HomeMy WebLinkAbout18155 Green Gables Tr Survey*Draintile connection required.
The curb box, drain tile cleanout, and catch
basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Maintain 6" between bottom of siding and sod.*No structures in easements.
ENGINEERING REVIEWED
Date:__________________07/03/2018 lritchie
Planning DepartmentApprovedDate:__________________07/17/2018 dmorey