Loading...
HomeMy WebLinkAboutLA162856 - 5625 162nd St W Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received _______ ________ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ HOME PHONE _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN. NAME OF APPLICANT (Please Print)DATE APPLICANT’S SIGNATURE: www.lakevillemn.gov 5625 162nd St W Lakeville MN 55044 New Single Family Dwelling n/a $265,000.00 7/14/18 1/14/19 23 3 Dodd Crossing ■ ■ invoices@stonecottage.com Stone Cottage Construction, Inc. 636874 952.388.1301 651.261.1633 14787 Energy Way Apple Valley MN 55124 Scherer Plumbing 952.447.6734 15548 Red Oaks Road SE Prior Lake MN 55372 Lofgren Heating & Air Conditioning 952.431.5811 5708 Upper 147th St W #102 Apple Valley MN 55124 Bohn Well Drilling 952.445.4809 Troy Asleson - President, Stone Cottage Construction, Inc.6/26/18 ✘ ✘ ✘ RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: C o n c e p t A p p r o v a l O N L Y S u b j e c t t o F i e l d I n s p e c t i o n I n s p e c t o r D a t e 2 0 1 5 M N B l d g C o d e 0 7 / 1 7 / 2 0 1 8 d m a t h e w s 2 2 9 . 2 5 B r a c e d w a l l p a n e l s n e e d e d o n L / L C r i p p l e w a l l s , n o t s h o w n o n p r o v i d e d w a l l b r a c i n g p a g e s . UFER Ground-Provide 20' Rebar in footing and s t u b up near electrical service panel. 4 . 2 5 3 4 2 2 4 4 6 . 7 5 4 . 2 5 2 6 4 4 4 3 3 P F H P F H P F H 1 6 - M i n . 1 5 " c l e a r a n c e t o a n y o b s t r u c t i o n f r o m c e n t e r o f W . C . , 2 4 " i n f r o n t ( t y p ) . 2 2 2 2 2 2 2 2 2 2 2 2 2 L e t b e a m i n t o h o u s e t o b e a r o n h o u s e f o u n d a t i o n . 2 1 " m i n d i a m e t e r f o o t i n g Stone Cottage HVAC Load Calculations for Thomas 5625 162nd St W Lakeville,mn Prepared By: Randy Andrews Lofgren Heating 5708 Upper 147th Street West Apple Vallley, MN 55124 Wednesday, June 13, 2018 Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 2 Project Report General Project Information Project Title:Stone Cottage Project Date:Wednesday, June 13, 2018 Client Name:Thomas Client Address:5625 162nd St W Client City:Lakeville,mn Company Name:Lofgren Heating Company Representative:Randy Andrews Company Address:5708 Upper 147th Street West Company City:Apple Vallley, MN 55124 Company E-Mail Address:rrandrews@lofgrenheating-ac.com Design Data Reference City:Minneapolis, Minnesota Building Orientation:Front door faces South Daily Temperature Range:Medium Latitude:44 Degrees Elevation:834 ft. Altitude Factor:0.970 Elevation Sensible Adj. Factor:1.000 Elevation Total Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29 Check Figures Total Building Supply CFM:1,186 CFM Per Square ft.:0.355 Square ft. of Room Area:3,344 Square ft. Per Ton:1,167 Volume (ft³) of Cond. Space:27,842 Building Loads Total Heating Required Including Ventilation Air:52,596 Btuh 52.596 MBH Total Sensible Gain:25,792 Btuh 80 % Total Latent Gain:6,532 Btuh 20 % Total Cooling Required Including Ventilation Air:32,323 Btuh 2.69 Tons (Based On Sensible + Latent) 2.87 Tons (Based On 75% Sensible Capacity) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\5625 162ND ST 06132018.rhv Wednesday, June 13, 2018, 12:33 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 3 Load Preview Report Scope Has AED Net Ton ft.² /Ton Area Sen Gain Lat Gain Net Gain Sen Loss Sys Htg CFM Sys Clg CFM Sys Act CFM Duct Size Building 2.69 1,241 3,344 25,792 6,532 32,323 52,596 960 1,186 1,186 System 1 Yes 2.69 1,241 3,344 25,792 6,532 32,323 52,596 960 1,186 1,186 21x10 Ventilation 486 1,352 1,837 6,500 Zone 1 3,344 25,306 5,180 30,486 46,096 960 1,186 1,186 21x10 1-Main Level 1,090 10,657 1,791 12,448 17,670 368 499 499 6--6 2-Upper Level 1,164 12,368 2,403 14,771 18,443 384 579 579 7--6 3-Lower Level 1,090 2,281 986 3,267 9,983 208 107 107 1--6 C:\ ...