HomeMy WebLinkAbout16345 Dunfield Dr Survey1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6.Grading plan date/revision date: 6/5/2017.7.Plan No. SBF18.13.07-THE WOODBRIDGE- D ELEVATION016'5Lot= 9,247 sq. ft.House/Garage= 1,864 sq. ft.Porch= 132 sq. ft.Driveway= 810 sq. ft.Patio= 168 sq. ft.Total Impervious= 2,974 sq. ft. or 32.2 % of lot*#4&%18'4%#.%7.#6+105ProposedGarage Floor @ Front= 937.2Garage Top of Block= 937.9House Top of Block= 937.9Lowest Floor= 929.9Lot 13, Block 7, SPIRIT OF BRANDTJEN FARM 18TH ADDITION, Dakota County,Minnesota2412'46;&'5%4+26+1016345 Dunfield Drive, Lakeville, Minnesota2412'46;#&&4'55I hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 1st day of June, 2018Marcus F. Hampton, MN L.S. No. 474815748';145%'46+(+%#6'(.114'.'8#6+105Top nut of hydrant located at Lots 2 and 3, Block 10 = 937.04$'0%*/#4-Denotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________06/08/2018lritchiePlanning DepartmentApprovedDate:__________________06/20/2018dmorey