August 24, 2018 Item No. ______
INTERSTATE SOUTH LOGISTICS PARK FINAL PLAT
PROPOSED ACTION
Staff recommends adoption of the following motion: Move to approve: 1) a resolution
approving the final plat of Interstate South Logistics Park.
OVERVIEW
Scannell Properties #180 LLC (Scannell) has submitted a final application and plans for Interstate
South Logistics Park, which proposes two lots and five outlots. The subject property is 22 acres in
area, is zoned I-1, Light Industrial District and is located south of 215th Street (CSAH 70) and west of
Dodd Boulevard (CSAH 9).
The City Council approved the Interstate South Logistics park preliminary plat at their August
20, 2018 meeting.
PRIMARY ISSUES TO CONSIDER
Is the final plat consistent with the Interstate South Logistics Park preliminary plat? To
consolidate the status of ownership of the area of the proposed final plat, the developer has
administratively subdivided the area that is now included on the proposed final plat and now
represents the sole ownership and signatory on the development contract.
SUPPORTING INFORMATION
◊ Final plat resolution
◊ Signed development contract
◊ Planning report and engineering report dated August 22, 2018
Financial Impact: $ TIF Dist. No. 23 Budgeted: Y☐ N☐ Source:
Related Documents (CIP, ERP, etc.): Zoning and Subdivision Ordinances
Envision Lakeville Community Values: Diversified Economic Development
Report Completed By: Frank Dempsey, AICP, Associate Planner
(Reserved for Dakota County Recording Information)
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. 18- ______
RESOLUTION APPROVING FINAL PLAT OF INTERSTATE SOUTH LOGISTICS PARK
WHEREAS, the owner of the property described as INTERSTATE SOUTH LOGISTICS
PARK has requested final plat approval; and
WHEREAS, the final plat is consistent with the approved Interstate South Logistics Park
preliminary plat; and
WHEREAS, the final plat is acceptable to the City;
NOW THEREFORE BE IT RESOLVED by the Lakeville City Council:
1. INTERSTATE SOUTH LOGISTICS PARK final plat is approved subject to the
development contract and security requirements.
2. The Mayor and City Clerk are hereby authorized to sign the development contract and
the final plat mylars.
3. The City Clerk is directed to file a certified copy of this resolution with the Dakota
County Recorder.
2
DATED this 27th day of August 2018
CITY OF LAKEVILLE
Douglas P. Anderson, Mayor
ATTEST:
_______________________
Charlene Friedges, City Clerk
STATE OF MINNESOTA )
CITY OF LAKEVILLE )
I hereby certify that the foregoing Resolution No. _________is a true and correct copy of the
resolution presented to and adopted by the City Council of the City of Lakeville at a duly
authorized meeting thereof held on the 27th day of August 2018 as shown by the minutes of
said meeting in my possession.
___________________________
Charlene Friedges
City Clerk
(Seal)
Drafted By:
City of Lakeville
20195 Holyoke Avenue
Lakeville, MN 55044
1
City of Lakeville
Planning Department
Memorandum
To: Daryl Morey, Planning Director
From: Frank Dempsey, AICP, Associate Planner
Date: August 22, 2018
Subject: Packet Material for the August 27, 2018 Special City Council Meeting
Agenda
Item: Interstate South Logistics Park Final Plat
BACKGROUND
Scannell Properties #180 LLC (Scannell) has submitted a final plat application and plans for
Interstate South Logistics Park, which proposes two lots and five outlots on part of a 176-acre
preliminary plat approved by the City Council on August 20, 2018. The area of the property
proposed for the final plat has been administratively subdivided from the parent parcel to be
incorporated into the 22-acre final plat. The subject property is located south of 215th Street
(CSAH 70) and west of Dodd Boulevard (CSAH 9).
Future lots will be determined when Outlot A is final platted into separate lots and blocks at
the time specific development projects are proposed. Future build-out is estimated to
include up to 2.2 million square feet of light industrial, warehouse and distribution space.
EXHIBITS
A. Aerial Photo Map
B. Final Plat
C. Approved Preliminary plat
STAFF ANALYSIS
FINAL PLAT
2
a. Alternative Urban Areawide Review (AUAR) - An AUAR was prepared for the proposed
176 acre property in advance of the preparation of the preliminary plat plans. The AUAR
completed for the Interstate South Logistics Park development was adopted by the City
Council on June 15, 2015. The Interstate South Logistics Park preliminary plat is (or must be)
consistent with the approved AUAR.
b. Comprehensive Plan. The property is located in Planning District Nos. 8 and 10 of the 2030
Comprehensive Land Use Plan and is in the current Metropolitan Urban Service Area (MUSA)
which means that City municipal services, including sanitary sewer, are available to the property.
