HomeMy WebLinkAboutLA164043 20125 Harness Ave Permit PackRESIDENTIAL BUILDING
PERMIT APPLICATION
CITY OF LAKEVILLE
BUILDING INSPECTIONS DEPARTMENT
20195 HOLYOKE AVENUE
LAKEVILLE, MN 55044
952-985-4440
Office Use Only
__________________
Permit Number
___________________
Received By
___________________
Date Received
______ _______
Fee Total
SITE ADDRESS:
MAILING ADDRESS: CITY: STATE: ZIP:
JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________
LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________
ESTIMATED VALUATION: PROPOSED START DATE: END DATE:
(New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION:
APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL
NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED)
PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License)
RESIDENT OWNER
NAME:_______________________________________________________________________________
HOME PHONE #:_____________________________ CELL PHONE:___________________________
GENERAL CONTRACTOR
Homeowner
Contractor
CONTRACTOR:_______________________________________________________________________
LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE)
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
PLUMBING WORK
Homeowner
Contractor
CONTRACTOR:__________________________________________LICENSE #: PM______________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
MECHANICAL WORK
Homeowner
Contractor
CONTRACTOR:________________________________________ _______________________________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
BOND #:_______________________________________ EXPIRATION DATE____________________
SEWER/WATER CONTRACTOR
New Construction Only
NAME:________________________________________________ ______________________________
HOME PHONE _____________________________ CELL PHONE:______________________________
BOND #:_______________________________________ EXPIRATION DATE____________________
INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE
ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY
APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND
ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND
WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START
WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN.
NAME OF APPLICANT (Please Print)DATE
APPLICANT’S SIGNATURE:
www.lakevillemn.gov
20125 Harness Ave
Lakeville MN 55044
New Single Family Home
n/a
$277,000 09.01.2018 03.01.2019
9 3 Berres Ridge 1st Addition
■
■
invoices@stonecottage,com
Stone Cottage Construction, Inc.
636874
952.388.1301 651.261.1633
14787 Energy Way Apple Valley MN 55124
Scherer Plumbing
952.447.6734
15548 Red Oaks Road SE Prior Lake MN 55372
Lofgren Heating & AIr Conditioning
952.431.5811
5708 upper 147th St W #100 Apple Valley MN 55124
Bohn Well Drilling
952.445.4809
Troy Asleson - President - Stone Cottage Construction, Inc.08.17.2018
✘
✘
✘
RESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT DECK FOOTING
CONDO FIREPLACE
ACESSORY BUILDING FOOTING
REROOF FOUNDATION
RESIDE FRAMING
PORCH FRAMING
GARAGES
INSULATION
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES LATH
LOWER LEVEL FINISH LOWER LEVEL FINAL
ADDITION OTHER
FOUNDATION ONLY PORCH FOOTING
MISCELLANEOUS POURED WALL
DEMO SEPTIC TANK REMOVAL
MOVED SITE
MECHANICAL
CITY BUILDING VALUATION: $AIR TEST
FINAL
BUILDING PERMIT FEES ROUGH-IN
$PERMIT FEE PLUMBING
$PLAN CHECK FINAL
$SURCHARGE ROUGH-IN
$METRO SAC METER SIZE
$CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE
$CITY SEWER HOOKUP UNIT SEWER/WATER
$LANDSCAPE ESCROW SEWER/WATER
$TREE ESCROW FINAL
$MISC ESCROW STREET DRAINTILE
$PLUMBING BUILDING INFORMATION
$MECHANICAL TYPE OF CONSTRUCTION
$SEWER WATER ZONING
$OTHER CODE EDITION
$TOTAL FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
LOT 9, BLOCK 3, BERRES RIDGE 1ST ADDITION*ALL DOOR & WINDOW HEADERSTO BE S.P.F. #2 OR BETTERRESIDENCE FOR:written consent of Planco MN, Inc. modified or used in any redesign without the priormay not be assigned or copied, and may not bemay not be re-used for any additional structures,structure. Planco MN reserves all rights. These planslicense is granted to use these plans to build oneCopyright for these drawings is owned by Planco MN,Planco MN, Inc.cALEXANDRA CARLSON#18-173SMA172018STONE COTTAGE CONSTRUCTION, INC.
