HomeMy WebLinkAboutSurveyC.O*Draintile connection required.*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________06/20/2018lritchieThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.Planning DepartmentApprovedDate:__________________07/06/2018dmorey