS @ SUMP AND OPENINGS 6 MIL POLY VAPOR BARRIER LAPPED SEAMS 12" BETWEEN 4" CLEAN AGGREGATE CAST-IN-PLACE ANCHOR BOLT 8" POURED CONC.WALL 20 X 8 CONCRETE FOOTING 5,000 PSI CONTINUOUS DRAIN TILE INTO SUMP PUMP. TREATED SILL PLATE W/ SILL SEAL SEAL BEHIND POLY FINISH GRADE WILL VARY SEAL BEHIND POLY ABOVE GRADE PROTECTION OF ENERGY BOARD EXTENDING 6" BELOW GRADE SEAL JOINT BETWEEN FOUNDATION WALL AND SLAB WITH APPROVED SEALANT 4 MIL POLY VAPOR BARRIER APPLIED ON WARM IN WINTER SIDE OF THERMAL INSULATION AT ABOVE GRADE FRAMED WALLS FLOORS AND CEILINGS. PASSIVE RADON VENT LABEL ON EACH FLR "RADON REDUCTION SYSTEM" PASSIVE SUB-SLAB DEPRESSURIZATION SYSTEM REQUIRED PER MINNESOTA RESIDENTIAL ENERGY CODE 1322.2100 TERMINATE 12" ABOVE ROOF P A S S I V E R A D O N V E N T 10' SECTION OF PERFORATED PIPE CONNECTED TO EACH SIDE OF A "T" FITTING IN AGGREGATE P A S S I V E R A D O N V E N T PASSIVE SUB-SLAB DEPRESSURIZATION SYSTEM REQUIRED PER MINNESOTA RESIDENTIAL ENERGY CODE 1322.2100 TERMINATE 12" ABOVE ROOF DN 7 : 1 2 7 : 1 2 8 : 12 8 : 12 8 : 12 8 : 12 T h e s e p l a n s a r e p r o p e r t y o f L o o m i s H o m e s L L C a n d m a y n o t b e r e p r o d u c e d o r u s e d w i t h o u t w r i t t e n c o n s e n t . SHEET: ROOF PLAN 3/8"=1'-0" 3/8"=1'-0" DATE: S2 S-1 S1 1/4"=1'-0" 1 8 9 3 5 I d e n W a y L a k e v i l l e ,M N L o t 6 B l o c k 7 C h o k e c h e r r y H i l l 2 n d 4/27/2018 R-4 on pipe in attic ELECTRICAL NOTES: 1.ELECTRICAL RECEPTACLES IN BATHROOMS, KITCHENS AND GARAGES SHALL BE G.F.I. AS PER NATIONAL ELECTRICAL CODE REQUIREMENTS. 2.PROVIDE ONE SMOKE DETECTOR IN EACH ROOM AND ONE IN EACH CORRIDOR ACCESSING BEDROOMS. CONNECT SMOKE DETECTORS TO HOUSE POWER AND INTER-CONNECT SMOKE DETECTORS SO THAT, WHEN ANY ONE IS TRIPPED, THEY ALL WILL SOUND. PROVIDE BATTERY BACKUP FOR ALL UNITS. 3.CO2 DETECTOR IS REQUIRED PER STATE STATUTE 299F.50 4.LIGHT BULBS MUST BE AT LEAST 75% CFL THROUGH OUT THE HOUSE. DN DW R E F . C C GFCI GFCI WP WP EP RR R R RR R R T WP WP S S S S UP T h e s e p l a n s a r e p r o p e r t y o f L o o m i s H o m e s L L C a n d m a y n o t b e r e p r o d u c e d o r u s e d w i t h o u t w r i t t e n c o n s e n t . SHEET: DATE: 1ST Floor ElectricalLower Level Electrical 1 8 9 3 5 I d e n W a y L a k e v i l l e ,M N L o t 6 B l o c k 7 C h o k e c h e r r y H i l l 2 n d 4/27/2018 Smoke Smoke Smoke Smoke CO Smoke CO Smoke   5'6" 5'6" 1 SPF End Grain 2 SPF End Grain 3" 9 1/4" 1 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #1 S-P-F #2 2.000" X 10.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:240 Deflection TL:180 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 818 1684 0 0 2 0 818 1684 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 2988 ft-lb 2'9"3946 ft-lb 0.757 (76%)D+S L 2988 ft-lb 2'9"3946 ft-lb 0.757 (76%)D+S L Shear 1630 lb 11 1/2"2872 lb 0.568 (57%)D+S L LL Defl inch 0.034 (L/1792)2'9"0.256 (L/240)0.130 (13%)S L TL Defl inch 0.051 (L/1206)2'9"0.342 (L/180)0.150 (15%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"65%818 / 1684 2503 L D+S 2 -SPF End Grain 3.000"65%818 / 1684 2503 L D+S Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 17-6-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 1 of 34 1 1 / 2 " 5'6" 5'6" 1 SPF End Grain 2 SPF End Grain 3" 9 1/4" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #1 S-P-F #2 2.000" X 10.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 2 of 34 6'6" 6'6" 1 SPF End Grain 2 SPF End Grain 4 1/2" 9 1/4" 1 2 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #2 S-P-F #2 2.000" X 10.000" 3-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Member Information Type:Girder Plies:3 Moisture Condition:Dry Deflection LL:240 Deflection TL:180 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: Yes Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 1199 2468 0 0 2 0 1049 2161 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 4771 ft-lb 3'1 15/16"6807 ft-lb 0.701 (70%)D+S L 4771 ft-lb 3'1 15/16"6807 ft-lb 0.701 (70%)D+S L Shear 2446 lb 11 1/2"4308 lb 0.568 (57%)D+S