The subject property is guided Light Industrial/Warehouse according to the current plan,
therefore, the proposed light industrial and warehouse use is consistent with the
Comprehensive Plan. The proposed Interstate South Logistics Park preliminary plat meets the
recommended goals and objectives of Planning District Nos. 8 and 10.
c. Existing Site Conditions. The site is currently undeveloped and has been used for the
production of row crops. The property is bounded by Dodd Boulevard (CSAH 9) to the east
and 215th Street (CSAH 70) to the north. A 115kV electric transmission line runs from east to
west along the north boundary of the property. A 16.5 foot wide private communications
company easement is also located across the northeast quadrant of the property. This
easement will have to be vacated or abandoned prior to issuance of a building permit.
Wetlands and a stream are located within the parent parcel and will be dedicated to the City
as an outlot(s) in future platting phases.
d. Lot/Block/Outlot. The final plat of Interstate South Logistics Park consists of two lots, one
block and five outlots. The proposed lots exceed the minimum lot area and lot width
requirements for the I-1, Limited Industrial District. The following is a tabulation of the lots and
outlot as noted on the final plat plans.
Lot Area and
Lot Width
Requirements
Lot 1
Lot 2
30,000 sf area 11 Acres 9 Acres
100 feet 633 feet 526 feet
OUTLOTS
Outlots
A B C D E
A 0.52 acre as
easement for trail,
drainage, utility and
retaining wall
construction. To be
dedicated to City
CSAH 70 construction
A 0.86 acre
drainage area,
and temporary
cul-de-sac; to
be retained by
the developer
A 0.06 acre
future
development
and temporary
cul-de-sac
area; to be
retained by
the developer
A 1.80 acre
area for
stormwater
management
basin; to be
retained by
the developer
for future
development
A 178 acre area
to be retained
by the
developer for
grading and
excavation
during first
phase
development
3
e. Streets. The final plat of Interstate South Logistics Park includes the partial construction of
217th Street between Dodd Boulevard (CSAH 9) and approximately 415 feet west of Lot 2.
Access to Lot 1 will be via a shared driveway across Lot 2 north of 217th Street. Future street
construction will include the westerly extension of 217th Street and the southerly extension of
Jacquard Avenue south of 215th Street (CSAH 70) in compliance with the Transportation Plan.
There are three streets associated with the first phase preliminary plat of Interstate South
Logistics Park:
215th Street (CSAH 70) is a two-lane roadway that abuts the north side of the property and
is classified as a high density minor arterial in the Transportation Plan. The existing road
right-of-way width of 137 feet is adequate for future planned road improvements.
Ultimate development includes plans to construct 215th Street (CSAH 70) as a four lane
divided roadway. An existing roadway easement exists that was acquired by Dakota
County in 1975. No additional right-of-way is required with the Interstate South Logistics
Park final plat. Dakota County is requiring the dedication of a trail and wall easement
along the north side of the final plat to allow for future trail construction at the time 215th
Street is improved. Full access to the Interstate South Logistics Park at 215th Street (CSAH
70) will occur at the time that Jacquard Avenue is constructed.
Dodd Boulevard (CSAH 9) abuts the east side of the property. Dodd Boulevard is
classified as a low density minor arterial roadway in the Transportation Plan. A total of
60 feet of west half right-of-way will be required to be dedicated with the final plat
consistent with the Dakota County Road Plat Review Needs Map. Access from Interstate
South Logistics Park onto Dodd Boulevard (CSAH 9) will be at 217th Street only.
217th Street is a local street that will include a full access onto Dodd Boulevard (CSAH 9)
consistent with Dakota County Access Spacing Guidelines. 217th Street will be constructed
as a 40 foot wide rural section road within an 80 foot wide right-of-way. 217th Street is
identified in the Transportation Plan as a minor collector road that will be extended to the
west toward Jacquard Avenue and points west as development of Interstate South Logistics
Park occurs. A temporary turnaround easement shall be submitted as a condition of final
plat approval.
Jacquard Avenue – Jacquard Avenue is a future major collector roadway that will be
extended south of 215th Street consistent with the Comprehensive Transportation Plan at
the time Outlot A develops. The developer shall acquire the necessary property to convey
to the City a roadway easement for future Jacquard Avenue at the time a preliminary plat
application and plans are submitted to the City for parcel number 220310050032, abutting
the west side of the future extension of Jacquard Avenue. This easement is necessary to
allow full intersection construction at Jacquard Avenue on the south side of 215th Street at
the time parcel number 220310050032 is developed.
f. Grading, Drainage, Erosion Control and Utilities. City sanitary sewer and water is currently
available to the site, which is within the current MUSA. All public utilities will be constructed by
the developer to serve the proposed first phase development. Sewer and water will be available
to serve the remaining outlot area when it is platted and developed. The existing and planned
4
future City sanitary sewer and water systems available to serve the area of the final plat are
adequate to accommodate the proposed and future industrial buildings within the plat area.