20125 HARNESS WAY, LAKEVILLE FRONT ELEVATION 1/4" = 1'-0" 16x7 OVH. DR.9x7 OVH. DR.8127127124" TRIMVINYLB & BVINYLB & BVINYLB & B6128121'-6"WOOD PORCHVINYLSIDING4" TRIM8'-4" POURED FOUNDATION9' CEILING @ FIRST FLOORTOTAL2nd FLR.1st FLR.1,178 SQ. FT.1,254 SQ. FT.2,432 SQ. FT.4" VINYL TRIMSIMONTONFRONT ONLYGRIDS IN WDWS.FRONT ONLYVINYL SIDINGALL SIDES4/1210/12(2) BRACKETSVINYLB & BVINYLSIDINGWINDOWS(4) GABLEBRACKETSSTONEON JOG12x12 BOXED COL.ON 18x18x40BOXED BASEADDRESSSTONEKEYPAD LEFT ELEVATION 1/8" = 1'-0" 7128128123'-4"STAIRLANDINGSIDINGVINYL VINYLCORNERS4" TRIMVINYLB & B6/12 RIGHT ELEVATION 1/8" = 1'-0" 812712812SIDINGVINYL SIDINGVINYL VINYLCORNERS1'-0"1'-9"812WDW. WELLEGRESS REAR ELEVATION 1/8" = 1'-0" 812712SIDINGVINYL VINYLCORNERS1'-6"8121'-6"Secure door closed until deck isconstructed with a separate permit.Concept Approval ONLYSubject to Field InspectionInspectorDate2015MN BldgCode09/04/2018dmathews
Planco MN, Inc.C#18-173SMA272018 BASEMENT PLAN 1/4" = 1'-0" UP15 R(2) 6x6 POSTON 12x16 PIER FTG.24x24 FROST FTG. UNEXCAVATED WHFURNF.D.92%SUMP4834 FUT. FAMILY ROOM *UNFINISHED FUT. BDRM *UNFINISHED MECH/STORAGE *UNFINISHED2-9 1/2" LSL2'-8"2'-6"2'-4"4'-0"2-11 7/8" LSL FLUSHTREATED 4x6 CURB2x6 - 16" O.C.16x8 FTG.TREATED 4x6 CURB2x6 - 16" O.C.16x8 FTG.TREATED 4x4 CURB2x4 - 16" O.C.16x8 FTG.TREATED
2x8
16" O.C.TRT. 3-2x8 FLUSHTRT. 3-2x8 FLUSH50'-0"15'-0"15'-0"14'-0"49'-0"19'-6"30'-6"11'-0"19'-6"8'-6"11'-0"40'-0"4'-0"36'-0"11'-8"7'-4"17'-0"6'-6"
1'-0"44'-0"24'-6"24'-6"
2'-0"22'-6"11'-6"13'-0"4'-6"5'-10"9'-8"3'-8"3'-8"
14'-0"10'-0"9"9'-6"9"5'-10"10'-6"14'-6"24'-0"6'-0"2" LEDGE8'-4" POURED FOUNDATIONWALLEDGEWALLEDGE5'-0"42" 3/4 R.I. 11 7/8" LSL
19.2" O.C.
11 7/8" LSL
19.2" O.C.
11 7/8" LSL
19.2" O.C.2-2x10TREATED 4x4 CURB2x4 - 16" O.C.16x8 FTG.20'-8"
11 7/8" LSL
19.2" O.C.10"2'-7"10'-5"5'-0"2'-6"11 7/8" LSL
19.2" O.C.
18'-10"1/2 WALL2-11 7/8" LSL FLUSH
42x48x12 CONC.PAD FTG. W/2-#4 REBAR EACH WAY4'-0"RADONVENTTREATED 4x6 CURB2x6 - 16" O.C.16x8 FTG.7'-6"4'-0"7'-8"
2-2x10
5/0x3/6 SL5'-9"9"6'-6"TRT. 2-2x8 FLUSHTREATED2x812" O.C.TRT. 3-2x8 FLUSHTRT. 3-2x8 FLUSH13'-0"
7'-6"9"5'-9"6'-6"UFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.Smoke
Planco MN, Inc.C#18-173SMA372018 FIRST FLOOR PLAN 1/4" = 1'-0" 1,149 SQ. FT.9' CEILING @ FIRST FLOOR50'-0"15'-0"15'-0"14'-0"PED
49'-0"REF'GUP17 RDN15 R24"PANT.12" S.B.3'-0"9x7 OVH. DR.16x7 OVH. DR.2'-6"9/0x5/0 SL3-9 1/2" LSL2-9 1/2" LSL
6'-0" P.D.2'-4"2'-4"2'-4"2'-8"FIREDOORPANTRY*VINYL16" SH'S2'-8" C.O. FOYER *WOOD*WOOD DINING KITCHEN *WOOD*WOOD GREAT ROOM OFFICE *CARPET*4" CONC. FLOOR GARAGE WOOD PORCH 19'-6"30'-6"11'-0"19'-6"8'-6"11'-0"40'-0"4'-0"36'-0"11'-8"7'-4"17'-0"6'-6"5'-6"1'-0"1'-0"44'-0"8'-0"7'-0"7'-6"7'-6"8'-0"6'-0"1'-6"4'-6"2-2x102/0x2/0 AWN24'-6"24'-6"
2'-0"22'-6"11'-6"13'-0"
6'-2"5'-4"24'-0"6'-0"6'-0"8'-4"9'-8"5'-0"7'-0"5'-11"5'-1"9'-9"9'-9"*VINYL*VINYL W.I.C. *VINYL5'-6"6'-0"5'-6"4'-0"3'-6"8'-0"3'-6"7'-1"3'-6"2'-10"6'-6"3'-8"3'-8"4'-6"6'-8"10"WALLEDGEWALLEDGE2x62x6RAIL2'-6"4'-10"7'-2"
11'-0"3'-6516"GYP. BD.5'-6"4'-3"9"9'-6"9"FSD14'-0"10'-0"CHASE30" RANGE
W/ HOODVENT
1'-0"5/0x5/0 SL2-2x1016" FLR.TRUSS
19.2" O.C.