L LL Defl inch 0.053 (L/1400)3'2 3/4"0.306 (L/240)0.170 (17%)S L TL Defl inch 0.078 (L/942)3'2 3/4"0.408 (L/180)0.190 (19%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"64%1199 / 2468 3667 L D+S 2 -SPF End Grain 3.000"56%1049 / 2161 3210 L D+S Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Part. Uniform 0-0-0 to 2-0-0 24-6-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF 2 Part. Uniform 2-0-0 to 6-6-0 18-6-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 3 of 34 1 1 / 2 " 6'6" 6'6" 1 SPF End Grain 2 SPF End Grain 4 1/2" 9 1/4" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #2 S-P-F #2 2.000" X 10.000" 3-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Nail from both sides. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 4 of 34 6'6" 6'6" 1 SPF End Grain 2 SPF End Grain 3 1/2" 9 1/2" 1 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #3 LP-LSL 1.55E 1.750" X 9.500" 2-Ply -PASSED LP SolidStart Design Version 3.0.03 (Build 18.11.048) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:240 Deflection TL:180 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 1582 3185 0 0 2 0 1582 3185 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 6878 ft-lb 3'3"12245 ft-lb 0.562 (56%)D+S L Shear 3330 lb 11 3/4"10452 lb 0.319 (32%)D+S L LL Defl inch 0.101 (L/731)3'3"0.306 (L/240)0.330 (33%)S L TL Defl inch 0.151 (L/488)3'3"0.408 (L/180)0.370 (37%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"52%1582 / 3185 4767 L D+S 2 -SPF End Grain 3.000"52%1582 / 3185 4767 L D+S Design Notes 1 Provide restraint at supports to ensure lateral stability. 2 Dead Load Deflection: Instant = 0.050", Long Term = 0.075" 3 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 4 Refer to last page of calculations for fasteners required for specified loads. 5 Girders are designed to be supported on the bottom edge only. 6 Top loads must be supported equally by all plies. 7 Top must be continuously braced. 8 Bottom braced at bearings. 9 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 28-0-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF Self Weight 11 PLF This design is valid until6/30/2018 Louisiana-Pacific Corp 414 Union Street, Suite 2000 Nashville, TN 37219 (888) 820-0325www.lpcorp.comAPA: PR-L280, ICC-ES: ESR-2403, LADBS: RR-25783, Florida: FL15228 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Notes This component analysis is based on the loads, geometry and other conditions as entered by the user and listed in this report. The user is responsible to ensure the accuracy of the input and the applicability to the actual conditions of the structure for which this component is intended. This analysis is valid only for the product listed. Copyright 2016 All rights reserved by Louisiana Pacific Corp. 414 Union St Suite 2000, Nashville, TN 37219 Page 5 of 34 1 1 / 2 " 6'6" 6'6" 1 SPF End Grain 2 SPF End Grain 3 1/2" 9 1/2" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #3 LP-LSL 1.55E 1.750" X 9.500" 2-Ply -PASSED LP SolidStart Design Version 3.0.03 (Build 18.11.048) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 197.8 PLF Yield Limit per Fastener 98.9 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until6/30/2018 Louisiana-Pacific Corp 414 Union Street, Suite 2000 Nashville, TN 37219 (888) 820-0325www.lpcorp.comAPA: PR-L280, ICC-ES: ESR-2403, LADBS: RR-25783, Florida: FL15228 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Notes This component analysis is based on the loads, geometry and other conditions as entered by the user and listed in this report. The user is responsible to ensure the accuracy of the input and the applicability to the actual conditions of the structure for which this component is intended. This analysis is valid only for the product listed. Copyright 2016 All rights reserved by Louisiana Pacific Corp. 414 Union St Suite 2000, Nashville, TN 37219 Page 6 of 34 5'6" 5'6" 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" 1 2 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #4 