Grading and utility plans have been submitted with the Interstate South Logistics Park final
plat. Final plat grading, drainage, erosion control, and utility review comments are addressed
in the engineering report dated August 22, 2018. A copy of the engineering report is
attached for your review. Engineering recommends approval of the Interstate South Logistics
Park final plat.
g. Wetlands. Three areas of wetlands have been identified with the wetland delineation
report prepared by Wenck and Associates. There are no impacts proposed to the existing
wetlands on site with the development of the two lots in the first phase. Any impacts
identified with future phase final plats will be reviewed at that time for compliance with the
Wetland Conservation Act.
h. Tree Preservation. The site includes 66 significant trees, primarily willow and poplar trees,
and primarily located around the channel on the south side of the property. All of the significant
trees identified in the inventory will be saved. Additional significant trees along the west
property line are not included in the inventory at this time but will be included and identified at
the time of final plat of that area of the property.
i. Park Dedication, Trails and Sidewalks. The City’s Comprehensive Parks, Trails, and Open
Space Plan does not identify any future park needs in the area of the plat. Future trails will be
constructed along Dodd Boulevard (CSAH 9) and 215th Street (CSAH 70). No interior public trails
or sidewalks are being constructed with this plat. The 2018 rate for park dedication is $4,558.00
per acre.
j. Airlake Airport. Airlake Airport is considered a reliever airport under the management of the
Metropolitan Airports Commission (MAC). The majority of the airport property is located in
Eureka Township with one building and a small portion of the west end of the runway in the City
of Lakeville. The MAC did not express concerns regarding the size or use of the proposed
buildings in this development in their review of the AUAR.
Due to the site’s proximity to the Airlake Airport, the Federal Aviation Administration may
require an FAA permit if any construction cranes are used during the construction of the
buildings. The developer is advised to coordinate any required permit with the FAA as early
as possible during the construction planning phase.
RECOMMENDATION
Planning Department staff recommends approval of the Interstate South Logistics Park final plat
subject to the following stipulations:
1. Implementation of the recommendations listed in the August 22, 2018 engineering
report.
5
2. The site and buildings shall be developed in compliance with the plans approved
by the City Council and Zoning Ordinance requirements.
3. A temporary turn-around easement will be required at the end of 217th Street as a
condition of final plat approval.
4. A private shared access easement shall be submitted to provide Lot 1 with access
to 217th Street.
5. A $40,000 security shall be submitted to guarantee installation of the approved
landscaping at the time of final plat approval. All landscaped areas within and adjacent
to the parking lot shall be irrigated. Landscaping shall not be planted in street
boulevards.
6. Snow storage shall not take place in required parking spaces.
7. The 16.5 foot wide private communications company easement shown on the survey
shall be vacated or abandoned prior to issuance of a building permit.
8. If required by the Federal Aviation Administration (FAA), approval of any required
permits shall be obtained from the FAA prior to commencing construction.
9. Parking deferment applications shall be submitted to the Planning Department prior
to issuance of building permits for Lots 1 and 2.
Interstate South Logistics Park Final Plat
Property Information
Au gust 21, 2018
0 875 1,750437.5 ft
0 270 540135 m
1:9,600
Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification.
INTERSTATE SOUTH LOGISTICS PARKWENCKASSOCIATES
S0°00'00"E
156.16 S89°55'01"W 2633.96S89°57'36"E 828.96N2
3
°
3
8
'
2
3
"
E
8
9
9
.
2
4
L=1242.51 R=146532.48
Δ=0°29'09"
N2
3
°
0
9
'
1
4
"
E
7
2
5
.
1
4S89°59'25"E 358.52N89°51'30"E 2280.81S0°00'35"W
120.00
S0°00'00"E 978.20S89°59'25"E119.67S89°59'25"E139.68N0°00'25"E20.00S0°25'35"W 620.19
S2
3
°
3
1
'
5
5
"
W
7
1
7
.
8
6N73°52'52"W99.37N90°00'00"W 435.69N89°51'30"E 544.38C.S.A.H. NO. 70 (215TH STREET WEST)DO
D
D
B
O
U
L
E
V
A
R
D 217TH STREET WEST 12S0°33'32"W97.25S86°15'59"E17.60L=769.67 R=11554.26Δ=3°49'00"OUTLOT AOUTLOT B
O
U
T
L
O
T
DOUTLOT E906.67BL
O
C
K
1 L=531.42R=11364.26Δ=2°40'46"CH=531.38CHB=N87°36'21.10"WOUTLOT C(SEE DETAIL B)(SEE DETAIL A)WENCKASSOCIATESLEGEND DETAIL AINTERSTATE SOUTH LOGISTICS PARKDETAIL B - 217TH AVE WEST
C.S.A.H. NO. 70 (215TH STREET WEST)DO
D
D
B
O
U
L
E
V
A
R
DOUTLOT A217TH STREET WESTS89°55'01"W 2633.96S89°57'36"E 828.96S0°33'32"W 2633.55
N2
3
°
3
8
'
2
3
"
E
8
9
9
.
