HomeMy WebLinkAbout18895 Iden Way SurveyZoning = RST-2
FY - 20' House, 25' GarageSY - 7'RY Buffer - 50'
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will
be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Maintain 6" between bottom of siding and sod.*No structures in easements.
ENGINEERING REVIEWED
Date:__________________05/25/2018 lritchie