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 360 289 0 0 2 0 360 289 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 775 ft-lb 2'9"1649 ft-lb 0.470 (47%)D+S L 775 ft-lb 2'9"1649 ft-lb 0.470 (47%)D+S L Shear 497 lb 7 3/4"1708 lb 0.291 (29%)D+S L LL Defl inch 0.028 (L/2197)2'9"0.171 (L/360)0.160 (16%)S L TL Defl inch 0.063 (L/978)2'9"0.256 (L/240)0.250 (25%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"17%360 / 289 649 L D+S 2 -SPF End Grain 3.000"17%360 / 289 649 L D+S Design Notes 1 Fasten all plies using 1 row of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 3-0-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF 2 Uniform Top 80 PLF 0 PLF 0 PLF 0 PLF 0 PLF Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 7 of 34 1 1 / 2 " 5'6" 5'6" 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #4 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Multi-Ply Analysis Fasten all plies using 1 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 78.7 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 8 of 34 5'6" 5'6" 1 SPF End Grain 2 SPF End Grain 4 1/2" 9 1/4" 1 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #5 S-P-F #2 2.000" X 10.000" 3-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Member Information Type:Girder Plies:3 Moisture Condition:Dry Deflection LL:240 Deflection TL:180 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: Yes Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 1309 2695 0 0 2 0 1309 2695 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 4780 ft-lb 2'9"6807 ft-lb 0.702 (70%)D+S L 4780 ft-lb 2'9"6807 ft-lb 0.702 (70%)D+S L Shear 2609 lb 4'6 1/2"4308 lb 0.606 (61%)D+S L LL Defl inch 0.037 (L/1680)2'9"0.256 (L/240)0.140 (14%)S L TL Defl inch 0.054 (L/1131)2'9"0.342 (L/180)0.160 (16%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"70%1309 / 2695 4004 L D+S 2 -SPF End Grain 3.000"70%1309 / 2695 4004 L D+S Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 28-0-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 9 of 34 1 1 / 2 " 5'6" 5'6" 1 SPF End Grain 2 SPF End Grain 4 1/2" 9 1/4" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #5 S-P-F #2 2.000" X 10.000" 3-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Nail from both sides. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 10 of 34 5' 5' 1 SPF End Grain 2 SPF End Grain 3" 9 1/4" 1 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #6 S-P-F #2 2.000" X 10.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:240 Deflection TL:180 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 1148 2363 0 0 2 0 1148 2363 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 3754 ft-lb 2'6"3946 ft-lb 0.951 (95%)D+S L 3754 ft-lb 2'6"3946 ft-lb 0.951 (95%)D+S L Shear 2165 lb 11 1/2"2872 lb 0.754 (75%)D+S L LL Defl inch 0.035 (L/1580)2'6"0.231 (L/240)0.150 (15%)S L TL Defl inch 0.052 (L/1064)2'6"0.308 (L/180)0.170 (17%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"92%1148 / 2363 3510 L D+S 2 -SPF End Grain 3.000"92%1148 / 2363 3510 L D+S Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 27-0-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 11 of 34 1 1 / 2 " 5' 5' 1 SPF End Grain 2 SPF End Grain 3" 9 1/4" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #6 S-P-F #2 2.000" X 10.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 12 of 34 7'9" 7'9" 1 SPF End Grain 2 SPF End Grain 3" 7 1/4" 1 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #7 S-P-F #2 2.000" X 8.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 412 848 0 0 2 0 412 848 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 2210 ft-lb 3'10 1/2"2645 ft-lb 0.836 (84%)D+S L 2210 ft-lb 3'10 1/2"2607 ft-lb 0.847 (85%)D+S L Shear 1002 lb 9 1/2"2251 lb 0.445 (45%)D+S L LL Defl inch 0.109 (L/811)3'10 9/16"0.246 (L/360)0.440 (44%)S L TL Defl inch 0.162 (L/546)3'10 9/16"0.369 (L/240)0.440 (44%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"33%412 / 848 1259 L D+S 2 -SPF End Grain 3.000"33%412 / 848 1259 L D+S Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be laterally braced at a maximum of 2' o.c. