HomeMy WebLinkAbout18196 Greyhaven Path SurveyC.O.*Draintile connection required.*Maintain 6" between bottom of siding and sod.*No structures in easements.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________06/21/2018lritchiePlanning DepartmentApprovedDate:__________________07/06/2018dmorey