3'-0"3'-0"2/6x2/0 FX2-2x10 2/6x2/0 FX2-2x10
16" FLR.TRUSS
19.2" O.C.
GIRDER
GIRDER2-11 7/8" LSL FLUSH2-11 7/8" LSL FLUSH24" CANT.GIRDER F.T.2-2x103-2x1016" FLR.TRUSS
19.2" O.C.6'-0"2-9 1/2" LSL FLUSH2-9 1/2" LSL FLUSH2-7 1/4" LSL2-7 1/4" LSL2-11 7/8" LSL2-2x12RADONVENT*2x6 WALLSGIRDER
22'-8"TRUSSES24" O.C.21,387 # 5 1/2"x7 1.8EPARALLAM COL.SYP2400 TOP PLT.4'-9"2-9 1/2" LSL7/6x5/0 SL2-9 1/2" LSL
3'-0"FLUSH2'-8"3'-8"3'-8"5/0x4/0 FIXED2-2x10TEMP
SET ON SILL PLATE GASF.P.5'-0" C.O.2x61/6x5/0 FX3"1/6x5/0 FX3"1'-0"5'-6"1'-0"5'-6"5'-6"1'-0"2-7 1/4" LSL2-7 1/4" LSLTRUSSES24" O.C.TRUSSES
24" O.C.12x12 BOXED COL.ON 18x18x40BOXED BASE24'-0"1'-8"SmokeStrapStrapPFHPFHPFH4223.545.254.33233.753.752.53.55333433434
Planco MN, Inc.C#18-173SMA472018 SECOND FLOOR PLAN 1/4" = 1'-0" 1,278 SQ. FT.DN17 R5'-0" TUB
& SHOWER
1 PIECE FIB.66"2'-4"2'-6"2'-6"5'-0"2'-8"5'-0"2'-4" C.O.2'-4"2'-4"102"2-2x107/6x5/0 SL*CARPET MASTER BEDROOM *CARPET BEDROOM #2 BEDROOM #3 *CARPET BEDROOM #4 *CARPET W.I.C. *CARPET*VINYL*VINYL5/0x6/0 FIXED2-2x10
40" OFF LANDING
TEMP
41'-0"15'-0"15'-0"11'-0"12'-10"2'-2"7'-6"7'-6"43'-0"1'-0"38'-0"4'-0"11'-0"2'-8"7'-4"5'-8"11'-4"WALLEDGEWALLEDGE8'-138"9'-5 5
16"3'-6"18'-0"
13'-0"5'-0"41'-0"26'-0"15'-0"12'-0"14'-0"6'-0"6'-0"7'-0"7'-0"12'-0"
6'-4"5'-8"4'-6"5'-10"5'-11"3'-8"3'-8"10'-6"4'-6"15'-6"FFF3-2x106/0x4/6 SL6/0x4/6 SL2-2x106'-7"6'-3"6/0x4/6 SL2-2x10SD/COSDSDSDSDACCESS
ATTIC2'-6"1/2 WALLW/ WD. CAP2'-0"2'-0"9'-5"3'-9"5'-4"PKT.*C.T.*C.T.GIRDERTRUSSES
24" O.C.
TRUSSES
24" O.C.
TRUSSES
24" O.C.TRUSSES24" O.C.GIRDER6'-5"2x62x6RADONVENT46662'-4"LIN.2'-0"*C.T.5'-0"11'-2"2'-10"2'-0"7'-9"GIRDERGIRDER
3'-0"3'-9"4'-2 5
16"TRUSSES24" O.C.3'-8"3'-8"2-2x105/0x2/0 SH TEMP7'-11"3'-1"24"LIN.WD11'-35
16"1/2 WALLW/ WD. CAP7'-1"
7'-9"WALL HUNGLT6'-8"30"x60"FREESTANDINGTUB(2) CORIANSH'S STACKED13'-0"
2'-0"2'-0"*BOX VAULT-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).22.5222422223222322Verify loads with girdertruss spec, may requireremoval of top plates atbearing for crushing.