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 6-3-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 13 of 34 1 1 / 2 " 7'9" 7'9" 1 SPF End Grain 2 SPF End Grain 3" 7 1/4" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #7 S-P-F #2 2.000" X 8.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 14 of 34 20'6" 20'6" 1 SPF End Grain 2 SPF End Grain 3 1/2" 11 7/8" 1 2 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #8 LP-LVL 2900Fb-2.0E 1.750" X 11.875" 2-Ply -PASSED LP SolidStart Design Version 3.0.03 (Build 18.11.048) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:240 Deflection TL:180 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 1875 1076 0 0 2 0 1875 1076 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 14575 ft-lb 10'3"22888 ft-lb 0.637 (64%)D+S L Shear 2612 lb 1'2 1/8"9081 lb 0.288 (29%)D+S L LL Defl inch 0.411 (L/587)10'3 1/16"1.006 (L/240)0.410 (41%)S L TL Defl inch 1.128 (L/214)10'3 1/16"1.342 (L/180)0.840 (84%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"37%1875 / 1076 2951 L D+S 2 -SPF End Grain 3.000"37%1875 / 1076 2951 L D+S Design Notes 1 Provide restraint at supports to ensure lateral stability. 2 Dead Load Deflection: Instant = 0.717", Long Term = 1.075" 3 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 4 Refer to last page of calculations for fasteners required for specified loads. 5 Girders are designed to be supported on the bottom edge only. 6 Top loads must be supported equally by all plies. 7 Top must be continuously braced. 8 Bottom braced at bearings. 9 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 3-0-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF 2 Uniform Top 120 PLF 0 PLF 0 PLF 0 PLF 0 PLF Self Weight 12 PLF This design is valid until6/30/2018 Louisiana-Pacific Corp 414 Union Street, Suite 2000 Nashville, TN 37219 (888) 820-0325www.lpcorp.comAPA: PR-L280, ICC-ES: ESR-2403, LADBS: RR-25783, Florida: FL15228 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Notes This component analysis is based on the loads, geometry and other conditions as entered by the user and listed in this report. The user is responsible to ensure the accuracy of the input and the applicability to the actual conditions of the structure for which this component is intended. This analysis is valid only for the product listed. Copyright 2016 All rights reserved by Louisiana Pacific Corp. 414 Union St Suite 2000, Nashville, TN 37219 Page 15 of 34 1 1 / 2 " 20'6" 20'6" 1 SPF End Grain 2 SPF End Grain 3 1/2" 11 7/8" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #8 LP-LVL 2900Fb-2.0E 1.750" X 11.875" 2-Ply -PASSED LP SolidStart Design Version 3.0.03 (Build 18.11.048) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 181.1 PLF Yield Limit per Fastener 90.5 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until6/30/2018 Louisiana-Pacific Corp 414 Union Street, Suite 2000 Nashville, TN 37219 (888) 820-0325www.lpcorp.comAPA: PR-L280, ICC-ES: ESR-2403, LADBS: RR-25783, Florida: FL15228 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Notes This component analysis is based on the loads, geometry and other conditions as entered by the user and listed in this report. The user is responsible to ensure the accuracy of the input and the applicability to the actual conditions of the structure for which this component is intended. This analysis is valid only for the product listed. Copyright 2016 All rights reserved by Louisiana Pacific Corp. 414 Union St Suite 2000, Nashville, TN 37219 Page 16 of 34 8'6" 8'6" 1 SPF End Grain 2 SPF End Grain 3" 9 1/4" 1 2 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #9 S-P-F #2 2.000" X 10.