HomeMy WebLinkAboutSurvey Revised1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6.Grading plan date/revision date: 6/5/2017.7.Plan No. SBF18.11.06-HAMILTON016'5Lot= 4,163 sq. ft.House/Garage= 2,508 sq. ft.Porch= 163 sq. ft.Driveway= 77 sq. ft.Patio= 179 sq. ft.Total Impervious= 2,927 sq. ft. or 70.3 % of lot*#4&%18'4%#.%7.#6+105ProposedGarage Floor @ Front= 934.8Garage Top of Block= 935.5House Top of Block= 935.5Lowest Floor= 927.5Lot 11, Block 6, SPIRIT OF BRANDTJEN FARM 18TH ADDITION, Dakota County,Minnesota2412'46;&'5%4+26+1016336 Duragno Trail, Lakeville, Minnesota2412'46;#&&4'55I hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 19th day of March, 2018Marcus F. Hampton, MN L.S. No. 474815748';145%'46+(+%#6'(.114'.'8#6+105Top nut of hydrant located at Lots 13 and 14, Block 6 = 934.33$'0%*/#4-Denotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevation*Front wall is 9.0 ft.Planning DepartmentApprovedDate:__________________03/19/2018dmoreyThe curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between siding & sod*No structures in easementsENGINEERING REVIEWEDDate:03/08/2018 ibradshaw