Planco MN, Inc.C#18-173SMA572018 CROSS SECTION 3/8" = 1'-0" 17 RISERS
9'-11
8"3/4" T & G FLOORCURBTREATED 4x415 RISERS
16X811 7/8" LSL @ 19.2" O.C.CURB2X6- 16" O.C.TREATED 4x63 1/2" CONC. FLOOR16X816X82X4- 16" O.C.CURB2X6- 16" O.C.TREATED 4x68'-11
8"5/8" GYP. BD.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.DBL. 2x4 STUDSR-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-49 INSUL.11'-8"2x6- 16" O.C.1/2" GYP. BD.R-21 INSUL.1/2" GYP. BD.2x6- 16" O.C.3/4" T & G FLOOR2x42x6VBR-21 INSUL.W/ V.B.5/8" GYP. BD.VB2'-0"1'-0"R-20 SPRAY FOAM16" FLOOR TRUSSES @ 19.2" O.C.73
8"PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED16x8DRAIN TILE 73
8"R-20 SPRAY FOAMR-20 SPRAY FOAMENERGY HEELENERGY HEEL6'-6"(DESIGNED BY MFR)TRUSSES @ 24" O.C.DECKINGTRT. 2x8 JTS. @ 16" O.C.6x6 POST35'-0"3'-0"GIRDERR-20 SPRAY FOAM2-7 1/4" LSL1261'-4"6'-0"5916"50% ROOF 50% SOFFITROOF VENTS @ 1/300 ATTIC1/2" SHTG.15# FELTSHINGLES1'-9"712R-30 INSUL.MIN.PROOFINGWATERR-10 W/ <2.6 ACHINSUL.24x24 PADFOOTING12x16 PIERFOOTINGTRT. 3-2x8GRADEVENTEDSOFFITFASCIAALUM. ALUM.TRT. 6x6 POSTPER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED16x8PROOFINGWATERR-10 W/ <2.6 ACHINSUL.DRAIN TILE GRADESIDINGSHEATHING7/16" OSBHOUSE WRAPR-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED16x8PROOFINGWATERR-10 W/ <2.6 ACHINSUL.DRAIN TILE R-20 SPRAY FOAMGRADEFASCIAALUM. SOFFITVENTEDALUM.ENERGY HEEL1/2" SHTG.15# FELTSHINGLES1'-6"812R-49 INSUL.3'-0"11 7/8" LSL @ 19.2" O.C. TRUSSES @ 19.2" O.C. CROSS SECTION 3/8" = 1'-0" MUD ROOM 2-9 1/2" LSLSIDINGSHEATHING7/16" OSBHOUSE WRAP
Planco MN, Inc.C#18-173SMA672018 CROSS SECTION 3/8" = 1'-0" 9'-11
8"3/4" T & G FLOORCURBTREATED 4x4
11 7/8" LSL @ 19.2" O.C.3 1/2" CONC. FLOOR16X82X4- 16" O.C.8'-11
8"5/8" GYP. BD.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-49 INSUL.2x6- 16" O.C.1/2" GYP. BD.R-21 INSUL.1/2" GYP. BD.2x6- 16" O.C.3/4" T & G FLOORVBR-21 INSUL.W/ V.B.5/8" GYP. BD.VB4'-0"1'-0"R-20 SPRAY FOAM16" FLOOR TRUSSES @ 19.2" O.C.PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED16x8PROOFINGWATERR-10 W/ <2.6 ACHINSUL.DRAIN TILE R-20 SPRAY FOAMR-20 SPRAY FOAMENERGY HEELENERGY HEEL(DESIGNED BY MFR)TRUSSES @ 24" O.C.7'-6"DECKINGTRT. 2x8 JTS. @ 16" O.C.24x24 PADFOOTING12x16 PIERFOOTINGTRT. 3-2x8GRADEVENTEDSOFFITFASCIAALUM. ALUM.2-7 1/4" LSL1261'-4"7'-0"6x6 POST35'-0"4'-0"GIRDER4'-0"GIRDERCURBTREATED 4x416X82X4- 16" O.C.2-11 7/8" LSL5916"2-11 7/8" LSL2-11 7/8" LSLR-20 SPRAY FOAM50% ROOF 50% SOFFITROOF VENTS @ 1/300 ATTIC1/2" SHTG.15# FELTSHINGLES712R-30 INSUL.MIN.PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED16x8PROOFINGWATERR-10 W/ <2.6 ACHINSUL.DRAIN TILE GRADESIDINGSHEATHING7/16" OSBHOUSE WRAPSIDINGSHEATHING7/16" OSBHOUSE WRAP15'-6"TRT. 6x6 POST1'-0"BOX VAULT @MASTER BDRM2'-0"2'-0"
Planco MN, Inc.C#18-173SMA7720184" CONC. FLOOR GARAGE 16X8GRADEPOURED WALL2X6- 16" O.C.SLOPE TO DOORS CROSS SECTION 1/4" = 1'-0" 9'-118"3/4" T & G FLOOR