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:240 Deflection TL:180 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 727 446 0 0 2 0 727 446 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 2278 ft-lb 4'3"3946 ft-lb 0.577 (58%)D+S L 2278 ft-lb 4'3"3946 ft-lb 0.577 (58%)D+S L Shear 909 lb 7'6 1/2"2872 lb 0.316 (32%)D+S L LL Defl inch 0.037 (L/2623)4'3 1/16"0.406 (L/240)0.090 (9%)S L TL Defl inch 0.098 (L/998)4'3 1/16"0.542 (L/180)0.180 (18%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"31%727 / 446 1173 L D+S 2 -SPF End Grain 3.000"31%727 / 446 1173 L D+S Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 3-0-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF 2 Uniform Top 120 PLF 0 PLF 0 PLF 0 PLF 0 PLF Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 17 of 34 1 1 / 2 " 8'6" 8'6" 1 SPF End Grain 2 SPF End Grain 3" 9 1/4" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #9 S-P-F #2 2.000" X 10.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 18 of 34 3'3" 3'3" 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" 1 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #10 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 0 456 938 0 0 2 0 456 938 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 1047 ft-lb 1'7 1/2"1649 ft-lb 0.635 (64%)D+S L 1047 ft-lb 1'7 1/2"1649 ft-lb 0.635 (64%)D+S L Shear 947 lb 6 1/4"1708 lb 0.555 (55%)D+S L LL Defl inch 0.021 (L/1762)1'7 1/2"0.104 (L/360)0.200 (20%)S L TL Defl inch 0.032 (L/1186)1'7 1/2"0.156 (L/240)0.200 (20%)D+S L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 1.500"73%456 / 938 1394 L D+S 2 -SPF End Grain 1.500"73%456 / 938 1394 L D+S Design Notes 1 Fasten all plies using 1 row of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 16-6-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 19 of 34 1 1 / 2 " 3'3" 3'3" 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: Main LevelBeam #10 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Multi-Ply Analysis Fasten all plies using 1 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 78.7 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 20 of 34 5'6" 5'6" 1 SPF End Grain 2 SPF End Grain 3" 9 1/4" 1 2 3 4 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: BasementBeam #11 S-P-F #2 2.000" X 10.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 1320 1561 1684 0 0 2 1320 1561 1684 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 2462 ft-lb 2'9"3431 ft-lb 0.718 (72%)D+L L 2462 ft-lb 2'9"3431 ft-lb 0.718 (72%)D+L L Shear 1344 lb 11 1/2"2498 lb 0.538 (54%)D+L L LL Defl inch 0.027 (L/2286)2'9"0.171 (L/360)0.160 (16%)L L TL Defl inch 0.042 (L/1463)2'9"0.256 (L/240)0.160 (16%)D+L L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"100%1561 / 2253 3814 L D+0.75(L+S) 2 -SPF End Grain 3.000"100%1561 / 2253 3814 L D+0.75(L+S) Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 12-0-0 Top 15 PSF 40 PSF 0 PSF 0 PSF 0 PSF 2 Uniform Top 90 PLF 0 PLF 0 PLF 0 PLF 0 PLF 3 Point 0-0-0 Top 818 lb 0 lb 1684 lb 0 lb 0 lb Beam #1 Brg 1 4 Point 5-6-0 Top 818 lb 0 lb 1684 lb 0 lb 0 lb Beam #1 Brg 2 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 21 of 34 1 1 / 2 " 5'6" 5'6" 1 SPF End Grain 2 SPF End Grain 3" 9 1/4" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: BasementBeam #11 S-P-F #2 2.000" X 10.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 22 of 34 5'6" 5'6" 1 SPF End Grain 2 SPF End Grain 3" 9 1/4" 1 2 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: BasementBeam #12 S-P-F #2 2.000" X 10.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 1320 743 0 0 0 2 1320 743 0 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 2462 ft-lb 2'9"3431 ft-lb 0.718 (72%)D+L L 2462 ft-lb 2'9"3431 ft-lb 0.718 (72%)D+L L Shear 1344 lb 11 1/2"2498 lb 0.538 (54%)D+L L LL Defl inch 0.027 (L/2286)2'9"0.171 (L/360)0.160 (16%)L L TL Defl inch 0.042 (L/1463)2'9"0.256 (L/240)0.160 (16%)D+L L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"54%743 / 1320 2063 L D+L 2 -SPF End Grain 3.000"54%743 / 1320 2063 L D+L Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 12-0-0 Top 15 PSF 40 PSF 0 PSF 0 PSF 0 PSF 2 Uniform Top 90 PLF 0 PLF 0 PLF 0 PLF 0 PLF Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 23 of 34 1 1 / 2 " 5'6" 5'6" 1 SPF End Grain 2 SPF End Grain 3" 9 1/4" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: BasementBeam #12 S-P-F #2 2.000" X 10.