Loading...
HomeMy WebLinkAbout16428 Dunfield Dr Survey1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6.Grading plan date/revision date: 7/28/2017.7.Plan No. SBF18.10.10-THE ST.CROIX-ELEVATION B016'5Lot= 11,212 sq. ft.House/Garage= 2,096 sq. ft.Porch= 143 sq. ft.Driveway= 797 sq. ft.Total Impervious= 3,018 sq. ft. or 26.9 % of lot*#4&%18'4%#.%7.#6+105ProposedGarage Floor @ Front= 936.4Garage Top of Block= 937.1House Top of Block= 937.1Lowest Floor= 929.1Lot 10, Block 10, SPIRIT OF BRANDTJEN FARM 18TH ADDITION, DakotaCounty, Minnesota2412'46;&'5%4+26+1016428 Dunfield Drive, Lakeville, Minnesota2412'46;#&&4'55I hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 31st day of July, 2018Marcus F. Hampton, MN L.S. No. 474815748';14ž5%'46+(+%#6'(.114'.'8#6+105Top nut of hydrant located at Lots 11 and 12, Block 10 = 936.80$'0%*/#4-Denotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________08/13/2018lritchiePlanning DepartmentApprovedDate:__________________08/16/2018dmorey