\5625 162ND ST 06132018.rhv Wednesday, June 13, 2018, 12:33 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 4 Total Building Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 557 15,505 0 12,113 12,113 11N: Door-Metal - Polystyrene Core 63 1,918 0 529 529 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2134 12,068 0 1,845 1,845 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 954 4,067 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1164 2,025 0 1,117 1,117 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1090 2,371 0 0 0 Subtotals for structure:37,954 0 15,604 15,604 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 88, Summer CFM: 46 8,142 880 632 1,512 Ventilation: Winter CFM: 140, Summer CFM: 70 6,500 1,352 486 1,837 Total Building Load Totals:52,596 6,532 25,792 32,323 Check Figures Total Building Supply CFM:1,186 CFM Per Square ft.:0.355 Square ft. of Room Area:3,344 Square ft. Per Ton:1,167 Volume (ft³) of Cond. Space:27,842 Building Loads Total Heating Required Including Ventilation Air:52,596 Btuh 52.596 MBH Total Sensible Gain:25,792 Btuh 80 % Total Latent Gain:6,532 Btuh 20 % Total Cooling Required Including Ventilation Air:32,323 Btuh 2.69 Tons (Based On Sensible + Latent) 2.87 Tons (Based On 75% Sensible Capacity) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\5625 162ND ST 06132018.rhv Wednesday, June 13, 2018, 12:33 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 5 Building Pie Chart Building Loss 52,596 Btuh Floor 5%Roof 4% Wall 31% Glass 29% Door 4% Infiltration 15% Ventilation 12% Building Gain 32,323 Btuh Roof 3%Wall 6% Glass 37% Door 2%People 12% Equipment 29% Infiltration 5% Ventilation 6% C:\ ...\5625 162ND ST 06132018.rhv Wednesday, June 13, 2018, 12:33 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 6 System 1 Whole House Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 557 15,505 0 12,113 12,113 11N: Door-Metal - Polystyrene Core 63 1,918 0 529 529 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2134 12,068 0 1,845 1,845 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 954 4,067 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1164 2,025 0 1,117 1,117 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1090 2,371 0 0 0 Subtotals for structure:37,954 0 15,604 15,604 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 88, Summer CFM: 46 8,142 880 632 1,512 Ventilation: Winter CFM: 140, Summer CFM: 70 6,500 1,352 486 1,837 System 1 Whole House Load Totals:52,596 6,532 25,792 32,323 Check Figures Supply CFM:1,186 CFM Per Square ft.:0.355 Square ft. of Room Area:3,344 Square ft. Per Ton:1,167 Volume (ft³) of Cond. Space:27,842 System Loads Total Heating Required Including Ventilation Air:52,596 Btuh 52.596 MBH Total Sensible Gain:25,792 Btuh 80 % Total Latent Gain:6,532 Btuh 20 % Total Cooling Required Including Ventilation Air:32,323 Btuh 2.69 Tons (Based On Sensible + Latent) 2.87 Tons (Based On 75% Sensible Capacity) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\5625 162ND ST 06132018.rhv Wednesday, June 13, 2018, 12:33 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 7 Detailed Room Loads - Room 1 - Main Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,090.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,090.0 sq.ft.Supply Air:499 CFM Ceiling Height:9.0 ft.Supply Air Changes:3.1 AC/hr Volume:9,810.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:6 Actual Winter Vent.:54 CFM Runout Air:83 CFM Percent of Supply.:11 % Runout Duct Size:6 in.Actual Summer Vent.:29 CFM Runout Air Velocity:424 ft./min.Percent of Supply:6 % Runout Air Velocity:424 ft./min.Actual Winter Infil.:39 CFM Actual Loss:0.112 in.wg./100 ft.Actual Summer Infil.:20 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain N -Wall-12F-0sw 30 X 9 172 0.065 5.7 973 0.9 0 149 S -Wall-12F-0sw 30 X 9 158 0.065 5.7 893 0.9 0 137 E -Wall-12F-0sw 38 X 9 285 0.065 5.7 1,612 0.9 0 246 W -Wall-12F-0sw 38 X 9 295 0.065 5.7 1,668 0.9 0 255 S -Door-11N 6 X 7 42 0.350 30.5 1,279 8.4 0 353 S -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 N -Gls-4A-1a-o shgc-0.33 100%S 98 0.320 27.8 2,728 10.4 0 1,020 S -Gls-4A-1a-o shgc-0.33 0%S 49 0.320 27.8 1,364 19.2 0 940 E -Gls-4A-1a-o shgc-0.33 0%S 57 0.320 27.8 1,587 35.0 0 1,995 W -Gls-4A-1a-o shgc-0.33 0%S 47 0.320 27.8 1,308 35.0 0 1,645 Subtotals for Structure:14,051 0 6,916 Infil.: Win.: 39.0, Sum.: 20.3 1,224 2.957 3,619 0.230 391 281 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:1,000 3,000 Room Totals:17,670 1,791 10,657 C:\ ...