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 24 of 34 6'6" 6'6" 1 SPF End Grain 2 SPF End Grain 3 1/2" 9 1/2" 1 2 3 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: BasementBeam #13 LP-LSL 1.55E 1.750" X 9.500" 2-Ply -PASSED LP SolidStart Design Version 3.0.03 (Build 18.11.048) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 1495 2469 3185 0 0 2 1495 888 0 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 3438 ft-lb 3'3"10648 ft-lb 0.323 (32%)D+L L Shear 1665 lb 5'6 1/4"9088 lb 0.183 (18%)D+L L LL Defl inch 0.047 (L/1556)3'3"0.204 (L/360)0.230 (23%)L L TL Defl inch 0.075 (L/977)3'3"0.306 (L/240)0.250 (25%)D+L L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"65%2469 / 3510 5979 L D+0.75(L+S) 2 -SPF End Grain 3.000"26%888 / 1495 2383 L D+L Design Notes 1 Provide restraint at supports to ensure lateral stability. 2 Dead Load Deflection: Instant = 0.028", Long Term = 0.042" 3 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 4 Refer to last page of calculations for fasteners required for specified loads. 5 Girders are designed to be supported on the bottom edge only. 6 Top loads must be supported equally by all plies. 7 Top must be continuously braced. 8 Bottom braced at bearings. 9 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 11-6-0 Top 15 PSF 40 PSF 0 PSF 0 PSF 0 PSF 2 Uniform Top 90 PLF 0 PLF 0 PLF 0 PLF 0 PLF 3 Point 0-0-0 Top 1582 lb 0 lb 3185 lb 0 lb 0 lb Beam #3 Brg 1 Bearing Length 0-3-0 Self Weight 11 PLF This design is valid until6/30/2018 Louisiana-Pacific Corp 414 Union Street, Suite 2000 Nashville, TN 37219 (888) 820-0325www.lpcorp.comAPA: PR-L280, ICC-ES: ESR-2403, LADBS: RR-25783, Florida: FL15228 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Notes This component analysis is based on the loads, geometry and other conditions as entered by the user and listed in this report. The user is responsible to ensure the accuracy of the input and the applicability to the actual conditions of the structure for which this component is intended. This analysis is valid only for the product listed. Copyright 2016 All rights reserved by Louisiana Pacific Corp. 414 Union St Suite 2000, Nashville, TN 37219 Page 25 of 34 1 1 / 2 " 6'6" 6'6" 1 SPF End Grain 2 SPF End Grain 3 1/2" 9 1/2" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: BasementBeam #13 LP-LSL 1.55E 1.750" X 9.500" 2-Ply -PASSED LP SolidStart Design Version 3.0.03 (Build 18.11.048) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 197.8 PLF Yield Limit per Fastener 98.9 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until6/30/2018 Louisiana-Pacific Corp 414 Union Street, Suite 2000 Nashville, TN 37219 (888) 820-0325www.lpcorp.comAPA: PR-L280, ICC-ES: ESR-2403, LADBS: RR-25783, Florida: FL15228 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Notes This component analysis is based on the loads, geometry and other conditions as entered by the user and listed in this report. The user is responsible to ensure the accuracy of the input and the applicability to the actual conditions of the structure for which this component is intended. This analysis is valid only for the product listed. Copyright 2016 All rights reserved by Louisiana Pacific Corp. 414 Union St Suite 2000, Nashville, TN 37219 Page 26 of 34 5'6" 5'6" 1 SPF End Grain 2 SPF End Grain 4 1/2" 7 1/4 1 2 3 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: BasementBeam #14 S-P-F #2 2.000" X 8.000" 3-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Member Information Type:Girder Plies:3 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: Yes Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 1265 2303 3185 0 0 2 1265 722 0 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 2372 ft-lb 2'9"3967 ft-lb 0.598 (60%)D+L L 2372 ft-lb 2'9"3967 ft-lb 0.598 (60%)D+L L Shear 1415 lb 4'8 1/2"2936 lb 0.482 (48%)D+L L LL Defl inch 0.036 (L/1723)2'9"0.171 (L/360)0.210 (21%)L L TL Defl inch 0.056 (L/1097)2'9"0.256 (L/240)0.220 (22%)D+L L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"98%2303 / 3338 5641 L D+0.75(L+S) 