11 7/8" LSL @ 19.2" O.C.3 1/2" CONC. FLOOR8'-118"5/8" GYP. BD.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-49 INSUL.2x6- 16" O.C.1/2" GYP. BD.R-21 INSUL.1/2" GYP. BD.2x6- 16" O.C.3/4" T & G FLOORVBR-21 INSUL.W/ V.B.5/8" GYP. BD.VBR-20 SPRAY FOAMR-20 SPRAY FOAM16" FLOOR TRUSSES @ 19.2" O.C.PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED16x8PROOFINGWATERR-10 W/ <2.6 ACHINSUL.DRAIN TILE R-20 SPRAY FOAMR-20 SPRAY FOAM1/2" SHTG.15# FELTSHINGLES(DESIGNED BY MFR)TRUSSES @ 24" O.C.10'-314"(DESIGNED BY MFR)TRUSSES @ 24" O.C.12'-0"24'-0"4'-0"ENERGY HEEL50% ROOF 50% SOFFITROOF VENTS @ 1/300 ATTICVENTEDSOFFITALUM.ALUM. FASCIA1/2" SHTG.15# FELTSHINGLES1'-9"7128'-101116"1/2" GYP. BD.PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED16x8PROOFINGWATERR-10 W/ <2.6 ACHINSUL.DRAIN TILE GRADESIDINGSHEATHING7/16" OSBHOUSE WRAPSIDINGSHEATHING7/16" OSBHOUSE WRAP GARAGE 9'-11
8"3/4" T & G FLOOR CROSS SECTION 1/4" = 1'-0"
11 7/8" LSL @ 19.2" O.C.3 1/2" CONC. FLOOR16x8PROOFINGWATER5/8" GYP. BD.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED4" CONC. FLOORSLOPE TO DRAIN1/2" GYP. BD.R-10 W/ <2.6 ACHINSUL.16" FLOOR TRUSSES @ 19.2" O.C.R-20 SPRAY FOAM16x8GRADEPOURED WALL2X6- 16" O.C.10'-314"FASCIAALUM. SOFFITVENTEDALUM.1/2" SHTG.15# FELTSHINGLES1'-6"812(DESIGNED BY MFR)TRUSSES @ 24" O.C.71116"GIRDER6'-0"5/8" GYP. BD.R-20 SPRAY FOAM22'-8"R-30 INSUL.MIN.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.ROOF VENTS @ 1/300 ATTIC50% ROOF 50% SOFFIT24'-0"CLEAT15'-3"SIDINGSHEATHING7/16" OSBHOUSE WRAP ROOF PLAN 1/8" = 1'-0" 1'-6"1'-9"1'-0"1'-0"1'-4"1'-9"1271271278128128128128128126/12GIRDERGIRDERGIRDERGIRDER
1'-0"1'-6"1274/12GIRDERGIRDER
1'-6"8/126/121'-4"6"FLOOR SYSTEMROOFTRUSSPVC T-FITTINGTO SUPPORTVENT PIPEMIN. 4" OF GASPERMEABLE MATERIAL3 1/2" CONC. SLAB4" PVC VENT PIPESUPPORTSTRAPPINGFLASHINGEXHAUST 10' FROM OPNGS.INTO CONDITIONED SPACESOF BUILDING12" MIN. ABOVE ROOFSEAL6 MIL POLYUNDER SLAB10' OF DRAIN TILEEACH WAY FROMT-FITTING(ROCK) RADON GAS VENT SYSTEM 1/4" = 1'-0" 36" MIN. HT. CLEAR SPACE24" DIA. AROUND VENTPROVIDE ELECTRICALBOX POWER SOURCER-4 MIN. INSUL. VENT PIPE@ UNCONDITIONED SPACE4" MIN. CLEARANCEFOR FUT. FAN
Stone Cottage
HVAC Load Calculations
for
Carson
20125 Harness Way
Lakeville,mn
Prepared By:
Randy Andrews
Lofgren Heating
5708 Upper 147th Street West
Apple Vallley, MN 55124
Wednesday, August 01, 2018
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 2
Project Report
General Project Information
Project Title:Stone Cottage
Project Date:Wednesday, August 01, 2018
Client Name:Carson
Client Address:20125 Harness Way
Client City:Lakeville,mn
Company Name:Lofgren Heating
Company Representative:Randy Andrews
Company Address:5708 Upper 147th Street West
Company City:Apple Vallley, MN 55124
Company E-Mail Address:rrandrews@lofgrenheating-ac.com
Design Data
Reference City:Minneapolis, Minnesota
Building Orientation:Front door faces West
Daily Temperature Range:Medium
Latitude:44 Degrees
Elevation:834 ft.