2
4
L=1242.51 R=146532.48
Δ=0°29'09"
S23
°
0
9
'
1
4
"
W
7
2
5
.
1
4LOT 1BLOCK 1LOT 2ΔΔΔN89°51'30"E 2349.51DWN BY:ISSUE DATE:PROJECT NO.:5024-0022M:\5024\0022 Interstate South Logistics Park - Lakeville Industrial\Survey\CAD\5024-0022 Pre-plat1.dwg
DESCRIPTION:DATE:ISSUE NO.:JUNE 20181ISSUE NO.:
06/18/2018 CITY SUBMITTAL 1SHEET NO.:SHEET TITLE:6/21/2018 10:02:30 AM
INTERSTATE SOUTH
LOGISTICS PARK
SW CORNER OF 215TH ST WEST & DODD BLVD
PROJECT TITLE:1800 PIONEER CREEK CENTERP.O. BOX 249MAPLE PLAIN, MN 55359PHONE: 763-479-4200WWW.WENCK.COMJRACHK'D BY:MJSAPP'D BY:JTWCERTIFICATION:294 GROVE LANE, SUITE 140WAYZATA, MN 55391LEGEND PROPERTY ZONED:I-1 LIGHT INDUSTRIAL DISTRICTPURPOSE AND PROPOSED NAME OF SUBDIVISION:CREATING LOTS 1 & 2, BLOCK 1 AND OUTLOT A IN THE PROPOSED PLAT OF:INTERSTATE SOUTH LOGISTICS PARKDATE OF PREPARATIONJUNE 20, 2018PROPERTY OWNERS:VALERIAN HAUER AND DELORES E. HAUER, HUSBAND AND WIFE;THOMAS J. STEPKA AND JANE M. STEPKA, TRUSTEES OF THE THOMAS J. STEPKA TRUST UNDER AGREEMENT DATEDJANUARY 31, 2006;JANE M. STEPKA AND THOMAS J. STEPKA, TRUSTEES OF THE JANE M. STEPKA TRUST AGREEMENT UNDER DATEDJANUARY 31, 2006;JAMES D. HAUER;ARTHUR S. WANN AND ANN W. WANN, CO-TRUSTEES OF THE WANN FAMILY TRUST DATED MARCH 21, 2013;JOAN HAUER (FORMERLY KNOWN AS JOAN E. SMITH AND PRIOR TO THAT, FORMERLY KNOWN AS JOANKATZENMEYER); ANDMICHAEL V. HAUER AND JEAN A. HAUER, AS TRUSTEES OF THE MICHAEL V. HAUER AND JEAN A. HAUER JOINTREVOCABLE LIVING TRUST, U/A/D JUNE 12, 2013, AS AMENDED.SUBDIVIDER:SCANNELL PROPERTIES8801 RIVER CROSSING BLVD, SUITE 300INDIANAPOLIS, IN 46240DESIGNER:JARED WARDWENCK ASSOCIATES, INC1800 PIONEER CREEK CENTERMAPLE PLAIN, MN 55359MN LICENCE NUMBER: 48677SURVEYOR:GARY BJORKLUNDWENCK ASSOCIATES, INC1800 PIONEER CREEK CENTERMAPLE PLAIN, MN 55359MN LICENCE NUMBER: 46563PROPERTY DESCRIPTION:ALL THAT PART OF THE SOUTHEAST QUARTER (SE 1/4) OF SECTIONTHIRTY-ONE (31), TOWNSHIP ONE HUNDRED FOURTEEN (114) NORTH, RANGETWENTY (20) WEST OF THE FIFTH PRINCIPAL MERIDIAN, DAKOTA COUNTYMINNESOTA LYING WESTERLY OF THE HIGHWAY KNOWN AS DODD%28/(9$5'$1'$/627+$73$572)7+(6287+:(6748$57(56:OF SECTION THIRTY-TWO (32), TOWNSHIP ONE HUNDRED FOURTEEN (114)NORTH, RANGE TWENTY (20) WEST, DAKOTA COUNTY, MINNESOTA, LYINGWESTERLY OF THE HIGHWAY KNOWN AS DODD BOULEVARD.NOTES:WETLANDS (2) & (3) DELINEATION PERFORMED ON FEBRUARY, 2015 BY WENCKASSOCIATES, INC.WETLAND (1)DELINEATION PREFORMED ON OCT. 2014 BY WAYNE JACOBSON OF JACOBSONENVIRONMENTAL, PLLCLAND AREAS AND ZONING:GROSS AREA=175.789 ACRESCOMPREHENSIVE LAND USE DESIGNATION= AREHOUSE/LIGHT INDUSTRIALEX. & PROP. ZONING = I-1 LIGHT INDUSTRIAL DISTRICTAREA OF ROW = 15.972 ACRESAREA OF WETLAND = 9.485 ACRESLOT 1 AREA = 11.101 ACRESLOT 2 AREA = 9.011 ACRESOUTLOT A AREA = 139.705 ACRES
City of Lakeville
Public Works – Engineering Division
Memorandum
To: Frank Dempsey, Associate Planner
From: Alex Jordan, Assistant City Engineer
McKenzie L. Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
David Olson, Community and Economic Development Director
Date: August 22, 2018
Subject: Interstate South Logistics Park
• Final Plat Review
• Site Plan Review
• Grading and Erosion Control Plan Review
• Utility Plan Review
• Tree Preservation Plan
BBAACCKKGGRROOUUNNDD
Scannell Properties has submitted a final plat named Interstate South Logistics Park and plans
to construct two warehouse buildings and parking improvements. The preliminary plat was
approved by the City Council at their August 20th meeting. The proposed development is
located west of and adjacent to Dodd Boulevard (CSAH 9) and south of and adjacent to 215th
Street (CSAH 70). The parent parcels are two metes and bounds parcels zoned I-1, Light
Industrial District (PID No. 220310075010 and 220320050010).