2 -SPF End Grain 3.000"35%722 / 1265 1987 L D+L Design Notes 1 Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 11-6-0 Top 15 PSF 40 PSF 0 PSF 0 PSF 0 PSF 2 Uniform Top 90 PLF 0 PLF 0 PLF 0 PLF 0 PLF 3 Point 0-0-0 Top 1582 lb 0 lb 3185 lb 0 lb 0 lb Beam #3 Brg 1 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 27 of 34 1 1 / 2 " 5'6" 5'6" 1 SPF End Grain 2 SPF End Grain 4 1/2" 7 1/4 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: BasementBeam #14 S-P-F #2 2.000" X 8.000" 3-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Multi-Ply Analysis Fasten all plies using 2 rows of 10d Box nails (.128x3") at 12" o.c.. Nail from both sides. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 157.4 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 28 of 34 21'1" 21'1" 1 SPF End Grain 2 SPF End Grain 5 1/4" 1'8" 1 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: BasementBeam #15 LP-LVL 2900Fb-2.0E 1.750" X 20.000" 3-Ply -PASSED LP SolidStart Design Version 3.0.03 (Build 18.11.048) Powered by iStruct Member Information Type:Girder Plies:3 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: Yes Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 8698 3576 0 0 0 2 8836 3633 0 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 61025 ft-lb 10'5 1/2"81776 ft-lb 0.746 (75%)D+L L Shear 10012 lb 18'11 7/8"19950 lb 0.502 (50%)D+L L LL Defl inch 0.510 (L/480)10'5 9/16"0.680 (L/360)0.750 (75%)L L TL Defl inch 0.720 (L/340)10'5 9/16"1.020 (L/240)0.710 (71%)D+L L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 4.000"78%3576 / 8698 12274 L D+L 2 -SPF End Grain 6.000"53%3633 / 8836 12469 L D+L Design Notes 1 Provide restraint at supports to ensure lateral stability. 2 Dead Load Deflection: Instant = 0.210", Long Term = 0.315" 3 Fasten all plies using 3 rows of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 4 Refer to last page of calculations for fasteners required for specified loads. 5 Girders are designed to be supported on the bottom edge only. 6 Top loads must be supported equally by all plies. 7 Top must be laterally braced at a maximum of 2' o.c. 8 Bottom braced at bearings. 9 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 20-9-8 Top 15 PSF 40 PSF 0 PSF 0 PSF 0 PSF Self Weight 30 PLF This design is valid until6/30/2018 Louisiana-Pacific Corp 414 Union Street, Suite 2000 Nashville, TN 37219 (888) 820-0325www.lpcorp.comAPA: PR-L280, ICC-ES: ESR-2403, LADBS: RR-25783, Florida: FL15228 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Notes This component analysis is based on the loads, geometry and other conditions as entered by the user and listed in this report. The user is responsible to ensure the accuracy of the input and the applicability to the actual conditions of the structure for which this component is intended. This analysis is valid only for the product listed. Copyright 2016 All rights reserved by Louisiana Pacific Corp. 414 Union St Suite 2000, Nashville, TN 37219 Page 29 of 34 1 1 / 2 " 21'1" 21'1" 1 SPF End Grain 2 SPF End Grain 5 1/4" 1'8" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: BasementBeam #15 LP-LVL 2900Fb-2.0E 1.750" X 20.000" 3-Ply -PASSED LP SolidStart Design Version 3.0.03 (Build 18.11.048) Powered by iStruct Multi-Ply Analysis Fasten all plies using 3 rows of 10d Box nails (.128x3") at 12" o.c.. Nail from both sides. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 271.6 PLF Yield Limit per Fastener 90.5 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 This design is valid until6/30/2018 Louisiana-Pacific Corp 414 Union Street, Suite 2000 Nashville, TN 37219 (888) 820-0325www.lpcorp.comAPA: PR-L280, ICC-ES: ESR-2403, LADBS: RR-25783, Florida: FL15228 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Notes This component analysis is based on the loads, geometry and other conditions as entered by the user and listed in this report. The user is responsible to ensure the accuracy of the input and the applicability to the actual conditions of the structure for which this component is intended. This