Altitude Factor:0.970
Elevation Sensible Adj. Factor:1.000
Elevation Total Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference
Winter:-15 -15.33 80%n/a 72 n/a
Summer:88 72 47%50%75 29
Check Figures
Total Building Supply CFM:1,234 CFM Per Square ft.:0.342
Square ft. of Room Area:3,610 Square ft. Per Ton:1,218
Volume (ft³) of Cond. Space:30,058
Building Loads
Total Heating Required Including Ventilation Air:53,723 Btuh 53.723 MBH
Total Sensible Gain:26,672 Btuh 80 %
Total Latent Gain:6,712 Btuh 20 %
Total Cooling Required Including Ventilation Air:33,384 Btuh 2.78 Tons (Based On Sensible + Latent)
2.96 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\20125 HARNESS LAKEVILLE 08022018.rhv Wednesday, August 01, 2018, 10:45 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 3
Load Preview Report
Scope
Has
AED
Net
Ton
ft.²
/Ton Area
Sen
Gain
Lat
Gain
Net
Gain
Sen
Loss
Sys
Htg
CFM
Sys
Clg
CFM
Sys
Act
CFM
Duct
Size
Building 2.78 1,298 3,610 26,672 6,712 33,384 53,723 1,024 1,234 1,234
System 1 Yes 2.78 1,298 3,610 26,672 6,712 33,384 53,723 1,024 1,234 1,234 21x10
Ventilation 340 1,352 1,692 4,550
Zone 1 3,610 26,332 5,360 31,692 49,173 1,024 1,234 1,234 21x10
1-Main Level 1,178 12,007 1,824 13,831 19,557 407 563 563 7--6
2-Upper Level 1,254 12,220 2,424 14,644 18,647 388 572 572 7--6
3-Lower Level 1,178 2,105 1,112 3,217 10,969 228 99 99 1--6
C:\ ...\20125 HARNESS LAKEVILLE 08022018.rhv Wednesday, August 01, 2018, 10:45 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 4
Total Building Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
429 11,943 0 12,086 12,086
11N: Door-Metal - Polystyrene Core 63 1,918 0 529 529
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2532 14,317 0 2,188 2,188
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
756 3,223 0 0 0
15BO-10sf-10: Wall-756 3,223 0 493 493
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1254 2,182 0 1,204 1,204
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
1178 2,562 0 0 0
Subtotals for structure:39,368 0 16,500 16,500
People:9 1,800 2,070 3,870
Equipment:2,500 7,000 9,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 106, Summer CFM: 55 9,805 1,060 762 1,822
Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692
Total Building Load Totals:53,723 6,712 26,672 33,384
Check Figures
Total Building Supply CFM:1,234 CFM Per Square ft.:0.342
Square ft. of Room Area:3,610 Square ft. Per Ton:1,218
Volume (ft³) of Cond. Space:30,058
Building Loads
Total Heating Required Including Ventilation Air:53,723 Btuh 53.723 MBH
Total Sensible Gain:26,672 Btuh 80 %
Total Latent Gain:6,712 Btuh 20 %
Total Cooling Required Including Ventilation Air:33,384 Btuh 2.78 Tons (Based On Sensible + Latent)
2.96 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\20125 HARNESS LAKEVILLE 08022018.rhv Wednesday, August 01, 2018, 10:45 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 5
Building Pie Chart
Building
Loss
53,723
Btuh
Floor 5%Roof 4%
Wall 39%
Glass 22%
Door 4%
Infiltration 18%
Ventilation 8%
Building
Gain
33,384
Btuh
Roof 4%
Wall 8%
Glass 36%
Door 2%People 12%
Equipment 28%
Infiltration 5%
Ventilation 5%
C:\ ...\20125 HARNESS LAKEVILLE 08022018.rhv Wednesday, August 01, 2018, 10:45 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 6
System 1 Whole House Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
429 11,943 0 12,086 12,086
11N: Door-Metal - Polystyrene Core 63 1,918 0 529 529
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2532 14,317 0 2,188 2,188
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
756 3,223 0 0 0
15BO-10sf-10: Wall-756 3,223 0 493 493
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1254 2,182 0 1,204 1,204
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
1178 2,562 0 0 0
Subtotals for structure:39,368 0 16,500 16,500
People:9 1,800 2,070 3,870
Equipment:2,500 7,000 9,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 106, Summer CFM: 55 9,805 1,060 762 1,822
Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692
System 1 Whole House Load Totals:53,723 6,712 26,672 33,384
Check Figures
Supply CFM:1,234 CFM Per Square ft.:0.342
Square ft. of Room Area:3,610 Square ft. Per Ton:1,218
Volume (ft³) of Cond. Space:30,058
System Loads
Total Heating Required Including Ventilation Air:53,723 Btuh 53.723 MBH
Total Sensible Gain:26,672 Btuh 80 %
Total Latent Gain:6,712 Btuh 20 %
Total Cooling Required Including Ventilation Air:33,384 Btuh 2.78 Tons (Based On Sensible + Latent)
2.96 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\20125 HARNESS LAKEVILLE 08022018.rhv Wednesday, August 01, 2018, 10:45 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 7
