HomeMy WebLinkAboutItem 06.j Date: September 4, 2018 Item No. APPROVAL OF A CONTACT AMENDMENT WITH PEMBER COMPANIES, INC. EXTENDING THE CONTRACT FOR WELLS 21 AND 22 Proposed Action Staff recommends adoption of the following motion: Move to approve the contract amendment with Pember Companies, Inc. extending completion of Wells 21 and 22 to October 31, 2018. Overview In 2017, the City contracted with Pember Companies, Inc. for the completion of utilities installation and site work for the construction of Wells 21 and 22, City Project 15-10. Installation was progressing with the generator and electrical connections when Dakota Electric Association called out a change in the type of switchgear needed for the generator. Switchgear allows the transfer of power to the well pumps from the electric utility to the generator. This new type of switchgear is built specifically for the generator and the load that is expected on the generator. The lead time for manufacturing of the equipment and installation has pushed the completion date of the project to the end of October. Other aspects of the project, such as the well construction, utility connections, and initial restoration are complete. The manufacture and installation of the switch gear is the final item in the project. The change in the switchgear caused a change order to the project in the amount of $17,670.91. Staff recommends its approval. Primary Issues to Consider • What caused the change to the switchgear? Dakota Electric Association, in reviewing the electrical subcontractor’s submittal for the generator, mandated, in June 2018, a change to a different type of switchgear which impacted the completion date of the project. Supporting Information • A copy of the proposed contract amendment is attached. Financial Impact: $0 Budgeted: Yes Source: Related Documents (CIP, ERP, etc.): City Project 15-10 Envision Lakeville Community Values: Good Value for Public Services Report Completed by: Neil Normandin, Interim Public Works Director AMENDMENT TO STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE THIS AMENDMENT (this "Amendment") is made as of this 4th day of September 2018, by and between the CITY OF LAKEVILLE, a Minnesota municipal corporation ("City"), and PEMBER COMPANIES, INC., a Wisconsin corporation, (“Contractor”). WHEREAS, the City and Contractor entered into a Standard Form of Agreement Between Owner and Contractor on the Basis of a Stipulated Price, dated May 15, 2017 related to work on City Well Nos. 21 and 22 (“Agreement”); WHEREAS, the parties desire to extend the Contract Times identified in the Agreement; NOW THEREFORE, THE PARTIES HERETO AGREE AS FOLLOWS: 1. AMENDMENT TO PARAGRAPH 4.02 OF THE AGREEMENT. Subparagraph A of Paragraph 4.02 of the Agreement is amended to read as follows A. The Work will be substantially completed on or before October 31, 2018 and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before October 31, 2018. 2. EFFECT OF AGREEMENT. The Agreement shall remain in full force and effect except as specifically amended herein. IN WITNESS WHEREOF, the City and Contractor have entered into this Amendment as of the date first above written. CITY OF LAKEVILLE BY: ________________________________ Douglas P. Anderson, Mayor AND _______________________________ Tamara Wallace, Deputy City Clerk PEMBER COMPANIES, INC. BY: _______________________________ Its: __________________________