\5625 162ND ST 06132018.rhv Wednesday, June 13, 2018, 12:33 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 8 Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,164.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,164.0 sq.ft.Supply Air:579 CFM Ceiling Height:8.0 ft.Supply Air Changes:3.7 AC/hr Volume:9,312.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:7 Actual Winter Vent.:56 CFM Runout Air:83 CFM Percent of Supply.:10 % Runout Duct Size:6 in.Actual Summer Vent.:34 CFM Runout Air Velocity:422 ft./min.Percent of Supply:6 % Runout Air Velocity:422 ft./min.Actual Winter Infil.:40 CFM Actual Loss:0.111 in.wg./100 ft.Actual Summer Infil.:21 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain N -Wall-12F-0sw 30 X 9 191 0.065 5.7 1,080 0.9 0 165 S -Wall-12F-0sw 30 X 9 213 0.065 5.7 1,205 0.9 0 184 E -Wall-12F-0sw 40 X 9 312 0.065 5.7 1,764 0.9 0 270 W -Wall-12F-0sw 40 X 9 293 0.065 5.7 1,657 0.9 0 253 N -Gls-4A-1a-o shgc-0.33 100%S 79 0.320 27.8 2,199 10.4 0 822 S -Gls-4A-1a-o shgc-0.33 0%S 57 0.320 27.8 1,587 19.2 0 1,093 E -Gls-4A-1a-o shgc-0.33 0%S 48 0.320 27.8 1,336 35.0 0 1,680 W -Gls-4A-1a-o shgc-0.33 0%S 67 0.320 27.8 1,865 35.0 0 2,345 UP-Ceil-16B-50 1164 X 1 1164 0.020 1.7 2,025 1.0 0 1,117 Subtotals for Structure:14,718 0 7,929 Infil.: Win.: 40.1, Sum.: 20.9 1,260 2.956 3,725 0.229 403 289 People: 200 lat/per, 230 sen/per:5 1,000 1,150 Equipment:1,000 3,000 Room Totals:18,443 2,403 12,368 C:\ ...\5625 162ND ST 06132018.rhv Wednesday, June 13, 2018, 12:33 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 9 Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,090.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,090.0 sq.ft.Supply Air:107 CFM Ceiling Height:8.0 ft.Supply Air Changes:0.7 AC/hr Volume:8,720.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:1 Actual Winter Vent.:30 CFM Runout Air:107 CFM Percent of Supply.:28 % Runout Duct Size:6 in.Actual Summer Vent.:6 CFM Runout Air Velocity:544 ft./min.Percent of Supply:6 % Runout Air Velocity:544 ft./min.Actual Winter Infil.:9 CFM Actual Loss:0.184 in.wg./100 ft.Actual Summer Infil.:4 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain N -Wall-12F-0sw 30 X 9 215 0.065 5.7 1,216 0.9 0 186 S -Wall-15B0-10sf-10 30 X 9 270 0.049 4.3 1,151 0.0 0 0 E -Wall-15B0-10sf-10 38 X 9 342 0.049 4.3 1,458 0.0 0 0 W -Wall-15B0-10sf-10 38 X 9 342 0.049 4.3 1,458 0.0 0 0 N -Gls-4A-1a-o shgc-0.33 100%S 55 0.320 27.8 1,531 10.4 0 573 Floor-21A-24 1 X 1090 1090 0.025 2.2 2,371 0.0 0 0 Subtotals for Structure:9,185 0 759 Infil.: Win.: 8.6, Sum.: 4.5 270 2.956 798 0.230 86 62 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:500 1,000 Room Totals:9,983 986 2,281 C:\ ...\5625 162ND ST 06132018.rhv Wednesday, June 13, 2018, 12:33 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 10 System 1 Room Load Summary No Room Name Area SF Htg Sens Btuh Min Htg CFM Run Duct Size Run Duct Vel Clg Sens Btuh Clg Lat Btuh Min Clg CFM Act Sys CFM ---Zone 1--- 1 Main Level 1,090 17,670 368 6-6 424 10,657 1,791 499 499 2 Upper Level 1,164 18,443 384 7-6 422 12,368 2,403 579 579 3 Lower Level 1,090 9,983 208 1-6 544 2,281 986 107 107 Ventilation 6,500 486 1,352 System 1 total 3,344 52,596 960 25,792 6,532 1,186 1,186 System 1 Main Trunk Size:21x10 in. Velocity:813 ft./min Loss per 100 ft.:0.097 in.wg Cooling System Summary Cooling Tons Sensible/Latent Split Sensible Btuh Latent Btuh Total Btuh Net Required:2.69 80% / 20%25,792 6,532 32,323 Recommended:2.87 75% / 25%25,792 8,597 34,389 Actual:1.00 77% / 23%9,240 2,760 12,000 Equipment Data Heating System Cooling System Type:Natural Gas Furnace Standard Air Conditioner Model:QC-F38-E78-G QC-C12 Indoor Model:S12 Brand:Quikcool FE Series Quikcool AS Series Description:Hi Efficiency Furnace Standard Efficiency Air Condit Efficiency:78.3 AFUE 12.4 SEER Sound:8.1 bels Capacity:38,000 Btuh 12,000 Btuh Sensible Capacity:n/a 9,240 Btuh Latent Capacity:n/a 2,760 Btuh C:\ ...