Detailed Room Loads - Room 1 - Main Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,178.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,178.0 sq.ft.Supply Air:563 CFM
Ceiling Height:9.0 ft.Supply Air Changes:3.2 AC/hr
Volume:10,602.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:7 Actual Winter Vent.:56 CFM
Runout Air:80 CFM Percent of Supply.:10 %
Runout Duct Size:6 in.Actual Summer Vent.:32 CFM
Runout Air Velocity:409 ft./min.Percent of Supply:6 %
Runout Air Velocity:409 ft./min.Actual Winter Infil.:42 CFM
Actual Loss:0.105 in.wg./100 ft.Actual Summer Infil.:22 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
S -Wall-12F-0sw 40 X 9 287 0.065 5.7 1,623 0.9 0 248
N -Wall-12F-0sw 40 X 9 324 0.065 5.7 1,832 0.9 0 280
E -Wall-12F-0sw 44 X 9 300 0.065 5.7 1,696 0.9 0 259
W -Wall-12F-0sw 44 X 9 289 0.065 5.7 1,634 0.9 0 250
W -Door-11N 6 X 7 42 0.350 30.5 1,279 8.4 0 353
W -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176
S -Gls-4A-1a-o shgc-0.33 0%S 73 0.320 27.8 2,032 19.2 0 1,400
N -Gls-4A-1a-o shgc-0.33 100%S 36 0.320 27.8 1,002 10.4 0 375
E -Gls-4A-1a-o shgc-0.33 0%S 96 0.320 27.8 2,673 35.0 0 3,361
W -Gls-4A-1a-o shgc-0.33 0%S 44 0.320 27.8 1,225 35.0 0 1,540
Subtotals for Structure:15,635 0 8,242
Infil.: Win.: 42.2, Sum.: 22.0 1,512 2.594 3,922 0.202 424 305
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:1,000 3,000
Room Totals:19,557 1,824 12,007
C:\ ...\20125 HARNESS LAKEVILLE 08022018.rhv Wednesday, August 01, 2018, 10:45 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 8
Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,254.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,254.0 sq.ft.Supply Air:572 CFM
Ceiling Height:8.0 ft.Supply Air Changes:3.4 AC/hr
Volume:10,032.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:7 Actual Winter Vent.:53 CFM
Runout Air:82 CFM Percent of Supply.:9 %
Runout Duct Size:6 in.Actual Summer Vent.:32 CFM
Runout Air Velocity:417 ft./min.Percent of Supply:6 %
Runout Air Velocity:417 ft./min.Actual Winter Infil.:42 CFM
Actual Loss:0.109 in.wg./100 ft.Actual Summer Infil.:22 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
S -Wall-12F-0sw 43 X 9 382 0.065 5.7 2,160 0.9 0 330
N -Wall-12F-0sw 43 X 9 354 0.065 5.7 2,002 0.9 0 306
E -Wall-12F-0sw 41 X 9 287 0.065 5.7 1,623 0.9 0 248
W -Wall-12F-0sw 41 X 9 309 0.065 5.7 1,747 0.9 0 267
S -Gls-4A-1a-o shgc-0.33 0%S 5 0.320 27.8 139 19.2 0 96
N -Gls-4A-1a-o shgc-0.33 100%S 33 0.320 27.8 919 10.4 0 344
E -Gls-4A-1a-o shgc-0.33 0%S 82 0.320 27.8 2,283 35.0 0 2,870
W -Gls-4A-1a-o shgc-0.33 0%S 60 0.320 27.8 1,670 35.0 0 2,100
UP-Ceil-16B-50 1254 X 1 1254 0.020 1.7 2,182 1.0 0 1,204
Subtotals for Structure:14,725 0 7,765
Infil.: Win.: 42.2, Sum.: 22.0 1,512 2.594 3,922 0.202 424 305
People: 200 lat/per, 230 sen/per:5 1,000 1,150
Equipment:1,000 3,000
Room Totals:18,647 2,424 12,220
C:\ ...\20125 HARNESS LAKEVILLE 08022018.rhv Wednesday, August 01, 2018, 10:45 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 9
Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,178.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,178.0 sq.ft.Supply Air:99 CFM
Ceiling Height:8.0 ft.Supply Air Changes:0.6 AC/hr
Volume:9,424.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:1 Actual Winter Vent.:31 CFM
Runout Air:99 CFM Percent of Supply.:32 %
Runout Duct Size:6 in.Actual Summer Vent.:6 CFM
Runout Air Velocity:502 ft./min.Percent of Supply:6 %
Runout Air Velocity:502 ft./min.Actual Winter Infil.:21 CFM
Actual Loss:0.157 in.wg./100 ft.Actual Summer Infil.:11 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
E -Wall-15B0-10sf-10 44 X 9 396 0.049 4.3 1,688 0.0 0 0
W -Wall-15BO-10sf-10 44 X 9 396 0.049 4.3 1,688 0.7 0 258
S -Wall-15BO-10sf-10 40 X 9 360 0.049 4.3 1,535 0.7 0 235
N -Wall-15B0-10sf-10 40 X 9 360 0.049 4.3 1,535 0.0 0 0
Floor-21A-24 1 X 1178 1178 0.025 2.2 2,562 0.0 0 0
Subtotals for Structure:9,008 0 493
Infil.: Win.: 21.1, Sum.: 11.0 756 2.594 1,961 0.201 212 152
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:500 1,000
Room Totals:10,969 1,112 2,105
C:\ ...\20125 HARNESS LAKEVILLE 08022018.rhv Wednesday, August 01, 2018, 10:45 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 10
System 1 Room Load Summary
No
Room
Name
Area
SF
Htg
Sens
Btuh
Min
Htg
CFM
Run
Duct
Size
Run
Duct
Vel
Clg
Sens
Btuh
Clg
Lat
Btuh
Min
Clg
CFM
Act
Sys
CFM
---Zone 1---
1 Main Level 1,178 19,557 407 7-6 409 12,007 1,824 563 563
2 Upper Level 1,254 18,647 388 7-6 417 12,220 2,424 572 572
3 Lower Level 1,178 10,969 228 1-6 502 2,105 1,112 99 99
Ventilation 4,550 340 1,352
System 1 total 3,610 53,723 1,024 26,672 6,712 1,234 1,234
System 1 Main Trunk Size:21x10 in.