The final plat consists of two lots within one block and five outlots on 175.79 acres. The
Developer is dedicating 14.09 acres as Dodd Boulevard (CSAH 9) and 215th Street (CSAH 70)
right-of-way.
The outlots created with the final plat shall have the following uses:
IINNTTEERRSSTTAATTEE SSOOUUTTHH LLOOGGIISSTTIICCSS PPAARRKK ––FFIINNAALL PPLLAATT
AAUUGGUUSSTT 2222,, 22001188
PPAAGGEE 22 OOFF 99
Outlot A (0.52 acres): CSAH 70 Easement and future development; to be retained by
the Developer
Outlot B (0.86 acres): Future development, drainage area, and temporary cul-de-sac; to
be retained by the Developer
Outlot C (0.06 acres): Future development and temporary cul-de-sac; to be retained by
the Developer
Outlot D (1.80 acres): Future development and stormwater management basin; to be
retained by the Developer
Outlot E (1.78 acres): Future development and borrow area; to be retained by the
Developer
The proposed development will be completed by:
Developer: Scannell Properties
Engineer/Surveyor: Wenck
SSIITTEE CCOONNDDIITTIIOONNSS
The Interstate South Logistics Park site is undeveloped cultivated agricultural land. A
homestead and outbuildings were located on the property adjacent to Dodd Boulevard
(CSAH 9) at 217th Street. These buildings were removed in 2012. Three wetlands have been
identified within the parent parcels. The land generally slopes from the west to the east.
EEAASSEEMMEENNTT VVAACCAATTIIOONN
Several easements for communication, gas pipeline, transmission line, highway, and utility
purposes exist across the parent parcels. The private easements that impact the development
improvements must be vacated prior to recording the final plat.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
Dodd Boulevard (CSAH 9)
Interstate South Logistics Park is located west of and adjacent to Dodd Boulevard, a minor
arterial county highway, as identified in the City’s Transportation Plan. The Dakota County
Plat Commission reviewed the proposed development at its July 9, 2018 meeting and
recommended approval. The current Dakota County Plat Review Needs Map identifies Dodd
Boulevard as a 2-lane rural/3-lane roadway with a half right-of-way requirement of 60-feet
adjacent to the plat. The Developer is dedicating the necessary right-of-way for Dodd
Boulevard as shown on the final plat.
The Developer is required to coordinate with Dakota County to determine the extent of
improvements that will be required along Dodd Boulevard. The plan for any County road
IINNTTEERRSSTTAATTEE SSOOUUTTHH LLOOGGIISSTTIICCSS PPAARRKK ––FFIINNAALL PPLLAATT
AAUUGGUUSSTT 2222,, 22001188
PPAAGGEE 33 OOFF 99
improvements must be approved by Dakota County, and a permit for the work within the
right-of-way must be obtained from the County.
215th Street (CSAH 70)
Interstate South Logistics Park is located south of and adjacent to 215th Street, a high-density
minor arterial roadway as identified in the City’s Comprehensive Transportation Plan. The
Dakota County Plat Commission reviewed the proposed development at its July 9, 2018
meeting and recommended approval. The current Dakota County Plat Review Needs Map
identifies 215th Street as a 4-lane divided roadway with a half right-of-way requirement of 75-
feet adjacent to the plat. The Developer is dedicating the necessary right-of-way for 215th
Street as shown on the final plat.
