Loading...
HomeMy WebLinkAbout8038 201st St Survey*Draintile connection required. The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod. *No structures in easements. ENGINEERING REVIEWED Date:__________________05/30/2018 lritchie