analysis is valid only for the product listed. Copyright 2016 All rights reserved by Louisiana Pacific Corp. 414 Union St Suite 2000, Nashville, TN 37219 Page 30 of 34 5'6" 5'6" 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" 1 2 3 4 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: BasementBeam #16 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 110 649 289 0 0 2 110 649 289 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 1132 ft-lb 2'9"1649 ft-lb 0.686 (69%)D+0.75(L+S)L 1132 ft-lb 2'9"1649 ft-lb 0.686 (69%)D+0.75(L+S)L Shear 725 lb 7 3/4"1708 lb 0.425 (42%)D+0.75(L+S)L LL Defl inch 0.029 (L/2122)2'9"0.171 (L/360)0.170 (17%)0.75(L+S)L TL Defl inch 0.092 (L/669)2'9"0.256 (L/240)0.360 (36%)D+0.75(L+S)L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 3.000"25%649 / 299 948 L D+0.75(L+S) 2 -SPF End Grain 3.000"25%649 / 299 948 L D+0.75(L+S) Design Notes 1 Fasten all plies using 1 row of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 1-0-0 Top 15 PSF 40 PSF 0 PSF 0 PSF 0 PSF 2 Uniform Top 90 PLF 0 PLF 0 PLF 0 PLF 0 PLF 3 Uniform 3-0-0 Top 17 PSF 0 PSF 35 PSF 0 PSF 0 PSF 4 Uniform Top 80 PLF 0 PLF 0 PLF 0 PLF 0 PLF Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 31 of 34 1 1 / 2 " 5'6" 5'6" 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: BasementBeam #16 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Multi-Ply Analysis Fasten all plies using 1 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 78.7 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 32 of 34 2'9" 2'9" 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" 1 Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: BasementBeam #17 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Member Information Type:Girder Plies:2 Moisture Condition:Dry Deflection LL:360 Deflection TL:240 Importance: Normal Temperature: Temp <= 100°F General Load Floor Live:40 PSF Dead:15 PSF Snow:17 PSF Application:Floor Design Method:ASD Building Code:IBC 2012 Load Sharing: No Deck:Not Checked Reactions PATTERNED lb (Uplift) Brg Live Dead Snow Wind Const 1 1178 442 0 0 0 2 1178 442 0 0 0 Analysis Results Analysis Actual Location Allowed Capacity Comb.Case Moment 1015 ft-lb 1'4 1/2"1434 ft-lb 0.708 (71%)D+L L 1015 ft-lb 1'4 1/2"1434 ft-lb 0.708 (71%)D+L L Shear 1006 lb 6 1/4"1485 lb 0.678 (68%)D+L L LL Defl inch 0.016 (L/2004)1'4 1/2"0.088 (L/360)0.180 (18%)L L TL Defl inch 0.022 (L/1457)1'4 1/2"0.131 (L/240)0.160 (16%)D+L L Bearings Bearing Length Cap.React D/L lb Total Ld. Case Ld. Comb. 1 -SPF End Grain 1.500"85%442 / 1178 1620 L D+L 2 -SPF End Grain 1.500"85%442 / 1178 1620 L D+L Design Notes 1 Fasten all plies using 1 row of 10d Box nails (.128x3") at 12" o.c. Maximum end distance not to exceed 6". 2 Refer to last page of calculations for fasteners required for specified loads. 3 Girders are designed to be supported on the bottom edge only. 4 Top loads must be supported equally by all plies. 5 Top must be continuously braced. 6 Bottom braced at bearings. 7 Lateral slenderness ratio based on single ply width. ID Load Type Location Trib Width Side Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments 1 Uniform 21-5-1 Top 15 PSF 40 PSF 0 PSF 0 PSF 0 PSF Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 33 of 34 1 1 / 2 " 2'9" 2'9" 1 SPF End Grain 2 SPF End Grain 3" 5 1/2" Client:Arrow Building Center-Watertown Yard Project:Loomis Homes Address:18935 Iden Way Lakeville, MN Date:5/3/2018 Designer:Justin Spreitzer Job Name:18935 Iden Way Project #:The Waterford-Elevation A Level: BasementBeam #17 S-P-F #2 2.000" X 6.000" 2-Ply -PASSED Version 3.0.03 (Build 18.11.048) Powered by iStruct Multi-Ply Analysis Fasten all plies using 1 rows of 10d Box nails (.128x3") at 12" o.c.. Maximum end distance not to exceed 6" Capacity 0.0 % Load 0.0 PLF Yield Limit per Foot 78.7 PLF Yield Limit per Fastener 78.7 lb. Yield Mode IV Edge Distance 1 1/2" Min. End Distance 3" Load Combination Duration Factor 1.00 Manufacturer Info Amerhart Ltd.2631 Territorial Road, MN55114 800-879-8123 Page 34 of 34