Dakota County and the City plan to reconstruct 215th Street to a four-lane divided roadway in
2020 adjacent to the plat. To accommodate the future right-of-way and construction needs
along 215th Street, the Developer shall grant a 10-ft wide trail, drainage, utility, and wall
easement to the County over all of Outlot A and outside of the right-of-way along Lot 1, Block
1.
Dakota County controls the right-of-way requirements and access locations along 215th
Street.
Jacquard Avenue
Future phases of the development shall include the right of way dedication for and extension
of Jacquard Avenue south of 215th Street. Jacquard Avenue is identified as a major collector
in the City’s Comprehensive Transportation Plan.
Development of the property west of and adjacent to the parent parcels will require the
construction of Jacquard Avenue to provide access to 215th Street. At the time a preliminary
plat application has been received by the City for PID No. 220310050032 (“Ryan Property”),
the Developer and City shall enter into an agreement that memorializes the Developer’s
obligation to acquire the necessary property (extending 100 feet south of the north property
line with an east/west width of 50 feet) and grant to the City a roadway easement for
Jacquard Avenue across the property. Such agreement will require the Developer to grant the
roadway easement upon final plat approval for the Ryan Property. The roadway easement is
necessary to allow the Ryan Property to have access to 215th Street.
The Developer is required to coordinate with Dakota County to determine the extent of
improvements that will be required along 215th Street for this intersection.
217th Street
217th Street will be constructed and extended through Interstate South Logistics Park. 217th
Street is a minor collector roadway as identified in the City’s Transportation Plan and will be
constructed as a rural section roadway to promote infiltration and stormwater treatment.
217th Street will be constructed as a 40-ft wide rural roadway with paved shoulders within an
80-foot right-of-way. There are dedicated right and left turn lanes at the intersection with
Dodd Boulevard.
IINNTTEERRSSTTAATTEE SSOOUUTTHH LLOOGGIISSTTIICCSS PPAARRKK ––FFIINNAALL PPLLAATT
AAUUGGUUSSTT 2222,, 22001188
PPAAGGEE 44 OOFF 99
A temporary cul-de-sac on 217th Street shall be constructed within a temporary easement on
Outlots B and C. A $2,000 escrow for future removal of the temporary cul-de-sac is required
with the final plat.
Future development of property west of the parent parcels will include extension of 217th
Street through Interstate South Logistics Park to an intersection with the future extension of
Jacquard Avenue. The City’s Transportation Plan indicates that 217th Street will ultimately
extend west to Kenrick Avenue (CSAH 5).
SITE PLAN
A Site Plan was submitted for Lots 1 and 2, Block 1, Interstate South Logistics Park. The Site
Plan includes construction of 157,820 SF manufacturing, warehouse, and office building on
Lot 1, Block 1 and a 130,192 square foot manufacturing, warehouse, and office building on
Lot 2, Block 1. Access to the site will be provided by two private driveways connecting to
217th Street.
Private parking areas and drive aisles are proposed connecting the two lots. A private access
easement will be required prior to recording the final plat for the private roadway across
multiple properties.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility and street construction shall from
Dodd Boulevard at the proposed intersection of 217th Street and at the proposed private
access to Dodd Boulevard. The Developer is required to coordinate accesses to Dodd
Boulevard with Dakota County.
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS
The Park Dedication Fee has not been collected on the parent parcels and shall be satisfied
through a cash contribution with the final plat, calculated as follows:
20.11 acres x $4,558.00 = $91,661.38
Acres of Lots 1 and 2, Block 1 Industrial Park
Dedication Rate
Park Dedication
Requirement
The Park Dedication Fee on Outlots B, C, D, and E will be required to be paid at the time the
outlots are final platted into lots and blocks.
The Parks, Trails and Open Space Plan identifies bituminous trails along the south side of 215th
Street and west side of Dodd Boulevard adjacent to the Interstate South Logistics Park.
IINNTTEERRSSTTAATTEE SSOOUUTTHH LLOOGGIISSTTIICCSS PPAARRKK ––FFIINNAALL PPLLAATT
AAUUGGUUSSTT 2222,, 22001188
PPAAGGEE 55 OOFF 99
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR
Interstate South Logistics Park is located within sub-district SC-10180 and SC-10410 of the
South Creek sanitary sewer district as identified in the City’s Comprehensive Sewer Plan. The
wastewater from the proposed site will be conveyed by City-owned sanitary sewer facilities to
the Elko/New Market interceptor and then to the Empire Wastewater Treatment Plant. The
existing City-owned downstream facilities are adequate to convey the wastewater generated
by the proposed development.
The Developer proposes to extend sanitary sewer from the MCES interceptor to the site and
then along 217th Street to the west property boundary.
Private sanitary sewer service will be extended from the sanitary sewer for development
within Lots 1 and 2, Block 1, Interstate South Logistics Park. A private utility access easement
shall be established prior to recording the final plat over the private sanitary sewer that
extends across multiple properties.
