Loading...
HomeMy WebLinkAbout19714 Henning Avenue-SURVEYRS-3 *Draintile connection required. The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. ENGINEERING REVIEWED Date:__________________08/31/2018 corlowsky *Maintain 6" between bottom of siding and sod.*No structures in easements.