Loading...
HomeMy WebLinkAbout18103 Gladston Tr surveyf:\jobs\6761 - 6780\6772 - avonlea\cad\survey\6772.043.dwgSave Date:06/04/18 House Address:Certificate of Survey for:House Model:3890 Pheasant Ridge Drive NE, Suite 100, Blaine, MN 55449Phone: 763-489-7900 Fax: 763-489-7959◦◦ Bloomington (A) M/I HOMES OF MINNEAPOLIS, LLC. 18103 Gladstone Trail, Lakeville, MN Planning DepartmentApprovedDate:__________________07/23/2018dmoreyENGINEERING REVIEWEDDate: 07/11/2018 lritchie EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONThe curb box, drain tile cleanout andcatch basin (if applicable) must beinspected and accepted beforeAs-built escrow monies will bereleased. All structures must beflush with the sod. This will bescheduled with the landscapeinspection.*Maintain 6" between siding & sod*No structures in easements