HomeMy WebLinkAbout18202 Glenbridge Ave SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________06/15/2018lritchiePlanning DepartmentApprovedDate:__________________06/29/2018dmorey