HomeMy WebLinkAbout20125 Harness Ave SurveyRS-4
int., 20' corner
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the
landscape inspection.
ENGINEERING REVIEWED
Date:__________________08/31/2018 corlowsky
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.
*No structures in easements.