\5625 162ND ST 06132018.rhv Wednesday, June 13, 2018, 12:33 PM Builders Associaton of Minnesota version 101014 Date Certificate Posted x Passive (No Fan) Active (With fan and monometer or other system monitoring device) Location (or future location) of Fan: Other Please Describe Here x 10/15 x x x 20 x 20 x 21 x 49 x x x x x Not applicable, all ducts located in conditioned space x Not required per mech. code Passive Powered Interlocked with exhaust device. Describe: Input in BTUS: 70,000 Capacity in Gallons: Other, describe: AFUE or HSPF% 93% Cfm's " round duct OR " metal duct Not required per mech. code x Passive Low: Other, describe: x Low: Location of fan(s), describe: Cfm's 4" " round duct OR Flex " metal duct City Mailing Address of the Dwelling or Dwelling Unit Combustion Air Select a Type Location of duct or system: 32,323 Below Entire Slab Rig i d , E x t r u d e d P o l y s t y r e n e Ceiling, flat Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. Place your logo here New Construction Energy Code Compliance Certificate Name of Residential Contractor Stone Cottage Construction Inc. MN License Number Lakeville5625 162nd St W BC636874 Mech Room Heat Recover Ventilator (HRV) Capacity in cfms: Energy Recover Ventilator (ERV) Capacity in cfms: 52,596 Heating Gain Cooling Load Attic Fuel Type Solar Heat Gain Coefficient (SHGC): Windows & Doors Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area Rim Joist (2nd Floor+) 0.30 Appliances THERMAL ENVELOPE Fo a m O p e n C e l l Wall Rig i d , I s o c y n u r a t e Perimeter of Slab on Grade RADON CONTROL SYSTEM No n o r N o t A p p l i c a b l e Cooling System To t a l R - V a l u e o f a l l T y p e s o f In s u l a t i o n Type: Check All That Apply Min e r a l F i b e r b o a r d Insulation Location Fo a m , C l o s e d C e l l 0.22 Describe other insulated areas Fi b e r g l a s s , B l o w n Fi b e r g l a s s , B a t t s Foundation Wall R-value Average U-Factor (excludes skylights and one door) U: Duct system air tightness: Building envelope air tightness: Rim Joist (1st Floor) GPVL-50 13ACXN042-230 Model Heating System Natrual Gas Lennox Location of duct or system: Heating or Cooling Ducts Outside Conditioned Spaces Electric Make-up Air Select a Type AO Smith Domestic Water Heater MECHANICAL SYSTEMS Rating or Size Efficiency 13 Seer 200CFM Select Type Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): 25,792Residential Load Calculation SEER /EER Total ventilation (intermittent + continuous) rate in cfms: Balanced Ventilation capacity in cfms: High: High: MECHANICAL VENTILATION SYSTEM Capacity continuous ventilation rate in cfms: ML193UH070 Heating Loss Manufacturer Lennox Natural Gas Output in Tons: 3 Ton50 NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. “The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit.” (NPDES Construction Stormwater Permit, MPCA) “The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.” (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500 5625 162nd St W Stone Cottage Construction, Inc. Brian Christopherson 651.755.7199 brian@stonecottage.com New Single Family Dwelling 4 8 5 5 9 Brian Christopherson Stone Cottage Construction, Inc. 651.261.1633 brian@stonecottage.com University of Minnesota 05.31.2021 Troy Asleson - President, Stone Cottage Construction, Inc.6.26.2018 07/02/18 X KH