The Sanitary Sewer Availability Charge has not been collected on the parent parcels and must
be paid with the building permit application for Lots 1 and 2.
The Sanitary Sewer Connection Charge will be collected for the proposed buildings and will
be required to be paid with the application for a building permit.
WWAATTEERRMMAAIINN
Development of Interstate South Logistics Park includes the extension of public watermain.
Consistent with the City’s Water Plan, the Developer shall extend 12-inch watermain from the
NW corner of Dodd Boulevard and 215th Street within the City’s Normal Pressure Zone. The
12-inch watermain will be extended within the subdivision along 217th Street and shall be
looped in the future to the existing watermain along Jacquard Avenue.
Final locations and sizes of all sanitary sewer and watermain facilities will be reviewed by City
staff with the final plat, building permit application and final construction plans.
OOVVEERRHHEEAADD LLIINNEESS
Great River Energy (GRE) has an existing electric transmission line along 215th Street. City
Code does not require the transmission line to be buried.
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
Interstate South Logistics Park is located within subdistrict SC-7, SC-9A, SC-19, and SC-20 of
the South Creek District of the City’s Comprehensive Water Resources Management Plan.
The Interstate South Logistics Park AUAR (prepared by Sambatek in 2015) identified
infiltration and ponding areas for the AUAR as a whole. Development of Interstate South
Logistics Park includes the construction of privately owned and maintained infiltration basins,
IINNTTEERRSSTTAATTEE SSOOUUTTHH LLOOGGIISSTTIICCSS PPAARRKK ––FFIINNAALL PPLLAATT
AAUUGGUUSSTT 2222,, 22001188
PPAAGGEE 66 OOFF 99
consistent with the AUAR. The private infiltration basins will be located on Lots 1 and 2, Block
1 and will treat runoff generated from the proposed subdivision. The Developer shall sign a
private maintenance agreement for the infiltration basin and dedicate a maintenance
easement over the basin area prior to City Council consideration of the final plat. The
stormwater management design is consistent with City requirements.
Following completion of the site improvements and restoration, the Developer shall conduct
two double ring infiltrometer tests in the location of the infiltration basins to demonstrate
that the design infiltration rates have been achieved. The Developer shall provide a $5,000
security with the final plat to ensure that this testing is completed.
The final grading plan shall identify all fill lots in which the building footings will be placed on
fill material. The grading specifications shall also indicate that all embankments meet
FHA/HUD 79G specifications. The Developer shall certify to the City that all lots with footings
placed on fill material are appropriately constructed. Building Certificates of Occupancy will
not be issued until a soils report and an as-built certified grading plan have been submitted
and approved by City staff.
Interstate South Logistics Park contains more than one acre of site disturbance. A National
Pollution Discharge Elimination System General Stormwater Permit for construction activity is
required from the Minnesota Pollution Control Agency for areas exceeding one acre being
disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be
submitted to the City upon receipt from the MPCA.
SSTTOORRMM SSEEWWEERR
Development of Interstate South Logistics Park includes the construction of public and
private storm sewer systems. The public storm sewer will be located within public right-of-
way. The privately-owned and maintained storm sewer will be located within Lots 1 and 2,
Block 1, Interstate South Logistics Park and will collect and convey stormwater runoff
generated from within the development to the stormwater management basins.
The Trunk Storm Sewer Area Charge has not been collected on the parent parcel and must be
paid with the final plat, calculated as follows:
954,138.24 sf x $0.250 = $238,534.56
Area of Lots 1 and 2, Block 1
and 217th St ROW
Industrial Area
Charge
Trunk Storm Sewer
Area Charge
The Trunk Storm Sewer Area Charge on Outlots B, C, D, and E will be required at the time the
outlots are final platted into lots and blocks.
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the
building permit application and final construction plans.
IINNTTEERRSSTTAATTEE SSOOUUTTHH LLOOGGIISSTTIICCSS PPAARRKK ––FFIINNAALL PPLLAATT
AAUUGGUUSSTT 2222,, 22001188
PPAAGGEE 77 OOFF 99
FEMA FLOODPLAIN ANALYSIS
A portion of Outlot E, Interstate South Logistics Park is shown on the Flood Insurance Rate
Map (FIRM) as Zone A by the Federal Emergency Management Agency (FEMA). Based on this
designation, a portion of the plat is located within a Special Flood Hazard Area (SFHA), as
determined by FEMA. A Letter of Map Revision will be required at the time Outlot E is final
platted into lots and blocks to determine the Base Flood Elevation for the floodplain.
The area of the 217th Street right-of-way and Lots 1 and 2, Block 1 are shown on the Flood
Insurance Rate Map (FIRM) as Zone X, which is not designated as a Special Flood Hazard Area
(SFHA) as determined by FEMA.