Velocity:846 ft./min
Loss per 100 ft.:0.105 in.wg
Cooling System Summary
Cooling
Tons
Sensible/Latent
Split
Sensible
Btuh
Latent
Btuh
Total
Btuh
Net Required:2.78 80% / 20%26,672 6,712 33,384
Recommended:2.96 75% / 25%26,672 8,891 35,563
Actual:1.00 77% / 23%9,240 2,760 12,000
Equipment Data
Heating System Cooling System
Type:Natural Gas Furnace Standard Air Conditioner
Model:QC-F38-E78-G QC-C12
Indoor Model:S12
Brand:Quikcool FE Series Quikcool AS Series
Description:Hi Efficiency Furnace Standard Efficiency Air Condit
Efficiency:78.3 AFUE 12.4 SEER
Sound:8.1 bels
Capacity:38,000 Btuh 12,000 Btuh
Sensible Capacity:n/a 9,240 Btuh
Latent Capacity:n/a 2,760 Btuh
C:\ ...\20125 HARNESS LAKEVILLE 08022018.rhv Wednesday, August 01, 2018, 10:45 AM
Builders Associaton of Minnesota version 101014
Date Certificate Posted
x Passive (No Fan)
Active (With fan and monometer or
other system monitoring device)
Location (or future location) of Fan:
Other Please Describe Here
x
10/15 x x
x
20 x
20 x
21 x
49 x
x
x
x
x Not applicable, all ducts located in conditioned space
x Not required per mech. code
Passive
Powered
Interlocked with exhaust device.
Describe:
Input in
BTUS:
70,000 Capacity in
Gallons:
Other, describe:
AFUE or
HSPF%
93%
Cfm's
" round duct OR
" metal duct
Not required per mech. code
x Passive
Low: Other, describe:
x Low:
Location of fan(s), describe: Cfm's
4" " round duct OR Flex
" metal duct
City Mailing Address of the Dwelling or Dwelling Unit
Combustion Air Select a Type
Location of duct or system:
33,384
Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat
Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel.
Place your
logo here
New Construction Energy Code Compliance Certificate
Name of Residential Contractor
Stone Cottage Construction Inc.
MN License Number
Lakeville20125 Harness Ave
BC636874
Mech Room
Heat Recover Ventilator (HRV) Capacity in cfms:
Energy Recover Ventilator (ERV) Capacity in cfms:
53,723
Heating Gain Cooling Load
Attic
Fuel Type
Solar Heat Gain Coefficient (SHGC):
Windows & Doors
Ceiling, vaulted
Bay Windows or cantilevered areas
Floors over unconditioned area
Rim Joist (2nd Floor+)
0.30
Appliances
THERMAL ENVELOPE
Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade
RADON CONTROL SYSTEM
Non or Not Applicable Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply
Mineral Fiberboard Insulation Location
Foam, Closed Cell0.22
Describe other insulated areas Fiberglass, BlownFiberglass, Batts Foundation Wall
R-value
Average U-Factor (excludes skylights and one door) U:
Duct system air tightness: Building envelope air tightness:
Rim Joist (1st Floor)
GPVL-50 13ACXN042-230 Model
Heating System
Natrual Gas
Lennox
Location of duct or system:
Heating or Cooling Ducts Outside Conditioned Spaces
Electric
Make-up Air Select a Type
AO Smith
Domestic Water
Heater
MECHANICAL SYSTEMS
Rating or Size
Efficiency 13 Seer
200CFM
Select Type
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air
source heat pump with gas back-up furnace):
26,672Residential Load Calculation
SEER
/EER
Total ventilation (intermittent + continuous) rate in cfms:
Balanced Ventilation capacity in cfms:
High:
High:
MECHANICAL VENTILATION SYSTEM
Capacity continuous ventilation rate in cfms:
ML193UH070
Heating Loss
Manufacturer Lennox
Natural Gas
Output in
Tons:
3 Ton50
NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION
This form must be completed and submitted with all new residential permit applications.
New residential building permits WILL NOT be issued without this completed form.
Project Site Address: _____________________________________________________________________
Company Name: _________________________________________________________________________
Primary Contact: _________________________________________________________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Description of Land Disturbing Activity: _____________________________________________________
NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___
If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an
erosion and sediment control plan MUST be submitted with the residential building permit application.
“The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities
in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater
Permit.” (NPDES Construction Stormwater Permit, MPCA)
“The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least
once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.”
(NPDES Construction Stormwater Permit, MPCA)
Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control
inspections and corrective actions:
Name of Person: ________________________________Company: _______________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Entity that Provided Training: ________________________ Certification Expiration Date: ____________
NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots.
No land disturbing activity may begin until a residential building permit has been issued.
I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National
Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER;
withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater
Permit (MN R 100001) or erosion and sediment control plan.
Signature: ________________________________________________ Date:_________________________
Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500
20125 Harness Ave, Lakeville MN 55044
Stone Cottage Construction, Inc.
Brian Christopherson
651.755.7199 brian@stonecottage.com
New Single Family Dwelling
5 0 0 5 9
Brian Christopherson Stone Cottage Construction, Inc.
651.755.7199 brian@stonecottage.com
University of Minnesota 05.31.2021
Troy Asleson - President - Stone Cottage Construction, Inc.08.17.2018
08/28/18 X
KH