WWEETTLLAANNDDSS
An off-site wetland delineation report was completed by Wenck and Associates in late March,
2015. After the aerial analysis, it was determined that there are three wetlands located in the
project area.
The Notice of Application was sent out March 16, 2015. No adverse comments were received
during the comment period.
Based on the information provided in the report dated March 2015 and site visit, the
indicated wetland boundaries have been determined to be acceptable for use in
implementing the Wetland Conservation Act.
There are no impacts to existing wetlands on site with the current plans. If impacts are
proposed with future phases a wetland replacement plan must be submitted, reviewed and
approved prior to any impacts. As future phases are submitted the wetlands and wetland
buffers must be placed in Outlots dedicated to the City. It is the applicant’s responsibility to
obtain proper wetland approvals from the U.S. Army Corps of Engineers.
TTRREEEE PPRREESSEERRVVAATTIIOONN
The tree plan identifies 66 trees around the existing channel on the southern property line.
All trees are proposed to remain. Trees along the property’s western boundary will be
inventoried and included in a tree preservation plan when that area is platted.
EERROOSSIIOONN CCOONNTTRROOLL
The Developer is responsible for obtaining a MPCA Construction Permit for the site as well as
developing a SWPPP for the site prior to construction. The permit requires that all erosion and
sediment BMPS be clearly outlined in a site’s SWPPP. Changes made throughout construction
must be documented in the SWPPP.
IINNTTEERRSSTTAATTEE SSOOUUTTHH LLOOGGIISSTTIICCSS PPAARRKK ––FFIINNAALL PPLLAATT
AAUUGGUUSSTT 2222,, 22001188
PPAAGGEE 88 OOFF 99
A maintenance schedule for the first 2 years must be included in the plans. This must include
mowing 2 to 3 times, 30 days apart during the first year with the mower deck set about 6-8
inches off the ground. The second year, the pond areas must be mowed once before weeds
set their seeds. This will reduce weed establishment and help stimulate the desirable
vegetation. This will cut down on maintenance in the long-term.
Additional erosion control measures may be required during construction as deemed
necessary by City staff or the Dakota County Soil and Water District. Any additional measures
required shall be installed and maintained by the developer.
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to Interstate South Logistics Park
CONSTRUCTION COSTS
Sanitary Sewer $154,050.00
Watermain 253,184.00
Storm Sewer
Streets
Site Grading, Erosion Control, Restoration and Grading
Certification
7,080.00
301,475.00
72,117.50
SUBTOTAL - CONSTRUCTION COSTS $ 787,906.50
OTHER COSTS
Developer’s Design (3.0%) $ 23,637.20
Developer’s Construction Survey (2.5%) 19,697.66
City’s Legal Expense (0.5%) 3,939.53
City Construction Observation (5.0%) 39,395.33
Developer’s Record Drawing (0.5%) 3,939.53
Infiltration Testing
Landscaping
5,000.00
40,000.00
Street Lights 4,200.00
Lot Corners/Iron Monuments 700.00
SUBTOTAL - OTHER COSTS $140,509.25
TOTAL PROJECT SECURITY $ 928,415.75
The street light security totals $4,200 which consists of three mast-arm street lights.
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
$700.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all
irons have been placed following site grading, street and utility construction.
CCAASSHH FFEEEESS
IINNTTEERRSSTTAATTEE SSOOUUTTHH LLOOGGIISSTTIICCSS PPAARRKK ––FFIINNAALL PPLLAATT
AAUUGGUUSSTT 2222,, 22001188
PPAAGGEE 99 OOFF 99
A cash fee for one-year of streetlight operating expenses shall be paid at the time of final plat
approval and is calculated as follows:
1159.56 lf x $.2477/ff/qtr. x 4 qtrs. = $1,148.89
Lots 1 and 2, Block 1
Dodd Blvd Frontage Streetlight Operating Fee Total
A cash fee for one-year of environmental resources expenses shall be paid at the time of final
plat approval and is calculated as follows:
20.11 acres x $10.42/unit/qtr. x 4.2 x 4 qtrs. = $3,520.38
Lots 1 and 2, Block 1 Environmental Resources Fee Utility Factor Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
7 units x $90.00/unit = $630.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be in either .dwg (AutoCAD) or .dxf format.
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction cost, or $23,637.20.
CASH REQUIREMENTS
Park Dedication Fee
217th Street Future Temporary Cul-de-sac Removal
Trunk Storm Sewer Area Charge
$91,661.38
2,000.00
238,534.56
Streetlight Operating Fee 1,148.89
Environmental Resources Fee 3,520.38
City Base Map Updating Fee 630.00
City Engineering Administration (3.00%) 23,637.20
TOTAL - CASH REQUIREMENTS $361,132.41
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the final plat, site plan, grading and erosion control
plan, utility plan, and tree preservation plan for Interstate South Logistics Park, subject to the
requirements and stipulations within this report.